1-Amended IN Assembly July 05, 2021 Amended IN Senate April 12, 2021 CALIFORNIA LEGISLATURE 20212022 REGULAR SESSION Senate Bill No. 99Introduced by Senator DoddDecember 28, 2020 An act to add Division 16.7 (commencing with Section 26450) to the Public Resources Code, relating to energy. LEGISLATIVE COUNSEL'S DIGESTSB 99, as amended, Dodd. Community Energy Resilience Act of 2021.Existing law establishes within the Natural Resources Agency the State Energy Resources Conservation and Development Commission. Existing law assigns the commission various duties, including applying for and accepting grants, contributions, and appropriations, and awarding grants consistent with the goals and objectives of a program or activity the commission is authorized to implement or administer.This bill, the Community Energy Resilience Act of 2021, would require the commission to develop and implement a grant program for local governments to develop community energy resilience plans and expedite permit review of distributed energy resources. The bill would authorize a community choice aggregator or other regional energy collaborative to apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. The bill would set forth guiding principles for plan development, including equitable access to reliable energy, as provided. resources by local governments. The bill would require that the plans to be consistent with the city, county, or city and county general plan and other local government planning documents. The bill would require a plan to, among other things, ensure that a reliable electricity supply is maintained at to identify critical facilities and identify areas most likely to experience a loss of electrical service. The bill would require a public utility to share information identifying critical facilities and areas most likely to experience a loss of electricity with the local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan. The bill would authorize grant funding awarded to be expended to complete environmental clearance of community energy resilience projects identified in the plan. facilities, locations and facilities where the construction of microgrids could meet local resilience needs, and potential funding sources, as specified.The bill would require the commission to maintain a publicly available and searchable database of all local governments, community choice aggregators, or regional energy collaboratives governments receiving grant funding pursuant to the program, including information on specific plan projects. program. The bill would require a local government, community choice aggregator, or regional energy collaborative, as a condition of receiving grant funding, to submit its plan and a report of project expenditures to the commission within 6 months of completing the plan. The bill would require the commission to annually report specified information about the grant program to the Legislature and post the report on its internet website.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: NO Bill TextThe people of the State of California do enact as follows:SECTION 1. (a) This act shall be known, and may be cited, as the Community Energy Resilience Act of 2021.(b) The Legislature finds and declares all of the following:(1) Development and implementation of community energy resilience plans will help ensure continuous electricity service during power outages, including unplanned outages and intentional deenergizations of the electrical grid, which in recent years have imposed enormous costs on California communities.(2) Developing reliable electrical systems for critical facilities is a paramount public safety priority to protect the health and well-being of California residents and businesses.(3) Local governments and community-based organizations typically lack the financial resources or expertise needed for community energy resilience planning in order to increase the utilization of distributed clean energy resources.(4)In the absence of community energy resilience plans, local governments, investor-owned utilities, businesses, and the public are spending enormous sums purchasing fossil fuel-powered backup generation, expenditures that run counter to Californias environmental goals and can be avoided with available clean energy technologies.(5)(4) Local governments have the greatest degree of local political accountability and the ability to identify, working in collaboration with community-based organizations, which facilities are most important to local residents and necessary to maintain public health and safety, and can most effectively integrate the permitting of distributed energy resources capable of providing electricity during outages. Local governments that have formed a community choice aggregator or other regional energy collaborative are well positioned to work together through that entity to develop an energy resilience plan covering the larger geographic area served by the community choice aggregator or other regional energy collaborative.(6)(5) With proper engineering and planning, local governments will be able to speed deployment of resilient clean energy systems and take advantage of state, federal, and other funding sources.(c) It is the intent of the Legislature to do all of the following:(1)Increase employment in California through deployment of community energy resilience improvements based on clean energy.(2)Prioritize development of clean energy resilience in lower income communities that suffer the most from air pollution and power outages.(3)Direct direct the State Energy Resources Conservation and Development Commission to develop necessary procedures for implementation of a new program to provide technical guidance and financial assistance for local governments to develop and implement community energy resilience plans, including specific resilience projects that can be implemented upon receiving an appropriation from the Legislature to fund this program. plans.SEC. 2. Division 16.7 (commencing with Section 26450) is added to the Public Resources Code, to read:DIVISION 16.7. Community Energy Resilience Planning26450. For the purposes of this division, the following terms have the following meanings:(a) Commission means the State Energy Resources Conservation and Development Commission, commonly known as the California Energy Commission.(b)Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code. (c)(b) Community energy resilience plan means a planning document prepared by a local government, community choice aggregator, or regional energy collaborative government pursuant to this division that sets forth a strategy and identifies specific projects for reducing the adverse impacts associated with electrical power interruptions resulting from scheduled and unintended outages. Unless the context requires otherwise, plan means a community energy resilience plan.(d)Critical facility means the types of facilities described in Public Utilities Commission Decision 19-05-042, Decision Adopting De-Energization Guidelines, or any subsequent amendments to that decision by the Public Utilities Commission, and other facilities identified by a local government. (e)(c) Local government means a city, county, city and county, or California Native American tribe, as defined in Section 21073.(f)(d) Public utility means an electrical corporation, as defined in Section 218 of the Public Utilities Code, or a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code.26451. (a) The commission shall develop and implement a grant program pursuant to this division for local governments to develop community energy resilience plans and expedite permit review of distributed energy resources. A community choice aggregator or other regional energy collaborative may apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. resources by local governments.(b) Before dispersing grant funds pursuant to this division, the commission shall do all both of the following:(1) Develop and adopt solicitation and evaluation procedures for applicants to submit a community energy resilience plan funding proposal to do both of the following:(A) Develop a community energy resilience plan and for overall plan structure and content, including development of a formula for prioritizing funds for critical facilities in low-income or disadvantaged communities that are most likely to experience future electrical grid deenergization events, power outages, followed in priority by other critical facilities statewide. in the planning area.(B) Develop a process for the expedited permit review of distributed energy resources. resources by local governments.(2) Conduct two public meetings to consider public comment.(c) The project plan solicitation and evaluation procedures shall prioritize proposals for funding that would support both of the following:(1)Equitable equitable collaboration between public utilities, local governments, community-based organizations, and state agencies to yield plans that not only help achieve local energy resilience objectives, but also state renewable energy goals.(2)Integration of available mobile storage resources that may become available through transportation electrification.(d) A community energy resiliency plan shall be consistent with the city, county, or city and county general plan and other local government planning documents. The plan may include provisions to facilitate the expedited local permitting of community energy resilience projects identified in the plan. distributed energy resources.(e) The commission shall fund technical assistance providers to assist in plan development, including all of the following:(1) Identifying and coordinating with appropriate local government staff and outside consultants capable of drafting the plan. A local government may hire a resilience manager to manage the plan development process and the implementation of any specific projects identified in the plan.(2) Convening and facilitating one or more community workshops enlisting local stakeholders, including, but not limited to, labor representatives, representatives from community-based organizations, community members, representatives from related technology vendors, local government staff in departments relating to emergency services, planning, and public works, disability rights advocates, and representatives from special districts, load-serving entities, school districts, environmental justice communities, communities of color, and other marginalized groups, to ensure that a diversity of perspectives and input is incorporated into the plan.(3) Soliciting and utilizing input from public utility operational and technical subject matter experts, including relevant data to enable local governments to design their plans to make efficient use of existing distribution infrastructure and support grid operation. experts.(4) Providing guidance and support to each local government receiving plan funds for the local government to designate a diverse plan steering committee to ensure robust and meaningful public participation.(f) A plan for which a local government, community choice aggregator, or regional energy collaborative government receives grant funding shall do all of the following:(1) Identify critical facilities, including facilities that can serve as community resilience hubs to accommodate and provide basic services to people who have lost power to their homes.(2)Identify areas most likely to experience a loss of electrical service based on public utility determinations of remote or hazardous areas likely to be subject to a planned deenergization of the electrical grid.(3)Identify electrical distribution system improvements that can be undertaken by a public utility and that will reduce the risk of deenergization for communities and critical facilities.(4)Identify projects that can be combined to share engineering costs and achieve scalability of projects across like facilities to create the most value for a community.(5)(2) Identify locations and facilities where the construction of microgrids could meet local resilience needs.(6)(3) Identify critical facilities that are in greatest need of backup energy generation and potential backup energy systems that may meet the needs of those facilities.(7)(4) Identify potential funding sources for implementation of projects included in the plan.(g)Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative pursuant to this division may be expended to complete environmental clearance of community energy resilience projects identified in the plan. (h)(g) Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative government pursuant to this division does not affect the entitys eligibility to receive other incentives available from federal, state, or other local governments, public utilities, or any other source, or to leverage the grant funding awarded pursuant to this division with any other incentive.(i)A public utility shall share information identifying critical facilities and areas most likely to experience a loss of electricity with a local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan.26452. (a) The commission shall maintain a publicly available and searchable database of all local governments, community choice aggregators, or regional energy collaboratives governments receiving grant funding pursuant to this division, including information on specific plan projects. division. The database shall include relevant metrics to be determined by the commission.(b) As a condition of receiving grant funding, within six months of completing its plan, a local government, community choice aggregator, or regional energy collaborative government shall submit the plan and a report of project expenditures to the commission.(c) (1) The commission shall prepare an annual summary of statewide program expenditures and hire an independent, third-party evaluator to quantify and evaluate the effects of the grant program.(2) Pursuant to Section 9795 of the Government Code, the commission shall annually report the information it receives to the Legislature and post the report on its internet website.
