California 2021-2022 Regular Session

California Assembly Bill AB2083 Compare Versions

OldNewDifferences
1-Assembly Bill No. 2083 CHAPTER 689An act to add Section 748.2 to the Public Utilities Code, relating to public utilities. [ Approved by Governor September 28, 2022. Filed with Secretary of State September 28, 2022. ] LEGISLATIVE COUNSEL'S DIGESTAB 2083, Bauer-Kahan. Public utilities: rates.Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. Existing law prohibits electrical corporations and gas corporations from recovering fines and penalties through rates approved by the commission.This bill would prohibit an electrical corporation or gas corporation from recovering, through a rate approved by the commission, costs arising directly from new or additional activities expressly agreed to by the corporation, or any direct payment, fine, or penalty paid by the corporation, in a settlement agreement resolving a criminal or civil inquiry, investigation, or prosecution, except when the commission determines that those costs were just and reasonably incurred, as specified.Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.Because the above requirements would be a part of the act, and because a violation of an action of the commission implementing the above prohibition would be a crime, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 748.2 is added to the Public Utilities Code, to read:748.2. (a) Except as specified in subdivision (b), an electrical corporation or gas corporation shall not recover, through a rate approved by the commission, costs arising directly from new or additional activities expressly agreed to by the corporation, or any direct payment, fine, or penalty paid by the corporation, in a settlement agreement resolving a criminal or civil inquiry, investigation, or prosecution for a violation of law, conducted by the Attorney General or a district attorney, county counsel, city attorney, or city prosecutor, and in exchange for the inquiry, investigation, or prosecution to be terminated or concluded.(b) Notwithstanding subdivision (a), the commission shall only approve an electrical corporation or gas corporation to recover, through a rate, costs described in subdivision (a) if the commission determines that those costs were just and reasonably incurred.SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
1+Enrolled August 24, 2022 Passed IN Senate August 17, 2022 Passed IN Assembly August 22, 2022 Amended IN Senate June 27, 2022 Amended IN Assembly May 02, 2022 Amended IN Assembly April 18, 2022 Amended IN Assembly March 24, 2022 CALIFORNIA LEGISLATURE 20212022 REGULAR SESSION Assembly Bill No. 2083Introduced by Assembly Member Bauer-KahanFebruary 14, 2022An act to add Section 748.2 to the Public Utilities Code, relating to public utilities.LEGISLATIVE COUNSEL'S DIGESTAB 2083, Bauer-Kahan. Public utilities: rates.Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. Existing law prohibits electrical corporations and gas corporations from recovering fines and penalties through rates approved by the commission.This bill would prohibit an electrical corporation or gas corporation from recovering, through a rate approved by the commission, costs arising directly from new or additional activities expressly agreed to by the corporation, or any direct payment, fine, or penalty paid by the corporation, in a settlement agreement resolving a criminal or civil inquiry, investigation, or prosecution, except when the commission determines that those costs were just and reasonably incurred, as specified.Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.Because the above requirements would be a part of the act, and because a violation of an action of the commission implementing the above prohibition would be a crime, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 748.2 is added to the Public Utilities Code, to read:748.2. (a) Except as specified in subdivision (b), an electrical corporation or gas corporation shall not recover, through a rate approved by the commission, costs arising directly from new or additional activities expressly agreed to by the corporation, or any direct payment, fine, or penalty paid by the corporation, in a settlement agreement resolving a criminal or civil inquiry, investigation, or prosecution for a violation of law, conducted by the Attorney General or a district attorney, county counsel, city attorney, or city prosecutor, and in exchange for the inquiry, investigation, or prosecution to be terminated or concluded.(b) Notwithstanding subdivision (a), the commission shall only approve an electrical corporation or gas corporation to recover, through a rate, costs described in subdivision (a) if the commission determines that those costs were just and reasonably incurred.SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
22
