1 | | - | ORIGINAL HOUSE ENGROSSED |
---|
2 | | - | BILL NO. HB0117 |
---|
3 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
4 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
5 | | - | 2025 GENERAL SESSION |
---|
| 1 | + | 2025 |
---|
| 2 | + | STATE OF WYOMING |
---|
| 3 | + | 25LSO-0452 |
---|
| 4 | + | ENGROSSED |
---|
| 5 | + | 1HB0117 |
---|
| 6 | + | HOUSE BILL NO. HB0117 |
---|
| 7 | + | Omnibus water bill-construction. |
---|
| 8 | + | Sponsored by: Select Water Committee |
---|
| 9 | + | A BILL |
---|
| 10 | + | for |
---|
| 11 | + | 1 AN ACT relating to water development projects; authorizing |
---|
| 12 | + | 2 construction of designated water projects; describing |
---|
| 13 | + | 3 projects; specifying terms and conditions of funding for |
---|
| 14 | + | 4 projects; providing grants; providing loans; providing |
---|
| 15 | + | 5 appropriations; amending the sponsor's contingency fund; |
---|
| 16 | + | 6 amending amounts and terms of appropriations for specified |
---|
| 17 | + | 7 prior projects; transferring funds from water development |
---|
| 18 | + | 8 account I to water development account II; transferring |
---|
| 19 | + | 9 funds from water development account III to water |
---|
| 20 | + | 10 development account II; transferring projects; repealing a |
---|
| 21 | + | 11 project; making conforming amendments; and providing for an |
---|
| 22 | + | 12 effective date. |
---|
| 23 | + | 13 |
---|
| 24 | + | 14 |
---|
| 25 | + | 15 2025STATE OF WYOMING25LSO-0452 |
---|
| 26 | + | ENGROSSED |
---|
| 27 | + | 2HB01171W.S. 99-3-3001 through 99-3-3004 are |
---|
| 28 | + | 2 created to read: |
---|
| 29 | + | 3 |
---|
| 30 | + | 4 ARTICLE 30 |
---|
| 31 | + | 5 2025 CONSTRUCTION PROJECTS |
---|
| 32 | + | 6 |
---|
| 33 | + | 7 |
---|
| 34 | + | 8 |
---|
| 35 | + | 9 The definitions in W.S. 99-3-101 apply to this article. |
---|
| 36 | + | 10 |
---|
| 37 | + | 11 |
---|
| 38 | + | 12 |
---|
| 39 | + | 13 The provisions of W.S. 99-3-102 apply to this article. |
---|
| 40 | + | 14 |
---|
| 41 | + | 15-3- |
---|
| 42 | + | 16 |
---|
| 43 | + | 17 |
---|
| 44 | + | 18 (a) Authorization is granted for the Level III new |
---|
| 45 | + | 19 development construction projects identified in this |
---|
| 46 | + | 20 section subject to the general conditions specified in W.S. |
---|
| 47 | + | 21 99-3-103, provided that W.S. 99-3-103(a)(iii) shall not |
---|
| 48 | + | 22 apply to the projects identified in this section unless |
---|
| 49 | + | 23 required by W.S. 41-2-121. 2025STATE OF WYOMING25LSO-0452 |
---|
| 50 | + | ENGROSSED |
---|
| 51 | + | 3HB01171 |
---|
| 52 | + | 2 (b) Project – Big Horn Regional JPB South |
---|
| 53 | + | 3 Transmission Project 2025: |
---|
| 54 | + | 4 |
---|
| 55 | + | 5 (i) Project sponsor: Big Horn Regional Joint |
---|
| 56 | + | 6 Powers Board; |
---|
| 57 | + | 7 |
---|
| 58 | + | 8 (ii) Project purpose: Municipal and rural |
---|
| 59 | + | 9 domestic water supply; |
---|
| 60 | + | 10 |
---|
| 61 | + | 11 (iii) Project description: Design and |
---|
| 62 | + | 12 pre-construction of water transmission pipelines, |
---|
| 63 | + | 13 structures and appurtenances necessary to make the project |
---|
| 64 | + | 14 function in the manner intended; |
---|
| 65 | + | 15 |
---|
| 66 | + | 16 (iv) Total project budget: Eight hundred ten |
---|
| 67 | + | 17 thousand dollars ($810,000.00); |
---|
| 68 | + | 18 |
---|
| 69 | + | 19 (v) Project grant: The state of Wyoming shall |
---|
| 70 | + | 20 grant to the sponsor from water development account I |
---|
| 71 | + | 21 through the commission for the design, permit procurement, |
---|
| 72 | + | 22 project land procurement and pre-construction engineering |
---|
| 73 | + | 23 of the project an amount not to exceed four hundred five 2025STATE OF WYOMING25LSO-0452 |
---|
| 74 | + | ENGROSSED |
---|
| 75 | + | 4HB0117 |
---|
| 76 | + | 1 thousand dollars ($405,000.00) or fifty percent (50%) of |
---|
| 77 | + | 2 these actual development costs, whichever is less; |
---|
| 78 | + | 3 |
---|
| 79 | + | 4 (vi) Appropriations: There is appropriated from |
---|
| 80 | + | 5 water development account I to the commission four hundred |
---|
| 81 | + | 6 five thousand dollars ($405,000.00) or as much thereof as |
---|
| 82 | + | 7 is necessary to carry out the purpose of this subsection. |
---|
| 83 | + | 8 Unexpended funds appropriated under this subsection shall |
---|
| 84 | + | 9 revert to water development account I on July 1, 2030; |
---|
| 85 | + | 10 |
---|
| 86 | + | 11 (vii) Special conditions: The sponsor is |
---|
| 87 | + | 12 responsible for acquiring fifty percent (50%) of the total |
---|
| 88 | + | 13 project budget from other sources. |
---|
| 89 | + | 14 |
---|
| 90 | + | 15 (c) Project – Hoback Junction Public Water System |
---|
| 91 | + | 16 2025: |
---|
| 92 | + | 17 |
---|
| 93 | + | 18 (i) Project sponsor: Hoback Junction Water and |
---|
| 94 | + | 19 Sewer District; |
---|
| 95 | + | 20 |
---|
| 96 | + | 21 (ii) Project purpose: Rural domestic water |
---|
| 97 | + | 22 supply; |
---|
| 98 | + | 23 2025STATE OF WYOMING25LSO-0452 |
---|
| 99 | + | ENGROSSED |
---|
| 100 | + | 5HB01171 (iii) Project description: Design and |
---|
| 101 | + | 2 pre-construction of a diversion structure, pumping |
---|
| 102 | + | 3 facilities, water transmission pipelines, tank, structures |
---|
| 103 | + | 4 and appurtenances necessary to make the project function in |
---|
| 104 | + | 5 the manner intended; |
---|
| 105 | + | 6 |
---|
| 106 | + | 7 (iv) Total project budget: Five hundred |
---|
| 107 | + | 8 forty-eight thousand nine hundred dollars ($548,900.00); |
---|
| 108 | + | 9 |
---|
| 109 | + | 10 (v) Project grant: The state of Wyoming shall |
---|
| 110 | + | 11 grant to the sponsor from water development account I |
---|
| 111 | + | 12 through the commission for the design, permit procurement, |
---|
| 112 | + | 13 project land procurement and pre-construction engineering |
---|
| 113 | + | 14 of the project an amount not to exceed two hundred |
---|
| 114 | + | 15 seventy-four thousand four hundred fifty dollars |
---|
| 115 | + | 16 ($274,450.00) or fifty percent (50%) of these actual |
---|
| 116 | + | 17 development costs, whichever is less; |
---|
| 117 | + | 18 |
---|
| 118 | + | 19 (vi) Appropriations: There is appropriated from |
---|
| 119 | + | 20 water development account I to the commission two hundred |
---|
| 120 | + | 21 seventy-four thousand four hundred fifty dollars |
---|
| 121 | + | 22 ($274,450.00) or as much thereof as is necessary to carry |
---|
| 122 | + | 23 out the purpose of this subsection. Unexpended funds 2025STATE OF WYOMING25LSO-0452 |
---|
| 123 | + | ENGROSSED |
---|
| 124 | + | 6HB0117 |
---|
| 125 | + | 1 appropriated under this subsection shall revert to water |
---|
| 126 | + | 2 development account I on July 1, 2030; |
---|
| 127 | + | 3 |
---|
| 128 | + | 4 (vii) Special conditions: The sponsor is |
---|
| 129 | + | 5 responsible for acquiring fifty percent (50%) of the total |
---|
| 130 | + | 6 project budget from other sources. |
---|
| 131 | + | 7 |
---|
| 132 | + | 8 (d) Project – SAWS JPB Upper Road Transmission Main |
---|
| 133 | + | 9 Phase I 2025: |
---|
| 134 | + | 10 |
---|
| 135 | + | 11 (i) Project sponsor: Sheridan Area Water Supply |
---|
| 136 | + | 12 Joint Powers Board; |
---|
| 137 | + | 13 |
---|
| 138 | + | 14 (ii) Project purpose: Municipal and rural |
---|
| 139 | + | 15 domestic water supply; |
---|
| 140 | + | 16 |
---|
| 141 | + | 17 (iii) Project description: Design and |
---|
| 142 | + | 18 construction of water transmission pipelines, structures |
---|
| 143 | + | 19 and appurtenances necessary to make the project function in |
---|
| 144 | + | 20 the manner intended; |
---|
| 145 | + | 21 2025STATE OF WYOMING25LSO-0452 |
---|
| 146 | + | ENGROSSED |
---|
| 147 | + | 7HB01171 (iv) Total project budget: Four million four |
---|
| 148 | + | 2 hundred thirteen thousand five hundred dollars |
---|
| 149 | + | 3 ($4,413,500.00); |
---|
| 150 | + | 4 |
---|
| 151 | + | 5 (v) Project grant: The state of Wyoming shall |
---|
| 152 | + | 6 grant to the sponsor from water development account I |
---|
| 153 | + | 7 through the commission for the design, permit procurement, |
---|
| 154 | + | 8 project land procurement, construction engineering and |
---|
| 155 | + | 9 construction of the project an amount not to exceed two |
---|
| 156 | + | 10 million two hundred six thousand seven hundred fifty |
---|
| 157 | + | 11 dollars ($2,206,750.00) or fifty percent (50%) of these |
---|
| 158 | + | 12 actual development costs, whichever is less; |
---|
| 159 | + | 13 |
---|
| 160 | + | 14 (vi) Appropriation: There is appropriated from |
---|
| 161 | + | 15 water development account I to the commission two million |
---|
| 162 | + | 16 two hundred six thousand seven hundred fifty dollars |
---|
| 163 | + | 17 ($2,206,750.00) or as much thereof as is necessary to carry |
---|
| 164 | + | 18 out the purpose of this subsection. Unexpended funds |
---|
| 165 | + | 19 appropriated under this subsection shall revert to water |
---|
| 166 | + | 20 development account I on July 1, 2030; |
---|
| 167 | + | 21 2025STATE OF WYOMING25LSO-0452 |
---|
| 168 | + | ENGROSSED |
---|
| 169 | + | 8HB01171 (vii) Special conditions: The sponsor is |
---|
| 170 | + | 2 responsible for acquiring fifty percent (50%) of the total |
---|
| 171 | + | 3 project budget from other sources. |
---|
| 172 | + | 4 |
---|
| 173 | + | 5 (e) Project - Small Water Development Projects – New |
---|
| 174 | + | 6 Development 2025: |
---|
| 175 | + | 7 |
---|
| 176 | + | 8 (i) Project sponsor: Eligible public entities; |
---|
| 177 | + | 9 |
---|
| 178 | + | 10 (ii) Project purpose: Multi-purpose - |
---|
| 179 | + | 11 agriculture, recreation and environmental; |
---|
| 180 | + | 12 |
---|
| 181 | + | 13 (iii) Project description: Small dams, |
---|
| 182 | + | 14 windmills, springs, guzzlers and other water collection, |
---|
| 183 | + | 15 storage and drinking systems, pipelines, etc., to impound, |
---|
| 184 | + | 16 develop and convey water for livestock, wildlife, |
---|
| 185 | + | 17 irrigation, environmental and recreational purposes; |
---|
| 186 | + | 18 |
---|
| 187 | + | 19 (iv) Total project budget: Three million dollars |
---|
| 188 | + | 20 ($3,000,000.00); |
---|
| 189 | + | 21 |
---|
| 190 | + | 22 (v) Project grant: The state of Wyoming shall |
---|
| 191 | + | 23 grant to sponsors of small water development projects from 2025STATE OF WYOMING25LSO-0452 |
---|
| 192 | + | ENGROSSED |
---|
| 193 | + | 9HB0117 |
---|
| 194 | + | 1 water development account I through the commission for the |
---|
| 195 | + | 2 design, permit procurement, project land procurement, |
---|
| 196 | + | 3 construction engineering and construction of the project a |
---|
| 197 | + | 4 total amount not to exceed one million five hundred |
---|
| 198 | + | 5 thousand dollars ($1,500,000.00) or fifty percent (50%) of |
---|
| 199 | + | 6 the actual development costs of the small water development |
---|
| 200 | + | 7 projects, whichever is less; |
---|
| 201 | + | 8 |
---|
| 202 | + | 9 (vi) Appropriation: There is appropriated from |
---|
| 203 | + | 10 water development account I to the commission one million |
---|
| 204 | + | 11 five hundred thousand dollars ($1,500,000.00) or as much |
---|
| 205 | + | 12 thereof as is necessary to carry out the purpose of this |
---|
| 206 | + | 13 subsection. Unexpended funds appropriated under this |
---|
| 207 | + | 14 subsection shall revert to water development account I on |
---|
| 208 | + | 15 July 1, 2030; |
---|
| 209 | + | 16 |
---|
| 210 | + | 17 (vii) Definition: "Small water development |
---|
| 211 | + | 18 project" means a project where the maximum financial |
---|
| 212 | + | 19 contribution from the commission is thirty-five thousand |
---|
| 213 | + | 20 dollars ($35,000.00) or less; |
---|
| 214 | + | 21 |
---|
| 215 | + | 22 (viii) Special conditions: |
---|
| 216 | + | 23 2025STATE OF WYOMING25LSO-0452 |
---|
| 217 | + | ENGROSSED |
---|
| 218 | + | 10HB01171 (A) The commission may grant a sponsor |
---|
| 219 | + | 2 fifty percent (50%) of the design, permit procurement, |
---|
| 220 | + | 3 project land procurement, construction engineering and |
---|
| 221 | + | 4 construction cost of a small project. No grant shall be |
---|
| 222 | + | 5 more than thirty-five thousand dollars ($35,000.00); |
---|
| 223 | + | 6 |
---|
| 224 | + | 7 (B) The small water development project |
---|
| 225 | + | 8 sponsors shall substantiate the public benefit that will be |
---|
| 226 | + | 9 derived from proposed small water development projects; |
---|
| 227 | + | 10 |
---|
| 228 | + | 11 (C) The commission may make monthly |
---|
| 229 | + | 12 progress payments for no more than fifty percent (50%) of |
---|
| 230 | + | 13 eligible monthly project expenses; |
---|
| 231 | + | 14 |
---|
| 232 | + | 15 (D) An appropriate land management or |
---|
| 233 | + | 16 resource management entity shall certify that the proposed |
---|
| 234 | + | 17 small water development project will meet expectations and |
---|
| 235 | + | 18 that appropriate engineering standards, as approved by the |
---|
| 236 | + | 19 commission, will be adhered to; |
---|
| 237 | + | 20 |
---|
| 238 | + | 21 (E) The establishment of criteria and |
---|
| 239 | + | 22 administrative procedures for the development of small |
---|
| 240 | + | 23 water development projects under this subsection and 2025STATE OF WYOMING25LSO-0452 |
---|
| 241 | + | ENGROSSED |
---|
| 242 | + | 11HB0117 |
---|
| 243 | + | 1 decisions of the commission relating to the |
---|
| 244 | + | 2 recommendations, prioritization or disqualification of |
---|
| 245 | + | 3 small water development projects are specifically exempt |
---|
| 246 | + | 4 from the provisions of the Wyoming Administrative Procedure |
---|
| 247 | + | 5 Act including judicial review under W.S. 16-3-114 and |
---|
| 248 | + | 6 16-3-115; |
---|
| 249 | + | 7 |
---|
| 250 | + | 8 (F) W.S. 16-6-116 shall not apply to a |
---|
| 251 | + | 9 small water development project unless the project sponsor |
---|
| 252 | + | 10 determines the small water development project meets the |
---|
| 253 | + | 11 definition of a "public work" as defined in W.S. |
---|
| 254 | + | 12 16-6-101(a)(ix). |
---|
| 255 | + | 13 |
---|
| 256 | + | 14 (f) Project – LaPrele Irrigation District Additional |
---|
| 257 | + | 15 Supply – 2025: |