1+Amended IN Senate April 12, 2021 CALIFORNIA LEGISLATURE 20212022 REGULAR SESSION Senate Bill No. 99Introduced by Senator DoddDecember 28, 2020 An act to add Division 16.7 (commencing with Section 26450) to the Public Resources Code, relating to energy. LEGISLATIVE COUNSEL'S DIGESTSB 99, as amended, Dodd. Community Energy Resilience Act of 2021.Existing law establishes within the Natural Resources Agency the State Energy Resources Conservation and Development Commission. Existing law assigns the commission various duties, including applying for and accepting grants, contributions, and appropriations, and awarding grants consistent with the goals and objectives of a program or activity the commission is authorized to implement or administer.This bill, the Community Energy Resilience Act of 2021, would require the commission to develop and implement a grant program for local governments to develop community energy resilience plans. plans and expedite permit review of distributed energy resources. The bill would authorize a community choice aggregator or other regional energy collaborative to apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. The bill would set forth guiding principles for plan development, including equitable access to reliable energy, as provided, and integration with other existing local planning documents. provided. The bill would require plans to be consistent with the city, county, or city and county general plan and other local government planning documents. The bill would require a plan to, among other things, ensure that a reliable electricity supply is maintained at critical facilities and identify areas most likely to experience a loss of electrical service. The bill would require a public utility to share information identifying critical facilities and areas most likely to experience a loss of electricity with the local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan. The bill would authorize grant funding awarded to be expended to complete environmental clearance of community energy resilience projects identified in the plan.The bill would require the commission to maintain a publicly available and searchable database of all local governments governments, community choice aggregators, or regional energy collaboratives receiving grant funding pursuant to the program, including information on specific plan projects. The bill would require a local government, community choice aggregator, or regional energy collaborative, as a condition of receiving grant funding, to submit its plan and a report of project expenditures to the commission within 6 months of completing the plan. The bill would require the commission to annually report specified information about the grant program to the Legislature and post the report on its internet website.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: NO Bill TextThe people of the State of California do enact as follows:SECTION 1. (a) This act shall be known, and may be cited, as the Community Energy Resilience Act of 2021.(b) The Legislature finds and declares all of the following:(1) California local governments need to develop Development and implement implementation of community energy resilience plans to will help ensure continuous electricity service during outages, including unplanned outages and intentional deenergizations of the electrical grid, which in recent years have imposed enormous costs on California communities.(2) Developing reliable electrical systems for critical facilities is a paramount public safety priority to protect the health and well-being of California residents and businesses.(3) Local governments and community-based organizations typically lack the financial resources or expertise needed for community energy resilience planning based on in order to increase the utilization of distributed clean energy resources.(4) In the absence of community energy resilience plans, local governments, investor-owned utilities, businesses, and the public are spending enormous sums purchasing fossil fuel-powered backup generation, expenditures that run counter to Californias environmental goals. goals and can be avoided with available clean energy technologies.(5) Local governments have the greatest degree of local political accountability and the ability to identify, working in collaboration with community-based organizations, which facilities are most important to local residents, residents and necessary to maintain public health and safety, and to plan for can most effectively integrate the permitting of distributed energy resources capable of providing electricity during outages. Local governments that have formed a community choice aggregator or other regional energy collaborative are well positioned to work together through that entity to develop an energy resilience plan covering the larger geographic area served by the community choice aggregator or other regional energy collaborative.(6) With proper engineering and planning, local governments will be able to speed deployment of resilient clean energy systems and take advantage of state, federal, and other funding sources.(c) It is the intent of the Legislature to do all of the following:(1) Increase employment in California through deployment of community energy resilience improvements based on clean energy.(2) Prioritize development of clean energy resilience in lower income communities that suffer the most from air pollution and power outages.(3) Direct the State Energy Resources Conservation and Development Commission to develop necessary guidelines and procedures for implementation of a new program to provide technical guidance and financial assistance for local governments to develop and implement community energy resilience plans, including specific resilience projects that can be implemented upon receiving an appropriation from the Legislature to fund this program.SEC. 2. Division 16.7 (commencing with Section 26450) is added to the Public Resources Code, to read:DIVISION 16.7. Community Energy Resilience Planning26450. For the purposes of this division, the following terms have the following meanings:(a) Commission means the State Energy Resources Conservation and Development Commission, commonly known as the California Energy Commission.(b) Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code. (c) Community energy resilience plan means a planning document prepared by a local government or government, community choice aggregator aggregator, or regional energy collaborative pursuant to this division that sets forth a strategy and identifies specific projects for maintaining a reliable supply of electricity during both reducing the adverse impacts associated with electrical power interruptions resulting from scheduled and unintended outages. Unless the context requires otherwise, plan means a community energy resilience plan.(d) Critical facility means the types of facilities described in Public Utilities Commission Decision 19-05-042, Decision Adopting De-Energization Guidelines, or any subsequent amendments to that decision by the Public Utilities Commission, and other facilities identified by a local government. (d)(e) Local government means a city, county, city and county, or community choice aggregator. or California Native American tribe, as defined in Section 21073.(e)(f) Public utility means an electrical corporation, as defined in Section 218 of the Public Utilities Code, or a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code.26451. (a) The commission shall develop and implement a grant program pursuant to this division for local governments to develop community energy resilience plans. plans and expedite permit review of distributed energy resources. A community choice aggregator or other regional energy collaborative may apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government.(b) Before dispersing grant funds pursuant to this division, the commission shall do both all of the following:(1) Develop and adopt project solicitation and evaluation guidelines procedures for applicants to submit a community energy resilience plan funding proposal to develop to do both of the following:(A) Develop a community energy resilience plan and for overall plan structure and content, including development of a formula for prioritizing funds for critical facilities in low-income or disadvantaged communities that are most likely to experience future electrical grid deenergization events, followed in priority by other critical facilities statewide.(B) Develop a process for the expedited permit review of distributed energy resources.(2) Conduct two public meetings to consider public comment.(c) The project solicitation and evaluation guidelines procedures shall prioritize proposals for funding that would support all both of the following:(1) Equitable collaboration between public utilities, local governments, community-based organizations, and state agencies to yield plans that not only help achieve local energy resilience objectives, but also state renewable energy goals.(2) Integration of available mobile storage resources that may become available through transportation electrification.(3)Integration of community energy resilience plans with other existing local government planning documents, including general plans and climate action plans, with an assumption that, upon completion, a community energy resilience plan would be incorporated by the local government into the existing general plan.(d) A community energy resiliency plan shall be consistent with the city, county, or city and county general plan and other local government planning documents. The plan may include provisions to facilitate the expedited local permitting of community energy resilience projects identified in the plan. (d)(e) The commission shall fund technical assistance providers to assist in plan development, including all of the following:(1) Identifying and coordinating with appropriate local government staff and outside consultants capable of drafting the plan. A local government may hire a resilience manager to manage the plan development process and the implementation of any specific projects identified in the plan.