Wisconsin 2023-2024 Regular Session

Wisconsin Senate Bill SB651 Compare Versions

Only one version of the bill is available at this time.
OldNewDifferences
11 LRB-4441/1
22 EHS&KP:amn
33 2023 - 2024 LEGISLATURE
44 2023 SENATE BILL 651
55 November 9, 2023 - Introduced by Senators COWLES and STROEBEL, cosponsored by
66 Representatives GUSTAFSON, NEYLON, TITTL, ANDRACA, DITTRICH, KRUG,
77 MURPHY, O'CONNOR, RETTINGER, ROZAR and SPIROS. Referred to Committee on
88 Utilities and Technology.
99 AN ACT to repeal 196.491 (2) (a) 3g., 196.491 (2) (a) 3r., 196.491 (2) (a) 12.,
1010 196.491 (2) (a) 13., 196.491 (2) (b) 10. and 196.491 (2) (gm); to renumber and
1111 amend 196.027 (1) (f); to amend 196.025 (1) (ar), 196.027 (3) (b), 196.378 (2)
1212 (c), 196.491 (title), 196.491 (1) (b), 196.491 (2) (a) 3., 196.491 (2) (a) 3m., 196.491
1313 (2) (a) 4., 196.491 (2) (a) 7., 196.491 (2) (ag), 196.491 (2) (b) 7., 196.491 (2) (b) 8.,
1414 196.491 (2) (e), 196.491 (2) (f), 196.491 (2) (g), 196.491 (2r), 196.491 (3) (dm) and
1515 196.795 (7) (a) 1. b.; to repeal and recreate 196.491 (2) (title), 196.491 (2) (a)
1616 (intro.) and 196.491 (2) (b) (intro.); and to create 196.027 (1) (d) 3., 196.027 (1)
1717 (f) 1. b., 196.491 (1) (fm), 196.491 (1) (s), 196.491 (2) (a) 1., 196.491 (2) (a) 2.,
1818 196.491 (2) (a) 5., 196.491 (2) (a) 6., 196.491 (2) (a) 8., 196.491 (2) (a) 14., 196.491
1919 (2) (b) 11., 196.491 (2) (c), 196.491 (2) (d), 196.491 (2) (i), 196.491 (2) (j), 196.491
2020 (2) (jm), 196.491 (2) (k), 196.491 (2) (km), 196.491 (2) (L), 196.491 (2) (m) and
2121 196.491 (5m) of the statutes; relating to: use of environmental trust bonds to
2222 finance the costs of retiring electric generating facilities; integrated resource
2323 1
2424 2
2525 3
2626 4
2727 5
2828 6
2929 7
3030 8
3131 9
3232 10
3333 11
3434 12
3535 13
3636 14 - 2 -2023 - 2024  Legislature LRB-4441/1
3737 EHS&KP:amn
3838 SENATE BILL 651
3939 and reliability planning by electric utilities and cooperatives; closure of large
4040 electric generating facilities; and granting rule-making authority.
4141 Analysis by the Legislative Reference Bureau
4242 This bill authorizes the use of environmental trust financing for the costs of
4343 retiring an electric generating facility, requires integrated resource and reliability
4444 planning by electric utilities and cooperatives, eliminates the requirement that the
4545 Public Service Commission prepare a biennial strategic energy assessment, and
4646 provides a process by which PSC determines whether a proposed closure of a large
4747 electric generating facility will affect electric reliability.
4848 Environmental trust financing
4949 Under current law, an energy utility is allowed to apply to PSC for an order
5050 allowing the utility to finance or recover the costs of the following activities by issuing
5151 bonds:  1) the construction, installation, or otherwise putting into place of
5252 environmental control equipment in connection with a plant that, before March 30,
5353 2004, has been used to provide service to customers; and 2) the retiring of any
5454 existing plant, facility, or other property to reduce, control, or eliminate
5555 environmental pollution in accordance with federal or state law.  Current law defines
5656 these activities as “environmental control activities.”  If approved by PSC, the bonds,
5757 which are referred to as “environmental trust bonds,” are secured by revenues
5858 arising from charges paid by an energy utility's customers for the utility to recover
5959 the cost of the activities, as well as the cost of financing the bonds.
