California 2017-2018 Regular Session

California Assembly Bill AB2900 Compare Versions

OldNewDifferences
1-Assembly Bill No. 2900 CHAPTER 195 An act to amend Section 116527 of the Health and Safety Code, relating to drinking water. [ Approved by Governor August 24, 2018. Filed with Secretary of State August 24, 2018. ] LEGISLATIVE COUNSEL'S DIGESTAB 2900, Committee on Environmental Safety and Toxic Materials. Proposed new public water system: preliminary technical report.Existing law, the California Safe Drinking Water Act, imposes on the State Water Resources Control Board various responsibilities and duties relating to providing a dependable, safe supply of drinking water. The act prohibits a person from operating a public water system unless he or she first submits an application to the state board and receives a permit, as specified. The act requires a proposed new public water system to first submit a preliminary technical report to the state board at least 6 months before initiating construction of any water-related improvement that includes, among other things, the name of each public water system for which any service area boundary is within 3 miles of the proposed new public water systems service area and discussions of the feasibility of each of the adjacent public water systems supplying domestic water to the proposed new public water systems service area. The act makes it a misdemeanor for a person to knowingly make a false statement or representation in a report submitted, maintained, or used for purposes of compliance with the act. This bill would authorize the state board to approve the preliminary technical report and allow construction to proceed before the end of the 6-month period. The bill would require the preliminary technical report additionally to include the type of each public water system with a service boundary within 3 miles and would instead require discussions of each adjacent community water systems feasibility of supplying domestic water to the proposed new service area. Because a false statement in the report could be a crime under the provision described above, this bill would impose a state-mandated local program by expanding the scope of a crime. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 116527 of the Health and Safety Code is amended to read:116527. (a) As used in this section, water-related improvement includes, but is not limited to, a water pipe, a water pump, or drinking water infrastructure.(b) (1) Before a person submits an application for a permit for a proposed new public water system, the person shall first submit a preliminary technical report to the state board at least six months before initiating construction of any water-related improvement.(2) In order to assist in expediting the permitting process, a person that is considering submitting an application for a permit for a proposed new public water system is encouraged, but is not required, to submit the preliminary technical report no later than seven days after submission of an application to the city or county for a building permit for any water-related improvement.(3) For a proposed new public water system that would be regulated by a local primacy agency, the applicant shall also submit a copy of the preliminary technical report to the state board.(4) The state board may approve the preliminary technical report and allow construction to proceed before the end of the six-month period. For a proposed new public water system that would be regulated by a local primacy agency, the state board and local primacy agency may approve the preliminary technical report and allow construction to proceed before the end of the six-month period.(c) The preliminary technical report shall include all of the following:(1) The name and type of each public water system for which any service area boundary is within three miles, as measured through existing public rights-of-way, of any boundary of the applicants proposed public water systems service area.(2) A discussion of the feasibility of each of the adjacent community water systems identified pursuant to paragraph (1) annexing, connecting, or otherwise supplying domestic water to the applicants proposed new public water systems service area. The applicant shall consult with each adjacent community water system in preparing the report and shall include in the report any information provided by each adjacent community water system regarding the feasibility of annexing, connecting, or otherwise supplying domestic water to that service area.(3) A discussion of all actions taken by the applicant to secure a supply of domestic water from an existing community water system for the proposed new public water systems service area.(4) All sources of domestic water supply for the proposed new public water system.(5) The estimated cost to construct, operate, and maintain the proposed new public water system, including long-term operation and maintenance costs and a potential rate structure.(6) A comparison of the costs associated with the construction, operation and maintenance, and long-term sustainability of the proposed new public water system to the costs associated with providing water to the proposed new public water systems service area through annexation by, consolidation with, or connection to an existing community water system.(7) A discussion of all actions taken by the applicant to pursue a contract for managerial or operational oversight from an existing community water system.(8) An analysis of whether a proposed new public water systems total projected water supplies available during normal, single dry, or multiple dry water years during a 20-year projection will meet the projected water demand for the service area.(9) Any information provided by the local agency formation commission. The applicant shall consult with the local agency formation commission if any adjacent public water system identified pursuant to paragraph (1) is a local agency as defined by Section 56054 of the Government Code.(d) (1) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include the information required by subdivision (c), including documentation of the consultation with each adjacent community water system and the local agency formation commission, the applicant may submit those documents to the state board in lieu of the preliminary technical report and the documents shall be considered the functional equivalent of the preliminary technical report.(2) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include some, but not all, of the information required by subdivision (c), including documentation of the consultation with an adjacent community water system and the local agency formation commission, the applicant shall submit those documents and the preliminary technical report to the state board and together those documents and the preliminary technical report shall be considered the functional equivalent of the preliminary technical report requirements of this section. A preliminary technical report submitted pursuant to this paragraph shall only be required to include information that is not otherwise addressed by the other submitted documents.(e) Upon review of a preliminary technical report submitted pursuant to this section, the state board may do all of the following actions:(1) If an existing public water system has not already sought annexation of the service area of a proposed new public water system from the local agency formation commission or the applicant has not already sought an extension of services agreement from an existing public water system, direct the applicant to undertake additional discussion and negotiation with the local agency formation commission and any existing public water system meeting the requirements of paragraph (1) of subdivision (c) that the state board determines has the technical, managerial, and financial capacity to provide an adequate and reliable supply of domestic water to the service area of the proposed new public water system. The state board shall not direct the applicant to undertake additional discussion and negotiation if documentation submitted to the state board demonstrates that additional discussion and negotiation is unlikely to be successful, including, but not limited to, documentation that the local agency formation commission has previously denied the application for an extension of service or annexation, or that the existing public water system has declined to apply to the local agency formation commission for approval of an extension of services to, or annexation of, the service area of the proposed new public water system.(2) Direct the applicant to report on the results of discussion and negotiations conducted pursuant to paragraph (1) to the state board.(3) Establish a time schedule for the applicants performance of directives issued pursuant to this subdivision.(f) (1) An applicant shall comply with the state boards directives as assigned in and consistent with subdivision (e) before submitting an application for a permit for a proposed new public water system under this chapter.(2) An application for a permit for a proposed new public water system under this chapter shall not be deemed complete unless the applicant has complied with the requirements of this section.(g) The state boards review of a preliminary technical report pursuant to this section shall not be deemed a project or approval of a permit application submitted under this chapter.(h) The requirements of this section do not apply to either of the following:(1) An application for a permit for a new public water system that was deemed complete prior to January 1, 2017, pursuant to the statutory permit application requirements effective at the date of the permit submission.(2) An extension of, or annexation to, an existing public water system.(i) (1) The requirements of this section do not apply to a service area where an applicant certifies in writing to the state board that the applicant will not rely on the establishment of a new public water system for its water supply. The state board shall acknowledge receipt of the applicants certification in a timely manner.(2) An applicant who certifies that the service area will not rely on the establishment of a new public water system and later seeks a permit for a new public water system shall comply with the provisions of this section and shall assume all risk of delay or rejection related to the permit application.(j) (1) The provisions of this subdivision apply to a proposed new public water system that achieves either or both of the following:(A) Consolidates two or more existing public water systems, existing state small water systems, or other existing water systems, which results in the creation of a new public water system.(B) Provides water service in lieu of individual domestic wells.(2) At least six months before the construction of any water-related improvements, an applicant for a new public water system that meets the criteria in paragraph (1) shall provide a written notice to the state board that does both of the following:(A) Clearly describes the proposed new public water system and how it meets the criteria in paragraph (1).(B) Requests an exemption from the requirements of this section.(3) The state board shall promptly acknowledge receipt of a written notice described in paragraph (2). The state board shall have 30 days from the acknowledgment of receipt of the written notice to issue a written notice to the applicant that compliance with the requirements of this section is necessary and that an application for a permit of a new public water system under this chapter is not complete until the applicant has complied with the requirements of this section. A determination by the state board that compliance with the requirements of this section is necessary shall be final and is not subject to review by the state board. A determination by the state board pursuant to this subdivision is not considered a project subject to Division 13 (commencing with Section 21000) of the Public Resources Code.(4) If the state board receives a written notice from a project applicant that satisfies the requirements of paragraph (2), the project described in the notice is deemed exempt from the requirements of this section on the 35th day following the date of the state boards acknowledgment of receipt of the written notice, unless the state board has issued a notice to comply pursuant to paragraph (3).SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