---|
| 258 | + | 16 |
---|
| 259 | + | 17 (i) Project sponsor: The state of Wyoming; |
---|
| 260 | + | 18 |
---|
| 261 | + | 19 (ii) Project purpose: To provide additional |
---|
| 262 | + | 20 supply to lands served by the LaPrele Irrigation District; |
---|
| 263 | + | 21 |
---|
| 264 | + | 22 (iii) Project description: Investigate the |
---|
| 265 | + | 23 feasibility of, and if feasible, design and construction of 2025STATE OF WYOMING25LSO-0452 |
---|
| 266 | + | ENGROSSED |
---|
| 267 | + | 12HB0117 |
---|
| 268 | + | 1 one (1) or more wells or other water projects necessary to |
---|
| 269 | + | 2 provide additional supply to lands served by the LaPrele |
---|
| 270 | + | 3 Irrigation District; |
---|
| 271 | + | 4 |
---|
| 272 | + | 5 (iv) Total project budget: Twenty million |
---|
| 273 | + | 6 dollars ($20,000,000.00); |
---|
| 274 | + | 7 |
---|
| 275 | + | 8 (v) Appropriation: There is appropriated from |
---|
| 276 | + | 9 the legislative stabilization reserve account to water |
---|
| 277 | + | 10 development account I which shall be further appropriated |
---|
| 278 | + | 11 from water development account I to the Wyoming water |
---|
| 279 | + | 12 development office twenty million dollars ($20,000,000.00) |
---|
| 280 | + | 13 or as much thereof as is necessary to carry out the purpose |
---|
| 281 | + | 14 of this subsection. Of this appropriation, one million |
---|
| 282 | + | 15 dollars ($1,000,000.00) is appropriated for water |
---|
| 283 | + | 16 exploration to determine the placement of one (1) or more |
---|
| 284 | + | 17 wells or other water projects within the LaPrele Irrigation |
---|
| 285 | + | 18 District pursuant to paragraph (iii) of this subsection and |
---|
| 286 | + | 19 the remaining nineteen million dollars ($19,000,000.00) is |
---|
| 287 | + | 20 appropriated as a loan for a term of thirty (30) years that |
---|
| 288 | + | 21 shall have an interest rate of two percent (2%) interest |
---|
| 289 | + | 22 per annum to the LaPrele Irrigation District for the design |
---|
| 290 | + | 23 and construction of one (1) or more wells or other water 2025STATE OF WYOMING25LSO-0452 |
---|
| 291 | + | ENGROSSED |
---|
| 292 | + | 13HB0117 |
---|
| 293 | + | 1 projects necessary to provide additional supply to lands |
---|
| 294 | + | 2 served by the LaPrele Irrigation District. Unexpended funds |
---|
| 295 | + | 3 appropriated under this subsection shall revert to the |
---|
| 296 | + | 4 legislative stabilization reserve account on July 1, 2030; |
---|
| 297 | + | 5 |
---|
| 298 | + | 6 (vi) Special conditions: The Wyoming Water |
---|
| 299 | + | 7 Development Office shall investigate the feasibility of |
---|
| 300 | + | 8 developing groundwater to meet the needs of water rights |
---|
| 301 | + | 9 holders within the LaPrele Irrigation District whose rights |
---|
| 302 | + | 10 have been affected by the required breach and replacement |
---|
| 303 | + | 11 of the LaPrele Dam. The office shall assess whether |
---|
| 304 | + | 12 drilling and constructing wells or other water projects |
---|
| 305 | + | 13 within the project budget is likely to significantly |
---|
| 306 | + | 14 supplement the available water. Upon a determination by the |
---|
| 307 | + | 15 Water Development Commission that there is a reasonable |
---|
| 308 | + | 16 likelihood of successful development, the office shall |
---|
| 309 | + | 17 proceed with the construction of the wells or other water |
---|
| 310 | + | 18 projects. |
---|
| 311 | + | 19 |
---|
| 312 | + | 20 |
---|
| 313 | + | 21 |
---|
| 314 | + | 22 2025STATE OF WYOMING25LSO-0452 |
---|
| 315 | + | ENGROSSED |
---|
| 316 | + | 14HB01171 (a) Authorization is granted for the Level III |
---|
| 317 | + | 2 rehabilitation construction projects identified in this |
---|
| 318 | + | 3 section subject to the general conditions specified in W.S. |
---|
| 319 | + | 4 99-3-104, provided that W.S. 99-3-104(a)(iii) shall not |
---|
| 320 | + | 5 apply to the projects identified in this section unless |
---|
| 321 | + | 6 required by W.S. 41-2-121. |
---|
| 322 | + | 7 |
---|
| 323 | + | 8 (b) Project – CAID Lateral 256 Check Structure |
---|
| 324 | + | 9 Rehabilitation 2025: |
---|
| 325 | + | 10 |
---|
| 326 | + | 11 (i) Project sponsor: Casper Alcova Irrigation |
---|
| 327 | + | 12 District; |
---|
| 328 | + | 13 |
---|
| 329 | + | 14 (ii) Project purpose: Agricultural water supply; |
---|
| 330 | + | 15 |
---|
| 331 | + | 16 (iii) Project description: Design and |
---|
| 332 | + | 17 construction of a check structure and appurtenances |
---|
| 333 | + | 18 necessary to make the project function in the manner |
---|
| 334 | + | 19 intended; |
---|
| 335 | + | 20 |
---|
| 336 | + | 21 (iv) Total project budget: Seven hundred |
---|
| 337 | + | 22 forty-five thousand dollars ($745,000.00); |
---|
| 338 | + | 23 2025STATE OF WYOMING25LSO-0452 |
---|
| 339 | + | ENGROSSED |
---|
| 340 | + | 15HB01171 (v) Project grant: The state of Wyoming shall |
---|
| 341 | + | 2 grant to the sponsor from water development account II |
---|
| 342 | + | 3 through the commission for the design, permit procurement, |
---|
| 343 | + | 4 project land procurement, construction engineering and |
---|
| 344 | + | 5 construction of the project an amount not to exceed three |
---|
| 345 | + | 6 hundred seventy-two thousand five hundred dollars |
---|
| 346 | + | 7 ($372,500.00) or fifty percent (50%) of these actual |
---|
| 347 | + | 8 development costs, whichever is less; |
---|
| 348 | + | 9 |
---|
| 349 | + | 10 (vi) Appropriation: There is appropriated from |
---|
| 350 | + | 11 water development account II to the commission three |
---|
| 351 | + | 12 hundred seventy-two thousand five hundred dollars |
---|
| 352 | + | 13 ($372,500.00) or as much thereof as is necessary to carry |
---|
| 353 | + | 14 out the purpose of this subsection. Unexpended funds |
---|
| 354 | + | 15 appropriated under this subsection shall revert to water |
---|
| 355 | + | 16 development account II on July 1, 2030; |
---|
| 356 | + | 17 |
---|
| 357 | + | 18 (vii) Special conditions: The sponsor is |
---|
| 358 | + | 19 responsible for acquiring fifty percent (50%) of the total |
---|
| 359 | + | 20 project budget from other sources. |
---|
| 360 | + | 21 |
---|
| 361 | + | 22 (c) Project – Casper Tank Replacement 2025: |
---|
| 362 | + | 23 2025STATE OF WYOMING25LSO-0452 |
---|
| 363 | + | ENGROSSED |
---|
| 364 | + | 16HB01171 (i) Project sponsor: City of Casper; |
---|
| 365 | + | 2 |
---|
| 366 | + | 3 (ii) Project purpose: Municipal water supply; |
---|
| 367 | + | 4 |
---|
| 368 | + | 5 (iii) Project description: Design and |
---|
| 369 | + | 6 construction of water transmission pipelines, tanks, |
---|
| 370 | + | 7 structures and appurtenances necessary to make the project |
---|
| 371 | + | 8 function in the manner intended; |
---|
| 372 | + | 9 |
---|
| 373 | + | 10 (iv) Total project budget: Eleven million three |
---|
| 374 | + | 11 hundred forty-four thousand dollars ($11,344,000.00); |
---|
| 375 | + | 12 |
---|
| 376 | + | 13 (v) Project grant: The state of Wyoming shall |
---|
| 377 | + | 14 grant to the sponsor from water development account II |
---|
| 378 | + | 15 through the commission for the design, permit procurement, |
---|
| 379 | + | 16 project land procurement, construction engineering and |
---|
| 380 | + | 17 construction of the project an amount not to exceed five |
---|
| 381 | + | 18 million six hundred seventy-two thousand dollars |
---|
| 382 | + | 19 ($5,672,000.00) or fifty percent (50%) of these actual |
---|
| 383 | + | 20 development costs, whichever is less; |
---|
| 384 | + | 21 |
---|
| 385 | + | 22 (vi) Appropriation: There is appropriated from |
---|
| 386 | + | 23 water development account II to the commission five million 2025STATE OF WYOMING25LSO-0452 |
---|
| 387 | + | ENGROSSED |
---|
| 388 | + | 17HB0117 |
---|
| 389 | + | 1 six hundred seventy-two thousand dollars ($5,672,000.00) or |
---|
| 390 | + | 2 as much thereof as is necessary to carry out the purpose of |
---|
| 391 | + | 3 this subsection. Unexpended funds appropriated under this |
---|
| 392 | + | 4 subsection shall revert to water development account II on |
---|
| 393 | + | 5 July 1, 2030; |
---|
| 394 | + | 6 |
---|
| 395 | + | 7 (vii) Special conditions: The sponsor is |
---|
| 396 | + | 8 responsible for acquiring fifty percent (50%) of the total |
---|
| 397 | + | 9 project budget from other sources. |
---|
| 398 | + | 10 |
---|
| 399 | + | 11 (d) Project – Cottonwood Irrigation District Pipeline |
---|
| 400 | + | 12 Replacement 2025: |
---|
| 401 | + | 13 |
---|
| 402 | + | 14 (i) Project sponsor: Cottonwood Irrigation |
---|
| 403 | + | 15 District; |
---|
| 404 | + | 16 |
---|
| 405 | + | 17 (ii) Project purpose: Agricultural water supply; |
---|
| 406 | + | 18 |
---|
| 407 | + | 19 (iii) Project description: Design and |
---|
| 408 | + | 20 construction of pipelines, structures and appurtenances |
---|
| 409 | + | 21 necessary to make the project function in the manner |
---|
| 410 | + | 22 intended; |
---|
| 411 | + | 23 2025STATE OF WYOMING25LSO-0452 |
---|
| 412 | + | ENGROSSED |
---|
| 413 | + | 18HB01171 (iv) Total project budget: One million one |
---|
| 414 | + | 2 hundred two thousand dollars ($1,102,000.00); |
---|
| 415 | + | 3 |
---|
| 416 | + | 4 (v) Project grant: The state of Wyoming shall |
---|
| 417 | + | 5 grant to the sponsor from water development account II |
---|
| 418 | + | 6 through the commission for the design, permit procurement, |
---|
| 419 | + | 7 project land procurement, construction engineering and |
---|
| 420 | + | 8 construction of the project an amount not to exceed five |
---|
| 421 | + | 9 hundred fifty-one thousand dollars ($551,000.00) or fifty |
---|
| 422 | + | 10 percent (50%) of these actual development costs, whichever |
---|
| 423 | + | 11 is less; |
---|
| 424 | + | 12 |
---|
| 425 | + | 13 (vi) Project loan: The state of Wyoming shall |
---|
| 426 | + | 14 loan to the sponsor from water development account II |
---|
| 427 | + | 15 through the commission for the design, permit procurement |
---|
| 428 | + | 16 and project land procurement of the project an amount not |
---|
| 429 | + | 17 to exceed forty-seven thousand dollars ($47,000.00) or |
---|
| 430 | + | 18 fifty percent (50%) of these actual development costs, |
---|
| 431 | + | 19 whichever is less, for a term of twenty (20) years from the |
---|
| 432 | + | 20 date the commission determines that project benefits accrue |
---|
| 433 | + | 21 to the sponsor, at an annual interest rate of four percent |
---|
| 434 | + | 22 (4%); |
---|
| 435 | + | 23 2025STATE OF WYOMING25LSO-0452 |
---|
| 436 | + | ENGROSSED |
---|
| 437 | + | 19HB01171 (vii) Appropriation: There is appropriated from |
---|
| 438 | + | 2 water development account II to the commission five hundred |
---|
| 439 | + | 3 ninety-eight thousand dollars ($598,000.00) or as much |
---|
| 440 | + | 4 thereof as is necessary to carry out the purpose of this |
---|
| 441 | + | 5 subsection. Unexpended funds appropriated under this |
---|
| 442 | + | 6 subsection shall revert to water development account II on |
---|
| 443 | + | 7 July 1, 2030; |
---|
| 444 | + | 8 |
---|
| 445 | + | 9 (viii) Special conditions: The sponsor is |
---|
| 446 | + | 10 responsible for acquiring forty-five and seventy-four |
---|
| 447 | + | 11 hundredths percent (45.74%) of the total project budget |
---|
| 448 | + | 12 from other sources. |
---|
| 449 | + | 13 |
---|
| 450 | + | 14 (e) Project – EVIDD Farson Lateral Phase 4A 2025: |
---|
| 451 | + | 15 |
---|
| 452 | + | 16 (i) Project sponsor: Eden Valley Irrigation and |
---|
| 453 | + | 17 Drainage District; |
---|
| 454 | + | 18 |
---|
| 455 | + | 19 (ii) Project purpose: Agricultural water supply; |
---|
| 456 | + | 20 |
---|
| 457 | + | 21 (iii) Project description: Construction of |
---|
| 458 | + | 22 pipelines, structures and appurtenances necessary to make |
---|
| 459 | + | 23 the project function in the manner intended; 2025STATE OF WYOMING25LSO-0452 |
---|
| 460 | + | ENGROSSED |
---|
| 461 | + | 20HB01171 |
---|
| 462 | + | 2 (iv) Total project budget: Four million four |
---|
| 463 | + | 3 hundred fifty thousand dollars ($4,450,000.00); |
---|
| 464 | + | 4 |
---|
| 465 | + | 5 (v) Project grant: The state of Wyoming shall |
---|
| 466 | + | 6 grant to the sponsor from water development account II |
---|
| 467 | + | 7 through the commission for the permit procurement, project |
---|
| 468 | + | 8 land procurement and construction of the project an amount |
---|
| 469 | + | 9 not to exceed one million one hundred twelve thousand five |
---|
| 470 | + | 10 hundred dollars ($1,112,500.00) or twenty-five percent |
---|
| 471 | + | 11 (25%) of these actual development costs, whichever is less; |
---|
| 472 | + | 12 |
---|
| 473 | + | 13 (vi) Appropriation: There is appropriated from |
---|
| 474 | + | 14 water development account II to the commission one million |
---|
| 475 | + | 15 one hundred twelve thousand five hundred dollars |
---|
| 476 | + | 16 ($1,112,500.00) or as much thereof as is necessary to carry |
---|
| 477 | + | 17 out the purpose of this subsection. Unexpended funds |
---|
| 478 | + | 18 appropriated under this subsection shall revert to water |
---|
| 479 | + | 19 development account II on July 1, 2030; |
---|
| 480 | + | 20 |
---|
| 481 | + | 21 (vii) Special conditions: The sponsor is |
---|
| 482 | + | 22 responsible for acquiring seventy-five percent (75%) of the |
---|
| 483 | + | 23 total project budget from other sources. 2025STATE OF WYOMING25LSO-0452 |
---|
| 484 | + | ENGROSSED |
---|
| 485 | + | 21HB01171 |
---|
| 486 | + | 2 (f) Project – GID 62.2 Check Structure Project 2025: |
---|
| 487 | + | 3 |
---|
| 488 | + | 4 (i) Project sponsor: Goshen Irrigation District; |
---|
| 489 | + | 5 |
---|
| 490 | + | 6 (ii) Project purpose: Agricultural water supply; |
---|
| 491 | + | 7 |
---|
| 492 | + | 8 (iii) Project description: Design and |
---|
| 493 | + | 9 construction of a check structure and appurtenances |
---|
| 494 | + | 10 necessary to make the project function in the manner |
---|
| 495 | + | 11 intended; |
---|
| 496 | + | 12 |
---|
| 497 | + | 13 (iv) Total project budget: One million three |
---|
| 498 | + | 14 hundred twenty-two thousand dollars ($1,322,000.00); |
---|
| 499 | + | 15 |
---|
| 500 | + | 16 (v) Project grant: The state of Wyoming shall |
---|
| 501 | + | 17 grant to the sponsor from water development account II |