(2) Convening and facilitating one or more community workshops enlisting local stakeholders, including, but not limited to, labor representatives, representatives from community-based organizations, community members, representatives from related technology vendors, local government staff in departments relating to emergency services, planning, and public works, disability rights advocates, and representatives from special districts, load-serving entities, school districts, environmental justice communities, communities of color, and other marginalized groups, to ensure that a diversity of perspectives and input is incorporated into the plan.(3) Soliciting and utilizing input from public utility operational and technical subject matter experts, including relevant data to enable local governments to design their plans to make efficient use of existing distribution infrastructure and support grid operation. (4) Providing guidance and support to each local government receiving plan funds for the local government to designate a diverse plan steering committee to ensure robust and meaningful public participation.(e)(f) A plan for which a local government government, community choice aggregator, or regional energy collaborative receives grant funding shall do all of the following:(1) Identify critical facilities, including facilities that can serve as community resilience hubs. hubs to accommodate and provide basic services to people who have lost power to their homes.(2) Identify areas most likely to experience a loss of electrical service based on public utility determinations of remote or hazardous areas likely to be subject to a planned deenergization of the electrical grid.(3)Include a preliminary feasibility analysis of expected costs and benefits for anticipated projects within the local jurisdiction. A proposed plan shall also include an analysis of multiple project options for each location, including distribution segmentation and microgrids.(3) Identify electrical distribution system improvements that can be undertaken by a public utility and that will reduce the risk of deenergization for communities and critical facilities.(4) Identify projects that can be combined to share engineering costs and achieve scalability of projects across like facilities to create the most value for a community.(5) Identify locations and facilities where the construction of microgrids could meet local resilience needs.(6) Identify critical facilities that are in greatest need of backup energy generation and potential backup energy systems that may meet the needs of those facilities.(7) Identify potential funding sources for implementation of projects included in the plan.(g) Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative pursuant to this division may be expended to complete environmental clearance of community energy resilience projects identified in the plan. (f)(h) Grant funding awarded to a local government local government, community choice aggregator, or regional energy collaborative pursuant to this division does not affect the entitys eligibility to receive other incentives available from federal, state, or other local governments, public utilities, or any other source, or to leverage the grant funding awarded pursuant to this division with any other incentive.(i) A public utility shall share information identifying critical facilities and areas most likely to experience a loss of electricity with a local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan.26452. (a) The commission shall maintain a publicly available and searchable database of all local governments local governments, community choice aggregators, or regional energy collaboratives receiving grant funding pursuant to this division, including information on specific plan projects. The database shall include relevant metrics to be determined by the commission.(b) As a condition of receiving grant funding, within six months of completing its plan, a local government government, community choice aggregator, or regional energy collaborative shall submit the plan and a report of project expenditures to the commission.(c) (1) The commission shall prepare an annual summary of statewide program expenditures and hire an independent, third-party evaluator to quantify and evaluate the effects of the grant program.(2) Pursuant to Section 9795 of the Government Code, the commission shall annually report the information it receives to the Legislature and post the report on its internet website.
22
3- Amended IN Assembly July 05, 2021 Amended IN Senate April 12, 2021 CALIFORNIA LEGISLATURE 20212022 REGULAR SESSION Senate Bill No. 99Introduced by Senator DoddDecember 28, 2020 An act to add Division 16.7 (commencing with Section 26450) to the Public Resources Code, relating to energy. LEGISLATIVE COUNSEL'S DIGESTSB 99, as amended, Dodd. Community Energy Resilience Act of 2021.Existing law establishes within the Natural Resources Agency the State Energy Resources Conservation and Development Commission. Existing law assigns the commission various duties, including applying for and accepting grants, contributions, and appropriations, and awarding grants consistent with the goals and objectives of a program or activity the commission is authorized to implement or administer.This bill, the Community Energy Resilience Act of 2021, would require the commission to develop and implement a grant program for local governments to develop community energy resilience plans and expedite permit review of distributed energy resources. The bill would authorize a community choice aggregator or other regional energy collaborative to apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. The bill would set forth guiding principles for plan development, including equitable access to reliable energy, as provided. resources by local governments. The bill would require that the plans to be consistent with the city, county, or city and county general plan and other local government planning documents. The bill would require a plan to, among other things, ensure that a reliable electricity supply is maintained at to identify critical facilities and identify areas most likely to experience a loss of electrical service. The bill would require a public utility to share information identifying critical facilities and areas most likely to experience a loss of electricity with the local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan. The bill would authorize grant funding awarded to be expended to complete environmental clearance of community energy resilience projects identified in the plan. facilities, locations and facilities where the construction of microgrids could meet local resilience needs, and potential funding sources, as specified.The bill would require the commission to maintain a publicly available and searchable database of all local governments, community choice aggregators, or regional energy collaboratives governments receiving grant funding pursuant to the program, including information on specific plan projects. program. The bill would require a local government, community choice aggregator, or regional energy collaborative, as a condition of receiving grant funding, to submit its plan and a report of project expenditures to the commission within 6 months of completing the plan. The bill would require the commission to annually report specified information about the grant program to the Legislature and post the report on its internet website.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: NO
3+ Amended IN Senate April 12, 2021 CALIFORNIA LEGISLATURE 20212022 REGULAR SESSION Senate Bill No. 99Introduced by Senator DoddDecember 28, 2020 An act to add Division 16.7 (commencing with Section 26450) to the Public Resources Code, relating to energy. LEGISLATIVE COUNSEL'S DIGESTSB 99, as amended, Dodd. Community Energy Resilience Act of 2021.Existing law establishes within the Natural Resources Agency the State Energy Resources Conservation and Development Commission. Existing law assigns the commission various duties, including applying for and accepting grants, contributions, and appropriations, and awarding grants consistent with the goals and objectives of a program or activity the commission is authorized to implement or administer.This bill, the Community Energy Resilience Act of 2021, would require the commission to develop and implement a grant program for local governments to develop community energy resilience plans. plans and expedite permit review of distributed energy resources. The bill would authorize a community choice aggregator or other regional energy collaborative to apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. The bill would set forth guiding principles for plan development, including equitable access to reliable energy, as provided, and integration with other existing local planning documents. provided. The bill would require plans to be consistent with the city, county, or city and county general plan and other local government planning documents. The bill would require a plan to, among other things, ensure that a reliable electricity supply is maintained at critical facilities and identify areas most likely to experience a loss of electrical service. The bill would require a public utility to share information identifying critical facilities and areas most likely to experience a loss of electricity with the local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan. The bill would authorize grant funding awarded to be expended to complete environmental clearance of community energy resilience projects identified in the plan.The bill would require the commission to maintain a publicly available and searchable database of all local governments governments, community choice aggregators, or regional energy collaboratives receiving grant funding pursuant to the program, including information on specific plan projects. The bill would require a local government, community choice aggregator, or regional energy collaborative, as a condition of receiving grant funding, to submit its plan and a report of project expenditures to the commission within 6 months of completing the plan. The bill would require the commission to annually report specified information about the grant program to the Legislature and post the report on its internet website.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: NO