6060 This bill adds the retiring of any existing electric generating facility as an
6161 environmental control activity, the costs of which, including the unrecovered value,
6262 may be financed or recovered by an environmental trust bond.  In addition, with
6363 respect to this new environmental control activity, the bill adds to the costs that may
6464 be financed or recovered the portion of an energy utility's rate that is attributable to
6565 the rate of return for the facility authorized under PSC's order in a rate-making
6666 proceeding and that is forgone as a result of the retirement.  Under current law, the
6767 costs that may be financed or recovered include capital cost incurred or expected to
6868 be incurred in undertaking an environmental control activity and, with respect to
6969 retiring a plant, facility, or other property, the unrecovered value of property that is
7070 retired.
7171 Under this bill, PSC may order an energy utility to use environmental trust
7272 bonds to finance an expenditure.  Under current law, PSC may not order an energy
7373 utility to use environmental trust bonds to finance an expenditure unless the energy
7474 utility has applied to PSC to do so, and PSC may not refuse to allow an energy utility
7575 to recover costs for environmental control activities in an alternate manner because
7676 of the potential availability of environmental trust financing.
7777 Integrated resource and reliability planning
7878 This bill requires electric utilities and cooperative associations to submit
7979 biennial integrated resource and reliability plans to PSC that include certain
8080 information about their plans to construct the following:  1) large electric generating
8181 1
8282 2 - 3 -2023 - 2024  Legislature
8383 LRB-4441/1
8484 EHS&KP:amn
8585 SENATE BILL 651
8686 facilities with a capacity of 100 megawatts or more; 2) small electric generating
8787 facilities with a capacity of at least 12 but less than 100 megawatts; and 3)
8888 high-voltage transmission lines that are longer than one mile and operate at 100
8989 kilovolts or more.  As part of an integrated resource and reliability plan, an electric
9090 utility must identify alternatives to the proposed electric generating facilities,
9191 including alternative locations, fuel types, and methods of generation, and must
9292 explain the reasons for selecting the types of electric generating facilities proposed.
9393 An electric utility must also identify alternative routes for any high-voltage
9494 transmission lines proposed and indicate their effects on the environment and how
9595 the utility will avoid or minimize potential adverse effects.  An electric utility's
9696 detailed projection for electricity demand and assessment of whether it has sufficient
9797 capacity to make electricity available to consumers at a reasonable price must also
9898 be included in the plan, as well as a description of existing and planned programs and
9999 policies for discouraging inefficient and excessive electricity use.  After holding a
100100 hearing on a utility's plan, PSC may approve the plan if PSC finds that the plan will
101101 provide a reasonably adequate supply of electricity to meet the needs of the public
102102 and that the plan satisfies certain other criteria.
103103 Strategic energy assessment
104104 In addition, the bill eliminates the requirement that PSC prepare a biennial
105105 strategic energy assessment.  Under current law, the strategic energy assessment
106106 evaluates the adequacy and reliability of the state's current and future energy supply
107107 and includes information on the following:  1) planned large electric generating
108108 facilities and high-voltage transmission lines; 2) plans for assuring an adequate
109109 ability to transfer electricity into the state; 3) the projected demand for electricity;
110110 4) activities discouraging inefficient and excessive electricity use; 5) the extent to
111111 which effective competition contributes to a reliable, low-cost, and environmentally
112112 sound source of electricity; and 6) whether sufficient electricity is available at a
113113 reasonable price.  Current law requires PSC to hold a hearing on a draft of the
114114 strategic energy assessment and prepare a final strategic energy assessment based
115115 on received comments.
116116 Closure of large electric generating facilities
117117 The bill requires electric utilities and cooperative associations to notify PSC at
118118 least 180 days prior to closing any large electric generating facility with a capacity
119119 of 100 megawatts or more, and requires PSC, after public comment and hearing, to
120120 issue a determination as to whether the proposed closure will have an effect on
121121 electric reliability.  The bill requires PSC to make its determination by considering
122122 the utility or cooperative's most recent integrated resources and reliability plan and
123123 information collected from the electric utility or cooperative and from the public, as
124124 well as any other information PSC deems relevant.  Under the bill, PSC must notify
125125 the electric utility or cooperative of its determination no less than 45 days prior to
126126 the planned closure. - 4 -2023 - 2024  Legislature LRB-4441/1
127127 EHS&KP:amn
128128 SENATE BILL 651
129129 For further information see the state fiscal estimate, which will be printed as
130130 an appendix to this bill.