---|
| 502 | + | 18 through the commission for the design, permit procurement, |
---|
| 503 | + | 19 project land procurement, construction engineering and |
---|
| 504 | + | 20 construction of the project an amount not to exceed six |
---|
| 505 | + | 21 hundred sixty-one thousand dollars ($661,000.00) or fifty |
---|
| 506 | + | 22 percent (50%) of these actual development costs, whichever |
---|
| 507 | + | 23 is less; 2025STATE OF WYOMING25LSO-0452 |
---|
| 508 | + | ENGROSSED |
---|
| 509 | + | 22HB01171 |
---|
| 510 | + | 2 (vi) Project loan: The state of Wyoming shall |
---|
| 511 | + | 3 loan to the sponsor from water development account II |
---|
| 512 | + | 4 through the commission for the design, permit procurement, |
---|
| 513 | + | 5 project land procurement, construction engineering and |
---|
| 514 | + | 6 construction of the project an amount not to exceed six |
---|
| 515 | + | 7 hundred sixty-one thousand dollars ($661,000.00) or fifty |
---|
| 516 | + | 8 percent (50%) of these actual development costs, whichever |
---|
| 517 | + | 9 is less, for a term of twenty (20) years from the date the |
---|
| 518 | + | 10 commission determines that project benefits accrue to the |
---|
| 519 | + | 11 sponsor, at an annual interest rate of four percent (4%); |
---|
| 520 | + | 12 |
---|
| 521 | + | 13 (vii) Appropriation: There is appropriated from |
---|
| 522 | + | 14 water development account II to the commission one million |
---|
| 523 | + | 15 three hundred twenty-two thousand dollars ($1,322,000.00) |
---|
| 524 | + | 16 or as much thereof as is necessary to carry out the purpose |
---|
| 525 | + | 17 of this subsection. Unexpended funds appropriated under |
---|
| 526 | + | 18 this subsection shall revert to water development account |
---|
| 527 | + | 19 II on July 1, 2030. |
---|
| 528 | + | 20 |
---|
| 529 | + | 21 (g) Project – Kirby Creek Spillway Replacement 2025: |
---|
| 530 | + | 22 2025STATE OF WYOMING25LSO-0452 |
---|
| 531 | + | ENGROSSED |
---|
| 532 | + | 23HB01171 (i) Project sponsor: Kirby Ditch Irrigation |
---|
| 533 | + | 2 District; |
---|
| 534 | + | 3 |
---|
| 535 | + | 4 (ii) Project purpose: Agricultural water supply; |
---|
| 536 | + | 5 |
---|
| 537 | + | 6 (iii) Project description: Design and |
---|
| 538 | + | 7 construction of a spillway and appurtenances necessary to |
---|
| 539 | + | 8 make the project function in the manner intended; |
---|
| 540 | + | 9 |
---|
| 541 | + | 10 (iv) Total project budget: Five hundred |
---|
| 542 | + | 11 fifty-four thousand dollars ($554,000.00); |
---|
| 543 | + | 12 |
---|
| 544 | + | 13 (v) Project grant: The state of Wyoming shall |
---|
| 545 | + | 14 grant to the sponsor from water development account II |
---|
| 546 | + | 15 through the commission for the design, permit procurement, |
---|
| 547 | + | 16 project land procurement, construction engineering and |
---|
| 548 | + | 17 construction of the project an amount not to exceed two |
---|
| 549 | + | 18 hundred seventy-seven thousand dollars ($277,000.00) or |
---|
| 550 | + | 19 fifty percent (50%) of these actual development costs, |
---|
| 551 | + | 20 whichever is less; |
---|
| 552 | + | 21 |
---|
| 553 | + | 22 (vi) Project loan: The state of Wyoming shall |
---|
| 554 | + | 23 loan to the sponsor from water development account II 2025STATE OF WYOMING25LSO-0452 |
---|
| 555 | + | ENGROSSED |
---|
| 556 | + | 24HB0117 |
---|
| 557 | + | 1 through the commission for the design, permit procurement, |
---|
| 558 | + | 2 project land procurement, construction engineering and |
---|
| 559 | + | 3 construction of the project an amount not to exceed two |
---|
| 560 | + | 4 hundred seventy-seven thousand dollars ($277,000.00) or |
---|
| 561 | + | 5 fifty percent (50%) of these actual development costs, |
---|
| 562 | + | 6 whichever is less, for a term of thirty (30) years from the |
---|
| 563 | + | 7 date the commission determines that project benefits accrue |
---|
| 564 | + | 8 to the sponsor, at an annual interest rate of four percent |
---|
| 565 | + | 9 (4%); |
---|
| 566 | + | 10 |
---|
| 567 | + | 11 (vii) Appropriation: There is appropriated from |
---|
| 568 | + | 12 water development account II to the commission five hundred |
---|
| 569 | + | 13 fifty-four thousand dollars ($554,000.00) or as much |
---|
| 570 | + | 14 thereof as is necessary to carry out the purpose of this |
---|
| 571 | + | 15 subsection. Unexpended funds appropriated under this |
---|
| 572 | + | 16 subsection shall revert to water development account II on |
---|
| 573 | + | 17 July 1, 2030. |
---|
| 574 | + | 18 |
---|
| 575 | + | 19 (h) Project – Meeteetse Trails Estates 2025: |
---|
| 576 | + | 20 |
---|
| 577 | + | 21 (i) Project sponsor: Town of Meeteetse; |
---|
| 578 | + | 22 |
---|
| 579 | + | 23 (ii) Project purpose: Municipal water supply; 2025STATE OF WYOMING25LSO-0452 |
---|
| 580 | + | ENGROSSED |
---|
| 581 | + | 25HB01171 |
---|
| 582 | + | 2 (iii) Project description: Design and |
---|
| 583 | + | 3 construction of water storage tank and appurtenances |
---|
| 584 | + | 4 necessary to make the project function in the manner |
---|
| 585 | + | 5 intended; |
---|
| 586 | + | 6 |
---|
| 587 | + | 7 (iv) Total project budget: One million one |
---|
| 588 | + | 8 hundred eighty-one thousand dollars ($1,181,000.00); |
---|
| 589 | + | 9 |
---|
| 590 | + | 10 (v) Project grant: The state of Wyoming shall |
---|
| 591 | + | 11 grant to the sponsor from water development account II |
---|
| 592 | + | 12 through the commission for the design, permit procurement, |
---|
| 593 | + | 13 project land procurement, construction engineering and |
---|
| 594 | + | 14 construction of the project an amount not to exceed three |
---|
| 595 | + | 15 hundred twenty-four thousand five hundred eighty-one |
---|
| 596 | + | 16 dollars ($324,581.00) or twenty-seven and five-tenths |
---|
| 597 | + | 17 percent (27.5%) of these actual development costs, |
---|
| 598 | + | 18 whichever is less; |
---|
| 599 | + | 19 |
---|
| 600 | + | 20 (vi) Appropriation: There is appropriated from |
---|
| 601 | + | 21 water development account II to the commission three |
---|
| 602 | + | 22 hundred twenty-four thousand five hundred eighty-one |
---|
| 603 | + | 23 dollars ($324,581.00) or as much thereof as is necessary to 2025STATE OF WYOMING25LSO-0452 |
---|
| 604 | + | ENGROSSED |
---|
| 605 | + | 26HB0117 |
---|
| 606 | + | 1 carry out the purpose of this subsection. Unexpended funds |
---|
| 607 | + | 2 appropriated under this subsection shall revert to water |
---|
| 608 | + | 3 development account II on July 1, 2030; |
---|
| 609 | + | 4 |
---|
| 610 | + | 5 (vii) Special conditions: The sponsor is |
---|
| 611 | + | 6 responsible for acquiring seventy-two and five‑tenths |
---|
| 612 | + | 7 percent (72.5%) of the total project budget from other |
---|
| 613 | + | 8 sources. |
---|
| 614 | + | 9 |
---|
| 615 | + | 10 (j) Project – Rawlins Sage Creek Pipeline 2025: |
---|
| 616 | + | 11 |
---|
| 617 | + | 12 (i) Project sponsor: City of Rawlins; |
---|
| 618 | + | 13 |
---|
| 619 | + | 14 (ii) Project purpose: Municipal water supply; |
---|
| 620 | + | 15 |
---|
| 621 | + | 16 (iii) Project description: Design and |
---|
| 622 | + | 17 construction of blowoffs, air and vacuum stations, inline |
---|
| 623 | + | 18 valves and appurtenances necessary to make the project |
---|
| 624 | + | 19 function in the manner intended; |
---|
| 625 | + | 20 |
---|
| 626 | + | 21 (iv) Total project budget: Five million six |
---|
| 627 | + | 22 hundred seventy thousand dollars ($5,670,000.00); |
---|
| 628 | + | 23 2025STATE OF WYOMING25LSO-0452 |
---|
| 629 | + | ENGROSSED |
---|
| 630 | + | 27HB01171 (v) Project grant: The state of Wyoming shall |
---|
| 631 | + | 2 grant to the sponsor from water development account II |
---|
| 632 | + | 3 through the commission for the design, permit procurement, |
---|
| 633 | + | 4 project land procurement, construction engineering and |
---|
| 634 | + | 5 construction of the project an amount not to exceed two |
---|
| 635 | + | 6 million eight hundred thirty-five thousand dollars |
---|
| 636 | + | 7 ($2,835,000.00) or fifty percent (50%) of these actual |
---|
| 637 | + | 8 development costs, whichever is less; |
---|
| 638 | + | 9 |
---|
| 639 | + | 10 (vi) Appropriation: There is appropriated from |
---|
| 640 | + | 11 water development account II to the commission two million |
---|
| 641 | + | 12 eight hundred thirty-five thousand dollars ($2,835,000.00) |
---|
| 642 | + | 13 or as much thereof as is necessary to carry out the purpose |
---|
| 643 | + | 14 of this subsection. Unexpended funds appropriated under |
---|
| 644 | + | 15 this subsection shall revert to water development account |
---|
| 645 | + | 16 II on July 1, 2030; |
---|
| 646 | + | 17 |
---|
| 647 | + | 18 (vii) Special conditions: The sponsor is |
---|
| 648 | + | 19 responsible for acquiring fifty percent (50%) of the total |
---|
| 649 | + | 20 project budget from other sources. |
---|
| 650 | + | 21 |
---|
| 651 | + | 22 (k) Project – Sidon ID Canal Crossing 2025: |
---|
| 652 | + | 23 2025STATE OF WYOMING25LSO-0452 |
---|
| 653 | + | ENGROSSED |
---|
| 654 | + | 28HB01171 (i) Project sponsor: Sidon Irrigation District; |
---|
| 655 | + | 2 |
---|
| 656 | + | 3 (ii) Project purpose: Agricultural water supply; |
---|
| 657 | + | 4 |
---|
| 658 | + | 5 (iii) Project description: Design and |
---|
| 659 | + | 6 construction of culverts, structures and appurtenances |
---|
| 660 | + | 7 necessary to make the project function in the manner |
---|
| 661 | + | 8 intended; |
---|
| 662 | + | 9 |
---|
| 663 | + | 10 (iv) Total project budget: Eight hundred |
---|
| 664 | + | 11 ninety-five thousand one hundred ten dollars ($895,110.00); |
---|
| 665 | + | 12 |
---|
| 666 | + | 13 (v) Project grant: The state of Wyoming shall |
---|
| 667 | + | 14 grant to the sponsor from water development account II |
---|
| 668 | + | 15 through the commission for the purchase of project |
---|
| 669 | + | 16 materials as supported by vendor invoices and as approved |
---|
| 670 | + | 17 by the commission an amount not to exceed four hundred |
---|
| 671 | + | 18 thirty-two thousand dollars ($432,000.00) or one hundred |
---|
| 672 | + | 19 percent (100%) of the approved materials costs, whichever |
---|
| 673 | + | 20 is less; |
---|
| 674 | + | 21 2025STATE OF WYOMING25LSO-0452 |
---|
| 675 | + | ENGROSSED |
---|
| 676 | + | 29HB01171 (vi) Appropriation: There is appropriated from |
---|
| 677 | + | 2 water development account II to the commission four hundred |
---|
| 678 | + | 3 thirty-two thousand dollars ($432,000.00) or as much |
---|
| 679 | + | 4 thereof as is necessary to carry out the purpose of this |
---|
| 680 | + | 5 subsection. Unexpended funds appropriated under this |
---|
| 681 | + | 6 subsection shall revert to water development account II on |
---|
| 682 | + | 7 July 1, 2030; |
---|
| 683 | + | 8 |
---|
| 684 | + | 9 (vii) Special conditions: |
---|
| 685 | + | 10 |
---|
| 686 | + | 11 (A) The sponsor is responsible for all |
---|
| 687 | + | 12 project costs with the exception of the purchase of project |
---|
| 688 | + | 13 materials as supported by vendor invoices and as approved |
---|
| 689 | + | 14 by the commission, up to the amount appropriated in this |
---|
| 690 | + | 15 subsection; |
---|
| 691 | + | 16 |
---|
| 692 | + | 17 (B) The sponsor is responsible for |
---|
| 693 | + | 18 retaining professional engineering services to design the |
---|
| 694 | + | 19 project, compile materials and bidding documents and |
---|
| 695 | + | 20 monitor construction activities including the installation |
---|
| 696 | + | 21 of project components and the tracking of project |
---|
| 697 | + | 22 expenditures. |
---|
| 698 | + | 23 2025STATE OF WYOMING25LSO-0452 |
---|
| 699 | + | ENGROSSED |
---|
| 700 | + | 30HB01171 (m) Project - Small Water Development Projects – |
---|
| 701 | + | 2 Rehabilitation 2025: |
---|
| 702 | + | 3 |
---|
| 703 | + | 4 (i) Project sponsor: Eligible public entities; |
---|
| 704 | + | 5 |
---|
| 705 | + | 6 (ii) Project purpose: Multi-purpose - |
---|
| 706 | + | 7 agriculture, recreation and environmental; |
---|
| 707 | + | 8 |
---|
| 708 | + | 9 (iii) Project description: Rehabilitation and |
---|
| 709 | + | 10 replacement of small dams, windmills, springs, guzzlers and |
---|
| 710 | + | 11 other water collection, storage and drinking systems, |
---|
| 711 | + | 12 pipelines, etc., to impound, develop and convey water for |
---|
| 712 | + | 13 livestock, wildlife, irrigation, environmental and |
---|
| 713 | + | 14 recreational purposes; |
---|
| 714 | + | 15 |
---|
| 715 | + | 16 (iv) Total project budget: One million dollars |
---|
| 716 | + | 17 ($1,000,000.00); |
---|
| 717 | + | 18 |
---|
| 718 | + | 19 (v) Project grant: The state of Wyoming shall |
---|
| 719 | + | 20 grant to sponsors of small water development projects from |
---|
| 720 | + | 21 water development account II through the commission for the |
---|
| 721 | + | 22 design, permit procurement, project land procurement, |
---|
| 722 | + | 23 construction engineering and construction of small water 2025STATE OF WYOMING25LSO-0452 |
---|
| 723 | + | ENGROSSED |
---|
| 724 | + | 31HB0117 |
---|
| 725 | + | 1 development projects a total amount not to exceed five |
---|
| 726 | + | 2 hundred thousand dollars ($500,000.00) or fifty percent |
---|
| 727 | + | 3 (50%) of the actual development costs of the small water |
---|
| 728 | + | 4 development projects, whichever is less; |
---|
| 729 | + | 5 |
---|
| 730 | + | 6 (vi) Appropriation: There is appropriated from |
---|
| 731 | + | 7 water development account II to the commission five hundred |
---|
| 732 | + | 8 thousand dollars ($500,000.00) or as much thereof as is |
---|
| 733 | + | 9 necessary to carry out the purpose of this subsection. |
---|
| 734 | + | 10 Unexpended funds appropriated under this subsection shall |
---|
| 735 | + | 11 revert to water development account II on July 1, 2030; |
---|
| 736 | + | 12 |
---|
| 737 | + | 13 (vii) Definition: "Small water development |
---|
| 738 | + | 14 project" means a project where the maximum financial |
---|
| 739 | + | 15 contribution from the commission is thirty-five thousand |
---|
| 740 | + | 16 dollars ($35,000.00) or less; |
---|
| 741 | + | 17 |
---|
| 742 | + | 18 (viii) Special conditions: |
---|
| 743 | + | 19 |
---|