1+Enrolled August 08, 2018 Passed IN Senate August 06, 2018 Passed IN Assembly April 12, 2018 CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION Assembly Bill No. 2900Introduced by Committee on Environmental Safety and Toxic Materials (Assembly Members Quirk (Chair), Chen (Vice Chair), Arambula, Brough, Holden, and Muratsuchi)February 16, 2018 An act to amend Section 116527 of the Health and Safety Code, relating to drinking water. LEGISLATIVE COUNSEL'S DIGESTAB 2900, Committee on Environmental Safety and Toxic Materials. Proposed new public water system: preliminary technical report.Existing law, the California Safe Drinking Water Act, imposes on the State Water Resources Control Board various responsibilities and duties relating to providing a dependable, safe supply of drinking water. The act prohibits a person from operating a public water system unless he or she first submits an application to the state board and receives a permit, as specified. The act requires a proposed new public water system to first submit a preliminary technical report to the state board at least 6 months before initiating construction of any water-related improvement that includes, among other things, the name of each public water system for which any service area boundary is within 3 miles of the proposed new public water systems service area and discussions of the feasibility of each of the adjacent public water systems supplying domestic water to the proposed new public water systems service area. The act makes it a misdemeanor for a person to knowingly make a false statement or representation in a report submitted, maintained, or used for purposes of compliance with the act. This bill would authorize the state board to approve the preliminary technical report and allow construction to proceed before the end of the 6-month period. The bill would require the preliminary technical report additionally to include the type of each public water system with a service boundary within 3 miles and would instead require discussions of each adjacent community water systems feasibility of supplying domestic water to the proposed new service area. Because a false statement in the report could be a crime under the provision described above, this bill would impose a state-mandated local program by expanding the scope of a crime. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 116527 of the Health and Safety Code is amended to read:116527. (a) As used in this section, water-related improvement includes, but is not limited to, a water pipe, a water pump, or drinking water infrastructure.(b) (1) Before a person submits an application for a permit for a proposed new public water system, the person shall first submit a preliminary technical report to the state board at least six months before initiating construction of any water-related improvement.(2) In order to assist in expediting the permitting process, a person that is considering submitting an application for a permit for a proposed new public water system is encouraged, but is not required, to submit the preliminary technical report no later than seven days after submission of an application to the city or county for a building permit for any water-related improvement.(3) For a proposed new public water system that would be regulated by a local primacy agency, the applicant shall also submit a copy of the preliminary technical report to the state board.(4) The state board may approve the preliminary technical report and allow construction to proceed before the end of the six-month period. For a proposed new public water system that would be regulated by a local primacy agency, the state board and local primacy agency may approve the preliminary technical report and allow construction to proceed before the end of the six-month period.(c) The preliminary technical report shall include all of the following:(1) The name and type of each public water system for which any service area boundary is within three miles, as measured through existing public rights-of-way, of any boundary of the applicants proposed public water systems service area.(2) A discussion of the feasibility of each of the adjacent community water systems identified pursuant to paragraph (1) annexing, connecting, or otherwise supplying domestic water to the applicants proposed new public water systems service area. The applicant shall consult with each adjacent community water system in preparing the report and shall include in the report any information provided by each adjacent community water system regarding the feasibility of annexing, connecting, or otherwise supplying domestic water to that service area.(3) A discussion of all actions taken by the applicant to secure a supply of domestic water from an existing community water system for the proposed new public water systems service area.(4) All sources of domestic water supply for the proposed new public water system.(5) The estimated cost to construct, operate, and maintain the proposed new public water system, including long-term operation and maintenance costs and a potential rate structure.(6) A comparison of the costs associated with the construction, operation and maintenance, and long-term sustainability of the proposed new public water system to the costs associated with providing water to the proposed new public water systems service area through annexation by, consolidation with, or connection to an existing community water system.(7) A discussion of all actions taken by the applicant to pursue a contract for managerial or operational oversight from an existing community water system.(8) An analysis of whether a proposed new public water systems total projected water supplies available during normal, single dry, or multiple dry water years during a 20-year projection will meet the projected water demand for the service area.(9) Any information provided by the local agency formation commission. The applicant shall consult with the local agency formation commission if any adjacent public water system identified pursuant to paragraph (1) is a local agency as defined by Section 56054 of the Government Code.(d) (1) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include the information required by subdivision (c), including documentation of the consultation with each adjacent community water system and the local agency formation commission, the applicant may submit those documents to the state board in lieu of the preliminary technical report and the documents shall be considered the functional equivalent of the preliminary technical report.(2) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include some, but not all, of the information required by subdivision (c), including documentation of the consultation with an adjacent community water system and the local agency formation commission, the applicant shall submit those documents and the preliminary technical report to the state board and together those documents and the preliminary technical report shall be considered the functional equivalent of the preliminary technical report requirements of this section. A preliminary technical report submitted pursuant to this paragraph shall only be required to include information that is not otherwise addressed by the other submitted documents.(e) Upon review of a preliminary technical report submitted pursuant to this section, the state board may do all of the following actions:(1) If an existing public water system has not already sought annexation of the service area of a proposed new public water system from the local agency formation commission or the applicant has not already sought an extension of services agreement from an existing public water system, direct the applicant to undertake additional discussion and negotiation with the local agency formation commission and any existing public water system meeting the requirements of paragraph (1) of subdivision (c) that the state board determines has the technical, managerial, and financial capacity to provide an adequate and reliable supply of domestic water to the service area of the proposed new public water system. The state board shall not direct the applicant to undertake additional discussion and negotiation if documentation submitted to the state board demonstrates that additional discussion and negotiation is unlikely to be successful, including, but not limited to, documentation that the local agency formation commission has previously denied the application for an extension of service or annexation, or that the existing public water system has declined to apply to the local agency formation commission for approval of an extension of services to, or annexation of, the service area of the proposed new public water system.(2) Direct the applicant to report on the results of discussion and negotiations conducted pursuant to paragraph (1) to the state board.(3) Establish a time schedule for the applicants performance of directives issued pursuant to this subdivision.(f) (1) An applicant shall comply with the state boards directives as assigned in and consistent with subdivision (e) before submitting an application for a permit for a proposed new public water system under this chapter.(2) An application for a permit for a proposed new public water system under this chapter shall not be deemed complete unless the applicant has complied with the requirements of this section.(g) The state boards review of a preliminary technical report pursuant to this section shall not be deemed a project or approval of a permit application submitted under this chapter.(h) The requirements of this section do not apply to either of the following:(1) An application for a permit for a new public water system that was deemed complete prior to January 1, 2017, pursuant to the statutory permit application requirements effective at the date of the permit submission.(2) An extension of, or annexation to, an existing public water system.(i) (1) The requirements of this section do not apply to a service area where an applicant certifies in writing to the state board that the applicant will not rely on the establishment of a new public water system for its water supply. The state board shall acknowledge receipt of the applicants certification in a timely manner.