44
5- Amended IN Assembly July 05, 2021 Amended IN Senate April 12, 2021
5+ Amended IN Senate April 12, 2021
66
7-Amended IN Assembly July 05, 2021
87 Amended IN Senate April 12, 2021
98
109 CALIFORNIA LEGISLATURE 20212022 REGULAR SESSION
1110
1211 Senate Bill
1312
1413 No. 99
1514
1615 Introduced by Senator DoddDecember 28, 2020
1716
1817 Introduced by Senator Dodd
1918 December 28, 2020
2019
2120 An act to add Division 16.7 (commencing with Section 26450) to the Public Resources Code, relating to energy.
2221
2322 LEGISLATIVE COUNSEL'S DIGEST
2423
2524 ## LEGISLATIVE COUNSEL'S DIGEST
2625
2726 SB 99, as amended, Dodd. Community Energy Resilience Act of 2021.
2827
29-Existing law establishes within the Natural Resources Agency the State Energy Resources Conservation and Development Commission. Existing law assigns the commission various duties, including applying for and accepting grants, contributions, and appropriations, and awarding grants consistent with the goals and objectives of a program or activity the commission is authorized to implement or administer.This bill, the Community Energy Resilience Act of 2021, would require the commission to develop and implement a grant program for local governments to develop community energy resilience plans and expedite permit review of distributed energy resources. The bill would authorize a community choice aggregator or other regional energy collaborative to apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. The bill would set forth guiding principles for plan development, including equitable access to reliable energy, as provided. resources by local governments. The bill would require that the plans to be consistent with the city, county, or city and county general plan and other local government planning documents. The bill would require a plan to, among other things, ensure that a reliable electricity supply is maintained at to identify critical facilities and identify areas most likely to experience a loss of electrical service. The bill would require a public utility to share information identifying critical facilities and areas most likely to experience a loss of electricity with the local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan. The bill would authorize grant funding awarded to be expended to complete environmental clearance of community energy resilience projects identified in the plan. facilities, locations and facilities where the construction of microgrids could meet local resilience needs, and potential funding sources, as specified.The bill would require the commission to maintain a publicly available and searchable database of all local governments, community choice aggregators, or regional energy collaboratives governments receiving grant funding pursuant to the program, including information on specific plan projects. program. The bill would require a local government, community choice aggregator, or regional energy collaborative, as a condition of receiving grant funding, to submit its plan and a report of project expenditures to the commission within 6 months of completing the plan. The bill would require the commission to annually report specified information about the grant program to the Legislature and post the report on its internet website.
28+Existing law establishes within the Natural Resources Agency the State Energy Resources Conservation and Development Commission. Existing law assigns the commission various duties, including applying for and accepting grants, contributions, and appropriations, and awarding grants consistent with the goals and objectives of a program or activity the commission is authorized to implement or administer.This bill, the Community Energy Resilience Act of 2021, would require the commission to develop and implement a grant program for local governments to develop community energy resilience plans. plans and expedite permit review of distributed energy resources. The bill would authorize a community choice aggregator or other regional energy collaborative to apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. The bill would set forth guiding principles for plan development, including equitable access to reliable energy, as provided, and integration with other existing local planning documents. provided. The bill would require plans to be consistent with the city, county, or city and county general plan and other local government planning documents. The bill would require a plan to, among other things, ensure that a reliable electricity supply is maintained at critical facilities and identify areas most likely to experience a loss of electrical service. The bill would require a public utility to share information identifying critical facilities and areas most likely to experience a loss of electricity with the local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan. The bill would authorize grant funding awarded to be expended to complete environmental clearance of community energy resilience projects identified in the plan.The bill would require the commission to maintain a publicly available and searchable database of all local governments governments, community choice aggregators, or regional energy collaboratives receiving grant funding pursuant to the program, including information on specific plan projects. The bill would require a local government, community choice aggregator, or regional energy collaborative, as a condition of receiving grant funding, to submit its plan and a report of project expenditures to the commission within 6 months of completing the plan. The bill would require the commission to annually report specified information about the grant program to the Legislature and post the report on its internet website.
3029
3130 Existing law establishes within the Natural Resources Agency the State Energy Resources Conservation and Development Commission. Existing law assigns the commission various duties, including applying for and accepting grants, contributions, and appropriations, and awarding grants consistent with the goals and objectives of a program or activity the commission is authorized to implement or administer.
3231
33-This bill, the Community Energy Resilience Act of 2021, would require the commission to develop and implement a grant program for local governments to develop community energy resilience plans and expedite permit review of distributed energy resources. The bill would authorize a community choice aggregator or other regional energy collaborative to apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. The bill would set forth guiding principles for plan development, including equitable access to reliable energy, as provided. resources by local governments. The bill would require that the plans to be consistent with the city, county, or city and county general plan and other local government planning documents. The bill would require a plan to, among other things, ensure that a reliable electricity supply is maintained at to identify critical facilities and identify areas most likely to experience a loss of electrical service. The bill would require a public utility to share information identifying critical facilities and areas most likely to experience a loss of electricity with the local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan. The bill would authorize grant funding awarded to be expended to complete environmental clearance of community energy resilience projects identified in the plan. facilities, locations and facilities where the construction of microgrids could meet local resilience needs, and potential funding sources, as specified.
32+This bill, the Community Energy Resilience Act of 2021, would require the commission to develop and implement a grant program for local governments to develop community energy resilience plans. plans and expedite permit review of distributed energy resources. The bill would authorize a community choice aggregator or other regional energy collaborative to apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. The bill would set forth guiding principles for plan development, including equitable access to reliable energy, as provided, and integration with other existing local planning documents. provided. The bill would require plans to be consistent with the city, county, or city and county general plan and other local government planning documents. The bill would require a plan to, among other things, ensure that a reliable electricity supply is maintained at critical facilities and identify areas most likely to experience a loss of electrical service. The bill would require a public utility to share information identifying critical facilities and areas most likely to experience a loss of electricity with the local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan. The bill would authorize grant funding awarded to be expended to complete environmental clearance of community energy resilience projects identified in the plan.