131131 The people of the state of Wisconsin, represented in senate and assembly, do
132132 enact as follows:
133133 SECTION 1. 196.025 (1) (ar) of the statutes is amended to read:
134134 196.025 (1) (ar)  Consideration of energy priorities.  Except as provided in pars.
135135 (b) to (d), to the extent cost-effective, technically feasible and environmentally
136136 sound, the commission shall implement the priorities under s. 1.12 (4) in making all
137137 energy-related decisions and orders, including strategic energy assessment
138138 approval of integrated resource and reliability plans under s. 196.491 (2), rate setting
139139 and rule-making orders.
140140 SECTION 2. 196.027 (1) (d) 3. of the statutes is created to read:
141141 196.027 (1) (d) 3.  The retiring of any existing electric generating facility.
142142 SECTION 3. 196.027 (1) (f) of the statutes is renumbered 196.027 (1) (f) 1. (intro.)
143143 and amended to read:
144144 196.027 (1) (f) 1. (intro.)  “Environmental control cost" means capital all of the
145145 following:
146146 a.  Capital cost, including the capitalized cost relating to regulatory assets,
147147 incurred or expected to be incurred by an energy utility in undertaking an
148148 environmental control activity and, with respect to an environmental control activity
149149 described in par. (d) 2., includes or 3., the unrecovered value of property that is
150150 retired, including any demolition or similar cost that exceeds the salvage value of the
151151 property.
152152 1
153153 2
154154 3
155155 4
156156 5
157157 6
158158 7
159159 8
160160 9
161161 10
162162 11
163163 12
164164 13
165165 14
166166 15
167167 16
168168 17
169169 18
170170 19 - 5 -2023 - 2024  Legislature
171171 LRB-4441/1
172172 EHS&KP:amn
173173 SECTION 3
174174 SENATE BILL 651
175175 2.  “Environmental control cost" does not include any monetary penalty, fine,
176176 or forfeiture assessed against an energy utility by a government agency or court
177177 under a federal or state environmental statute, rule, or regulation.
178178 SECTION 4. 196.027 (1) (f) 1. b. of the statutes is created to read:
179179 196.027 (1) (f) 1. b.  With respect to an environmental control activity described
180180 in par. (d) 3., and subject to sub. (2) (b) 2. a., the portion of an energy utility's rate that
181181 is attributable to the rate of return for the facility authorized under the commission's
182182 order in a rate-making proceeding and that is forgone as a result of the retirement.
183183 SECTION 5. 196.027 (3) (b) of the statutes is amended to read:
184184 196.027 (3) (b)  The commission may not order or otherwise directly or
185185 indirectly require an energy utility to use environmental trust bonds to finance any
186186 a project, addition, plant, facility, extension, capital improvement, environmental
187187 control equipment, retirement, or any other expenditure, unless, except as provided
188188 in sub. (2) (c), the energy utility has made an application under sub. (2) (a) to finance
189189 such expenditure using environmental trust bonds.  The commission may not refuse
190190 to allow an energy utility to recover costs for environmental control activities in an
191191 otherwise permissible fashion solely because of the potential availability of
192192 environmental trust financing.
193193 SECTION 6. 196.378 (2) (c) of the statutes is amended to read:
194194 196.378 (2) (c)  No later than April 15 annually, or another annual date specified
195195 by the commission by rule, an electric provider shall submit a report to the
196196 commission that identifies the electric provider's renewable energy percentage for
197197 the previous year and describes the electric provider's compliance with par. (a) 2. and
198198 the electric provider's implementation plans for future compliance.  Reports under
199199 this paragraph may include certifications from renewable energy suppliers
200200 1
201201 2
202202 3
203203 4
204204 5
205205 6
206206 7
207207 8
208208 9
209209 10
210210 11
211211 12
212212 13
213213 14
214214 15
215215 16
216216 17
217217 18
218218 19
219219 20
220220 21
221221 22
222222 23
223223 24
224224 25 - 6 -2023 - 2024  Legislature LRB-4441/1
225225 EHS&KP:amn
226226 SECTION 6 SENATE BILL 651
227227 regarding the sources and amounts of renewable energy supplied to the electric
228228 provider.  The commission may specify the documentation that is required to be
229229 included with reports submitted under this paragraph.  The commission may require
230230 that electric providers submit the reports in a proceeding, initiated by the
231231 commission under this section relating to the implementation of s. 1.12, or in a
232232 proceeding for preparing a strategic energy assessment an integrated resource and
233233 reliability plan under s. 196.491 (2).  No later than 90 days after the commission's
234234 receipt of an electric provider's report, the commission shall inform the electric
235235 provider whether the electric provider is in compliance with par. (a) 2.