(2) An applicant who certifies that the service area will not rely on the establishment of a new public water system and later seeks a permit for a new public water system shall comply with the provisions of this section and shall assume all risk of delay or rejection related to the permit application.(j) (1) The provisions of this subdivision apply to a proposed new public water system that achieves either or both of the following:(A) Consolidates two or more existing public water systems, existing state small water systems, or other existing water systems, which results in the creation of a new public water system.(B) Provides water service in lieu of individual domestic wells.(2) At least six months before the construction of any water-related improvements, an applicant for a new public water system that meets the criteria in paragraph (1) shall provide a written notice to the state board that does both of the following:(A) Clearly describes the proposed new public water system and how it meets the criteria in paragraph (1).(B) Requests an exemption from the requirements of this section.(3) The state board shall promptly acknowledge receipt of a written notice described in paragraph (2). The state board shall have 30 days from the acknowledgment of receipt of the written notice to issue a written notice to the applicant that compliance with the requirements of this section is necessary and that an application for a permit of a new public water system under this chapter is not complete until the applicant has complied with the requirements of this section. A determination by the state board that compliance with the requirements of this section is necessary shall be final and is not subject to review by the state board. A determination by the state board pursuant to this subdivision is not considered a project subject to Division 13 (commencing with Section 21000) of the Public Resources Code.(4) If the state board receives a written notice from a project applicant that satisfies the requirements of paragraph (2), the project described in the notice is deemed exempt from the requirements of this section on the 35th day following the date of the state boards acknowledgment of receipt of the written notice, unless the state board has issued a notice to comply pursuant to paragraph (3).SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
22
3- Assembly Bill No. 2900 CHAPTER 195 An act to amend Section 116527 of the Health and Safety Code, relating to drinking water. [ Approved by Governor August 24, 2018. Filed with Secretary of State August 24, 2018. ] LEGISLATIVE COUNSEL'S DIGESTAB 2900, Committee on Environmental Safety and Toxic Materials. Proposed new public water system: preliminary technical report.Existing law, the California Safe Drinking Water Act, imposes on the State Water Resources Control Board various responsibilities and duties relating to providing a dependable, safe supply of drinking water. The act prohibits a person from operating a public water system unless he or she first submits an application to the state board and receives a permit, as specified. The act requires a proposed new public water system to first submit a preliminary technical report to the state board at least 6 months before initiating construction of any water-related improvement that includes, among other things, the name of each public water system for which any service area boundary is within 3 miles of the proposed new public water systems service area and discussions of the feasibility of each of the adjacent public water systems supplying domestic water to the proposed new public water systems service area. The act makes it a misdemeanor for a person to knowingly make a false statement or representation in a report submitted, maintained, or used for purposes of compliance with the act. This bill would authorize the state board to approve the preliminary technical report and allow construction to proceed before the end of the 6-month period. The bill would require the preliminary technical report additionally to include the type of each public water system with a service boundary within 3 miles and would instead require discussions of each adjacent community water systems feasibility of supplying domestic water to the proposed new service area. Because a false statement in the report could be a crime under the provision described above, this bill would impose a state-mandated local program by expanding the scope of a crime. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES
3+ Enrolled August 08, 2018 Passed IN Senate August 06, 2018 Passed IN Assembly April 12, 2018 CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION Assembly Bill No. 2900Introduced by Committee on Environmental Safety and Toxic Materials (Assembly Members Quirk (Chair), Chen (Vice Chair), Arambula, Brough, Holden, and Muratsuchi)February 16, 2018 An act to amend Section 116527 of the Health and Safety Code, relating to drinking water. LEGISLATIVE COUNSEL'S DIGESTAB 2900, Committee on Environmental Safety and Toxic Materials. Proposed new public water system: preliminary technical report.Existing law, the California Safe Drinking Water Act, imposes on the State Water Resources Control Board various responsibilities and duties relating to providing a dependable, safe supply of drinking water. The act prohibits a person from operating a public water system unless he or she first submits an application to the state board and receives a permit, as specified. The act requires a proposed new public water system to first submit a preliminary technical report to the state board at least 6 months before initiating construction of any water-related improvement that includes, among other things, the name of each public water system for which any service area boundary is within 3 miles of the proposed new public water systems service area and discussions of the feasibility of each of the adjacent public water systems supplying domestic water to the proposed new public water systems service area. The act makes it a misdemeanor for a person to knowingly make a false statement or representation in a report submitted, maintained, or used for purposes of compliance with the act. This bill would authorize the state board to approve the preliminary technical report and allow construction to proceed before the end of the 6-month period. The bill would require the preliminary technical report additionally to include the type of each public water system with a service boundary within 3 miles and would instead require discussions of each adjacent community water systems feasibility of supplying domestic water to the proposed new service area. Because a false statement in the report could be a crime under the provision described above, this bill would impose a state-mandated local program by expanding the scope of a crime. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES
4+
5+ Enrolled August 08, 2018 Passed IN Senate August 06, 2018 Passed IN Assembly April 12, 2018
6+
7+Enrolled August 08, 2018
8+Passed IN Senate August 06, 2018
9+Passed IN Assembly April 12, 2018
10+
11+ CALIFORNIA LEGISLATURE 20172018 REGULAR SESSION
412
513 Assembly Bill No. 2900
6-CHAPTER 195
14+
15+Introduced by Committee on Environmental Safety and Toxic Materials (Assembly Members Quirk (Chair), Chen (Vice Chair), Arambula, Brough, Holden, and Muratsuchi)February 16, 2018
16+
17+Introduced by Committee on Environmental Safety and Toxic Materials (Assembly Members Quirk (Chair), Chen (Vice Chair), Arambula, Brough, Holden, and Muratsuchi)
18+February 16, 2018
719
820 An act to amend Section 116527 of the Health and Safety Code, relating to drinking water.
9-
10- [ Approved by Governor August 24, 2018. Filed with Secretary of State August 24, 2018. ]
1121
1222 LEGISLATIVE COUNSEL'S DIGEST
1323
1424 ## LEGISLATIVE COUNSEL'S DIGEST
1525
1626 AB 2900, Committee on Environmental Safety and Toxic Materials. Proposed new public water system: preliminary technical report.
1727
1828 Existing law, the California Safe Drinking Water Act, imposes on the State Water Resources Control Board various responsibilities and duties relating to providing a dependable, safe supply of drinking water. The act prohibits a person from operating a public water system unless he or she first submits an application to the state board and receives a permit, as specified. The act requires a proposed new public water system to first submit a preliminary technical report to the state board at least 6 months before initiating construction of any water-related improvement that includes, among other things, the name of each public water system for which any service area boundary is within 3 miles of the proposed new public water systems service area and discussions of the feasibility of each of the adjacent public water systems supplying domestic water to the proposed new public water systems service area. The act makes it a misdemeanor for a person to knowingly make a false statement or representation in a report submitted, maintained, or used for purposes of compliance with the act. This bill would authorize the state board to approve the preliminary technical report and allow construction to proceed before the end of the 6-month period. The bill would require the preliminary technical report additionally to include the type of each public water system with a service boundary within 3 miles and would instead require discussions of each adjacent community water systems feasibility of supplying domestic water to the proposed new service area. Because a false statement in the report could be a crime under the provision described above, this bill would impose a state-mandated local program by expanding the scope of a crime. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.
1929
2030 Existing law, the California Safe Drinking Water Act, imposes on the State Water Resources Control Board various responsibilities and duties relating to providing a dependable, safe supply of drinking water. The act prohibits a person from operating a public water system unless he or she first submits an application to the state board and receives a permit, as specified. The act requires a proposed new public water system to first submit a preliminary technical report to the state board at least 6 months before initiating construction of any water-related improvement that includes, among other things, the name of each public water system for which any service area boundary is within 3 miles of the proposed new public water systems service area and discussions of the feasibility of each of the adjacent public water systems supplying domestic water to the proposed new public water systems service area. The act makes it a misdemeanor for a person to knowingly make a false statement or representation in a report submitted, maintained, or used for purposes of compliance with the act.
2131
2232 This bill would authorize the state board to approve the preliminary technical report and allow construction to proceed before the end of the 6-month period. The bill would require the preliminary technical report additionally to include the type of each public water system with a service boundary within 3 miles and would instead require discussions of each adjacent community water systems feasibility of supplying domestic water to the proposed new service area. Because a false statement in the report could be a crime under the provision described above, this bill would impose a state-mandated local program by expanding the scope of a crime.