3433
35-The bill would require the commission to maintain a publicly available and searchable database of all local governments, community choice aggregators, or regional energy collaboratives governments receiving grant funding pursuant to the program, including information on specific plan projects. program. The bill would require a local government, community choice aggregator, or regional energy collaborative, as a condition of receiving grant funding, to submit its plan and a report of project expenditures to the commission within 6 months of completing the plan. The bill would require the commission to annually report specified information about the grant program to the Legislature and post the report on its internet website.
34+The bill would require the commission to maintain a publicly available and searchable database of all local governments governments, community choice aggregators, or regional energy collaboratives receiving grant funding pursuant to the program, including information on specific plan projects. The bill would require a local government, community choice aggregator, or regional energy collaborative, as a condition of receiving grant funding, to submit its plan and a report of project expenditures to the commission within 6 months of completing the plan. The bill would require the commission to annually report specified information about the grant program to the Legislature and post the report on its internet website.
3635
3736 ## Digest Key
3837
3938 ## Bill Text
4039
41-The people of the State of California do enact as follows:SECTION 1. (a) This act shall be known, and may be cited, as the Community Energy Resilience Act of 2021.(b) The Legislature finds and declares all of the following:(1) Development and implementation of community energy resilience plans will help ensure continuous electricity service during power outages, including unplanned outages and intentional deenergizations of the electrical grid, which in recent years have imposed enormous costs on California communities.(2) Developing reliable electrical systems for critical facilities is a paramount public safety priority to protect the health and well-being of California residents and businesses.(3) Local governments and community-based organizations typically lack the financial resources or expertise needed for community energy resilience planning in order to increase the utilization of distributed clean energy resources.(4)In the absence of community energy resilience plans, local governments, investor-owned utilities, businesses, and the public are spending enormous sums purchasing fossil fuel-powered backup generation, expenditures that run counter to Californias environmental goals and can be avoided with available clean energy technologies.(5)(4) Local governments have the greatest degree of local political accountability and the ability to identify, working in collaboration with community-based organizations, which facilities are most important to local residents and necessary to maintain public health and safety, and can most effectively integrate the permitting of distributed energy resources capable of providing electricity during outages. Local governments that have formed a community choice aggregator or other regional energy collaborative are well positioned to work together through that entity to develop an energy resilience plan covering the larger geographic area served by the community choice aggregator or other regional energy collaborative.(6)(5) With proper engineering and planning, local governments will be able to speed deployment of resilient clean energy systems and take advantage of state, federal, and other funding sources.(c) It is the intent of the Legislature to do all of the following:(1)Increase employment in California through deployment of community energy resilience improvements based on clean energy.(2)Prioritize development of clean energy resilience in lower income communities that suffer the most from air pollution and power outages.(3)Direct direct the State Energy Resources Conservation and Development Commission to develop necessary procedures for implementation of a new program to provide technical guidance and financial assistance for local governments to develop and implement community energy resilience plans, including specific resilience projects that can be implemented upon receiving an appropriation from the Legislature to fund this program. plans.SEC. 2. Division 16.7 (commencing with Section 26450) is added to the Public Resources Code, to read:DIVISION 16.7. Community Energy Resilience Planning26450. For the purposes of this division, the following terms have the following meanings:(a) Commission means the State Energy Resources Conservation and Development Commission, commonly known as the California Energy Commission.(b)Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code. (c)(b) Community energy resilience plan means a planning document prepared by a local government, community choice aggregator, or regional energy collaborative government pursuant to this division that sets forth a strategy and identifies specific projects for reducing the adverse impacts associated with electrical power interruptions resulting from scheduled and unintended outages. Unless the context requires otherwise, plan means a community energy resilience plan.(d)Critical facility means the types of facilities described in Public Utilities Commission Decision 19-05-042, Decision Adopting De-Energization Guidelines, or any subsequent amendments to that decision by the Public Utilities Commission, and other facilities identified by a local government. (e)(c) Local government means a city, county, city and county, or California Native American tribe, as defined in Section 21073.(f)(d) Public utility means an electrical corporation, as defined in Section 218 of the Public Utilities Code, or a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code.26451. (a) The commission shall develop and implement a grant program pursuant to this division for local governments to develop community energy resilience plans and expedite permit review of distributed energy resources. A community choice aggregator or other regional energy collaborative may apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. resources by local governments.(b) Before dispersing grant funds pursuant to this division, the commission shall do all both of the following:(1) Develop and adopt solicitation and evaluation procedures for applicants to submit a community energy resilience plan funding proposal to do both of the following:(A) Develop a community energy resilience plan and for overall plan structure and content, including development of a formula for prioritizing funds for critical facilities in low-income or disadvantaged communities that are most likely to experience future electrical grid deenergization events, power outages, followed in priority by other critical facilities statewide. in the planning area.(B) Develop a process for the expedited permit review of distributed energy resources. resources by local governments.(2) Conduct two public meetings to consider public comment.(c) The project plan solicitation and evaluation procedures shall prioritize proposals for funding that would support both of the following:(1)Equitable equitable collaboration between public utilities, local governments, community-based organizations, and state agencies to yield plans that not only help achieve local energy resilience objectives, but also state renewable energy goals.(2)Integration of available mobile storage resources that may become available through transportation electrification.(d) A community energy resiliency plan shall be consistent with the city, county, or city and county general plan and other local government planning documents. The plan may include provisions to facilitate the expedited local permitting of community energy resilience projects identified in the plan. distributed energy resources.(e) The commission shall fund technical assistance providers to assist in plan development, including all of the following:(1) Identifying and coordinating with appropriate local government staff and outside consultants capable of drafting the plan. A local government may hire a resilience manager to manage the plan development process and the implementation of any specific projects identified in the plan.(2) Convening and facilitating one or more community workshops enlisting local stakeholders, including, but not limited to, labor representatives, representatives from community-based organizations, community members, representatives from related technology vendors, local government staff in departments relating to emergency services, planning, and public works, disability rights advocates, and representatives from special districts, load-serving entities, school districts, environmental justice communities, communities of color, and other marginalized groups, to ensure that a diversity of perspectives and input is incorporated into the plan.(3) Soliciting and utilizing input from public utility operational and technical subject matter experts, including relevant data to enable local governments to design their plans to make efficient use of existing distribution infrastructure and support grid operation. experts.(4) Providing guidance and support to each local government receiving plan funds for the local government to designate a diverse plan steering committee to ensure robust and meaningful public participation.(f) A plan for which a local government, community choice aggregator, or regional energy collaborative government receives grant funding shall do all of the following:(1) Identify critical facilities, including facilities that can serve as community resilience hubs to accommodate and provide basic services to people who have lost power to their homes.(2)Identify areas most likely to experience a loss of electrical service based on public utility determinations of remote or hazardous areas likely to be subject to a planned deenergization of the electrical grid.(3)Identify electrical distribution system improvements that can be undertaken by a public utility and that will reduce the risk of deenergization for communities and critical facilities.(4)Identify projects that can be combined to share engineering costs and achieve scalability of projects across like facilities to create the most value for a community.(5)(2) Identify locations and facilities where the construction of microgrids could meet local resilience needs.(6)(3) Identify critical facilities that are in greatest need of backup energy generation and potential backup energy systems that may meet the needs of those facilities.(7)(4) Identify potential funding sources for implementation of projects included in the plan.(g)Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative pursuant to this division may be expended to complete environmental clearance of community energy resilience projects identified in the plan. (h)(g) Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative government pursuant to this division does not affect the entitys eligibility to receive other incentives available from federal, state, or other local governments, public utilities, or any other source, or to leverage the grant funding awarded pursuant to this division with any other incentive.(i)A public utility shall share information identifying critical facilities and areas most likely to experience a loss of electricity with a local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan.26452. (a) The commission shall maintain a publicly available and searchable database of all local governments, community choice aggregators, or regional energy collaboratives governments receiving grant funding pursuant to this division, including information on specific plan projects. division. The database shall include relevant metrics to be determined by the commission.(b) As a condition of receiving grant funding, within six months of completing its plan, a local government, community choice aggregator, or regional energy collaborative government shall submit the plan and a report of project expenditures to the commission.(c) (1) The commission shall prepare an annual summary of statewide program expenditures and hire an independent, third-party evaluator to quantify and evaluate the effects of the grant program.(2) Pursuant to Section 9795 of the Government Code, the commission shall annually report the information it receives to the Legislature and post the report on its internet website.