3- Assembly Bill No. 2083 CHAPTER 689An act to add Section 748.2 to the Public Utilities Code, relating to public utilities. [ Approved by Governor September 28, 2022. Filed with Secretary of State September 28, 2022. ] LEGISLATIVE COUNSEL'S DIGESTAB 2083, Bauer-Kahan. Public utilities: rates.Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. Existing law prohibits electrical corporations and gas corporations from recovering fines and penalties through rates approved by the commission.This bill would prohibit an electrical corporation or gas corporation from recovering, through a rate approved by the commission, costs arising directly from new or additional activities expressly agreed to by the corporation, or any direct payment, fine, or penalty paid by the corporation, in a settlement agreement resolving a criminal or civil inquiry, investigation, or prosecution, except when the commission determines that those costs were just and reasonably incurred, as specified.Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.Because the above requirements would be a part of the act, and because a violation of an action of the commission implementing the above prohibition would be a crime, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES
3+ Enrolled August 24, 2022 Passed IN Senate August 17, 2022 Passed IN Assembly August 22, 2022 Amended IN Senate June 27, 2022 Amended IN Assembly May 02, 2022 Amended IN Assembly April 18, 2022 Amended IN Assembly March 24, 2022 CALIFORNIA LEGISLATURE 20212022 REGULAR SESSION Assembly Bill No. 2083Introduced by Assembly Member Bauer-KahanFebruary 14, 2022An act to add Section 748.2 to the Public Utilities Code, relating to public utilities.LEGISLATIVE COUNSEL'S DIGESTAB 2083, Bauer-Kahan. Public utilities: rates.Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. Existing law prohibits electrical corporations and gas corporations from recovering fines and penalties through rates approved by the commission.This bill would prohibit an electrical corporation or gas corporation from recovering, through a rate approved by the commission, costs arising directly from new or additional activities expressly agreed to by the corporation, or any direct payment, fine, or penalty paid by the corporation, in a settlement agreement resolving a criminal or civil inquiry, investigation, or prosecution, except when the commission determines that those costs were just and reasonably incurred, as specified.Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.Because the above requirements would be a part of the act, and because a violation of an action of the commission implementing the above prohibition would be a crime, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: YES
44
5- Assembly Bill No. 2083 CHAPTER 689
5+ Enrolled August 24, 2022 Passed IN Senate August 17, 2022 Passed IN Assembly August 22, 2022 Amended IN Senate June 27, 2022 Amended IN Assembly May 02, 2022 Amended IN Assembly April 18, 2022 Amended IN Assembly March 24, 2022
66
7- Assembly Bill No. 2083
7+Enrolled August 24, 2022
8+Passed IN Senate August 17, 2022
9+Passed IN Assembly August 22, 2022
10+Amended IN Senate June 27, 2022
11+Amended IN Assembly May 02, 2022
12+Amended IN Assembly April 18, 2022
13+Amended IN Assembly March 24, 2022
814
9- CHAPTER 689
15+ CALIFORNIA LEGISLATURE 20212022 REGULAR SESSION
16+
17+ Assembly Bill
18+
19+No. 2083
20+
21+Introduced by Assembly Member Bauer-KahanFebruary 14, 2022
22+
23+Introduced by Assembly Member Bauer-Kahan
24+February 14, 2022
1025
1126 An act to add Section 748.2 to the Public Utilities Code, relating to public utilities.
12-
13- [ Approved by Governor September 28, 2022. Filed with Secretary of State September 28, 2022. ]
1427
1528 LEGISLATIVE COUNSEL'S DIGEST
1629
1730 ## LEGISLATIVE COUNSEL'S DIGEST
1831
1932 AB 2083, Bauer-Kahan. Public utilities: rates.
2033
2134 Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. Existing law prohibits electrical corporations and gas corporations from recovering fines and penalties through rates approved by the commission.This bill would prohibit an electrical corporation or gas corporation from recovering, through a rate approved by the commission, costs arising directly from new or additional activities expressly agreed to by the corporation, or any direct payment, fine, or penalty paid by the corporation, in a settlement agreement resolving a criminal or civil inquiry, investigation, or prosecution, except when the commission determines that those costs were just and reasonably incurred, as specified.Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.Because the above requirements would be a part of the act, and because a violation of an action of the commission implementing the above prohibition would be a crime, the bill would impose a state-mandated local program.The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.This bill would provide that no reimbursement is required by this act for a specified reason.
2235
2336 Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations and gas corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable. Existing law prohibits electrical corporations and gas corporations from recovering fines and penalties through rates approved by the commission.
2437
2538 This bill would prohibit an electrical corporation or gas corporation from recovering, through a rate approved by the commission, costs arising directly from new or additional activities expressly agreed to by the corporation, or any direct payment, fine, or penalty paid by the corporation, in a settlement agreement resolving a criminal or civil inquiry, investigation, or prosecution, except when the commission determines that those costs were just and reasonably incurred, as specified.
2639
2740 Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.
2841
2942 Because the above requirements would be a part of the act, and because a violation of an action of the commission implementing the above prohibition would be a crime, the bill would impose a state-mandated local program.