2333
2434 The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
2535
2636 This bill would provide that no reimbursement is required by this act for a specified reason.
2737
2838 ## Digest Key
2939
3040 ## Bill Text
3141
3242 The people of the State of California do enact as follows:SECTION 1. Section 116527 of the Health and Safety Code is amended to read:116527. (a) As used in this section, water-related improvement includes, but is not limited to, a water pipe, a water pump, or drinking water infrastructure.(b) (1) Before a person submits an application for a permit for a proposed new public water system, the person shall first submit a preliminary technical report to the state board at least six months before initiating construction of any water-related improvement.(2) In order to assist in expediting the permitting process, a person that is considering submitting an application for a permit for a proposed new public water system is encouraged, but is not required, to submit the preliminary technical report no later than seven days after submission of an application to the city or county for a building permit for any water-related improvement.(3) For a proposed new public water system that would be regulated by a local primacy agency, the applicant shall also submit a copy of the preliminary technical report to the state board.(4) The state board may approve the preliminary technical report and allow construction to proceed before the end of the six-month period. For a proposed new public water system that would be regulated by a local primacy agency, the state board and local primacy agency may approve the preliminary technical report and allow construction to proceed before the end of the six-month period.(c) The preliminary technical report shall include all of the following:(1) The name and type of each public water system for which any service area boundary is within three miles, as measured through existing public rights-of-way, of any boundary of the applicants proposed public water systems service area.(2) A discussion of the feasibility of each of the adjacent community water systems identified pursuant to paragraph (1) annexing, connecting, or otherwise supplying domestic water to the applicants proposed new public water systems service area. The applicant shall consult with each adjacent community water system in preparing the report and shall include in the report any information provided by each adjacent community water system regarding the feasibility of annexing, connecting, or otherwise supplying domestic water to that service area.(3) A discussion of all actions taken by the applicant to secure a supply of domestic water from an existing community water system for the proposed new public water systems service area.(4) All sources of domestic water supply for the proposed new public water system.(5) The estimated cost to construct, operate, and maintain the proposed new public water system, including long-term operation and maintenance costs and a potential rate structure.(6) A comparison of the costs associated with the construction, operation and maintenance, and long-term sustainability of the proposed new public water system to the costs associated with providing water to the proposed new public water systems service area through annexation by, consolidation with, or connection to an existing community water system.(7) A discussion of all actions taken by the applicant to pursue a contract for managerial or operational oversight from an existing community water system.(8) An analysis of whether a proposed new public water systems total projected water supplies available during normal, single dry, or multiple dry water years during a 20-year projection will meet the projected water demand for the service area.(9) Any information provided by the local agency formation commission. The applicant shall consult with the local agency formation commission if any adjacent public water system identified pursuant to paragraph (1) is a local agency as defined by Section 56054 of the Government Code.(d) (1) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include the information required by subdivision (c), including documentation of the consultation with each adjacent community water system and the local agency formation commission, the applicant may submit those documents to the state board in lieu of the preliminary technical report and the documents shall be considered the functional equivalent of the preliminary technical report.(2) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include some, but not all, of the information required by subdivision (c), including documentation of the consultation with an adjacent community water system and the local agency formation commission, the applicant shall submit those documents and the preliminary technical report to the state board and together those documents and the preliminary technical report shall be considered the functional equivalent of the preliminary technical report requirements of this section. A preliminary technical report submitted pursuant to this paragraph shall only be required to include information that is not otherwise addressed by the other submitted documents.(e) Upon review of a preliminary technical report submitted pursuant to this section, the state board may do all of the following actions:(1) If an existing public water system has not already sought annexation of the service area of a proposed new public water system from the local agency formation commission or the applicant has not already sought an extension of services agreement from an existing public water system, direct the applicant to undertake additional discussion and negotiation with the local agency formation commission and any existing public water system meeting the requirements of paragraph (1) of subdivision (c) that the state board determines has the technical, managerial, and financial capacity to provide an adequate and reliable supply of domestic water to the service area of the proposed new public water system. The state board shall not direct the applicant to undertake additional discussion and negotiation if documentation submitted to the state board demonstrates that additional discussion and negotiation is unlikely to be successful, including, but not limited to, documentation that the local agency formation commission has previously denied the application for an extension of service or annexation, or that the existing public water system has declined to apply to the local agency formation commission for approval of an extension of services to, or annexation of, the service area of the proposed new public water system.(2) Direct the applicant to report on the results of discussion and negotiations conducted pursuant to paragraph (1) to the state board.(3) Establish a time schedule for the applicants performance of directives issued pursuant to this subdivision.(f) (1) An applicant shall comply with the state boards directives as assigned in and consistent with subdivision (e) before submitting an application for a permit for a proposed new public water system under this chapter.(2) An application for a permit for a proposed new public water system under this chapter shall not be deemed complete unless the applicant has complied with the requirements of this section.(g) The state boards review of a preliminary technical report pursuant to this section shall not be deemed a project or approval of a permit application submitted under this chapter.(h) The requirements of this section do not apply to either of the following:(1) An application for a permit for a new public water system that was deemed complete prior to January 1, 2017, pursuant to the statutory permit application requirements effective at the date of the permit submission.(2) An extension of, or annexation to, an existing public water system.(i) (1) The requirements of this section do not apply to a service area where an applicant certifies in writing to the state board that the applicant will not rely on the establishment of a new public water system for its water supply. The state board shall acknowledge receipt of the applicants certification in a timely manner.(2) An applicant who certifies that the service area will not rely on the establishment of a new public water system and later seeks a permit for a new public water system shall comply with the provisions of this section and shall assume all risk of delay or rejection related to the permit application.(j) (1) The provisions of this subdivision apply to a proposed new public water system that achieves either or both of the following:(A) Consolidates two or more existing public water systems, existing state small water systems, or other existing water systems, which results in the creation of a new public water system.(B) Provides water service in lieu of individual domestic wells.(2) At least six months before the construction of any water-related improvements, an applicant for a new public water system that meets the criteria in paragraph (1) shall provide a written notice to the state board that does both of the following:(A) Clearly describes the proposed new public water system and how it meets the criteria in paragraph (1).(B) Requests an exemption from the requirements of this section.(3) The state board shall promptly acknowledge receipt of a written notice described in paragraph (2). The state board shall have 30 days from the acknowledgment of receipt of the written notice to issue a written notice to the applicant that compliance with the requirements of this section is necessary and that an application for a permit of a new public water system under this chapter is not complete until the applicant has complied with the requirements of this section. A determination by the state board that compliance with the requirements of this section is necessary shall be final and is not subject to review by the state board. A determination by the state board pursuant to this subdivision is not considered a project subject to Division 13 (commencing with Section 21000) of the Public Resources Code.(4) If the state board receives a written notice from a project applicant that satisfies the requirements of paragraph (2), the project described in the notice is deemed exempt from the requirements of this section on the 35th day following the date of the state boards acknowledgment of receipt of the written notice, unless the state board has issued a notice to comply pursuant to paragraph (3).SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
3343
3444 The people of the State of California do enact as follows:
3545
3646 ## The people of the State of California do enact as follows:
3747
3848 SECTION 1. Section 116527 of the Health and Safety Code is amended to read:116527. (a) As used in this section, water-related improvement includes, but is not limited to, a water pipe, a water pump, or drinking water infrastructure.(b) (1) Before a person submits an application for a permit for a proposed new public water system, the person shall first submit a preliminary technical report to the state board at least six months before initiating construction of any water-related improvement.(2) In order to assist in expediting the permitting process, a person that is considering submitting an application for a permit for a proposed new public water system is encouraged, but is not required, to submit the preliminary technical report no later than seven days after submission of an application to the city or county for a building permit for any water-related improvement.(3) For a proposed new public water system that would be regulated by a local primacy agency, the applicant shall also submit a copy of the preliminary technical report to the state board.(4) The state board may approve the preliminary technical report and allow construction to proceed before the end of the six-month period. For a proposed new public water system that would be regulated by a local primacy agency, the state board and local primacy agency may approve the preliminary technical report and allow construction to proceed before the end of the six-month period.(c) The preliminary technical report shall include all of the following:(1) The name and type of each public water system for which any service area boundary is within three miles, as measured through existing public rights-of-way, of any boundary of the applicants proposed public water systems service area.(2) A discussion of the feasibility of each of the adjacent community water systems identified pursuant to paragraph (1) annexing, connecting, or otherwise supplying domestic water to the applicants proposed new public water systems service area. The applicant shall consult with each adjacent community water system in preparing the report and shall include in the report any information provided by each adjacent community water system regarding the feasibility of annexing, connecting, or otherwise supplying domestic water to that service area.(3) A discussion of all actions taken by the applicant to secure a supply of domestic water from an existing community water system for the proposed new public water systems service area.(4) All sources of domestic water supply for the proposed new public water system.(5) The estimated cost to construct, operate, and maintain the proposed new public water system, including long-term operation and maintenance costs and a potential rate structure.(6) A comparison of the costs associated with the construction, operation and maintenance, and long-term sustainability of the proposed new public water system to the costs associated with providing water to the proposed new public water systems service area through annexation by, consolidation with, or connection to an existing community water system.