40+The people of the State of California do enact as follows:SECTION 1. (a) This act shall be known, and may be cited, as the Community Energy Resilience Act of 2021.(b) The Legislature finds and declares all of the following:(1) California local governments need to develop Development and implement implementation of community energy resilience plans to will help ensure continuous electricity service during outages, including unplanned outages and intentional deenergizations of the electrical grid, which in recent years have imposed enormous costs on California communities.(2) Developing reliable electrical systems for critical facilities is a paramount public safety priority to protect the health and well-being of California residents and businesses.(3) Local governments and community-based organizations typically lack the financial resources or expertise needed for community energy resilience planning based on in order to increase the utilization of distributed clean energy resources.(4) In the absence of community energy resilience plans, local governments, investor-owned utilities, businesses, and the public are spending enormous sums purchasing fossil fuel-powered backup generation, expenditures that run counter to Californias environmental goals. goals and can be avoided with available clean energy technologies.(5) Local governments have the greatest degree of local political accountability and the ability to identify, working in collaboration with community-based organizations, which facilities are most important to local residents, residents and necessary to maintain public health and safety, and to plan for can most effectively integrate the permitting of distributed energy resources capable of providing electricity during outages. Local governments that have formed a community choice aggregator or other regional energy collaborative are well positioned to work together through that entity to develop an energy resilience plan covering the larger geographic area served by the community choice aggregator or other regional energy collaborative.(6) With proper engineering and planning, local governments will be able to speed deployment of resilient clean energy systems and take advantage of state, federal, and other funding sources.(c) It is the intent of the Legislature to do all of the following:(1) Increase employment in California through deployment of community energy resilience improvements based on clean energy.(2) Prioritize development of clean energy resilience in lower income communities that suffer the most from air pollution and power outages.(3) Direct the State Energy Resources Conservation and Development Commission to develop necessary guidelines and procedures for implementation of a new program to provide technical guidance and financial assistance for local governments to develop and implement community energy resilience plans, including specific resilience projects that can be implemented upon receiving an appropriation from the Legislature to fund this program.SEC. 2. Division 16.7 (commencing with Section 26450) is added to the Public Resources Code, to read:DIVISION 16.7. Community Energy Resilience Planning26450. For the purposes of this division, the following terms have the following meanings:(a) Commission means the State Energy Resources Conservation and Development Commission, commonly known as the California Energy Commission.(b) Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code. (c) Community energy resilience plan means a planning document prepared by a local government or government, community choice aggregator aggregator, or regional energy collaborative pursuant to this division that sets forth a strategy and identifies specific projects for maintaining a reliable supply of electricity during both reducing the adverse impacts associated with electrical power interruptions resulting from scheduled and unintended outages. Unless the context requires otherwise, plan means a community energy resilience plan.(d) Critical facility means the types of facilities described in Public Utilities Commission Decision 19-05-042, Decision Adopting De-Energization Guidelines, or any subsequent amendments to that decision by the Public Utilities Commission, and other facilities identified by a local government. (d)(e) Local government means a city, county, city and county, or community choice aggregator. or California Native American tribe, as defined in Section 21073.(e)(f) Public utility means an electrical corporation, as defined in Section 218 of the Public Utilities Code, or a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code.26451. (a) The commission shall develop and implement a grant program pursuant to this division for local governments to develop community energy resilience plans. plans and expedite permit review of distributed energy resources. A community choice aggregator or other regional energy collaborative may apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government.(b) Before dispersing grant funds pursuant to this division, the commission shall do both all of the following:(1) Develop and adopt project solicitation and evaluation guidelines procedures for applicants to submit a community energy resilience plan funding proposal to develop to do both of the following:(A) Develop a community energy resilience plan and for overall plan structure and content, including development of a formula for prioritizing funds for critical facilities in low-income or disadvantaged communities that are most likely to experience future electrical grid deenergization events, followed in priority by other critical facilities statewide.(B) Develop a process for the expedited permit review of distributed energy resources.(2) Conduct two public meetings to consider public comment.(c) The project solicitation and evaluation guidelines procedures shall prioritize proposals for funding that would support all both of the following:(1) Equitable collaboration between public utilities, local governments, community-based organizations, and state agencies to yield plans that not only help achieve local energy resilience objectives, but also state renewable energy goals.(2) Integration of available mobile storage resources that may become available through transportation electrification.(3)Integration of community energy resilience plans with other existing local government planning documents, including general plans and climate action plans, with an assumption that, upon completion, a community energy resilience plan would be incorporated by the local government into the existing general plan.(d) A community energy resiliency plan shall be consistent with the city, county, or city and county general plan and other local government planning documents. The plan may include provisions to facilitate the expedited local permitting of community energy resilience projects identified in the plan. (d)(e) The commission shall fund technical assistance providers to assist in plan development, including all of the following:(1) Identifying and coordinating with appropriate local government staff and outside consultants capable of drafting the plan. A local government may hire a resilience manager to manage the plan development process and the implementation of any specific projects identified in the plan.(2) Convening and facilitating one or more community workshops enlisting local stakeholders, including, but not limited to, labor representatives, representatives from community-based organizations, community members, representatives from related technology vendors, local government staff in departments relating to emergency services, planning, and public works, disability rights advocates, and representatives from special districts, load-serving entities, school districts, environmental justice communities, communities of color, and other marginalized groups, to ensure that a diversity of perspectives and input is incorporated into the plan.(3) Soliciting and utilizing input from public utility operational and technical subject matter experts, including relevant data to enable local governments to design their plans to make efficient use of existing distribution infrastructure and support grid operation. (4) Providing guidance and support to each local government receiving plan funds for the local government to designate a diverse plan steering committee to ensure robust and meaningful public participation.(e)(f) A plan for which a local government government, community choice aggregator, or regional energy collaborative receives grant funding shall do all of the following:(1) Identify critical facilities, including facilities that can serve as community resilience hubs. hubs to accommodate and provide basic services to people who have lost power to their homes.(2) Identify areas most likely to experience a loss of electrical service based on public utility determinations of remote or hazardous areas likely to be subject to a planned deenergization of the electrical grid.(3)Include a preliminary feasibility analysis of expected costs and benefits for anticipated projects within the local jurisdiction. A proposed plan shall also include an analysis of multiple project options for each location, including distribution segmentation and microgrids.(3) Identify electrical distribution system improvements that can be undertaken by a public utility and that will reduce the risk of deenergization for communities and critical facilities.(4) Identify projects that can be combined to share engineering costs and achieve scalability of projects across like facilities to create the most value for a community.(5) Identify locations and facilities where the construction of microgrids could meet local resilience needs.(6) Identify critical facilities that are in greatest need of backup energy generation and potential backup energy systems that may meet the needs of those facilities.(7) Identify potential funding sources for implementation of projects included in the plan.(g) Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative pursuant to this division may be expended to complete environmental clearance of community energy resilience projects identified in the plan. (f)(h) Grant funding awarded to a local government local government, community choice aggregator, or regional energy collaborative pursuant to this division does not affect the entitys eligibility to receive other incentives available from federal, state, or other local governments, public utilities, or any other source, or to leverage the grant funding awarded pursuant to this division with any other incentive.(i) A public utility shall share information identifying critical facilities and areas most likely to experience a loss of electricity with a local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan.26452. (a) The commission shall maintain a publicly available and searchable database of all local governments local governments, community choice aggregators, or regional energy collaboratives receiving grant funding pursuant to this division, including information on specific plan projects. The database shall include relevant metrics to be determined by the commission.(b) As a condition of receiving grant funding, within six months of completing its plan, a local government government, community choice aggregator, or regional energy collaborative shall submit the plan and a report of project expenditures to the commission.(c) (1) The commission shall prepare an annual summary of statewide program expenditures and hire an independent, third-party evaluator to quantify and evaluate the effects of the grant program.(2) Pursuant to Section 9795 of the Government Code, the commission shall annually report the information it receives to the Legislature and post the report on its internet website.