236236 SECTION 7. 196.491 (title) of the statutes is amended to read:
237237 196.491  (title)  Strategic energy assessment Integrated resource and
238238 reliability planning; electric generating facilities and transmission lines;
239239 natural gas lines.
240240 SECTION 8. 196.491 (1) (b) of the statutes is amended to read:
241241 196.491 (1) (b)  “Commencement of construction" means site clearing,
242242 excavation, placement of facilities or installations, or any other substantial action
243243 adversely affecting the natural environment of the site, but does not mean borings
244244 necessary to determine foundation conditions or other preconstruction monitoring
245245 to establish background information related to site or environmental suitability.
246246 SECTION 9. 196.491 (1) (fm) of the statutes is created to read:
247247 196.491 (1) (fm)  “Installation” means, unless the context requires otherwise,
248248 a small electric generating facility, a large electric generating facility, or a
249249 high-voltage transmission line.
250250 SECTION 10. 196.491 (1) (s) of the statutes is created to read:
251251 1
252252 2
253253 3
254254 4
255255 5
256256 6
257257 7
258258 8
259259 9
260260 10
261261 11
262262 12
263263 13
264264 14
265265 15
266266 16
267267 17
268268 18
269269 19
270270 20
271271 21
272272 22
273273 23
274274 24 - 7 -2023 - 2024  Legislature
275275 LRB-4441/1
276276 EHS&KP:amn
277277 SECTION 10
278278 SENATE BILL 651
279279 196.491 (1) (s)  “Small electric generating facility” means electric generating
280280 equipment and associated facilities designed for nominal operation at a capacity of
281281 at least 12 but less than 100 megawatts.
282282 SECTION 11. 196.491 (2) (title) of the statutes is repealed and recreated to read:
283283 196.491 (2) (title)  INTEGRATED RESOURCE AND RELIABILITY PLANNING.
284284 SECTION 12. 196.491 (2) (a) (intro.) of the statutes is repealed and recreated to
285285 read:
286286 196.491 (2) (a) (intro.)  On or before July 1 of each even-numbered year, or such
287287 biennial period as the commission may approve, each electric utility shall file its plan
288288 with the commission and with those persons or agencies listed in par. (b).  Such plans
289289 may be appropriate portions of a single regional plan or may be prepared jointly by
290290 2 or more electric utilities, and shall do all of the following:
291291 SECTION 13. 196.491 (2) (a) 1. of the statutes is created to read:
292292 196.491 (2) (a) 1.  Describe the general location, size, and type of installations
293293 that are expected to be owned or operated in whole or in part by the utility and the
294294 construction of which is expected to commence during the next 10 years, or such
295295 longer period as the commission deems necessary, and shall identify all existing
296296 installations intended to be removed from service during the period or upon
297297 completion of such construction.
298298 SECTION 14. 196.491 (2) (a) 2. of the statutes is created to read:
299299 196.491 (2) (a) 2.  Identify practical alternatives to the general location, fuel
300300 type, and method of generation of the proposed electric generating facilities, and set
301301 forth in detail the reasons for selecting the proposed general location, fuel type, and
302302 method of generation.
303303 SECTION 15. 196.491 (2) (a) 3. of the statutes is amended to read:
304304 1
305305 2
306306 3
307307 4
308308 5
309309 6
310310 7
311311 8
312312 9
313313 10
314314 11
315315 12
316316 13
317317 14
318318 15
319319 16
320320 17
321321 18
322322 19
323323 20
324324 21
325325 22
326326 23
327327 24
328328 25 - 8 -2023 - 2024  Legislature LRB-4441/1
329329 EHS&KP:amn
330330 SECTION 15 SENATE BILL 651
331331 196.491 (2) (a) 3.  Identify and describe the location of proposed and alternative
332332 sites for large electric generating facilities on which an electric utility plans to
333333 commence construction within 3 years for which neither a certificate of public
334334 convenience and necessity under sub. (3) nor a certificate under s. 196.49 has been
335335 applied for but the commencement of whose construction is planned within 5 years,
336336 or such longer period as the commission deems necessary, and indicate the impacts
337337 of the proposed and alternative generating facilities on the environment and the
338338 means by which potential adverse effects on such values will be avoided or
339339 minimized.