| 744 | + | 20 (A) The commission may grant a sponsor |
---|
| 745 | + | 21 fifty percent (50%) of the design, permit procurement, |
---|
| 746 | + | 22 project land procurement, construction engineering and |
---|
| 747 | + | 23 construction cost of a small water development project. No 2025STATE OF WYOMING25LSO-0452 |
---|
| 748 | + | ENGROSSED |
---|
| 749 | + | 32HB0117 |
---|
| 750 | + | 1 grant shall be more than thirty-five thousand dollars |
---|
| 751 | + | 2 ($35,000.00); |
---|
| 752 | + | 3 |
---|
| 753 | + | 4 (B) The small water development project |
---|
| 754 | + | 5 sponsors shall substantiate the public benefit that will be |
---|
| 755 | + | 6 derived from proposed small water development projects; |
---|
| 756 | + | 7 |
---|
| 757 | + | 8 (C) The commission may make monthly |
---|
| 758 | + | 9 progress payments for not more than fifty percent (50%) of |
---|
| 759 | + | 10 eligible monthly project expenses; |
---|
| 760 | + | 11 |
---|
| 761 | + | 12 (D) An appropriate land management or |
---|
| 762 | + | 13 resource management entity shall certify that the proposed |
---|
| 763 | + | 14 small water development project will meet expectations and |
---|
| 764 | + | 15 that appropriate engineering standards, as approved by the |
---|
| 765 | + | 16 commission, will be adhered to; |
---|
| 766 | + | 17 |
---|
| 767 | + | 18 (E) The establishment of criteria and |
---|
| 768 | + | 19 administrative procedures for the development of small |
---|
| 769 | + | 20 water development projects under this subsection and |
---|
| 770 | + | 21 decisions of the commission relating to the |
---|
| 771 | + | 22 recommendations, prioritization or disqualification of |
---|
| 772 | + | 23 small water development projects are specifically exempt 2025STATE OF WYOMING25LSO-0452 |
---|
| 773 | + | ENGROSSED |
---|
| 774 | + | 33HB0117 |
---|
| 775 | + | 1 from the provisions of the Wyoming Administrative Procedure |
---|
| 776 | + | 2 Act including judicial review under W.S. 16-3-114 and |
---|
| 777 | + | 3 16-3-115; |
---|
| 778 | + | 4 |
---|
| 779 | + | 5 (F) W.S. 16-6-116 shall not apply to a |
---|
| 780 | + | 6 small water development project unless the project sponsor |
---|
| 781 | + | 7 determines the small water development project meets the |
---|
| 782 | + | 8 definition of a "public work" as defined in W.S. |
---|
| 783 | + | 9 16-6-101(a)(ix). |
---|
| 784 | + | 10 |
---|
| 785 | + | 11 (n) Project – Upper Bluff Pump Plant No. 1 Pipeline |
---|
| 786 | + | 12 2025: |
---|
| 787 | + | 13 |
---|
| 788 | + | 14 (i) Project sponsor: Upper Bluff Irrigation |
---|
| 789 | + | 15 District; |
---|
| 790 | + | 16 |
---|
| 791 | + | 17 (ii) Project purpose: Agricultural water supply; |
---|
| 792 | + | 18 |
---|
| 793 | + | 19 (iii) Project description: Design and |
---|
| 794 | + | 20 construction of pipelines, structures and appurtenances |
---|
| 795 | + | 21 necessary to make the project function in the manner |
---|
| 796 | + | 22 intended; |
---|
| 797 | + | 23 2025STATE OF WYOMING25LSO-0452 |
---|
| 798 | + | ENGROSSED |
---|
| 799 | + | 34HB01171 (iv) Total project budget: Seven hundred |
---|
| 800 | + | 2 thirteen thousand five hundred dollars ($713,500.00); |
---|
| 801 | + | 3 |
---|
| 802 | + | 4 (v) Project grant: The state of Wyoming shall |
---|
| 803 | + | 5 grant to the sponsor from water development account II |
---|
| 804 | + | 6 through the commission for the design, permit procurement, |
---|
| 805 | + | 7 project land procurement, construction engineering and |
---|
| 806 | + | 8 construction of the project an amount not to exceed three |
---|
| 807 | + | 9 hundred fifty-six thousand seven hundred fifty dollars |
---|
| 808 | + | 10 ($356,750.00) or fifty percent (50%) of these actual |
---|
| 809 | + | 11 development costs, whichever is less; |
---|
| 810 | + | 12 |
---|
| 811 | + | 13 (vi) Appropriation: There is appropriated from |
---|
| 812 | + | 14 water development account II to the commission three |
---|
| 813 | + | 15 hundred fifty-six thousand seven hundred fifty dollars |
---|
| 814 | + | 16 ($356,750.00) or as much thereof as is necessary to carry |
---|
| 815 | + | 17 out the purpose of this subsection. Unexpended funds |
---|
| 816 | + | 18 appropriated under this subsection shall revert to water |
---|
| 817 | + | 19 development account II on July 1, 2030; |
---|
| 818 | + | 20 |
---|
| 819 | + | 21 (vii) Special conditions: The sponsor is |
---|
| 820 | + | 22 responsible for acquiring fifty percent (50%) of the total |
---|
| 821 | + | 23 project budget from other sources. 2025STATE OF WYOMING25LSO-0452 |
---|
| 822 | + | ENGROSSED |
---|
| 823 | + | 35HB01171 |
---|
| 824 | + | 2 (o) Project – West Afton ID Phase I Project 2025: |
---|
| 825 | + | 3 |
---|
| 826 | + | 4 (i) Project sponsor: West Afton Irrigation |
---|
| 827 | + | 5 District; |
---|
| 828 | + | 6 |
---|
| 829 | + | 7 (ii) Project purpose: Agricultural water supply; |
---|
| 830 | + | 8 |
---|
| 831 | + | 9 (iii) Project description: Design and |
---|
| 832 | + | 10 construction of pipelines, structures and appurtenances |
---|
| 833 | + | 11 necessary to make the project function in the manner |
---|
| 834 | + | 12 intended; |
---|
| 835 | + | 13 |
---|
| 836 | + | 14 (iv) Total project budget: One million three |
---|
| 837 | + | 15 hundred seventeen thousand dollars ($1,317,000.00); |
---|
| 838 | + | 16 |
---|
| 839 | + | 17 (v) Project grant: The state of Wyoming shall |
---|
| 840 | + | 18 grant to the sponsor from water development account II |
---|
| 841 | + | 19 through the commission for the design, permit procurement, |
---|
| 842 | + | 20 project land procurement, construction engineering and |
---|
| 843 | + | 21 construction of the project an amount not to exceed six |
---|
| 844 | + | 22 hundred fifty-eight thousand five hundred dollars 2025STATE OF WYOMING25LSO-0452 |
---|
| 845 | + | ENGROSSED |
---|
| 846 | + | 36HB0117 |
---|
| 847 | + | 1 ($658,500.00) or fifty percent (50%) of these actual |
---|
| 848 | + | 2 development costs, whichever is less; |
---|
| 849 | + | 3 |
---|
| 850 | + | 4 (vi) Project loan: The state of Wyoming shall |
---|
| 851 | + | 5 loan to the sponsor from water development account II |
---|
| 852 | + | 6 through the commission for the design, permit procurement, |
---|
| 853 | + | 7 project land procurement, construction engineering and |
---|
| 854 | + | 8 construction of the project an amount not to exceed six |
---|
| 855 | + | 9 hundred fifty-eight thousand five hundred dollars |
---|
| 856 | + | 10 ($658,500.00) or fifty percent (50%) of these actual |
---|
| 857 | + | 11 development costs, whichever is less, for a term of twenty |
---|
| 858 | + | 12 (20) years from the date the commission determines that |
---|
| 859 | + | 13 project benefits accrue to the sponsor, at an annual |
---|
| 860 | + | 14 interest rate of four percent (4%); |
---|
| 861 | + | 15 |
---|
| 862 | + | 16 (vii) Appropriation: There is appropriated from |
---|
| 863 | + | 17 water development account II to the commission one million |
---|
| 864 | + | 18 three hundred seventeen thousand dollars ($1,317,000.00) or |
---|
| 865 | + | 19 as much thereof as is necessary to carry out the purpose of |
---|
| 866 | + | 20 this subsection. Unexpended funds appropriated under this |
---|
| 867 | + | 21 subsection shall revert to water development account II on |
---|
| 868 | + | 22 July 1, 2030; |
---|
| 869 | + | 23 2025STATE OF WYOMING25LSO-0452 |
---|
| 870 | + | ENGROSSED |
---|
| 871 | + | 37HB01171 (viii) Special conditions: The appropriation |
---|
| 872 | + | 2 of funds for this project is contingent upon the transfer |
---|
| 873 | + | 3 of funds to water development account II as described in |
---|
| 874 | + | 4 section 4 of this act or transfer from another funding |
---|
| 875 | + | 5 source. |
---|
| 876 | + | 6 |
---|
| 877 | + | 7 (p) Project – Willwood ID Willwood Chute 2025: |
---|
| 878 | + | 8 |
---|
| 879 | + | 9 (i) Project sponsor: Willwood Irrigation |
---|
| 880 | + | 10 District; |
---|
| 881 | + | 11 |
---|
| 882 | + | 12 (ii) Project purpose: Agricultural water supply; |
---|
| 883 | + | 13 |
---|
| 884 | + | 14 (iii) Project description: Design and |
---|
| 885 | + | 15 construction of a chute, structures and appurtenances |
---|
| 886 | + | 16 necessary to make the project function in the manner |
---|
| 887 | + | 17 intended; |
---|
| 888 | + | 18 |
---|
| 889 | + | 19 (iv) Total project budget: One million six |
---|
| 890 | + | 20 hundred ninety-eight thousand dollars ($1,698,000.00); |
---|
| 891 | + | 21 |
---|
| 892 | + | 22 (v) Project grant: The state of Wyoming shall |
---|
| 893 | + | 23 grant to the sponsor from water development account II 2025STATE OF WYOMING25LSO-0452 |
---|
| 894 | + | ENGROSSED |
---|
| 895 | + | 38HB0117 |
---|
| 896 | + | 1 through the commission for the design, permit procurement, |
---|
| 897 | + | 2 project land procurement, construction engineering and |
---|
| 898 | + | 3 construction of the project an amount not to exceed seven |
---|
| 899 | + | 4 hundred ninety-eight thousand dollars ($798,000.00) or |
---|
| 900 | + | 5 forty-seven percent (47%) of these actual development |
---|
| 901 | + | 6 costs, whichever is less; |
---|
| 902 | + | 7 |
---|
| 903 | + | 8 (vi) Project loan: The state of Wyoming shall |
---|
| 904 | + | 9 loan to the sponsor from water development account II |
---|
| 905 | + | 10 through the commission for the design, permit procurement, |
---|
| 906 | + | 11 project land procurement, construction engineering and |
---|
| 907 | + | 12 construction of the project an amount not to exceed nine |
---|
| 908 | + | 13 hundred thousand dollars ($900,000.00) or fifty-three |
---|
| 909 | + | 14 percent (53%) of these actual development costs, whichever |
---|
| 910 | + | 15 is less, for a term of twenty (20) years from the date the |
---|
| 911 | + | 16 commission determines that project benefits accrue to the |
---|
| 912 | + | 17 sponsor, at an annual interest rate of four percent (4%); |
---|
| 913 | + | 18 |
---|
| 914 | + | 19 (vii) Appropriation: There is appropriated from |
---|
| 915 | + | 20 water development account II to the commission one million |
---|
| 916 | + | 21 six hundred ninety-eight thousand dollars ($1,698,000.00) |
---|
| 917 | + | 22 or as much thereof as is necessary to carry out the purpose |
---|
| 918 | + | 23 of this subsection. Unexpended funds appropriated under 2025STATE OF WYOMING25LSO-0452 |
---|
| 919 | + | ENGROSSED |
---|
| 920 | + | 39HB0117 |
---|
| 921 | + | 1 this subsection shall revert to water development account |
---|
| 922 | + | 2 II on July 1, 2030. |
---|
| 923 | + | 3 |
---|
| 924 | + | 4W.S. 99-3-303(b)(ii), (iii) and (iv) by |
---|
| 925 | + | 5 creating a new subdivision (F), 99-3-1106(b)(iv), (vi), |
---|
| 926 | + | 6 (vii) and (viii)(B), 99-3-1503(g)(vi), 99-3-2003(b)(vi), |
---|
| 927 | + | 7 99-3-2203(b)(iv) through (vi), (vii)(B) and (e)(vi), |
---|
| 928 | + | 8 99-3-2205(c)(v), (d)(iv), (v) and (vii), 99-3-2303(b)(vi), |
---|
| 929 | + | 9 99-3-2404(e)(iv) through (vii), 99-3-2406(h)(iii) through |
---|
| 930 | + | 10 (vii) and (vii)(A), 99-3-2503(f)(vi), 99-3-2504(g)(vii) and |
---|
| 931 | + | 11 (j)(vii), 99-3-2603(d)(iv) through (vi), 99-3-2803(f)(iii) |
---|
| 932 | + | 12 through (vi) and 99-3-2904(f)(iv) through (vi), (j)(iv) |
---|
| 933 | + | 13 through (vi) and by creating a new paragraph (vii) are |
---|
| 934 | + | 14 amended to read: |
---|
| 935 | + | 15 |
---|
| 936 | + | 16 |
---|
| 937 | + | 17 |
---|
| 938 | + | 18 |
---|
| 939 | + | 19 (b) Project - Aladdin Water Supply Project: |
---|
| 940 | + | 20 2025STATE OF WYOMING25LSO-0452 |
---|
| 941 | + | ENGROSSED |
---|
| 942 | + | 40HB01171 (ii) Project purpose: Municipal, domestic and to |
---|
| 943 | + | 2 water |
---|
| 944 | + | 3supply; |
---|
| 945 | + | 4 |
---|
| 946 | + | 5 (iii) Project description: Authorization for the |
---|
| 947 | + | 6 commission to |
---|
| 948 | + | 7 |
---|
| 949 | + | 8 |
---|
| 950 | + | 9; |
---|
| 951 | + | 10 |
---|
| 952 | + | 11 (iv) Special Conditions: |
---|
| 953 | + | 12 |
---|
| 954 | + | 13 |
---|
| 955 | + | 14 |
---|
| 956 | + | 15 |
---|
| 957 | + | 16 |
---|
| 958 | + | 17 |
---|
| 959 | + | 18 |
---|
| 960 | + | 19 |
---|
| 961 | + | 20 |
---|
| 962 | + | 21 |
---|
| 963 | + | 22 2025STATE OF WYOMING25LSO-0452 |
---|
| 964 | + | ENGROSSED |
---|
| 965 | + | 41HB01171 |
---|
| 966 | + | 2 |
---|
| 967 | + | 3 |
---|
| 968 | + | 4 |
---|
| 969 | + | 5 |
---|
| 970 | + | 6 |
---|
| 971 | + | 7 |
---|
| 972 | + | 8 |
---|
| 973 | + | 9 |
---|
| 974 | + | 10 (b) Project – Sponsor's Contingency |
---|
| 975 | + | 11 Fund-Rehabilitation: |
---|
| 976 | + | 12 |
---|
| 977 | + | 13 (iv) Total project budget: |
---|
| 978 | + | 14 |
---|
| 979 | + | 15; |
---|
| 980 | + | 16 |
---|
| 981 | + | 17 (vi) Project loan: The state of Wyoming shall |
---|
| 982 | + | 18 loan to sponsors from water development account II through |
---|
| 983 | + | 19 the commission sufficient supplemental funds which may be |
---|
| 984 | + | 20 used to complete construction of projects up to an amount |
---|
| 985 | + | 21 not to exceed |
---|
| 986 | + | 22 of the difference between the original project budget 2025STATE OF WYOMING25LSO-0452 |
---|
| 987 | + | ENGROSSED |
---|
| 988 | + | 42HB0117 |
---|
| 989 | + | 1 and the actual cost of construction, at an annual rate of |
---|
| 990 | + | 2 four percent (4%); |
---|
| 991 | + | 3 |
---|
| 992 | + | 4 (vii) Appropriation: There is appropriated from |
---|
| 993 | + | 5 water development account II to the commission |
---|
| 994 | + | 6 |
---|
| 995 | + | 7 or as |
---|
| 996 | + | 8 much thereof as is necessary to carry out the purpose of |
---|
| 997 | + | 9 this subsection. Unexpended funds appropriated under this |
---|
| 998 | + | 10 subsection shall revert to water development account II on |
---|
| 999 | + | 11 July 1, 2027 2028; and |
---|
| 1000 | + | 12 |
---|
| 1001 | + | 13 (viii) Special condition: |
---|
| 1002 | + | 14 |
---|
| 1003 | + | 15 (B) The appropriation of additional funds |
---|
| 1004 | + | 16 for this project in the amount of |
---|
| 1005 | + | 17 |
---|
| 1006 | + | 18 is contingent upon the |
---|
| 1007 | + | 19 transfer of funds to water development account II as |
---|
| 1008 | + | 20 described in |
---|
| 1009 | + | 21 from another funding source. |
---|
| 1010 | + | 22 2025STATE OF WYOMING25LSO-0452 |
---|
| 1011 | + | ENGROSSED |
---|