4241
4342 The people of the State of California do enact as follows:
4443
4544 ## The people of the State of California do enact as follows:
4645
47-SECTION 1. (a) This act shall be known, and may be cited, as the Community Energy Resilience Act of 2021.(b) The Legislature finds and declares all of the following:(1) Development and implementation of community energy resilience plans will help ensure continuous electricity service during power outages, including unplanned outages and intentional deenergizations of the electrical grid, which in recent years have imposed enormous costs on California communities.(2) Developing reliable electrical systems for critical facilities is a paramount public safety priority to protect the health and well-being of California residents and businesses.(3) Local governments and community-based organizations typically lack the financial resources or expertise needed for community energy resilience planning in order to increase the utilization of distributed clean energy resources.(4)In the absence of community energy resilience plans, local governments, investor-owned utilities, businesses, and the public are spending enormous sums purchasing fossil fuel-powered backup generation, expenditures that run counter to Californias environmental goals and can be avoided with available clean energy technologies.(5)(4) Local governments have the greatest degree of local political accountability and the ability to identify, working in collaboration with community-based organizations, which facilities are most important to local residents and necessary to maintain public health and safety, and can most effectively integrate the permitting of distributed energy resources capable of providing electricity during outages. Local governments that have formed a community choice aggregator or other regional energy collaborative are well positioned to work together through that entity to develop an energy resilience plan covering the larger geographic area served by the community choice aggregator or other regional energy collaborative.(6)(5) With proper engineering and planning, local governments will be able to speed deployment of resilient clean energy systems and take advantage of state, federal, and other funding sources.(c) It is the intent of the Legislature to do all of the following:(1)Increase employment in California through deployment of community energy resilience improvements based on clean energy.(2)Prioritize development of clean energy resilience in lower income communities that suffer the most from air pollution and power outages.(3)Direct direct the State Energy Resources Conservation and Development Commission to develop necessary procedures for implementation of a new program to provide technical guidance and financial assistance for local governments to develop and implement community energy resilience plans, including specific resilience projects that can be implemented upon receiving an appropriation from the Legislature to fund this program. plans.
46+SECTION 1. (a) This act shall be known, and may be cited, as the Community Energy Resilience Act of 2021.(b) The Legislature finds and declares all of the following:(1) California local governments need to develop Development and implement implementation of community energy resilience plans to will help ensure continuous electricity service during outages, including unplanned outages and intentional deenergizations of the electrical grid, which in recent years have imposed enormous costs on California communities.(2) Developing reliable electrical systems for critical facilities is a paramount public safety priority to protect the health and well-being of California residents and businesses.(3) Local governments and community-based organizations typically lack the financial resources or expertise needed for community energy resilience planning based on in order to increase the utilization of distributed clean energy resources.(4) In the absence of community energy resilience plans, local governments, investor-owned utilities, businesses, and the public are spending enormous sums purchasing fossil fuel-powered backup generation, expenditures that run counter to Californias environmental goals. goals and can be avoided with available clean energy technologies.(5) Local governments have the greatest degree of local political accountability and the ability to identify, working in collaboration with community-based organizations, which facilities are most important to local residents, residents and necessary to maintain public health and safety, and to plan for can most effectively integrate the permitting of distributed energy resources capable of providing electricity during outages. Local governments that have formed a community choice aggregator or other regional energy collaborative are well positioned to work together through that entity to develop an energy resilience plan covering the larger geographic area served by the community choice aggregator or other regional energy collaborative.(6) With proper engineering and planning, local governments will be able to speed deployment of resilient clean energy systems and take advantage of state, federal, and other funding sources.(c) It is the intent of the Legislature to do all of the following:(1) Increase employment in California through deployment of community energy resilience improvements based on clean energy.(2) Prioritize development of clean energy resilience in lower income communities that suffer the most from air pollution and power outages.(3) Direct the State Energy Resources Conservation and Development Commission to develop necessary guidelines and procedures for implementation of a new program to provide technical guidance and financial assistance for local governments to develop and implement community energy resilience plans, including specific resilience projects that can be implemented upon receiving an appropriation from the Legislature to fund this program.
4847
49-SECTION 1. (a) This act shall be known, and may be cited, as the Community Energy Resilience Act of 2021.(b) The Legislature finds and declares all of the following:(1) Development and implementation of community energy resilience plans will help ensure continuous electricity service during power outages, including unplanned outages and intentional deenergizations of the electrical grid, which in recent years have imposed enormous costs on California communities.(2) Developing reliable electrical systems for critical facilities is a paramount public safety priority to protect the health and well-being of California residents and businesses.(3) Local governments and community-based organizations typically lack the financial resources or expertise needed for community energy resilience planning in order to increase the utilization of distributed clean energy resources.(4)In the absence of community energy resilience plans, local governments, investor-owned utilities, businesses, and the public are spending enormous sums purchasing fossil fuel-powered backup generation, expenditures that run counter to Californias environmental goals and can be avoided with available clean energy technologies.(5)(4) Local governments have the greatest degree of local political accountability and the ability to identify, working in collaboration with community-based organizations, which facilities are most important to local residents and necessary to maintain public health and safety, and can most effectively integrate the permitting of distributed energy resources capable of providing electricity during outages. Local governments that have formed a community choice aggregator or other regional energy collaborative are well positioned to work together through that entity to develop an energy resilience plan covering the larger geographic area served by the community choice aggregator or other regional energy collaborative.(6)(5) With proper engineering and planning, local governments will be able to speed deployment of resilient clean energy systems and take advantage of state, federal, and other funding sources.(c) It is the intent of the Legislature to do all of the following:(1)Increase employment in California through deployment of community energy resilience improvements based on clean energy.(2)Prioritize development of clean energy resilience in lower income communities that suffer the most from air pollution and power outages.(3)Direct direct the State Energy Resources Conservation and Development Commission to develop necessary procedures for implementation of a new program to provide technical guidance and financial assistance for local governments to develop and implement community energy resilience plans, including specific resilience projects that can be implemented upon receiving an appropriation from the Legislature to fund this program. plans.