340340 SECTION 16. 196.491 (2) (a) 3g. of the statutes is repealed.
341341 SECTION 17. 196.491 (2) (a) 3m. of the statutes is amended to read:
342342 196.491 (2) (a) 3m.  Identify and describe the location of tentative and
343343 alternative routes for high-voltage transmission lines on which an electric utility
344344 plans to commence construction within 3 years is intended to be commenced in the
345345 next 5 years and indicate the effects of the transmission lines on the environment and
346346 the means by which potential adverse effects will be avoided or minimized.
347347 SECTION 18. 196.491 (2) (a) 3r. of the statutes is repealed.
348348 SECTION 19. 196.491 (2) (a) 4. of the statutes is amended to read:
349349 196.491 (2) (a) 4.  Identify and describe Indicate in detail the projected demand
350350 for electric energy over the next 5 years and the basis for determining the projected
351351 demand, and assess whether the utility has sufficient electric capacity and energy
352352 to make electric capacity and energy available to customers at a reasonable price
353353 over that period.
354354 SECTION 20. 196.491 (2) (a) 5. of the statutes is created to read:
355355 1
356356 2
357357 3
358358 4
359359 5
360360 6
361361 7
362362 8
363363 9
364364 10
365365 11
366366 12
367367 13
368368 14
369369 15
370370 16
371371 17
372372 18
373373 19
374374 20
375375 21
376376 22
377377 23
378378 24 - 9 -2023 - 2024  Legislature
379379 LRB-4441/1
380380 EHS&KP:amn
381381 SECTION 20
382382 SENATE BILL 651
383383 196.491 (2) (a) 5.  Describe the electric utility's relationship to other electric
384384 utilities and regional associations, power pools, and networks.
385385 SECTION 21. 196.491 (2) (a) 6. of the statutes is created to read:
386386 196.491 (2) (a) 6.  Identify and describe all major research projects and
387387 programs that will continue or commence in the next 5 years and set forth the
388388 reasons for selecting specific areas for research.
389389 SECTION 22. 196.491 (2) (a) 7. of the statutes is amended to read:
390390 196.491 (2) (a) 7.  Identify and describe activities existing and planned
391391 programs and policies to discourage inefficient and excessive power use.
392392 SECTION 23. 196.491 (2) (a) 8. of the statutes is created to read:
393393 196.491 (2) (a) 8.  Identify the total number of distributed generation facilities,
394394 as defined in s. 196.496 (1), that are known to be located within the utility's service
395395 territory and the total generation capacity, actual or projected, of those distributed
396396 generation facilities.
397397 SECTION 24. 196.491 (2) (a) 12. of the statutes is repealed.
398398 SECTION 25. 196.491 (2) (a) 13. of the statutes is repealed.
399399 SECTION 26. 196.491 (2) (a) 14. of the statutes is created to read:
400400 196.491 (2) (a) 14.  Provide any other information required by the commission.
401401 SECTION 27. 196.491 (2) (ag) of the statutes is amended to read:
402402 196.491 (2) (ag)  The commission shall promulgate rules that establish
403403 procedures and requirements for reporting information that is necessary for the
404404 commission electric utilities to prepare strategic energy assessments integrated
405405 resource and reliability plans under par. (a) and rules that identify any additional
406406 information to be included in an integrated resource and reliability plan under par.
407407 (a) 14.
408408 1
409409 2
410410 3
411411 4
412412 5
413413 6
414414 7
415415 8
416416 9
417417 10
418418 11
419419 12
420420 13
421421 14
422422 15
423423 16
424424 17
425425 18
426426 19
427427 20
428428 21
429429 22
430430 23
431431 24
432432 25 - 10 -2023 - 2024  Legislature LRB-4441/1
433433 EHS&KP:amn
434434 SECTION 28 SENATE BILL 651
435435 SECTION 28. 196.491 (2) (b) (intro.) of the statutes is repealed and recreated to
436436 read:
437437 196.491 (2) (b) (intro.)  A copy of each integrated resource and reliability plan
438438 shall, at the time it is filed with the commission, also be filed with each of the
439439 following:
440440 SECTION 29. 196.491 (2) (b) 7. of the statutes is amended to read:
441441 196.491 (2) (b) 7.  The director or chairperson of each regional planning
442442 commission constituted under s. 66.0309 which has jurisdiction over any area where
443443  a facility an installation is proposed to be located or which requests a copy of such
444444 plan.