(7) A discussion of all actions taken by the applicant to pursue a contract for managerial or operational oversight from an existing community water system.(8) An analysis of whether a proposed new public water systems total projected water supplies available during normal, single dry, or multiple dry water years during a 20-year projection will meet the projected water demand for the service area.(9) Any information provided by the local agency formation commission. The applicant shall consult with the local agency formation commission if any adjacent public water system identified pursuant to paragraph (1) is a local agency as defined by Section 56054 of the Government Code.(d) (1) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include the information required by subdivision (c), including documentation of the consultation with each adjacent community water system and the local agency formation commission, the applicant may submit those documents to the state board in lieu of the preliminary technical report and the documents shall be considered the functional equivalent of the preliminary technical report.(2) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include some, but not all, of the information required by subdivision (c), including documentation of the consultation with an adjacent community water system and the local agency formation commission, the applicant shall submit those documents and the preliminary technical report to the state board and together those documents and the preliminary technical report shall be considered the functional equivalent of the preliminary technical report requirements of this section. A preliminary technical report submitted pursuant to this paragraph shall only be required to include information that is not otherwise addressed by the other submitted documents.(e) Upon review of a preliminary technical report submitted pursuant to this section, the state board may do all of the following actions:(1) If an existing public water system has not already sought annexation of the service area of a proposed new public water system from the local agency formation commission or the applicant has not already sought an extension of services agreement from an existing public water system, direct the applicant to undertake additional discussion and negotiation with the local agency formation commission and any existing public water system meeting the requirements of paragraph (1) of subdivision (c) that the state board determines has the technical, managerial, and financial capacity to provide an adequate and reliable supply of domestic water to the service area of the proposed new public water system. The state board shall not direct the applicant to undertake additional discussion and negotiation if documentation submitted to the state board demonstrates that additional discussion and negotiation is unlikely to be successful, including, but not limited to, documentation that the local agency formation commission has previously denied the application for an extension of service or annexation, or that the existing public water system has declined to apply to the local agency formation commission for approval of an extension of services to, or annexation of, the service area of the proposed new public water system.(2) Direct the applicant to report on the results of discussion and negotiations conducted pursuant to paragraph (1) to the state board.(3) Establish a time schedule for the applicants performance of directives issued pursuant to this subdivision.(f) (1) An applicant shall comply with the state boards directives as assigned in and consistent with subdivision (e) before submitting an application for a permit for a proposed new public water system under this chapter.(2) An application for a permit for a proposed new public water system under this chapter shall not be deemed complete unless the applicant has complied with the requirements of this section.(g) The state boards review of a preliminary technical report pursuant to this section shall not be deemed a project or approval of a permit application submitted under this chapter.(h) The requirements of this section do not apply to either of the following:(1) An application for a permit for a new public water system that was deemed complete prior to January 1, 2017, pursuant to the statutory permit application requirements effective at the date of the permit submission.(2) An extension of, or annexation to, an existing public water system.(i) (1) The requirements of this section do not apply to a service area where an applicant certifies in writing to the state board that the applicant will not rely on the establishment of a new public water system for its water supply. The state board shall acknowledge receipt of the applicants certification in a timely manner.(2) An applicant who certifies that the service area will not rely on the establishment of a new public water system and later seeks a permit for a new public water system shall comply with the provisions of this section and shall assume all risk of delay or rejection related to the permit application.(j) (1) The provisions of this subdivision apply to a proposed new public water system that achieves either or both of the following:(A) Consolidates two or more existing public water systems, existing state small water systems, or other existing water systems, which results in the creation of a new public water system.(B) Provides water service in lieu of individual domestic wells.(2) At least six months before the construction of any water-related improvements, an applicant for a new public water system that meets the criteria in paragraph (1) shall provide a written notice to the state board that does both of the following:(A) Clearly describes the proposed new public water system and how it meets the criteria in paragraph (1).(B) Requests an exemption from the requirements of this section.(3) The state board shall promptly acknowledge receipt of a written notice described in paragraph (2). The state board shall have 30 days from the acknowledgment of receipt of the written notice to issue a written notice to the applicant that compliance with the requirements of this section is necessary and that an application for a permit of a new public water system under this chapter is not complete until the applicant has complied with the requirements of this section. A determination by the state board that compliance with the requirements of this section is necessary shall be final and is not subject to review by the state board. A determination by the state board pursuant to this subdivision is not considered a project subject to Division 13 (commencing with Section 21000) of the Public Resources Code.(4) If the state board receives a written notice from a project applicant that satisfies the requirements of paragraph (2), the project described in the notice is deemed exempt from the requirements of this section on the 35th day following the date of the state boards acknowledgment of receipt of the written notice, unless the state board has issued a notice to comply pursuant to paragraph (3).
3949
4050 SECTION 1. Section 116527 of the Health and Safety Code is amended to read:
4151
4252 ### SECTION 1.
4353
4454 116527. (a) As used in this section, water-related improvement includes, but is not limited to, a water pipe, a water pump, or drinking water infrastructure.(b) (1) Before a person submits an application for a permit for a proposed new public water system, the person shall first submit a preliminary technical report to the state board at least six months before initiating construction of any water-related improvement.(2) In order to assist in expediting the permitting process, a person that is considering submitting an application for a permit for a proposed new public water system is encouraged, but is not required, to submit the preliminary technical report no later than seven days after submission of an application to the city or county for a building permit for any water-related improvement.(3) For a proposed new public water system that would be regulated by a local primacy agency, the applicant shall also submit a copy of the preliminary technical report to the state board.(4) The state board may approve the preliminary technical report and allow construction to proceed before the end of the six-month period. For a proposed new public water system that would be regulated by a local primacy agency, the state board and local primacy agency may approve the preliminary technical report and allow construction to proceed before the end of the six-month period.(c) The preliminary technical report shall include all of the following:(1) The name and type of each public water system for which any service area boundary is within three miles, as measured through existing public rights-of-way, of any boundary of the applicants proposed public water systems service area.(2) A discussion of the feasibility of each of the adjacent community water systems identified pursuant to paragraph (1) annexing, connecting, or otherwise supplying domestic water to the applicants proposed new public water systems service area. The applicant shall consult with each adjacent community water system in preparing the report and shall include in the report any information provided by each adjacent community water system regarding the feasibility of annexing, connecting, or otherwise supplying domestic water to that service area.(3) A discussion of all actions taken by the applicant to secure a supply of domestic water from an existing community water system for the proposed new public water systems service area.(4) All sources of domestic water supply for the proposed new public water system.(5) The estimated cost to construct, operate, and maintain the proposed new public water system, including long-term operation and maintenance costs and a potential rate structure.(6) A comparison of the costs associated with the construction, operation and maintenance, and long-term sustainability of the proposed new public water system to the costs associated with providing water to the proposed new public water systems service area through annexation by, consolidation with, or connection to an existing community water system.(7) A discussion of all actions taken by the applicant to pursue a contract for managerial or operational oversight from an existing community water system.(8) An analysis of whether a proposed new public water systems total projected water supplies available during normal, single dry, or multiple dry water years during a 20-year projection will meet the projected water demand for the service area.(9) Any information provided by the local agency formation commission. The applicant shall consult with the local agency formation commission if any adjacent public water system identified pursuant to paragraph (1) is a local agency as defined by Section 56054 of the Government Code.(d) (1) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include the information required by subdivision (c), including documentation of the consultation with each adjacent community water system and the local agency formation commission, the applicant may submit those documents to the state board in lieu of the preliminary technical report and the documents shall be considered the functional equivalent of the preliminary technical report.(2) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include some, but not all, of the information required by subdivision (c), including documentation of the consultation with an adjacent community water system and the local agency formation commission, the applicant shall submit those documents and the preliminary technical report to the state board and together those documents and the preliminary technical report shall be considered the functional equivalent of the preliminary technical report requirements of this section. A preliminary technical report submitted pursuant to this paragraph shall only be required to include information that is not otherwise addressed by the other submitted documents.(e) Upon review of a preliminary technical report submitted pursuant to this section, the state board may do all of the following actions:(1) If an existing public water system has not already sought annexation of the service area of a proposed new public water system from the local agency formation commission or the applicant has not already sought an extension of services agreement from an existing public water system, direct the applicant to undertake additional discussion and negotiation with the local agency formation commission and any existing public water system meeting the requirements of paragraph (1) of subdivision (c) that the state board determines has the technical, managerial, and financial capacity to provide an adequate and reliable supply of domestic water to the service area of the proposed new public water system. The state board shall not direct the applicant to undertake additional discussion and negotiation if documentation submitted to the state board demonstrates that additional discussion and negotiation is unlikely to be successful, including, but not limited to, documentation that the local agency formation commission has previously denied the application for an extension of service or annexation, or that the existing public water system has declined to apply to the local agency formation commission for approval of an extension of services to, or annexation of, the service area of the proposed new public water system.(2) Direct the applicant to report on the results of discussion and negotiations conducted pursuant to paragraph (1) to the state board.(3) Establish a time schedule for the applicants performance of directives issued pursuant to this subdivision.