| 1012 | + | 43HB01171 new |
---|
| 1013 | + | 2 |
---|
| 1014 | + | 3 |
---|
| 1015 | + | 4 (g) Project ‑ Ethete Water Supply: |
---|
| 1016 | + | 5 |
---|
| 1017 | + | 6 (vi) Appropriation: There is appropriated from |
---|
| 1018 | + | 7 water development account I to the commission two million |
---|
| 1019 | + | 8 dollars ($2,000,000.00) or as much thereof as is necessary |
---|
| 1020 | + | 9 to carry out the purpose of this subsection. Unexpended |
---|
| 1021 | + | 10 funds appropriated under this subsection shall revert to |
---|
| 1022 | + | 11 water development account I on July 1, 2025 2026; |
---|
| 1023 | + | 12 |
---|
| 1024 | + | 13 new |
---|
| 1025 | + | 14 |
---|
| 1026 | + | 15 |
---|
| 1027 | + | 16 (b) Project ‑ Arapahoe Pipeline and Tank: |
---|
| 1028 | + | 17 |
---|
| 1029 | + | 18 (vi) Appropriation: There is appropriated from |
---|
| 1030 | + | 19 water development account I to the commission two million |
---|
| 1031 | + | 20 four hundred twenty thousand dollars ($2,420,000.00) or as |
---|
| 1032 | + | 21 much thereof as is necessary to carry out the purpose of |
---|
| 1033 | + | 22 this subsection. Unexpended funds appropriated under this 2025STATE OF WYOMING25LSO-0452 |
---|
| 1034 | + | ENGROSSED |
---|
| 1035 | + | 44HB0117 |
---|
| 1036 | + | 1 subsection shall revert to water development account I on |
---|
| 1037 | + | 2 July 1, 2025 2026; |
---|
| 1038 | + | 3 |
---|
| 1039 | + | 4 |
---|
| 1040 | + | 5 |
---|
| 1041 | + | 6 |
---|
| 1042 | + | 7 (b) Project – Broken Wheel Ranch Water Supply 2017: |
---|
| 1043 | + | 8 |
---|
| 1044 | + | 9 (iv) Total project budget: |
---|
| 1045 | + | 10 |
---|
| 1046 | + | 11 |
---|
| 1047 | + | 12; |
---|
| 1048 | + | 13 |
---|
| 1049 | + | 14 (v) Project grant: The state of Wyoming shall |
---|
| 1050 | + | 15 grant to the sponsor from water development account I |
---|
| 1051 | + | 16 through the commission for the design, permit procurement, |
---|
| 1052 | + | 17 project land procurement, construction engineering and |
---|
| 1053 | + | 18 construction of the project an amount not to exceed |
---|
| 1054 | + | 19 |
---|
| 1055 | + | 20 |
---|
| 1056 | + | 21‑tenths |
---|
| 1057 | + | 22 of the actual development costs, whichever |
---|
| 1058 | + | 23 is less; 2025STATE OF WYOMING25LSO-0452 |
---|
| 1059 | + | ENGROSSED |
---|
| 1060 | + | 45HB01171 |
---|
| 1061 | + | 2 (vi) Appropriation: There is appropriated from |
---|
| 1062 | + | 3 water development account I to the commission |
---|
| 1063 | + | 4 |
---|
| 1064 | + | 5 |
---|
| 1065 | + | 6 thereof as is necessary to carry out the purpose of this |
---|
| 1066 | + | 7 subsection. Unexpended funds appropriated under this |
---|
| 1067 | + | 8 subsection shall revert to water development account I on |
---|
| 1068 | + | 9 July 1, 2025 2026; |
---|
| 1069 | + | 10 |
---|
| 1070 | + | 11 (vii) Special conditions: |
---|
| 1071 | + | 12 |
---|
| 1072 | + | 13 (B) The sponsor is responsible for |
---|
| 1073 | + | 14 acquiring tenths |
---|
| 1074 | + | 15 |
---|
| 1075 | + | 16 sources. |
---|
| 1076 | + | 17 |
---|
| 1077 | + | 18 (e) Project - Gillette Regional Extensions 2017: |
---|
| 1078 | + | 19 |
---|
| 1079 | + | 20 (vi) Appropriation: There is appropriated from |
---|
| 1080 | + | 21 water development account I to the commission two million |
---|
| 1081 | + | 22 seven hundred fifty-three thousand seven hundred dollars |
---|
| 1082 | + | 23 ($2,753,700.00) or as much thereof as is necessary to carry 2025STATE OF WYOMING25LSO-0452 |
---|
| 1083 | + | ENGROSSED |
---|
| 1084 | + | 46HB0117 |
---|
| 1085 | + | 1 out the purpose of this subsection. Unexpended funds |
---|
| 1086 | + | 2 appropriated under this subsection shall revert to water |
---|
| 1087 | + | 3 development account I on July 1, 2025 2026; |
---|
| 1088 | + | 4 |
---|
| 1089 | + | 5 |
---|
| 1090 | + | 6 |
---|
| 1091 | + | 7 |
---|
| 1092 | + | 8 (c) Project – Middle Piney Reservoir: |
---|
| 1093 | + | 9 |
---|
| 1094 | + | 10 (v) Appropriation: There is appropriated from |
---|
| 1095 | + | 11 water development account III to the commission for project |
---|
| 1096 | + | 12 land procurement, construction engineering and construction |
---|
| 1097 | + | 13 of the project fourteen million two hundred twenty-eight |
---|
| 1098 | + | 14 thousand dollars ($14,228,000.00) or as much thereof as is |
---|
| 1099 | + | 15 necessary to carry out the purpose of this subsection. |
---|
| 1100 | + | 16 Unexpended funds appropriated under this subsection shall |
---|
| 1101 | + | 17 revert to water development account III on July 1, |
---|
| 1102 | + | 18 |
---|
| 1103 | + | 19 |
---|
| 1104 | + | 20 (d) Project – Alkali Creek Reservoir: |
---|
| 1105 | + | 21 2025STATE OF WYOMING25LSO-0452 |
---|
| 1106 | + | ENGROSSED |
---|
| 1107 | + | 47HB01171 (iv) Total project budget: |
---|
| 1108 | + | 2 |
---|
| 1109 | + | 3 |
---|
| 1110 | + | 4 |
---|
| 1111 | + | 5 (v) Project Grant: The state of Wyoming shall |
---|
| 1112 | + | 6 grant to the sponsor from water development account III |
---|
| 1113 | + | 7 through the commission for project land procurement, |
---|
| 1114 | + | 8 construction engineering and construction of the project an |
---|
| 1115 | + | 9 amount not to exceed |
---|
| 1116 | + | 10 |
---|
| 1117 | + | 11 or ninety-six and four |
---|
| 1118 | + | 12 tenths percent (96.4%) of the actual development costs, |
---|
| 1119 | + | 13 whichever is less; |
---|
| 1120 | + | 14 |
---|
| 1121 | + | 15 (vii) Appropriation: There is appropriated from |
---|
| 1122 | + | 16 water development account III to the commission |
---|
| 1123 | + | 17 |
---|
| 1124 | + | 18 or as much thereof as is necessary to carry |
---|
| 1125 | + | 19 out the purpose of this subsection. Unexpended funds |
---|
| 1126 | + | 20 appropriated under this subsection shall revert to water |
---|
| 1127 | + | 21 development account III on July 1, 2029. |
---|
| 1128 | + | 22 2025STATE OF WYOMING25LSO-0452 |
---|
| 1129 | + | ENGROSSED |
---|
| 1130 | + | 48HB01171 |
---|
| 1131 | + | 2 |
---|
| 1132 | + | 3 |
---|
| 1133 | + | 4 (b) Project - Gillette Regional Extensions Phase IV |
---|
| 1134 | + | 5 2018: |
---|
| 1135 | + | 6 |
---|
| 1136 | + | 7 (vi) Appropriation: There is appropriated from |
---|
| 1137 | + | 8 water development account I to the commission one million |
---|
| 1138 | + | 9 five hundred twelve thousand one hundred ninety dollars |
---|
| 1139 | + | 10 ($1,512,190.00) or as much thereof as is necessary to carry |
---|
| 1140 | + | 11 out the purpose of this subsection. Unexpended funds |
---|
| 1141 | + | 12 appropriated under this subsection shall revert to water |
---|
| 1142 | + | 13 development account I on July 1, 2025 2026; |
---|
| 1143 | + | 14 |
---|
| 1144 | + | 15 |
---|
| 1145 | + | 16 |
---|
| 1146 | + | 17 |
---|
| 1147 | + | 18 (e) Project GR/RS/SC JPWB Pump Station 2019: |
---|
| 1148 | + | 19 |
---|
| 1149 | + | 20 (iv) Total project budget: |
---|
| 1150 | + | 21 |
---|
| 1151 | + | 22 |
---|
| 1152 | + | 23; 2025STATE OF WYOMING25LSO-0452 |
---|
| 1153 | + | ENGROSSED |
---|
| 1154 | + | 49HB01171 |
---|
| 1155 | + | 2 (v) Project grant: The state of Wyoming shall |
---|
| 1156 | + | 3 grant to the sponsor from water development account I |
---|
| 1157 | + | 4 through the commission for the design, permit procurement, |
---|
| 1158 | + | 5 project land procurement, construction engineering and |
---|
| 1159 | + | 6 construction of the project an amount not to exceed |
---|
| 1160 | + | 7 |
---|
| 1161 | + | 8 |
---|
| 1162 | + | 9 |
---|
| 1163 | + | 10‑tenths |
---|
| 1164 | + | 11 of the actual development costs, whichever |
---|
| 1165 | + | 12 is less; |
---|
| 1166 | + | 13 |
---|
| 1167 | + | 14 (vi) Appropriation: There is appropriated from |
---|
| 1168 | + | 15 water development account I to the commission |
---|
| 1169 | + | 16 |
---|
| 1170 | + | 17 |
---|
| 1171 | + | 18 |
---|
| 1172 | + | 19 thereof as is necessary to carry out the purpose of this |
---|
| 1173 | + | 20 subsection. Unexpended funds appropriated under this |
---|
| 1174 | + | 21 subsection shall revert to water development account I on |
---|
| 1175 | + | 22 July 1, 2026 2028; |
---|
| 1176 | + | 23 2025STATE OF WYOMING25LSO-0452 |
---|
| 1177 | + | ENGROSSED |
---|
| 1178 | + | 50HB01171 (vii) Special conditions: The sponsor is |
---|
| 1179 | + | 2 responsible for acquiring |
---|
| 1180 | + | 3‑tenths percent (40.5%) |
---|
| 1181 | + | 4 from other sources. |
---|
| 1182 | + | 5 |
---|
| 1183 | + | 6 |
---|
| 1184 | + | 7 |
---|
| 1185 | + | 8 |
---|
| 1186 | + | 9 (h) Project – Eden Valley Irrigation District System |
---|
| 1187 | + | 10 Improvements 2019: |
---|
| 1188 | + | 11 |
---|
| 1189 | + | 12 (iii) Project description: Design and |
---|
| 1190 | + | 13 construction of |
---|
| 1191 | + | 14 appurtenances necessary to make the project function in the |
---|
| 1192 | + | 15 manner intended; |
---|
| 1193 | + | 16 |
---|
| 1194 | + | 17 (iv) Total project budget: |
---|
| 1195 | + | 18 |
---|
| 1196 | + | 19; |
---|
| 1197 | + | 20 |
---|
| 1198 | + | 21 (v) Project grant: The state of Wyoming shall |
---|
| 1199 | + | 22 grant to the sponsor from water development account II |
---|
| 1200 | + | 23 through the commission for the design, permit procurement, 2025STATE OF WYOMING25LSO-0452 |
---|
| 1201 | + | ENGROSSED |
---|
| 1202 | + | 51HB0117 |
---|
| 1203 | + | 1 project land procurement, construction engineering and |
---|
| 1204 | + | 2 construction of the project an amount not to exceed three |
---|
| 1205 | + | 3 hundred fifty-one thousand dollars ($351,000.00) or |
---|
| 1206 | + | 4 |
---|
| 1207 | + | 5 actual development costs, whichever is less; |
---|
| 1208 | + | 6 |
---|
| 1209 | + | 7 (vi) Appropriation: There is appropriated from |
---|
| 1210 | + | 8 water development account II to the commission three |
---|
| 1211 | + | 9 hundred fifty-one thousand dollars ($351,000.00) or as much |
---|
| 1212 | + | 10 thereof as is necessary to carry out the purpose of this |
---|
| 1213 | + | 11 subsection. Unexpended funds appropriated under this |
---|
| 1214 | + | 12 subsection shall revert to water development account II on |
---|
| 1215 | + | 13 July 1, 2026 2028; |
---|
| 1216 | + | 14 |
---|
| 1217 | + | 15 (vii) Special conditions: |
---|
| 1218 | + | 16 |
---|
| 1219 | + | 17 (A) The sponsor is responsible for |
---|
| 1220 | + | 18 acquiring |
---|
| 1221 | + | 19 of the total project budget from other sources; |
---|
| 1222 | + | 20 |
---|
| 1223 | + | 21 |
---|
| 1224 | + | 22 |
---|
| 1225 | + | 23 2025STATE OF WYOMING25LSO-0452 |
---|
| 1226 | + | ENGROSSED |
---|
| 1227 | + | 52HB01171 (f) Project – Gillette Regional Extensions Phase V |
---|
| 1228 | + | 2 2020: |
---|
| 1229 | + | 3 |
---|
| 1230 | + | 4 (vi) Appropriation: There is appropriated from |
---|
| 1231 | + | 5 water development account I to the commission three million |
---|
| 1232 | + | 6 eighty-eight thousand seven hundred dollars ($3,088,700.00) |
---|
| 1233 | + | 7 or as much thereof as is necessary to carry out the purpose |
---|
| 1234 | + | 8 of this subsection. Unexpended funds appropriated under |
---|
| 1235 | + | 9 this subsection shall revert to water development account I |
---|
| 1236 | + | 10 on July 1, 2025 2027; |
---|
| 1237 | + | 11 |
---|
| 1238 | + | 12 |
---|
| 1239 | + | 13 |
---|
| 1240 | + | 14 |
---|
| 1241 | + | 15 (g) Project – Enterprise Watershed Improvement |
---|
| 1242 | + | 16 District Canal Lining 2020: |
---|
| 1243 | + | 17 |
---|
| 1244 | + | 18 (vii) Appropriation: There is appropriated from |
---|
| 1245 | + | 19 water development account II to the commission six hundred |
---|
| 1246 | + | 20 ten thousand dollars ($610,000.00) or as much thereof as is |
---|
| 1247 | + | 21 necessary to carry out the purpose of this subsection. |
---|
| 1248 | + | 22 Unexpended funds appropriated under this subsection shall 2025STATE OF WYOMING25LSO-0452 |
---|
| 1249 | + | ENGROSSED |
---|
| 1250 | + | 53HB0117 |
---|
| 1251 | + | 1 revert to water development account II on July 1, |
---|
| 1252 | + | 2. |
---|
| 1253 | + | 3 |
---|
| 1254 | + | 4 (j) Project – Laramie Valley Diversion Structure |
---|
| 1255 | + | 5 2020: |
---|
| 1256 | + | 6 |
---|
| 1257 | + | 7 (vii) Appropriation: There is appropriated from |
---|
| 1258 | + | 8 water development account II to the commission one million |
---|
| 1259 | + | 9 eight hundred fifty thousand dollars ($1,850,000.00) or as |
---|
| 1260 | + | 10 much thereof as is necessary to carry out the purpose of |
---|
| 1261 | + | 11 this subsection. Unexpended funds appropriated under this |
---|
| 1262 | + | 12 subsection shall revert to water development account II on |
---|
| 1263 | + | 13 July 1, 2025 2027. |
---|
| 1264 | + | 14 |
---|
| 1265 | + | 15 |
---|
| 1266 | + | 16 |
---|
| 1267 | + | 17 |
---|
| 1268 | + | 18 (d) Project – Lander Well and Transmission Pipeline |
---|
| 1269 | + | 19 2021: |
---|
| 1270 | + | 20 |
---|
| 1271 | + | 21 (iv) Total project budget: |
---|
| 1272 | + | 22 2025STATE OF WYOMING25LSO-0452 |
---|
| 1273 | + | ENGROSSED |
---|
| 1274 | + | 54HB0117 |
---|
671 | | - | from the provisions of the Wyoming Administrative Procedure |
---|
672 | | - | Act including judicial review under W.S. 16-3-114 and |
---|
673 | | - | 16-3-115; |
---|
674 | | - | |
---|
675 | | - | (F) W.S. 16-6-116 shall not apply to a |
---|
676 | | - | small water development project unless the project sponsor |
---|
677 | | - | determines the small water development project meets the |
---|
678 | | - | definition of a "public work" as defined in W.S. |
---|
679 | | - | 16-6-101(a)(ix). |
---|
680 | | - | (n) Project – Upper Bluff Pump Plant No. 1 Pipeline |
---|
681 | | - | 2025: |
---|
682 | | - | (i) Project sponsor: Upper Bluff Irrigation |
---|
683 | | - | District; |
---|
684 | | - | (ii) Project purpose: Agricultural water supply; |
---|
685 | | - | (iii) Project description: Design and |
---|
686 | | - | construction of pipelines, structures and appurtenances |
---|
687 | | - | necessary to make the project function in the manner |
---|
688 | | - | intended; |
---|
689 | | - | (iv) Total project budget: Seven hundred |
---|
690 | | - | thirteen thousand five hundred dollars ($713,500.00); |
---|
691 | | - | (v) Project grant: The state of Wyoming shall |
---|
692 | | - | grant to the sponsor from water development account II |
---|
693 | | - | through the commission for the design, permit procurement, |