445445 SECTION 30. 196.491 (2) (b) 8. of the statutes is amended to read:
446446 196.491 (2) (b) 8.  The lower Wisconsin state riverway board if the draft plan
447447 includes an assessment of the construction, modification, or relocation of a
448448 high-voltage transmission line, as defined in s. 30.40 (3r), that is located in the lower
449449 Wisconsin riverway as defined in s. 30.40 (15).
450450 SECTION 31. 196.491 (2) (b) 10. of the statutes is repealed.
451451 SECTION 32. 196.491 (2) (b) 11. of the statutes is created to read:
452452 196.491 (2) (b) 11.  Standing committees of the legislature with jurisdiction over
453453 energy and utilities under s. 13.172 (3).
454454 SECTION 33. 196.491 (2) (c) of the statutes is created to read:
455455 196.491 (2) (c)  The agencies receiving copies under par. (b) 1. to 8. shall review
456456 the plans and submit their comments to the commission within 180 days after their
457457 receipt of the plans.  Comments shall include all of the following:
458458 1.  A description of any statutory permits or approvals required by the agency.
459459 1
460460 2
461461 3
462462 4
463463 5
464464 6
465465 7
466466 8
467467 9
468468 10
469469 11
470470 12
471471 13
472472 14
473473 15
474474 16
475475 17
476476 18
477477 19
478478 20
479479 21
480480 22
481481 23
482482 24 - 11 -2023 - 2024  Legislature
483483 LRB-4441/1
484484 EHS&KP:amn
485485 SECTION 33
486486 SENATE BILL 651
487487 2.  A description of the types and forms of information required for adequate
488488 review of an application for each permit or approval.
489489 3.  A detailed discussion as to the areas in which the plans coordinate with the
490490 agency's plans, policies, functions, and programs and the areas in which the plans
491491 conflict and the significance of such conflicts.
492492 4.  To the extent practicable and consistent with its program responsibilities,
493493 a discussion of the environmental impacts of the plan.
494494 SECTION 34. 196.491 (2) (d) of the statutes is created to read:
495495 196.491 (2) (d)  The commission shall, within 10 days after the plan is filed, send
496496 a copy of such plan, or the applicable portion thereof, to the county planner or, if none
497497 exists, to the county clerk of each county affected by the plan, to the main public
498498 library of each such county, and to any other county planner, county clerk, or public
499499 library that requests copies of the plan or portions of the plan.  The commission shall
500500 send a copy of the applicable portion of the plan to the clerk of each municipality and
501501 town in which a small or large electric generating facility is proposed to be located,
502502 and shall notify each public library in such municipality or town that copies of the
503503 plan are available upon request.
504504 SECTION 35. 196.491 (2) (e) of the statutes is amended to read:
505505 196.491 (2) (e)  Any state agency, as defined in s. 16.310 (1), county,
506506 municipality, town, or person may submit written comments on any plan to the
507507 commission on a strategic energy assessment within 90 180 days after copies of the
508508 draft are issued under par. (b) the plan is filed.
509509 SECTION 36. 196.491 (2) (f) of the statutes is amended to read:
510510 196.491 (2) (f)  Section 1.11 (2) (c) shall not apply to  a strategic energy
511511 assessment an integrated resource and reliability plan prepared under par. (a).