(f) (1) An applicant shall comply with the state boards directives as assigned in and consistent with subdivision (e) before submitting an application for a permit for a proposed new public water system under this chapter.(2) An application for a permit for a proposed new public water system under this chapter shall not be deemed complete unless the applicant has complied with the requirements of this section.(g) The state boards review of a preliminary technical report pursuant to this section shall not be deemed a project or approval of a permit application submitted under this chapter.(h) The requirements of this section do not apply to either of the following:(1) An application for a permit for a new public water system that was deemed complete prior to January 1, 2017, pursuant to the statutory permit application requirements effective at the date of the permit submission.(2) An extension of, or annexation to, an existing public water system.(i) (1) The requirements of this section do not apply to a service area where an applicant certifies in writing to the state board that the applicant will not rely on the establishment of a new public water system for its water supply. The state board shall acknowledge receipt of the applicants certification in a timely manner.(2) An applicant who certifies that the service area will not rely on the establishment of a new public water system and later seeks a permit for a new public water system shall comply with the provisions of this section and shall assume all risk of delay or rejection related to the permit application.(j) (1) The provisions of this subdivision apply to a proposed new public water system that achieves either or both of the following:(A) Consolidates two or more existing public water systems, existing state small water systems, or other existing water systems, which results in the creation of a new public water system.(B) Provides water service in lieu of individual domestic wells.(2) At least six months before the construction of any water-related improvements, an applicant for a new public water system that meets the criteria in paragraph (1) shall provide a written notice to the state board that does both of the following:(A) Clearly describes the proposed new public water system and how it meets the criteria in paragraph (1).(B) Requests an exemption from the requirements of this section.(3) The state board shall promptly acknowledge receipt of a written notice described in paragraph (2). The state board shall have 30 days from the acknowledgment of receipt of the written notice to issue a written notice to the applicant that compliance with the requirements of this section is necessary and that an application for a permit of a new public water system under this chapter is not complete until the applicant has complied with the requirements of this section. A determination by the state board that compliance with the requirements of this section is necessary shall be final and is not subject to review by the state board. A determination by the state board pursuant to this subdivision is not considered a project subject to Division 13 (commencing with Section 21000) of the Public Resources Code.(4) If the state board receives a written notice from a project applicant that satisfies the requirements of paragraph (2), the project described in the notice is deemed exempt from the requirements of this section on the 35th day following the date of the state boards acknowledgment of receipt of the written notice, unless the state board has issued a notice to comply pursuant to paragraph (3).
4555
4656 116527. (a) As used in this section, water-related improvement includes, but is not limited to, a water pipe, a water pump, or drinking water infrastructure.(b) (1) Before a person submits an application for a permit for a proposed new public water system, the person shall first submit a preliminary technical report to the state board at least six months before initiating construction of any water-related improvement.(2) In order to assist in expediting the permitting process, a person that is considering submitting an application for a permit for a proposed new public water system is encouraged, but is not required, to submit the preliminary technical report no later than seven days after submission of an application to the city or county for a building permit for any water-related improvement.(3) For a proposed new public water system that would be regulated by a local primacy agency, the applicant shall also submit a copy of the preliminary technical report to the state board.(4) The state board may approve the preliminary technical report and allow construction to proceed before the end of the six-month period. For a proposed new public water system that would be regulated by a local primacy agency, the state board and local primacy agency may approve the preliminary technical report and allow construction to proceed before the end of the six-month period.(c) The preliminary technical report shall include all of the following:(1) The name and type of each public water system for which any service area boundary is within three miles, as measured through existing public rights-of-way, of any boundary of the applicants proposed public water systems service area.(2) A discussion of the feasibility of each of the adjacent community water systems identified pursuant to paragraph (1) annexing, connecting, or otherwise supplying domestic water to the applicants proposed new public water systems service area. The applicant shall consult with each adjacent community water system in preparing the report and shall include in the report any information provided by each adjacent community water system regarding the feasibility of annexing, connecting, or otherwise supplying domestic water to that service area.(3) A discussion of all actions taken by the applicant to secure a supply of domestic water from an existing community water system for the proposed new public water systems service area.(4) All sources of domestic water supply for the proposed new public water system.(5) The estimated cost to construct, operate, and maintain the proposed new public water system, including long-term operation and maintenance costs and a potential rate structure.(6) A comparison of the costs associated with the construction, operation and maintenance, and long-term sustainability of the proposed new public water system to the costs associated with providing water to the proposed new public water systems service area through annexation by, consolidation with, or connection to an existing community water system.(7) A discussion of all actions taken by the applicant to pursue a contract for managerial or operational oversight from an existing community water system.(8) An analysis of whether a proposed new public water systems total projected water supplies available during normal, single dry, or multiple dry water years during a 20-year projection will meet the projected water demand for the service area.(9) Any information provided by the local agency formation commission. The applicant shall consult with the local agency formation commission if any adjacent public water system identified pursuant to paragraph (1) is a local agency as defined by Section 56054 of the Government Code.(d) (1) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include the information required by subdivision (c), including documentation of the consultation with each adjacent community water system and the local agency formation commission, the applicant may submit those documents to the state board in lieu of the preliminary technical report and the documents shall be considered the functional equivalent of the preliminary technical report.(2) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include some, but not all, of the information required by subdivision (c), including documentation of the consultation with an adjacent community water system and the local agency formation commission, the applicant shall submit those documents and the preliminary technical report to the state board and together those documents and the preliminary technical report shall be considered the functional equivalent of the preliminary technical report requirements of this section. A preliminary technical report submitted pursuant to this paragraph shall only be required to include information that is not otherwise addressed by the other submitted documents.(e) Upon review of a preliminary technical report submitted pursuant to this section, the state board may do all of the following actions:(1) If an existing public water system has not already sought annexation of the service area of a proposed new public water system from the local agency formation commission or the applicant has not already sought an extension of services agreement from an existing public water system, direct the applicant to undertake additional discussion and negotiation with the local agency formation commission and any existing public water system meeting the requirements of paragraph (1) of subdivision (c) that the state board determines has the technical, managerial, and financial capacity to provide an adequate and reliable supply of domestic water to the service area of the proposed new public water system. The state board shall not direct the applicant to undertake additional discussion and negotiation if documentation submitted to the state board demonstrates that additional discussion and negotiation is unlikely to be successful, including, but not limited to, documentation that the local agency formation commission has previously denied the application for an extension of service or annexation, or that the existing public water system has declined to apply to the local agency formation commission for approval of an extension of services to, or annexation of, the service area of the proposed new public water system.(2) Direct the applicant to report on the results of discussion and negotiations conducted pursuant to paragraph (1) to the state board.(3) Establish a time schedule for the applicants performance of directives issued pursuant to this subdivision.(f) (1) An applicant shall comply with the state boards directives as assigned in and consistent with subdivision (e) before submitting an application for a permit for a proposed new public water system under this chapter.(2) An application for a permit for a proposed new public water system under this chapter shall not be deemed complete unless the applicant has complied with the requirements of this section.(g) The state boards review of a preliminary technical report pursuant to this section shall not be deemed a project or approval of a permit application submitted under this chapter.(h) The requirements of this section do not apply to either of the following:(1) An application for a permit for a new public water system that was deemed complete prior to January 1, 2017, pursuant to the statutory permit application requirements effective at the date of the permit submission.(2) An extension of, or annexation to, an existing public water system.(i) (1) The requirements of this section do not apply to a service area where an applicant certifies in writing to the state board that the applicant will not rely on the establishment of a new public water system for its water supply. The state board shall acknowledge receipt of the applicants certification in a timely manner.(2) An applicant who certifies that the service area will not rely on the establishment of a new public water system and later seeks a permit for a new public water system shall comply with the provisions of this section and shall assume all risk of delay or rejection related to the permit application.(j) (1) The provisions of this subdivision apply to a proposed new public water system that achieves either or both of the following:(A) Consolidates two or more existing public water systems, existing state small water systems, or other existing water systems, which results in the creation of a new public water system.(B) Provides water service in lieu of individual domestic wells.(2) At least six months before the construction of any water-related improvements, an applicant for a new public water system that meets the criteria in paragraph (1) shall provide a written notice to the state board that does both of the following:(A) Clearly describes the proposed new public water system and how it meets the criteria in paragraph (1).(B) Requests an exemption from the requirements of this section.(3) The state board shall promptly acknowledge receipt of a written notice described in paragraph (2). The state board shall have 30 days from the acknowledgment of receipt of the written notice to issue a written notice to the applicant that compliance with the requirements of this section is necessary and that an application for a permit of a new public water system under this chapter is not complete until the applicant has complied with the requirements of this section. A determination by the state board that compliance with the requirements of this section is necessary shall be final and is not subject to review by the state board. A determination by the state board pursuant to this subdivision is not considered a project subject to Division 13 (commencing with Section 21000) of the Public Resources Code.(4) If the state board receives a written notice from a project applicant that satisfies the requirements of paragraph (2), the project described in the notice is deemed exempt from the requirements of this section on the 35th day following the date of the state boards acknowledgment of receipt of the written notice, unless the state board has issued a notice to comply pursuant to paragraph (3).