---|
694 | | - | project land procurement, construction engineering and |
---|
695 | | - | construction of the project an amount not to exceed three |
---|
696 | | - | hundred fifty-six thousand seven hundred fifty dollars |
---|
697 | | - | ($356,750.00) or fifty percent (50%) of these actual |
---|
698 | | - | development costs, whichever is less; ORIGINAL HOUSE ENGROSSED |
---|
699 | | - | BILL NO. HB0117 |
---|
700 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
701 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
702 | | - | 2025 GENERAL SESSION |
---|
703 | | - | 22(vi) Appropriation: There is appropriated from |
---|
704 | | - | water development account II to the commission three |
---|
705 | | - | hundred fifty-six thousand seven hundred fifty dollars |
---|
706 | | - | ($356,750.00) or as much thereof as is necessary to carry |
---|
707 | | - | out the purpose of this subsection. Unexpended funds |
---|
708 | | - | appropriated under this subsection shall revert to water |
---|
709 | | - | development account II on July 1, 2030; |
---|
710 | | - | (vii) Special conditions: The sponsor is |
---|
711 | | - | responsible for acquiring fifty percent (50%) of the total |
---|
712 | | - | project budget from other sources. |
---|
713 | | - | |
---|
714 | | - | (o) Project – West Afton ID Phase I Project 2025: |
---|
715 | | - | (i) Project sponsor: West Afton Irrigation |
---|
716 | | - | District; |
---|
717 | | - | (ii) Project purpose: Agricultural water supply; |
---|
718 | | - | (iii) Project description: Design and |
---|
719 | | - | construction of pipelines, structures and appurtenances |
---|
720 | | - | necessary to make the project function in the manner |
---|
721 | | - | intended; |
---|
722 | | - | (iv) Total project budget: One million three |
---|
723 | | - | hundred seventeen thousand dollars ($1,317,000.00); |
---|
724 | | - | (v) Project grant: The state of Wyoming shall |
---|
725 | | - | grant to the sponsor from water development account II |
---|
726 | | - | through the commission for the design, permit procurement, |
---|
727 | | - | project land procurement, construction engineering and |
---|
728 | | - | construction of the project an amount not to exceed six |
---|
729 | | - | hundred fifty-eight thousand five hundred dollars |
---|
730 | | - | ($658,500.00) or fifty percent (50%) of these actual |
---|
731 | | - | development costs, whichever is less; ORIGINAL HOUSE ENGROSSED |
---|
732 | | - | BILL NO. HB0117 |
---|
733 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
734 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
735 | | - | 2025 GENERAL SESSION |
---|
736 | | - | 23 |
---|
737 | | - | (vi) Project loan: The state of Wyoming shall |
---|
738 | | - | loan to the sponsor from water development account II |
---|
739 | | - | through the commission for the design, permit procurement, |
---|
740 | | - | project land procurement, construction engineering and |
---|
741 | | - | construction of the project an amount not to exceed six |
---|
742 | | - | hundred fifty-eight thousand five hundred dollars |
---|
743 | | - | ($658,500.00) or fifty percent (50%) of these actual |
---|
744 | | - | development costs, whichever is less, for a term of twenty |
---|
745 | | - | (20) years from the date the commission determines that |
---|
746 | | - | project benefits accrue to the sponsor, at an annual |
---|
747 | | - | interest rate of four percent (4%); |
---|
748 | | - | (vii) Appropriation: There is appropriated from |
---|
749 | | - | water development account II to the commission one million |
---|
750 | | - | three hundred seventeen thousand dollars ($1,317,000.00) or |
---|
751 | | - | as much thereof as is necessary to carry out the purpose of |
---|
752 | | - | this subsection. Unexpended funds appropriated under this |
---|
753 | | - | subsection shall revert to water development account II on |
---|
754 | | - | July 1, 2030; |
---|
755 | | - | (viii) Special conditions: The appropriation |
---|
756 | | - | of funds for this project is contingent upon the transfer |
---|
757 | | - | of funds to water development account II as described in |
---|
758 | | - | section 4 of this act or transfer from another funding |
---|
759 | | - | source. |
---|
760 | | - | (p) Project – Willwood ID Willwood Chute 2025: |
---|
761 | | - | (i) Project sponsor: Willwood Irrigation |
---|
762 | | - | District; |
---|
763 | | - | (ii) Project purpose: Agricultural water supply; ORIGINAL HOUSE ENGROSSED |
---|
764 | | - | BILL NO. HB0117 |
---|
765 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
766 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
767 | | - | 2025 GENERAL SESSION |
---|
768 | | - | 24(iii) Project description: Design and |
---|
769 | | - | construction of a chute, structures and appurtenances |
---|
770 | | - | necessary to make the project function in the manner |
---|
771 | | - | intended; |
---|
772 | | - | (iv) Total project budget: One million six |
---|
773 | | - | hundred ninety-eight thousand dollars ($1,698,000.00); |
---|
774 | | - | (v) Project grant: The state of Wyoming shall |
---|
775 | | - | grant to the sponsor from water development account II |
---|
776 | | - | through the commission for the design, permit procurement, |
---|
777 | | - | project land procurement, construction engineering and |
---|
778 | | - | construction of the project an amount not to exceed seven |
---|
779 | | - | hundred ninety-eight thousand dollars ($798,000.00) or |
---|
780 | | - | forty-seven percent (47%) of these actual development |
---|
781 | | - | costs, whichever is less; |
---|
782 | | - | (vi) Project loan: The state of Wyoming shall |
---|
783 | | - | loan to the sponsor from water development account II |
---|
784 | | - | through the commission for the design, permit procurement, |
---|
785 | | - | project land procurement, construction engineering and |
---|
786 | | - | construction of the project an amount not to exceed nine |
---|
787 | | - | hundred thousand dollars ($900,000.00) or fifty-three |
---|
788 | | - | percent (53%) of these actual development costs, whichever |
---|
789 | | - | is less, for a term of twenty (20) years from the date the |
---|
790 | | - | commission determines that project benefits accrue to the |
---|
791 | | - | sponsor, at an annual interest rate of four percent (4%); |
---|
792 | | - | (vii) Appropriation: There is appropriated from |
---|
793 | | - | water development account II to the commission one million |
---|
794 | | - | six hundred ninety-eight thousand dollars ($1,698,000.00) |
---|
795 | | - | or as much thereof as is necessary to carry out the purpose |
---|
796 | | - | of this subsection. Unexpended funds appropriated under |
---|
797 | | - | this subsection shall revert to water development account |
---|
798 | | - | II on July 1, 2030. ORIGINAL HOUSE ENGROSSED |
---|
799 | | - | BILL NO. HB0117 |
---|
800 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
801 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
802 | | - | 2025 GENERAL SESSION |
---|
803 | | - | 25 |
---|
804 | | - | Section 2. W.S. 99-3-303(b)(ii), (iii) and (iv) by |
---|
805 | | - | creating a new subdivision (F), 99-3-1106(b)(iv), (vi), |
---|
806 | | - | (vii) and (viii)(B), 99-3-1503(g)(vi), 99-3-2003(b)(vi), |
---|
807 | | - | 99-3-2203(b)(iv) through (vi), (vii)(B) and (e)(vi), |
---|
808 | | - | 99-3-2205(c)(v) and (d)(vii), 99-3-2303(b)(vi), |
---|
809 | | - | 99-3-2404(e)(iv) through (vii), 99-3-2406(h)(iii) through |
---|
810 | | - | (vii) and (vii)(A), 99-3-2503(f)(vi), 99-3-2504(g)(vii) and |
---|
811 | | - | (j)(vii), 99-3-2603(d)(iv) through (vi), 99-3-2803(f)(iii) |
---|
812 | | - | through (vi) and 99-3-2904(f)(iv) through (vi), (j)(iv) |
---|
813 | | - | through (vi) and by creating a new paragraph (vii) are |
---|
814 | | - | amended to read: |
---|
815 | | - | 99-3-303. Level III construction projects new |
---|
816 | | - | development. |
---|
817 | | - | (b) Project - Aladdin Water Supply Project: |
---|
818 | | - | (ii) Project purpose: Municipal, domestic and to |
---|
819 | | - | provide water |
---|
820 | | - | construction supply; |
---|
821 | | - | (iii) Project description: Authorization for the |
---|
822 | | - | commission to |
---|
823 | | - | development program funds to the Aladdin Water District and |
---|
824 | | - | to the Wyoming department of transportation |
---|
825 | | - | ownership of the Project; |
---|
826 | | - | (iv) Special Conditions: |
---|
827 | | - | (F) Notwithstanding any other provision of |
---|
828 | | - | law, the commission shall transfer to the Aladdin Water |
---|
829 | | - | District all rights, title and interest to the Project, to ORIGINAL HOUSE ENGROSSED |
---|
830 | | - | BILL NO. HB0117 |
---|
831 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
832 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
833 | | - | 2025 GENERAL SESSION |
---|
834 | | - | 26 |
---|
835 | | - | include the well and associated parcel of real property |
---|
836 | | - | upon occurrence of all the following: |
---|
837 | | - | (I) Expiration of any existing water |
---|
838 | | - | service contract between the commission and the Aladdin |
---|
839 | | - | Water District; |
---|
840 | | - | (II) A finding by the commission that |
---|
841 | | - | it has no further Project related interest; |
---|
842 | | - | (III) Execution of an agreement |
---|
843 | | - | between the commission and Aladdin Water District to |
---|
844 | | - | transfer the Project. |
---|
845 | | - | 99-3-1106. Sponsor's Contingency Funds. |
---|
846 | | - | (b) Project – Sponsor's Contingency |
---|
847 | | - | Fund-Rehabilitation: |
---|
848 | | - | (iv) Total project budget: |
---|
849 | | - | hundred thousand dollars ($5,700,000.00) |
---|
850 | | - | hundred thousand dollars ($8,600,000.00); |
---|
851 | | - | (vi) Project loan: The state of Wyoming shall |
---|
852 | | - | loan to sponsors from water development account II through |
---|
853 | | - | the commission sufficient supplemental funds which may be |
---|
854 | | - | used to complete construction of projects up to an amount |
---|
855 | | - | not to exceed |
---|
856 | | - | (50%) |
---|
857 | | - | and the actual cost of construction, at an annual rate of |
---|
858 | | - | four percent (4%); ORIGINAL HOUSE ENGROSSED |
---|
859 | | - | BILL NO. HB0117 |
---|
860 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
861 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
862 | | - | 2025 GENERAL SESSION |
---|
863 | | - | 27(vii) Appropriation: There is appropriated from |
---|
864 | | - | water development account II to the commission |
---|
865 | | - | seven hundred thousand dollars ($5,700,000.00) |
---|
866 | | - | million six hundred thousand dollars ($8,600,000.00) or as |
---|
867 | | - | much thereof as is necessary to carry out the purpose of |
---|
868 | | - | this subsection. Unexpended funds appropriated under this |
---|
869 | | - | subsection shall revert to water development account II on |
---|
870 | | - | July 1, 2027 2028; and |
---|
871 | | - | (viii) Special condition: |
---|
872 | | - | (B) The appropriation of additional funds |
---|
873 | | - | for this project in the amount of |
---|
874 | | - | thousand dollars ($1,200,000.00) |
---|
875 | | - | thousand dollars ($2,900,000.00) is contingent upon the |
---|
876 | | - | transfer of funds to water development account II as |
---|
877 | | - | described in |
---|
878 | | - | from another funding source. |
---|
879 | | - | 99-3-1503. Level III construction projects new |
---|
880 | | - | development. |
---|
881 | | - | (g) Project ‑ Ethete Water Supply: |
---|
882 | | - | (vi) Appropriation: There is appropriated from |
---|
883 | | - | water development account I to the commission two million |
---|
884 | | - | dollars ($2,000,000.00) or as much thereof as is necessary |
---|
885 | | - | to carry out the purpose of this subsection. Unexpended |
---|
886 | | - | funds appropriated under this subsection shall revert to |
---|
887 | | - | water development account I on July 1, 2025 2026 |
---|
888 | | - | 99-3-2003. Level III construction projects new |
---|
889 | | - | development. |
---|
890 | | - | (b) Project ‑ Arapahoe Pipeline and Tank: ORIGINAL HOUSE ENGROSSED |
---|
891 | | - | BILL NO. HB0117 |
---|
892 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
893 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
894 | | - | 2025 GENERAL SESSION |
---|
895 | | - | 28 |
---|
896 | | - | (vi) Appropriation: There is appropriated from |
---|
897 | | - | water development account I to the commission two million |
---|
898 | | - | four hundred twenty thousand dollars ($2,420,000.00) or as |
---|
899 | | - | much thereof as is necessary to carry out the purpose of |
---|
900 | | - | this subsection. Unexpended funds appropriated under this |
---|
901 | | - | subsection shall revert to water development account I on |
---|
902 | | - | July 1, 2025 2026; |
---|
903 | | - | 99-3-2203. Level III construction projects – new |
---|
904 | | - | development. |
---|
905 | | - | (b) Project – Broken Wheel Ranch Water Supply 2017: |
---|
906 | | - | (iv) Total project budget: |
---|
907 | | - | thousand dollars ($915,000.00) |
---|
908 | | - | forty-nine thousand four hundred eighty-seven dollars |
---|
909 | | - | ($1,849,487.00); |
---|
910 | | - | |
---|
911 | | - | (v) Project grant: The state of Wyoming shall |
---|
912 | | - | grant to the sponsor from water development account I |
---|
913 | | - | through the commission for the design, permit procurement, |
---|
914 | | - | project land procurement, construction engineering and |
---|
915 | | - | construction of the project an amount not to exceed |
---|
916 | | - | hundred thirteen thousand fifty dollars ($613,050.00) or |
---|
917 | | - | sixty-seven percent (67%) |
---|
918 | | - | fifty dollars ($913,050.00) or forty-nine and four‑tenths |
---|
919 | | - | percent (49.4%) of the actual development costs, whichever |
---|
920 | | - | is less; |
---|
921 | | - | |
---|
922 | | - | (vi) Appropriation: There is appropriated from |
---|
923 | | - | water development account I to the commission |
---|
924 | | - | thirteen thousand fifty dollars ($613,050.00) |
---|
925 | | - | thirteen thousand fifty dollars ($913,050.00) |
---|
926 | | - | thereof as is necessary to carry out the purpose of this ORIGINAL HOUSE ENGROSSED |
---|
927 | | - | BILL NO. HB0117 |
---|
928 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