512512 1
513513 2
514514 3
515515 4
516516 5
517517 6
518518 7
519519 8
520520 9
521521 10
522522 11
523523 12
524524 13
525525 14
526526 15
527527 16
528528 17
529529 18
530530 19
531531 20
532532 21
533533 22
534534 23
535535 24
536536 25 - 12 -2023 - 2024  Legislature LRB-4441/1
537537 EHS&KP:amn
538538 SECTION 37 SENATE BILL 651
539539 SECTION 37. 196.491 (2) (g) of the statutes is amended to read:
540540 196.491 (2) (g)  No sooner than 30 and no later than 90 Within 180 days after
541541 copies of the draft are issued a plan is filed under par. (b), the commission shall hold
542542 a hearing on the draft which may not be a hearing under s. 227.42 or 227.44 on the
543543 plan.  The hearing shall be held in an administrative district, established by
544544 executive order 22, issued August 24, 1970, which the commission determines will
545545 be significantly affected by facilities on which an electric utility plans to commence
546546 construction within installations proposed in the plan to be constructed in the
547547 following 3 years.  The commission may thereafter adjourn the hearing to other
548548 locations or may conduct the hearing by interactive video conference or other
549549 electronic method.  Notice of such hearing shall be given by class 1 notice, under ch.
550550 985, published in the official state newspaper and such other regional papers of
551551 general circulation as may be designated by the commission.  At such hearing the
552552 commission shall briefly describe the strategic energy assessment plan and give all
553553 interested persons an opportunity, subject to reasonable limitations on the
554554 presentation of repetitious material, to express their views on any aspect of the
555555 strategic energy assessment plan.  A record of the hearing shall be made and
556556 considered by the commission as comments on the strategic energy assessment plan
557557 under par. (e).  The electric utility, any agency, county, municipality, or town, or any
558558 person whose substantial rights may be adversely affected by the testing for or
559559 construction of installations described in an integrated resource and reliability plan
560560 shall, upon filing written notice setting forth its interest at least 10 days in
561561 integrated resource and reliability, be afforded all the rights of a party in a contested
562562 case.
563563 SECTION 38. 196.491 (2) (gm) of the statutes is repealed.
564564 1
565565 2
566566 3
567567 4
568568 5
569569 6
570570 7
571571 8
572572 9
573573 10
574574 11
575575 12
576576 13
577577 14
578578 15
579579 16
580580 17
581581 18
582582 19
583583 20
584584 21
585585 22
586586 23
587587 24
588588 25 - 13 -2023 - 2024  Legislature
589589 LRB-4441/1
590590 EHS&KP:amn
591591 SECTION 39
592592 SENATE BILL 651
593593 SECTION 39. 196.491 (2) (i) of the statutes is created to read:
594594 196.491 (2) (i)  A plan shall be approved if, based upon the record of the hearing
595595 and the written comments submitted under pars. (c) and (e), the commission
596596 determines that the plan meets all of the following conditions:
597597 1.  Provides for a reasonably adequate supply of electrical energy to meet the
598598 needs of the public during the planning period.
599599 2.  Is in the public interest when considering engineering, economic, health,
600600 safety, reliability, efficiency, and environmental factors and alternate methods of
601601 generation or sources of supply.
602602 3.  Is reasonably coordinated with long-range plans and policies of other state
603603 agencies or that a reasonable effort has been made to coordinate with such plans and
604604 policies.
605605 4.  Provides for programs that discourage inefficient and excessive power use.
606606 SECTION 40. 196.491 (2) (j) of the statutes is created to read:
607607 196.491 (2) (j)  If any portion of a plan does not meet the criteria under par. (i),
608608 the commission shall disapprove the plan or portion thereof, or approve them subject
609609 to such modifications as may be necessary to meet those criteria.
610610 SECTION 41. 196.491 (2) (jm) of the statutes is created to read:
611611 196.491 (2) (jm)  The commission shall either approve or disapprove each plan
612612 within 18 months after it is filed.
613613 SECTION 42. 196.491 (2) (k) of the statutes is created to read:
614614 196.491 (2) (k)  Any portion of a plan that is not approved may be resubmitted
615615 by the electric utility after entry of the order of disapproval and, if resubmitted, shall
616616 be reviewed under this subsection in the same manner as a new integrated resource
617617 1
618618 2
619619 3
620620 4
621621 5
622622 6
623623 7
624624 8
625625 9
626626 10
627627 11
628628 12
629629 13
630630 14
631631 15
632632 16
633633 17
634634 18
635635 19
636636 20
637637 21
638638 22
639639 23
640640 24 - 14 -2023 - 2024  Legislature LRB-4441/1
641641 EHS&KP:amn
642642 SECTION 42 SENATE BILL 651
643643 and reliability plan, except that the commission may reduce the time for comments
644644 thereon to not less than 30 days.