4757
4858 116527. (a) As used in this section, water-related improvement includes, but is not limited to, a water pipe, a water pump, or drinking water infrastructure.(b) (1) Before a person submits an application for a permit for a proposed new public water system, the person shall first submit a preliminary technical report to the state board at least six months before initiating construction of any water-related improvement.(2) In order to assist in expediting the permitting process, a person that is considering submitting an application for a permit for a proposed new public water system is encouraged, but is not required, to submit the preliminary technical report no later than seven days after submission of an application to the city or county for a building permit for any water-related improvement.(3) For a proposed new public water system that would be regulated by a local primacy agency, the applicant shall also submit a copy of the preliminary technical report to the state board.(4) The state board may approve the preliminary technical report and allow construction to proceed before the end of the six-month period. For a proposed new public water system that would be regulated by a local primacy agency, the state board and local primacy agency may approve the preliminary technical report and allow construction to proceed before the end of the six-month period.(c) The preliminary technical report shall include all of the following:(1) The name and type of each public water system for which any service area boundary is within three miles, as measured through existing public rights-of-way, of any boundary of the applicants proposed public water systems service area.(2) A discussion of the feasibility of each of the adjacent community water systems identified pursuant to paragraph (1) annexing, connecting, or otherwise supplying domestic water to the applicants proposed new public water systems service area. The applicant shall consult with each adjacent community water system in preparing the report and shall include in the report any information provided by each adjacent community water system regarding the feasibility of annexing, connecting, or otherwise supplying domestic water to that service area.(3) A discussion of all actions taken by the applicant to secure a supply of domestic water from an existing community water system for the proposed new public water systems service area.(4) All sources of domestic water supply for the proposed new public water system.(5) The estimated cost to construct, operate, and maintain the proposed new public water system, including long-term operation and maintenance costs and a potential rate structure.(6) A comparison of the costs associated with the construction, operation and maintenance, and long-term sustainability of the proposed new public water system to the costs associated with providing water to the proposed new public water systems service area through annexation by, consolidation with, or connection to an existing community water system.(7) A discussion of all actions taken by the applicant to pursue a contract for managerial or operational oversight from an existing community water system.(8) An analysis of whether a proposed new public water systems total projected water supplies available during normal, single dry, or multiple dry water years during a 20-year projection will meet the projected water demand for the service area.(9) Any information provided by the local agency formation commission. The applicant shall consult with the local agency formation commission if any adjacent public water system identified pursuant to paragraph (1) is a local agency as defined by Section 56054 of the Government Code.(d) (1) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include the information required by subdivision (c), including documentation of the consultation with each adjacent community water system and the local agency formation commission, the applicant may submit those documents to the state board in lieu of the preliminary technical report and the documents shall be considered the functional equivalent of the preliminary technical report.(2) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include some, but not all, of the information required by subdivision (c), including documentation of the consultation with an adjacent community water system and the local agency formation commission, the applicant shall submit those documents and the preliminary technical report to the state board and together those documents and the preliminary technical report shall be considered the functional equivalent of the preliminary technical report requirements of this section. A preliminary technical report submitted pursuant to this paragraph shall only be required to include information that is not otherwise addressed by the other submitted documents.(e) Upon review of a preliminary technical report submitted pursuant to this section, the state board may do all of the following actions:(1) If an existing public water system has not already sought annexation of the service area of a proposed new public water system from the local agency formation commission or the applicant has not already sought an extension of services agreement from an existing public water system, direct the applicant to undertake additional discussion and negotiation with the local agency formation commission and any existing public water system meeting the requirements of paragraph (1) of subdivision (c) that the state board determines has the technical, managerial, and financial capacity to provide an adequate and reliable supply of domestic water to the service area of the proposed new public water system. The state board shall not direct the applicant to undertake additional discussion and negotiation if documentation submitted to the state board demonstrates that additional discussion and negotiation is unlikely to be successful, including, but not limited to, documentation that the local agency formation commission has previously denied the application for an extension of service or annexation, or that the existing public water system has declined to apply to the local agency formation commission for approval of an extension of services to, or annexation of, the service area of the proposed new public water system.(2) Direct the applicant to report on the results of discussion and negotiations conducted pursuant to paragraph (1) to the state board.(3) Establish a time schedule for the applicants performance of directives issued pursuant to this subdivision.(f) (1) An applicant shall comply with the state boards directives as assigned in and consistent with subdivision (e) before submitting an application for a permit for a proposed new public water system under this chapter.(2) An application for a permit for a proposed new public water system under this chapter shall not be deemed complete unless the applicant has complied with the requirements of this section.(g) The state boards review of a preliminary technical report pursuant to this section shall not be deemed a project or approval of a permit application submitted under this chapter.(h) The requirements of this section do not apply to either of the following:(1) An application for a permit for a new public water system that was deemed complete prior to January 1, 2017, pursuant to the statutory permit application requirements effective at the date of the permit submission.(2) An extension of, or annexation to, an existing public water system.(i) (1) The requirements of this section do not apply to a service area where an applicant certifies in writing to the state board that the applicant will not rely on the establishment of a new public water system for its water supply. The state board shall acknowledge receipt of the applicants certification in a timely manner.(2) An applicant who certifies that the service area will not rely on the establishment of a new public water system and later seeks a permit for a new public water system shall comply with the provisions of this section and shall assume all risk of delay or rejection related to the permit application.(j) (1) The provisions of this subdivision apply to a proposed new public water system that achieves either or both of the following:(A) Consolidates two or more existing public water systems, existing state small water systems, or other existing water systems, which results in the creation of a new public water system.(B) Provides water service in lieu of individual domestic wells.(2) At least six months before the construction of any water-related improvements, an applicant for a new public water system that meets the criteria in paragraph (1) shall provide a written notice to the state board that does both of the following:(A) Clearly describes the proposed new public water system and how it meets the criteria in paragraph (1).(B) Requests an exemption from the requirements of this section.(3) The state board shall promptly acknowledge receipt of a written notice described in paragraph (2). The state board shall have 30 days from the acknowledgment of receipt of the written notice to issue a written notice to the applicant that compliance with the requirements of this section is necessary and that an application for a permit of a new public water system under this chapter is not complete until the applicant has complied with the requirements of this section. A determination by the state board that compliance with the requirements of this section is necessary shall be final and is not subject to review by the state board. A determination by the state board pursuant to this subdivision is not considered a project subject to Division 13 (commencing with Section 21000) of the Public Resources Code.(4) If the state board receives a written notice from a project applicant that satisfies the requirements of paragraph (2), the project described in the notice is deemed exempt from the requirements of this section on the 35th day following the date of the state boards acknowledgment of receipt of the written notice, unless the state board has issued a notice to comply pursuant to paragraph (3).