929 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
930 | | - | 2025 GENERAL SESSION |
---|
931 | | - | 29 |
---|
932 | | - | subsection. Unexpended funds appropriated under this |
---|
933 | | - | subsection shall revert to water development account I on |
---|
934 | | - | July 1, 2025 2026; |
---|
935 | | - | |
---|
936 | | - | (vii) Special conditions: |
---|
937 | | - | |
---|
938 | | - | (B) The sponsor is responsible for |
---|
939 | | - | acquiring ‑tenths |
---|
940 | | - | percent (50.6%) |
---|
941 | | - | sources. |
---|
942 | | - | (e) Project - Gillette Regional Extensions 2017: |
---|
943 | | - | (vi) Appropriation: There is appropriated from |
---|
944 | | - | water development account I to the commission two million |
---|
945 | | - | seven hundred fifty-three thousand seven hundred dollars |
---|
946 | | - | ($2,753,700.00) or as much thereof as is necessary to carry |
---|
947 | | - | out the purpose of this subsection. Unexpended funds |
---|
948 | | - | appropriated under this subsection shall revert to water |
---|
949 | | - | development account I on July 1, 2025 2026; |
---|
950 | | - | 99-3-2205. Level III construction projects – dams and |
---|
951 | | - | reservoirs. |
---|
952 | | - | (c) Project – Middle Piney Reservoir: |
---|
953 | | - | (v) Appropriation: There is appropriated from |
---|
954 | | - | water development account III to the commission for project |
---|
955 | | - | land procurement, construction engineering and construction |
---|
956 | | - | of the project fourteen million two hundred twenty-eight |
---|
957 | | - | thousand dollars ($14,228,000.00) or as much thereof as is |
---|
958 | | - | necessary to carry out the purpose of this subsection. |
---|
959 | | - | Unexpended funds appropriated under this subsection shall |
---|
960 | | - | revert to water development account III on July 1, |
---|
961 | | - | 2027; ORIGINAL HOUSE ENGROSSED |
---|
962 | | - | BILL NO. HB0117 |
---|
963 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
964 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
965 | | - | 2025 GENERAL SESSION |
---|
966 | | - | 30 |
---|
967 | | - | (d) Project – Alkali Creek Reservoir: |
---|
968 | | - | (vii) Appropriation: There is appropriated from |
---|
969 | | - | water development account III to the commission fifty-nine |
---|
970 | | - | million dollars ($59,000,000.00) or as much thereof as is |
---|
971 | | - | necessary to carry out the purpose of this subsection. |
---|
972 | | - | Unexpended funds appropriated under this subsection shall |
---|
973 | | - | revert to water development account III on July 1, |
---|
974 | | - | 2026. |
---|
975 | | - | 99-3-2303. Level III construction projects – new |
---|
976 | | - | development. |
---|
977 | | - | (b) Project - Gillette Regional Extensions Phase IV |
---|
978 | | - | 2018: |
---|
979 | | - | (vi) Appropriation: There is appropriated from |
---|
980 | | - | water development account I to the commission one million |
---|
981 | | - | five hundred twelve thousand one hundred ninety dollars |
---|
982 | | - | ($1,512,190.00) or as much thereof as is necessary to carry |
---|
983 | | - | out the purpose of this subsection. Unexpended funds |
---|
984 | | - | appropriated under this subsection shall revert to water |
---|
985 | | - | development account I on July 1, 2025 2026; |
---|
986 | | - | 99-3-2404. Level III construction projects – new |
---|
987 | | - | development. |
---|
988 | | - | (e) Project GR/RS/SC JPWB Pump Station 2019: |
---|
989 | | - | (iv) Total project budget: |
---|
990 | | - | hundred ninety thousand dollars ($11,190,000.00) |
---|
991 | | - | million one hundred twenty thousand dollars |
---|
992 | | - | ($20,120,000.00) |
---|
993 | | - | ORIGINAL HOUSE ENGROSSED |
---|
994 | | - | BILL NO. HB0117 |
---|
995 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
996 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
997 | | - | 2025 GENERAL SESSION |
---|
998 | | - | 31(v) Project grant: The state of Wyoming shall |
---|
999 | | - | grant to the sponsor from water development account I |
---|
1000 | | - | through the commission for the design, permit procurement, |
---|
1001 | | - | project land procurement, construction engineering and |
---|
1002 | | - | construction of the project an amount not to exceed |
---|
1003 | | - | million four hundred ninety-seven thousand three hundred |
---|
1004 | | - | dollars ($7,497,300.00) or sixty-seven percent (67%) |
---|
1005 | | - | million nine hundred sixty-two thousand three hundred |
---|
1006 | | - | dollars ($11,962,300.00) or fifty-nine and five‑tenths |
---|
1007 | | - | percent (59.5%) of the actual development costs, whichever |
---|
1008 | | - | is less; |
---|
1009 | | - | |
---|
1010 | | - | (vi) Appropriation: There is appropriated from |
---|
1011 | | - | water development account I to the commission |
---|
1012 | | - | four hundred ninety-seven thousand three hundred dollars |
---|
1013 | | - | ($7,497,300.00) |
---|
1014 | | - | thousand three hundred dollars ($11,962,300.00) |
---|
1015 | | - | thereof as is necessary to carry out the purpose of this |
---|
1016 | | - | subsection. Unexpended funds appropriated under this |
---|
1017 | | - | subsection shall revert to water development account I on |
---|
1018 | | - | July 1, 2026 2028; |
---|
1019 | | - | |
---|
1020 | | - | (vii) Special conditions: The sponsor is |
---|
1021 | | - | responsible for acquiring |
---|
1022 | | - | and fivetenths percent (40.5%) |
---|
1023 | | - | from other sources. |
---|
1024 | | - | 99-3-2406. Level III construction projects – |
---|
1025 | | - | rehabilitation. |
---|
1026 | | - | (h) Project – Eden Valley Irrigation District System |
---|
1027 | | - | Improvements 2019: |
---|
1028 | | - | (iii) Project description: Design and |
---|
1029 | | - | construction of ORIGINAL HOUSE ENGROSSED |
---|
1030 | | - | BILL NO. HB0117 |
---|
1031 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
1032 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
1033 | | - | 2025 GENERAL SESSION |
---|
1034 | | - | 32 |
---|
1035 | | - | appurtenances necessary to make the project function in the |
---|
1036 | | - | manner intended; |
---|
1037 | | - | |
---|
1038 | | - | (iv) Total project budget: |
---|
1039 | | - | thousand dollars ($650,000.00) |
---|
1040 | | - | four thousand dollars ($1,404,000.00) |
---|
1041 | | - | |
---|
1042 | | - | (v) Project grant: The state of Wyoming shall |
---|
1043 | | - | grant to the sponsor from water development account II |
---|
1044 | | - | through the commission for the design, permit procurement, |
---|
1045 | | - | project land procurement, construction engineering and |
---|
1046 | | - | construction of the project an amount not to exceed three |
---|
1047 | | - | hundred fifty-one thousand dollars ($351,000.00) or |
---|
1048 | | - | fifty-four percent (54%) of the |
---|
1049 | | - | actual development costs, whichever is less; |
---|
1050 | | - | |
---|
1051 | | - | (vi) Appropriation: There is appropriated from |
---|
1052 | | - | water development account II to the commission three |
---|
1053 | | - | hundred fifty-one thousand dollars ($351,000.00) or as much |
---|
1054 | | - | thereof as is necessary to carry out the purpose of this |
---|
1055 | | - | subsection. Unexpended funds appropriated under this |
---|
1056 | | - | subsection shall revert to water development account II on |
---|
1057 | | - | July 1, 2026 2028; |
---|
1058 | | - | |
---|
1059 | | - | (vii) Special conditions: |
---|
1060 | | - | |
---|
1061 | | - | (A) The sponsor is responsible for |
---|
1062 | | - | acquiring |
---|
1063 | | - | (75%) |
---|
1064 | | - | 99-3-2503. Level III construction projects new |
---|
1065 | | - | development. |
---|
1066 | | - | (f) Project – Gillette Regional Extensions Phase V |
---|
1067 | | - | 2020: ORIGINAL HOUSE ENGROSSED |
---|
1068 | | - | BILL NO. HB0117 |
---|
1069 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
1070 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
1071 | | - | 2025 GENERAL SESSION |
---|
1072 | | - | 33 |
---|
1073 | | - | (vi) Appropriation: There is appropriated from |
---|
1074 | | - | water development account I to the commission three million |
---|
1075 | | - | eighty-eight thousand seven hundred dollars ($3,088,700.00) |
---|
1076 | | - | or as much thereof as is necessary to carry out the purpose |
---|
1077 | | - | of this subsection. Unexpended funds appropriated under |
---|
1078 | | - | this subsection shall revert to water development account I |
---|
1079 | | - | on July 1, 2025 2027; |
---|
1080 | | - | 99-3-2504. Level III construction projects – |
---|
1081 | | - | rehabilitation. |
---|
1082 | | - | (g) Project – Enterprise Watershed Improvement |
---|
1083 | | - | District Canal Lining 2020: |
---|
1084 | | - | (vii) Appropriation: There is appropriated from |
---|
1085 | | - | water development account II to the commission six hundred |
---|
1086 | | - | ten thousand dollars ($610,000.00) or as much thereof as is |
---|
1087 | | - | necessary to carry out the purpose of this subsection. |
---|
1088 | | - | Unexpended funds appropriated under this subsection shall |
---|
1089 | | - | revert to water development account II on July 1, |
---|
1090 | | - | 2027. |
---|
1091 | | - | (j) Project – Laramie Valley Diversion Structure |
---|
1092 | | - | 2020: |
---|
1093 | | - | (vii) Appropriation: There is appropriated from |
---|
1094 | | - | water development account II to the commission one million |
---|
1095 | | - | eight hundred fifty thousand dollars ($1,850,000.00) or as |
---|
1096 | | - | much thereof as is necessary to carry out the purpose of |
---|
1097 | | - | this subsection. Unexpended funds appropriated under this |
---|
1098 | | - | subsection shall revert to water development account II on |
---|
1099 | | - | July 1, 2025 2027. ORIGINAL HOUSE ENGROSSED |
---|
1100 | | - | BILL NO. HB0117 |
---|
1101 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
1102 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
1103 | | - | 2025 GENERAL SESSION |
---|
1104 | | - | 3499-3-2603. Level III construction projects – new |
---|
1105 | | - | development. |
---|
1106 | | - | (d) Project – Lander Well and Transmission Pipeline |
---|
1107 | | - | 2021: |
---|
1108 | | - | (iv) Total project budget: |
---|
1109 | | - | hundred twenty thousand dollars ($1,320,000.00) |
---|
1110 | | - | eight hundred fifty-seven thousand four hundred dollars |
---|
1111 | | - | ($2,857,400.00); |
---|
1112 | | - | |
---|
1113 | | - | (v) Project grant: The state of Wyoming shall |
---|
1114 | | - | grant to the sponsor from water development account I |
---|
1115 | | - | through the commission for the design, permit procurement, |
---|
1116 | | - | project land procurement, construction engineering and |
---|
1117 | | - | construction of the project an amount not to exceed |
---|
1118 | | - | hundred eighty-four thousand four hundred dollars |
---|
1119 | | - | ($884,400.00) |
---|
1120 | | - | four hundred fifty-eight dollars ($1,914,458.00) or |
---|
1121 | | - | sixty-seven percent (67%) of the actual development costs, |
---|
1122 | | - | whichever is less; |
---|
1123 | | - | |
---|
1124 | | - | (vi) Appropriation: There is appropriated from |
---|
1125 | | - | water development account I to the commission |
---|
1126 | | - | eighty-four thousand four hundred dollars ($884,400.00) |
---|
1127 | | - | million nine hundred fourteen thousand four hundred |
---|
1128 | | - | fifty-eight dollars ($1,914,458.00) or as much thereof as |
---|
1129 | | - | is necessary to carry out the purpose of this subsection. |
---|
1130 | | - | Unexpended funds appropriated under this subsection shall |
---|
1131 | | - | revert to water development account I on July 1, 2026 2028; |
---|
1132 | | - | 99-3-2803. Level III construction projects new |
---|
1133 | | - | development. |
---|
1134 | | - | (f) Project ‑ South End Water Users ISD Pipeline 2023: ORIGINAL HOUSE ENGROSSED |
---|
1135 | | - | BILL NO. HB0117 |
---|
1136 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
1137 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
1138 | | - | 2025 GENERAL SESSION |
---|
1139 | | - | 35 |
---|
1140 | | - | (iii) Project description: Design and |
---|
1141 | | - | pre-construction |
---|
1142 | | - | pipelines, structures and appurtenances necessary to make |
---|
1143 | | - | the project function in the manner intended; |
---|
1144 | | - | (iv) Total project budget: |
---|
1145 | | - | fifty-nine thousand four hundred three dollars |
---|
1146 | | - | ($459,403.00) |
---|
1147 | | - | thousand four hundred three dollars ($5,548,403.00); |
---|
1148 | | - | (v) Project grant: The state of Wyoming shall |
---|
1149 | | - | grant to the sponsor from water development account I |
---|
1150 | | - | through the commission for the design, permit procurement, |
---|
1151 | | - | project land procurement and |
---|
1152 | | - | engineering of the project an amount not |
---|
1153 | | - | to exceed |
---|
1154 | | - | dollars ($307,800.00) |
---|
1155 | | - | thousand four hundred thirty dollars ($3,717,430.00) or |
---|
1156 | | - | sixty-seven percent (67%) of these actual development |
---|
1157 | | - | costs, whichever is less; |
---|
1158 | | - | (vi) Appropriation: There is appropriated from |
---|
1159 | | - | water development account I to the commission |
---|
1160 | | - | seven thousand eight hundred dollars ($307,800.00) |
---|
1161 | | - | million seven hundred seventeen thousand four hundred |
---|
1162 | | - | thirty dollars ($3,717,430.00) |
---|
1163 | | - | necessary to carry out the purpose of this subsection. |
---|
1164 | | - | Unexpended funds appropriated under this subsection shall |
---|
1165 | | - | revert to water development account I on July 1, 2028; |
---|
1166 | | - | 99-3-2904. Level III construction projects |
---|
1167 | | - | rehabilitation. ORIGINAL HOUSE ENGROSSED |
---|
1168 | | - | BILL NO. HB0117 |
---|
1169 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
1170 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
1171 | | - | 2025 GENERAL SESSION |
---|
1172 | | - | 36(f) Project Goshen Irrigation District Tunnels 1 and |
---|
1173 | | - | 2 Rehabilitation: |
---|
1174 | | - | (iv) Total project budget: |
---|
1175 | | - | dollars ($84,000,000.00) |
---|
1176 | | - | ($104,000,000.00). The sponsor's project budget |
---|