645645 SECTION 43. 196.491 (2) (km) of the statutes is created to read:
646646 196.491 (2) (km)  An electric utility may file an amendment to a previously
647647 approved plan with the commission at any time.  The commission may grant review
648648 and approval under pars. (b) to (L) and may reduce the time for comments thereon
649649 to not less than 30 days.
650650 SECTION 44. 196.491 (2) (L) of the statutes is created to read:
651651 196.491 (2) (L)  After a plan has been approved, the commission may limit the
652652 scope of the issues upon review of a subsequent plan to those directly related to
653653 material changes.
654654 SECTION 45. 196.491 (2) (m) of the statutes is created to read:
655655 196.491 (2) (m)  Any major contract relating to an installation for which neither
656656 a certificate of public convenience and necessity under sub. (3) nor a certificate under
657657 s. 196.49 has been applied for, other than a contract relating to acquisition of real
658658 property, shall be reported in writing to the commission, indicating the general
659659 nature and amount of that commitment, within 30 days after it has been entered
660660 into.
661661 SECTION 46. 196.491 (2r) of the statutes is amended to read:
662662 196.491 (2r)  LOCAL ORDINANCES.  No local ordinance may prohibit or restrict
663663 testing activities undertaken by an electric utility for purposes of preparing
664664 integrated resource and reliability plans or determining the suitability of a site for
665665 the placement of  a facility an installation.  Any local unit of government objecting
666666 to such testing may petition the commission to impose reasonable restrictions on
667667 such activity.
668668 1
669669 2
670670 3
671671 4
672672 5
673673 6
674674 7
675675 8
676676 9
677677 10
678678 11
679679 12
680680 13
681681 14
682682 15
683683 16
684684 17
685685 18
686686 19
687687 20
688688 21
689689 22
690690 23
691691 24
692692 25 - 15 -2023 - 2024  Legislature
693693 LRB-4441/1
694694 EHS&KP:amn
695695 SECTION 47
696696 SENATE BILL 651
697697 SECTION 47. 196.491 (3) (dm) of the statutes is amended to read:
698698 196.491 (3) (dm)  In making a determination required under par. (d), the
699699 commission may not consider a factual conclusion in  a strategic energy assessment
700700 an integrated resource and reliability plan unless the conclusion is independently
701701 corroborated in the hearing under par. (b).
702702 SECTION 48. 196.491 (5m) of the statutes is created to read:
703703 196.491 (5m)  CLOSURE OF LARGE ELECTRIC GENERATING FACILITIES.  (a)  No electric
704704 utility may permanently close a large electric generating facility unless the electric
705705 utility submits notice of the closure to the commission no less than 180 days prior to
706706 the planned closure.
707707 (b)  After receiving the notice under par. (a), the commission shall allow
708708 interested parties 30 days to make comments and shall hold a hearing on the effect
709709 of the proposed closure on electric reliability.
710710 (c)  After holding the hearing and after expiration of the public comment period
711711 under par. (b), the commission shall make a determination as to whether the
712712 proposed closure under par. (a) will have an impact on reliability of electric service.
713713 In making this determination, the commission shall consider the electric utility's
714714 most recent integrated resources and reliability plan under sub. (2), any information
715715 the commission collected from the electric utility, information provided during the
716716 public hearing and public comment period, and any other information the
717717 commission deems relevant.
718718 (d)  The commission shall notify the electric utility of its determination as to
719719 whether the proposed closure under par. (a) will have an impact on reliability of
720720 electric service no less than 45 days prior to the planned closure.
721721 SECTION 49. 196.795 (7) (a) 1. b. of the statutes is amended to read:
722722 1
723723 2
724724 3
725725 4
726726 5
727727 6
728728 7
729729 8
730730 9
731731 10
732732 11
733733 12
734734 13
735735 14
736736 15
737737 16
738738 17
739739 18
740740 19
741741 20
742742 21
743743 22
744744 23
745745 24
746746 25 - 16 -2023 - 2024  Legislature LRB-4441/1
747747 EHS&KP:amn
748748 SECTION 49 SENATE BILL 651
749749 196.795 (7) (a) 1. b.  Any public utility or member of a cooperative association
750750 organized under ch. 185 which reports or has reported information to the commission
751751 under the rules promulgated files or has filed an integrated resource and reliability
752752 plan under s. 196.491 (2) (ag).
753753 (END)