4959
5060
5161
5262 116527. (a) As used in this section, water-related improvement includes, but is not limited to, a water pipe, a water pump, or drinking water infrastructure.
5363
5464 (b) (1) Before a person submits an application for a permit for a proposed new public water system, the person shall first submit a preliminary technical report to the state board at least six months before initiating construction of any water-related improvement.
5565
5666 (2) In order to assist in expediting the permitting process, a person that is considering submitting an application for a permit for a proposed new public water system is encouraged, but is not required, to submit the preliminary technical report no later than seven days after submission of an application to the city or county for a building permit for any water-related improvement.
5767
5868 (3) For a proposed new public water system that would be regulated by a local primacy agency, the applicant shall also submit a copy of the preliminary technical report to the state board.
5969
6070 (4) The state board may approve the preliminary technical report and allow construction to proceed before the end of the six-month period. For a proposed new public water system that would be regulated by a local primacy agency, the state board and local primacy agency may approve the preliminary technical report and allow construction to proceed before the end of the six-month period.
6171
6272 (c) The preliminary technical report shall include all of the following:
6373
6474 (1) The name and type of each public water system for which any service area boundary is within three miles, as measured through existing public rights-of-way, of any boundary of the applicants proposed public water systems service area.
6575
6676 (2) A discussion of the feasibility of each of the adjacent community water systems identified pursuant to paragraph (1) annexing, connecting, or otherwise supplying domestic water to the applicants proposed new public water systems service area. The applicant shall consult with each adjacent community water system in preparing the report and shall include in the report any information provided by each adjacent community water system regarding the feasibility of annexing, connecting, or otherwise supplying domestic water to that service area.
6777
6878 (3) A discussion of all actions taken by the applicant to secure a supply of domestic water from an existing community water system for the proposed new public water systems service area.
6979
7080 (4) All sources of domestic water supply for the proposed new public water system.
7181
7282 (5) The estimated cost to construct, operate, and maintain the proposed new public water system, including long-term operation and maintenance costs and a potential rate structure.
7383
7484 (6) A comparison of the costs associated with the construction, operation and maintenance, and long-term sustainability of the proposed new public water system to the costs associated with providing water to the proposed new public water systems service area through annexation by, consolidation with, or connection to an existing community water system.
7585
7686 (7) A discussion of all actions taken by the applicant to pursue a contract for managerial or operational oversight from an existing community water system.
7787
7888 (8) An analysis of whether a proposed new public water systems total projected water supplies available during normal, single dry, or multiple dry water years during a 20-year projection will meet the projected water demand for the service area.
7989
8090 (9) Any information provided by the local agency formation commission. The applicant shall consult with the local agency formation commission if any adjacent public water system identified pursuant to paragraph (1) is a local agency as defined by Section 56054 of the Government Code.
8191
8292 (d) (1) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include the information required by subdivision (c), including documentation of the consultation with each adjacent community water system and the local agency formation commission, the applicant may submit those documents to the state board in lieu of the preliminary technical report and the documents shall be considered the functional equivalent of the preliminary technical report.
8393
8494 (2) If documents prepared to comply with Division 13 (commencing with Section 21000) of the Public Resources Code or any other application for public agency approval concerning providing drinking water to the proposed new public water systems service area include some, but not all, of the information required by subdivision (c), including documentation of the consultation with an adjacent community water system and the local agency formation commission, the applicant shall submit those documents and the preliminary technical report to the state board and together those documents and the preliminary technical report shall be considered the functional equivalent of the preliminary technical report requirements of this section. A preliminary technical report submitted pursuant to this paragraph shall only be required to include information that is not otherwise addressed by the other submitted documents.
8595
8696 (e) Upon review of a preliminary technical report submitted pursuant to this section, the state board may do all of the following actions:
8797
8898 (1) If an existing public water system has not already sought annexation of the service area of a proposed new public water system from the local agency formation commission or the applicant has not already sought an extension of services agreement from an existing public water system, direct the applicant to undertake additional discussion and negotiation with the local agency formation commission and any existing public water system meeting the requirements of paragraph (1) of subdivision (c) that the state board determines has the technical, managerial, and financial capacity to provide an adequate and reliable supply of domestic water to the service area of the proposed new public water system. The state board shall not direct the applicant to undertake additional discussion and negotiation if documentation submitted to the state board demonstrates that additional discussion and negotiation is unlikely to be successful, including, but not limited to, documentation that the local agency formation commission has previously denied the application for an extension of service or annexation, or that the existing public water system has declined to apply to the local agency formation commission for approval of an extension of services to, or annexation of, the service area of the proposed new public water system.
8999
90100 (2) Direct the applicant to report on the results of discussion and negotiations conducted pursuant to paragraph (1) to the state board.
91101
92102 (3) Establish a time schedule for the applicants performance of directives issued pursuant to this subdivision.
93103
94104 (f) (1) An applicant shall comply with the state boards directives as assigned in and consistent with subdivision (e) before submitting an application for a permit for a proposed new public water system under this chapter.
95105
96106 (2) An application for a permit for a proposed new public water system under this chapter shall not be deemed complete unless the applicant has complied with the requirements of this section.
97107
98108 (g) The state boards review of a preliminary technical report pursuant to this section shall not be deemed a project or approval of a permit application submitted under this chapter.
99109
100110 (h) The requirements of this section do not apply to either of the following:
101111
102112 (1) An application for a permit for a new public water system that was deemed complete prior to January 1, 2017, pursuant to the statutory permit application requirements effective at the date of the permit submission.
103113
104114 (2) An extension of, or annexation to, an existing public water system.
105115
106116 (i) (1) The requirements of this section do not apply to a service area where an applicant certifies in writing to the state board that the applicant will not rely on the establishment of a new public water system for its water supply. The state board shall acknowledge receipt of the applicants certification in a timely manner.
107117
108118 (2) An applicant who certifies that the service area will not rely on the establishment of a new public water system and later seeks a permit for a new public water system shall comply with the provisions of this section and shall assume all risk of delay or rejection related to the permit application.
109119
110120 (j) (1) The provisions of this subdivision apply to a proposed new public water system that achieves either or both of the following:
111121
112122 (A) Consolidates two or more existing public water systems, existing state small water systems, or other existing water systems, which results in the creation of a new public water system.
113123
114124 (B) Provides water service in lieu of individual domestic wells.
115125
116126 (2) At least six months before the construction of any water-related improvements, an applicant for a new public water system that meets the criteria in paragraph (1) shall provide a written notice to the state board that does both of the following:
117127
118128 (A) Clearly describes the proposed new public water system and how it meets the criteria in paragraph (1).
119129
120130 (B) Requests an exemption from the requirements of this section.
121131
122132 (3) The state board shall promptly acknowledge receipt of a written notice described in paragraph (2). The state board shall have 30 days from the acknowledgment of receipt of the written notice to issue a written notice to the applicant that compliance with the requirements of this section is necessary and that an application for a permit of a new public water system under this chapter is not complete until the applicant has complied with the requirements of this section. A determination by the state board that compliance with the requirements of this section is necessary shall be final and is not subject to review by the state board. A determination by the state board pursuant to this subdivision is not considered a project subject to Division 13 (commencing with Section 21000) of the Public Resources Code.
123133
124134 (4) If the state board receives a written notice from a project applicant that satisfies the requirements of paragraph (2), the project described in the notice is deemed exempt from the requirements of this section on the 35th day following the date of the state boards acknowledgment of receipt of the written notice, unless the state board has issued a notice to comply pursuant to paragraph (3).
125135
126136 SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
127137
128138 SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
129139
130140 SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
131141
132142 ### SEC. 2.