1177 | | - | twenty-one million eight hundred ten thousand dollars |
---|
1178 | | - | ($21,810,000.00) |
---|
1179 | | - | thousand dollars ($41,810,000.00) or forty-nine percent |
---|
1180 | | - | (49%) of the total project budget, whichever is less; |
---|
1181 | | - | (v) Project grant: The state of Wyoming shall |
---|
1182 | | - | grant to the sponsor from water development account II |
---|
1183 | | - | through the commission for the construction engineering and |
---|
1184 | | - | construction of the project an amount not to exceed |
---|
1185 | | - | twenty-one million eight hundred ten thousand dollars |
---|
1186 | | - | ($21,810,000.00) |
---|
1187 | | - | thousand dollars ($41,810,000.00) or one hundred percent |
---|
1188 | | - | (100%) of these actual development costs within the |
---|
1189 | | - | sponsor's project budget, whichever is less; |
---|
1190 | | - | (vi) Appropriation: |
---|
1191 | | - | (A) 2022 Wyoming Session Laws, Chapter 74, |
---|
1192 | | - | Section 1(a)(ii), as amended, appropriated twenty-one |
---|
1193 | | - | million eight hundred ten thousand dollars ($21,810,000.00) |
---|
1194 | | - | to the commission to carry out the purpose of this |
---|
1195 | | - | subsection;. |
---|
1196 | | - | (B) There is appropriated from the |
---|
1197 | | - | legislative stabilization reserve account to water |
---|
1198 | | - | development account II which shall be further appropriated |
---|
1199 | | - | from water development account II to the commission twenty |
---|
1200 | | - | million dollars ($20,000,000.00) or as much thereof as is |
---|
1201 | | - | necessary to carry out the purpose of this subsection. ORIGINAL HOUSE ENGROSSED |
---|
1202 | | - | BILL NO. HB0117 |
---|
1203 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
1204 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
1205 | | - | 2025 GENERAL SESSION |
---|
1206 | | - | 37 |
---|
1207 | | - | Unexpended funds appropriated under this subparagraph shall |
---|
1208 | | - | revert to the legislative stabilization reserve account on |
---|
1209 | | - | July 1, 2032. |
---|
1210 | | - | (j) Project ‑ LaPrele Dam Rehabilitation: |
---|
1211 | | - | (iv) Total project budget: |
---|
1212 | | - | million dollars ($118,000,000.00) |
---|
1213 | | - | million dollars ($182,000,000.00); |
---|
1214 | | - | (v) Project grant: The state of Wyoming shall |
---|
1215 | | - | grant to the sponsor from water development account II |
---|
1216 | | - | through the commission for the design and construction of |
---|
1217 | | - | the project an amount not to exceed |
---|
1218 | | - | ($30,000,000.00) or |
---|
1219 | | - | one hundred percent (100%) of these actual development |
---|
1220 | | - | costs, whichever is less; |
---|
1221 | | - | (vi) Appropriation: |
---|
1222 | | - | (A) 2022 Wyoming Session Laws, Chapter 74, |
---|
1223 | | - | Section 1(a)(iii), as amended, appropriated thirty million |
---|
1224 | | - | dollars ($30,000,000.00) to the commission to carry out the |
---|
1225 | | - | purpose of this subsection. |
---|
1226 | | - | (B) There is appropriated from the |
---|
1227 | | - | legislative stabilization reserve account to water |
---|
1228 | | - | development account II which shall be further appropriated |
---|
1229 | | - | from water development account II to the commission sixty |
---|
1230 | | - | million dollars ($60,000,000.00) or as much thereof as is |
---|
1231 | | - | necessary to carry out the purpose of this subsection. |
---|
1232 | | - | Unexpended funds appropriated under this subparagraph shall |
---|
1233 | | - | revert to water development account III on July 1, 2032. ORIGINAL HOUSE ENGROSSED |
---|
1234 | | - | BILL NO. HB0117 |
---|
1235 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
1236 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
1237 | | - | 2025 GENERAL SESSION |
---|
1238 | | - | 38(vii) Special conditions: Available federal |
---|
1239 | | - | funds shall be expended prior to the expenditure of funds |
---|
1240 | | - | appropriated under paragraph (vi) of this subsection. |
---|
1241 | | - | Section 3. W.S. 99-3-303(b)(iv)(A) through (E) and |
---|
1242 | | - | 99-3-2903(f) are repealed. |
---|
1243 | | - | Section 4. |
---|
1244 | | - | (a) The Wyoming water development commission is |
---|
1245 | | - | hereby authorized to transfer four million two hundred |
---|
1246 | | - | thousand dollars ($4,200,000.00) from water development |
---|
1247 | | - | account I created by W.S. 41-2-124(a)(i) to water |
---|
1248 | | - | development account II created by W.S. 41-2-124(a)(ii). |
---|
1249 | | - | (b) In accordance with W.S. 41-2-115(b), upon a |
---|
1250 | | - | finding that the transfer of test wells, Belvoir No. 5 and |
---|
1251 | | - | Belvoir No. 6, developed as part of the level II |
---|
1252 | | - | feasibility study authorized under 2004 Wyoming Session |
---|
1253 | | - | Laws, Chapter 34, Section 4, to the Cheyenne Board of |
---|
1254 | | - | Public Utilities (BOPU) is desirable and in the public |
---|
1255 | | - | interest and that BOPU is capable of constructing, |
---|
1256 | | - | operating and maintaining the project and accomplishing the |
---|
1257 | | - | public interest, the water development commission shall |
---|
1258 | | - | transfer to BOPU test wells, Belvoir No. 5 and Belvoir No. |
---|
1259 | | - | 6, developed as part of a level II feasibility study for |
---|
1260 | | - | further development by BOPU, provided agrees to terms |
---|
1261 | | - | outlined by the commission for reimbursement of the expense |
---|
1262 | | - | of predevelopment costs, an amount which shall be not less |
---|
1263 | | - | than two hundred eighteen thousand dollars ($218,000.00), |
---|
1264 | | - | payment for property and assurances of construction, |
---|
1265 | | - | operation and maintenance of the test wells, Belvoir No. 5 |
---|
1266 | | - | and Belvoir No. 6 in compliance with all applicable state |
---|
1267 | | - | and federal laws. ORIGINAL HOUSE ENGROSSED |
---|
1268 | | - | BILL NO. HB0117 |
---|
1269 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
1270 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
1271 | | - | 2025 GENERAL SESSION |
---|
1272 | | - | 39Section 5. |
---|
1273 | | - | (a) The state engineer's office is authorized up to |
---|
1274 | | - | one (1) full-time position in the board of control division |
---|
1275 | | - | for the period beginning with the effective date of this |
---|
1276 | | - | act and ending June 30, 2026 for a natural resources |
---|
1277 | | - | program supervisor. It is the intent of the legislature |
---|
1278 | | - | that the state engineer's office include this full-time |
---|
1279 | | - | position in its standard budget request for the immediately |
---|
1280 | | - | succeeding fiscal biennium. |
---|
1281 | | - | (b) There is appropriated one hundred fifty-six |
---|
1282 | | - | thousand three hundred twenty dollars ($156,320.00) from |
---|
1283 | | - | the general fund to the state engineer's office for the |
---|
1284 | | - | period beginning with the effective date of this act and |
---|
1285 | | - | ending June 30, 2026 to be expended only for purposes of |
---|
1286 | | - | funding the position authorized in subsection (a) of this |
---|
1287 | | - | section. This appropriation shall not be transferred or |
---|
1288 | | - | expended for any other purpose and any unexpended, |
---|
1289 | | - | unobligated funds remaining from this appropriation shall |
---|
1290 | | - | revert as provided by law on June 30, 2026. |
---|
1291 | | - | (c) This section shall not be effective if 2025 House |
---|
1292 | | - | Bill 0001 or 2025 Senate File 0001 is enacted into law and |
---|
1293 | | - | authorizes the position authorized in subsection (a) of |
---|
1294 | | - | this section. |
---|
1295 | | - | Section 6. |
---|
1296 | | - | (a) There is appropriated one hundred forty-eight |
---|
1297 | | - | thousand dollars ($148,000.00) from the general fund to the |
---|
1298 | | - | state engineer's office for updating the technology used |
---|
1299 | | - | for the accounting system that calculates the natural flow |
---|
1300 | | - | of the North Platte River. This appropriation shall not be |
---|
1301 | | - | transferred or expended for any other purpose and any ORIGINAL HOUSE ENGROSSED |
---|
1302 | | - | BILL NO. HB0117 |
---|
1303 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
1304 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
1305 | | - | 2025 GENERAL SESSION |
---|
1306 | | - | 40 |
---|
1307 | | - | unexpended, unobligated funds remaining from this |
---|
1308 | | - | appropriation shall revert as provided by law on June 30, |
---|
1309 | | - | 2026. |
---|
1310 | | - | (b) If 2025 Senate File 0001 or 2025 House Bill 0001 |
---|
1311 | | - | is enacted into law, the appropriation in subsection (a) of |
---|
1312 | | - | this section shall be reduced by one dollar ($1.00) for |
---|
1313 | | - | every one dollar ($1.00) appropriated to the state |
---|
1314 | | - | engineer's office for updating the technology used for the |
---|
1315 | | - | accounting system that calculates the natural flow of the |
---|
1316 | | - | North Platte River in 2025 Senate File 0001 or 2025 House |
---|
1317 | | - | Bill 0001. |
---|
1318 | | - | Section 7. The office of state lands and investments |
---|
1319 | | - | shall investigate opportunities to, and subject to the |
---|
1320 | | - | approval of the board of land commissioners shall, exchange |
---|
1321 | | - | public lands for private lands around the LaPrele dam and |
---|
1322 | | - | reservoir to increase public access to, and recreational |
---|
1323 | | - | activity in, the area. ORIGINAL HOUSE ENGROSSED |
---|
1324 | | - | BILL NO. HB0117 |
---|
1325 | | - | ENROLLED ACT NO. 56, HOUSE OF REPRESENTATIVES |
---|
1326 | | - | SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING |
---|
1327 | | - | 2025 GENERAL SESSION |
---|
1328 | | - | 41Section 8. This act is effective immediately upon |
---|
1329 | | - | completion of all acts necessary for a bill to become law |
---|
1330 | | - | as provided by Article 4, Section 8 of the Wyoming |
---|
1331 | | - | Constitution. |
---|
1332 | | - | (END) |
---|
1333 | | - | Speaker of the HousePresident of the SenateGovernorTIME APPROVED: _________DATE APPROVED: _________ |
---|
1334 | | - | I hereby certify that this act originated in the House. |
---|
1335 | | - | Chief Clerk |
---|
| 1420 | + | 22 2025STATE OF WYOMING25LSO-0452 |
---|
| 1421 | + | ENGROSSED |
---|
| 1422 | + | 60HB0117 |
---|
| 1423 | + | 1 |
---|
| 1424 | + | 2 |
---|
| 1425 | + | 3 |
---|
| 1426 | + | 4 |
---|
| 1427 | + | 5 |
---|
| 1428 | + | 6 |
---|
| 1429 | + | 7 |
---|
| 1430 | + | 8 |
---|
| 1431 | + | 9 |
---|
| 1432 | + | 10 |
---|
| 1433 | + | 11 |
---|
| 1434 | + | 12 |
---|
| 1435 | + | 13 |
---|
| 1436 | + | 14 |
---|
| 1437 | + | 15 |
---|
| 1438 | + | 16 |
---|
| 1439 | + | 17 |
---|
| 1440 | + | 18 |
---|
| 1441 | + | 19 |
---|
| 1442 | + | 20 |
---|
| 1443 | + | 21 2025STATE OF WYOMING25LSO-0452 |
---|
| 1444 | + | ENGROSSED |
---|
| 1445 | + | 61HB01171 |
---|
| 1446 | + | 2 |
---|
| 1447 | + | 3 |
---|
| 1448 | + | 4 |
---|
| 1449 | + | 5 |
---|
| 1450 | + | 6 |
---|
| 1451 | + | 7 |
---|
| 1452 | + | 8 |
---|
| 1453 | + | 9 |
---|
| 1454 | + | 10 |
---|
| 1455 | + | 11 |
---|
| 1456 | + | 12 |
---|
| 1457 | + | 13 |
---|
| 1458 | + | 14 |
---|
| 1459 | + | 15W.S. 99-3-303(b)(iv)(A) through (E) and |
---|
| 1460 | + | 16 99-3-2903(f) are repealed. |
---|
| 1461 | + | 17 |
---|
| 1462 | + | 18 |
---|
| 1463 | + | 19 |
---|
| 1464 | + | 20 (a) The Wyoming water development commission is |
---|
| 1465 | + | 21 hereby authorized to transfer four million two hundred |
---|
| 1466 | + | 22 thousand dollars ($4,200,000.00) from water development 2025STATE OF WYOMING25LSO-0452 |
---|
| 1467 | + | ENGROSSED |
---|
| 1468 | + | 62HB0117 |
---|
| 1469 | + | 1 account I created by W.S. 41-2-124(a)(i) to water |
---|
| 1470 | + | 2 development account II created by W.S. 41-2-124(a)(ii). |
---|
| 1471 | + | 3 |
---|
| 1472 | + | 4 (b) The Wyoming water development commission is |
---|
| 1473 | + | 5 hereby authorized to transfer fifty million dollars |
---|
| 1474 | + | 6 ($50,000,000.00) from water development account III created |
---|
| 1475 | + | 7 by W.S. 41-2-124(a)(iii) to water development account II |
---|
| 1476 | + | 8 created by W.S. 41-2-124(a)(ii). The appropriation of funds |
---|
| 1477 | + | 9 under W.S. 99-3-2904(j)(vi)(B) is contingent upon the |
---|
| 1478 | + | 10 transfer of funds under this subsection. |
---|
| 1479 | + | 11 |
---|
| 1480 | + | 12 (c) In accordance with W.S. 41-2-115(c), upon a |
---|
| 1481 | + | 13 finding that the transfer of test wells, Belvoir No. 5 and |
---|
| 1482 | + | 14 Belvoir No. 6, developed as part of the level II |
---|
| 1483 | + | 15 feasibility study authorized under 2004 Wyoming Session |
---|
| 1484 | + | 16 Laws, Chapter 34, Section 4, to the Cheyenne Board of |
---|
| 1485 | + | 17 Public Utilities (BOPU) is desirable and in the public |
---|
| 1486 | + | 18 interest and that BOPU is capable of constructing, |
---|
| 1487 | + | 19 operating and maintaining the project and accomplishing the |
---|
| 1488 | + | 20 public interest, the water development commission shall |
---|
| 1489 | + | 21 transfer to BOPU test wells, Belvoir No. 5 and Belvoir No. |
---|
| 1490 | + | 22 6, developed as part of a level II feasibility study for |
---|
| 1491 | + | 23 further development by BOPU, provided agrees to terms 2025STATE OF WYOMING25LSO-0452 |
---|
| 1492 | + | ENGROSSED |
---|
| 1493 | + | 63HB0117 |
---|
| 1494 | + | 1 outlined by the commission for reimbursement of the expense |
---|
| 1495 | + | 2 of predevelopment costs, an amount which shall be not less |
---|
| 1496 | + | 3 than two hundred eighteen thousand dollars ($218,000.00), |
---|
| 1497 | + | 4 payment for property and assurances of construction, |
---|
| 1498 | + | 5 operation and maintenance of the test wells, Belvoir No. 5 |
---|
| 1499 | + | 6 and Belvoir No. 6 in compliance with all applicable state |
---|
| 1500 | + | 7 and federal laws. |
---|
| 1501 | + | 8 |
---|
| 1502 | + | 9. This act is effective immediately upon |
---|
| 1503 | + | 10 completion of all acts necessary for a bill to become law |
---|
| 1504 | + | 11 as provided by Article 4, Section 8 of the Wyoming |
---|
| 1505 | + | 12 Constitution. |
---|
| 1506 | + | 13 |
---|
| 1507 | + | 14 (END) |
---|