Wisconsin 2025 2025-2026 Regular Session

Wisconsin Assembly Bill AB108 Introduced / Bill

Filed 03/11/2025

                    2025 - 2026  LEGISLATURE
LRB-1212/1
KP:emw
2025 ASSEMBLY BILL 108
March 11, 2025 - Introduced by Representatives SORTWELL, STEFFEN, WITTKE, 
CALLAHAN, DITTRICH, GREEN, GUSTAFSON, KNODL, MOSES, MURPHY, MURSAU, 
O'CONNOR, SNYDER, SPIROS, SUBECK, TUSLER, ZIMMERMAN and WICHGERS, 
cosponsored by Senators BRADLEY, FEYEN and WANGGAARD. Referred to 
Committee on Jobs and Economy. 
 
 ***AUTHORS SUBJECT TO CHANGE***
AN ACT to renumber 196.491 (3) (g); to create 20.155 (1) (a), 196.025 (8) and 
196.491 (3) (g) 2. of the statutes; relating to: a nuclear power siting study and 
time limits for taking final action on certain certificate of public convenience 
and necessity applications.
Analysis by the Legislative Reference Bureau
This bill requires the Public Service Commission to conduct a nuclear power 
siting study and to submit a report to the legislature containing the results of the 
study no later than 12 months after the bill takes effect.  The study must satisfy 
certain requirements specified in the bill.
The bill also requires PSC to take final action on an application for a 
certificate of public convenience and necessity (CPCN) for a large electric 
generating facility that contains an advanced nuclear reactor within 150 days after 
the application is complete, unless the chairperson of PSC extends the time period 
for no more than an additional 150 days for good cause.  Under current law, a person 
seeking to construct a large electric generating facility must obtain a CPCN from 
PSC.
For further information see the state fiscal estimate, which will be printed as 
an appendix to this bill.
1
2
3
4 2025 - 2026  Legislature
ASSEMBLY BILL 108
- 2 -	LRB-1212/1
KP:emw
SECTION 1
The people of the state of Wisconsin, represented in senate and assembly, do 
enact as follows:
SECTION 1. 20.005 (3) (schedule) of the statutes:  at the appropriate place, 
insert the following amounts for the purposes indicated:
2025-26 2026-27
20.155 Public service commission
(1) REGULATION OF PUBLIC UTILITIES
(a) Nuclear power siting study GPR C -0- -0-
SECTION 2. 20.155 (1) (a) of the statutes is created to read:
20.155 (1) (a)  Nuclear power siting study. As a continuing appropriation, the 
amounts in the schedule for conducting the nuclear power siting study under s. 
196.025 (8) (b).
SECTION 3. 196.025 (8) of the statutes is created to read:
196.025 (8) NUCLEAR POWER SITING STUDY.  (a)  Definition. In this subsection, 
Xadvanced nuclear reactorY has the meaning given in 42 USC 16271 (b) (1).
(b)  Nuclear power siting study. 1.  The commission shall conduct a nuclear 
power siting study that does all of the following:
a.  Identifies nuclear power generation opportunities on existing nuclear and 
nonnuclear power generation sites.
b. Identifies new nuclear power and fusion energy generation sites not 
currently dedicated to power generation.
c.  Identifies sites for the development and demonstration of nuclear power 
generation and advanced technologies derived from and associated with nuclear 
fission and fusion, including advanced nuclear reactors.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22 2025 - 2026  Legislature
ASSEMBLY BILL 108
- 3 -	LRB-1212/1
KP:emw
SECTION 3
d.  Develops and provides guidance for advanced nuclear fission and fusion 
reactors including small modular reactors and fusion energy generating 
technologies.
e.  Considers the siting study conducted by the U.S. department of energy in 
2024, titled XEvaluation of Nuclear Power Plant and Coal Power Plant Sites for New 
Nuclear Capacity.Y
2.  The commission may use a request-for-proposal process to contract with a 
3rd party to conduct all or part of the study required under subd. 1.
3.  On or before the first day of 13th month beginning after the effective date of 
this subdivision .... [LRB inserts date], the commission shall submit a report 
containing the results of the study required under subd. 1. to the legislature in the 
manner provided in s. 13.172 (2).
SECTION 4. 196.491 (3) (g) of the statutes is renumbered 196.491 (3) (g) 1.
SECTION 5. 196.491 (3) (g) 2. of the statutes is created to read:
196.491 (3) (g) 2.  Notwithstanding subd. 1., the commission shall take final 
action on an application filed under par. (a) 1. for a large electric generating facility 
that contains an advanced nuclear reactor, as defined in s. 196.025 (8) (a), within 
150 days after the application is determined or considered to be complete under par. 
(a) 2.  If the commission fails to take final action within the 150-day period, the 
commission is considered to have issued a certificate of public convenience and 
necessity with respect to the application, unless the chairperson of the commission 
extends the time period for no more than an additional 150 days for good cause.  If 
the commission fails to take action within the extended period, the commission is 
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23 2025 - 2026  Legislature
ASSEMBLY BILL 108
- 4 -	LRB-1212/1
KP:emw
SECTION 5
considered to have issued a certificate of public convenience and necessity with 
respect to the application.
SECTION 6.  Initial applicability.
(1)  The treatment of s. 196.491 (3) (g) 2. first applies to an application for a 
certificate of public convenience and necessity that is determined or considered by 
the public service commission to be complete on the effective date of this subsection.
SECTION 7.  Effective date.
(1)  This act takes effect on the day after publication, or on the 2nd day after 
publication of the 2025 biennial budget act, whichever is later.
(END)