3043
3144 The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
3245
3346 This bill would provide that no reimbursement is required by this act for a specified reason.
3447
3548 ## Digest Key
3649
3750 ## Bill Text
3851
3952 The people of the State of California do enact as follows:SECTION 1. Section 748.2 is added to the Public Utilities Code, to read:748.2. (a) Except as specified in subdivision (b), an electrical corporation or gas corporation shall not recover, through a rate approved by the commission, costs arising directly from new or additional activities expressly agreed to by the corporation, or any direct payment, fine, or penalty paid by the corporation, in a settlement agreement resolving a criminal or civil inquiry, investigation, or prosecution for a violation of law, conducted by the Attorney General or a district attorney, county counsel, city attorney, or city prosecutor, and in exchange for the inquiry, investigation, or prosecution to be terminated or concluded.(b) Notwithstanding subdivision (a), the commission shall only approve an electrical corporation or gas corporation to recover, through a rate, costs described in subdivision (a) if the commission determines that those costs were just and reasonably incurred.SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
4053
4154 The people of the State of California do enact as follows:
4255
4356 ## The people of the State of California do enact as follows:
4457
4558 SECTION 1. Section 748.2 is added to the Public Utilities Code, to read:748.2. (a) Except as specified in subdivision (b), an electrical corporation or gas corporation shall not recover, through a rate approved by the commission, costs arising directly from new or additional activities expressly agreed to by the corporation, or any direct payment, fine, or penalty paid by the corporation, in a settlement agreement resolving a criminal or civil inquiry, investigation, or prosecution for a violation of law, conducted by the Attorney General or a district attorney, county counsel, city attorney, or city prosecutor, and in exchange for the inquiry, investigation, or prosecution to be terminated or concluded.(b) Notwithstanding subdivision (a), the commission shall only approve an electrical corporation or gas corporation to recover, through a rate, costs described in subdivision (a) if the commission determines that those costs were just and reasonably incurred.
4659
4760 SECTION 1. Section 748.2 is added to the Public Utilities Code, to read:
4861
4962 ### SECTION 1.
5063
5164 748.2. (a) Except as specified in subdivision (b), an electrical corporation or gas corporation shall not recover, through a rate approved by the commission, costs arising directly from new or additional activities expressly agreed to by the corporation, or any direct payment, fine, or penalty paid by the corporation, in a settlement agreement resolving a criminal or civil inquiry, investigation, or prosecution for a violation of law, conducted by the Attorney General or a district attorney, county counsel, city attorney, or city prosecutor, and in exchange for the inquiry, investigation, or prosecution to be terminated or concluded.(b) Notwithstanding subdivision (a), the commission shall only approve an electrical corporation or gas corporation to recover, through a rate, costs described in subdivision (a) if the commission determines that those costs were just and reasonably incurred.
5265
5366 748.2. (a) Except as specified in subdivision (b), an electrical corporation or gas corporation shall not recover, through a rate approved by the commission, costs arising directly from new or additional activities expressly agreed to by the corporation, or any direct payment, fine, or penalty paid by the corporation, in a settlement agreement resolving a criminal or civil inquiry, investigation, or prosecution for a violation of law, conducted by the Attorney General or a district attorney, county counsel, city attorney, or city prosecutor, and in exchange for the inquiry, investigation, or prosecution to be terminated or concluded.(b) Notwithstanding subdivision (a), the commission shall only approve an electrical corporation or gas corporation to recover, through a rate, costs described in subdivision (a) if the commission determines that those costs were just and reasonably incurred.
5467
5568 748.2. (a) Except as specified in subdivision (b), an electrical corporation or gas corporation shall not recover, through a rate approved by the commission, costs arising directly from new or additional activities expressly agreed to by the corporation, or any direct payment, fine, or penalty paid by the corporation, in a settlement agreement resolving a criminal or civil inquiry, investigation, or prosecution for a violation of law, conducted by the Attorney General or a district attorney, county counsel, city attorney, or city prosecutor, and in exchange for the inquiry, investigation, or prosecution to be terminated or concluded.(b) Notwithstanding subdivision (a), the commission shall only approve an electrical corporation or gas corporation to recover, through a rate, costs described in subdivision (a) if the commission determines that those costs were just and reasonably incurred.
5669
5770
5871
5972 748.2. (a) Except as specified in subdivision (b), an electrical corporation or gas corporation shall not recover, through a rate approved by the commission, costs arising directly from new or additional activities expressly agreed to by the corporation, or any direct payment, fine, or penalty paid by the corporation, in a settlement agreement resolving a criminal or civil inquiry, investigation, or prosecution for a violation of law, conducted by the Attorney General or a district attorney, county counsel, city attorney, or city prosecutor, and in exchange for the inquiry, investigation, or prosecution to be terminated or concluded.
6073
6174 (b) Notwithstanding subdivision (a), the commission shall only approve an electrical corporation or gas corporation to recover, through a rate, costs described in subdivision (a) if the commission determines that those costs were just and reasonably incurred.
6275
6376 SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
6477
6578 SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
6679
6780 SEC. 2. No reimbursement is required by this act pursuant to Section 6 of Article XIIIB of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIIIB of the California Constitution.
6881
6982 ### SEC. 2.