48+SECTION 1. (a) This act shall be known, and may be cited, as the Community Energy Resilience Act of 2021.(b) The Legislature finds and declares all of the following:(1) California local governments need to develop Development and implement implementation of community energy resilience plans to will help ensure continuous electricity service during outages, including unplanned outages and intentional deenergizations of the electrical grid, which in recent years have imposed enormous costs on California communities.(2) Developing reliable electrical systems for critical facilities is a paramount public safety priority to protect the health and well-being of California residents and businesses.(3) Local governments and community-based organizations typically lack the financial resources or expertise needed for community energy resilience planning based on in order to increase the utilization of distributed clean energy resources.(4) In the absence of community energy resilience plans, local governments, investor-owned utilities, businesses, and the public are spending enormous sums purchasing fossil fuel-powered backup generation, expenditures that run counter to Californias environmental goals. goals and can be avoided with available clean energy technologies.(5) Local governments have the greatest degree of local political accountability and the ability to identify, working in collaboration with community-based organizations, which facilities are most important to local residents, residents and necessary to maintain public health and safety, and to plan for can most effectively integrate the permitting of distributed energy resources capable of providing electricity during outages. Local governments that have formed a community choice aggregator or other regional energy collaborative are well positioned to work together through that entity to develop an energy resilience plan covering the larger geographic area served by the community choice aggregator or other regional energy collaborative.(6) With proper engineering and planning, local governments will be able to speed deployment of resilient clean energy systems and take advantage of state, federal, and other funding sources.(c) It is the intent of the Legislature to do all of the following:(1) Increase employment in California through deployment of community energy resilience improvements based on clean energy.(2) Prioritize development of clean energy resilience in lower income communities that suffer the most from air pollution and power outages.(3) Direct the State Energy Resources Conservation and Development Commission to develop necessary guidelines and procedures for implementation of a new program to provide technical guidance and financial assistance for local governments to develop and implement community energy resilience plans, including specific resilience projects that can be implemented upon receiving an appropriation from the Legislature to fund this program.
5049
5150 SECTION 1. (a) This act shall be known, and may be cited, as the Community Energy Resilience Act of 2021.
5251
5352 ### SECTION 1.
5453
5554 (b) The Legislature finds and declares all of the following:
5655
57-(1) Development and implementation of community energy resilience plans will help ensure continuous electricity service during power outages, including unplanned outages and intentional deenergizations of the electrical grid, which in recent years have imposed enormous costs on California communities.
56+(1) California local governments need to develop Development and implement implementation of community energy resilience plans to will help ensure continuous electricity service during outages, including unplanned outages and intentional deenergizations of the electrical grid, which in recent years have imposed enormous costs on California communities.
5857
5958 (2) Developing reliable electrical systems for critical facilities is a paramount public safety priority to protect the health and well-being of California residents and businesses.
6059
61-(3) Local governments and community-based organizations typically lack the financial resources or expertise needed for community energy resilience planning in order to increase the utilization of distributed clean energy resources.
60+(3) Local governments and community-based organizations typically lack the financial resources or expertise needed for community energy resilience planning based on in order to increase the utilization of distributed clean energy resources.
6261
63-(4)In the absence of community energy resilience plans, local governments, investor-owned utilities, businesses, and the public are spending enormous sums purchasing fossil fuel-powered backup generation, expenditures that run counter to Californias environmental goals and can be avoided with available clean energy technologies.
62+(4) In the absence of community energy resilience plans, local governments, investor-owned utilities, businesses, and the public are spending enormous sums purchasing fossil fuel-powered backup generation, expenditures that run counter to Californias environmental goals. goals and can be avoided with available clean energy technologies.
6463
64+(5) Local governments have the greatest degree of local political accountability and the ability to identify, working in collaboration with community-based organizations, which facilities are most important to local residents, residents and necessary to maintain public health and safety, and to plan for can most effectively integrate the permitting of distributed energy resources capable of providing electricity during outages. Local governments that have formed a community choice aggregator or other regional energy collaborative are well positioned to work together through that entity to develop an energy resilience plan covering the larger geographic area served by the community choice aggregator or other regional energy collaborative.
6565
66-
67-(5)
68-
69-
70-
71-(4) Local governments have the greatest degree of local political accountability and the ability to identify, working in collaboration with community-based organizations, which facilities are most important to local residents and necessary to maintain public health and safety, and can most effectively integrate the permitting of distributed energy resources capable of providing electricity during outages. Local governments that have formed a community choice aggregator or other regional energy collaborative are well positioned to work together through that entity to develop an energy resilience plan covering the larger geographic area served by the community choice aggregator or other regional energy collaborative.
72-
73-(6)
74-
75-
76-
77-(5) With proper engineering and planning, local governments will be able to speed deployment of resilient clean energy systems and take advantage of state, federal, and other funding sources.
66+(6) With proper engineering and planning, local governments will be able to speed deployment of resilient clean energy systems and take advantage of state, federal, and other funding sources.
7867
7968 (c) It is the intent of the Legislature to do all of the following:
8069
8170 (1) Increase employment in California through deployment of community energy resilience improvements based on clean energy.
8271
83-
84-
8572 (2) Prioritize development of clean energy resilience in lower income communities that suffer the most from air pollution and power outages.
8673
74+(3) Direct the State Energy Resources Conservation and Development Commission to develop necessary guidelines and procedures for implementation of a new program to provide technical guidance and financial assistance for local governments to develop and implement community energy resilience plans, including specific resilience projects that can be implemented upon receiving an appropriation from the Legislature to fund this program.
8775
88-
89-(3)Direct direct the State Energy Resources Conservation and Development Commission to develop necessary procedures for implementation of a new program to provide technical guidance and financial assistance for local governments to develop and implement community energy resilience plans, including specific resilience projects that can be implemented upon receiving an appropriation from the Legislature to fund this program. plans.
90-
91-SEC. 2. Division 16.7 (commencing with Section 26450) is added to the Public Resources Code, to read:DIVISION 16.7. Community Energy Resilience Planning26450. For the purposes of this division, the following terms have the following meanings:(a) Commission means the State Energy Resources Conservation and Development Commission, commonly known as the California Energy Commission.(b)Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code. (c)(b) Community energy resilience plan means a planning document prepared by a local government, community choice aggregator, or regional energy collaborative government pursuant to this division that sets forth a strategy and identifies specific projects for reducing the adverse impacts associated with electrical power interruptions resulting from scheduled and unintended outages. Unless the context requires otherwise, plan means a community energy resilience plan.(d)Critical facility means the types of facilities described in Public Utilities Commission Decision 19-05-042, Decision Adopting De-Energization Guidelines, or any subsequent amendments to that decision by the Public Utilities Commission, and other facilities identified by a local government. (e)(c) Local government means a city, county, city and county, or California Native American tribe, as defined in Section 21073.(f)(d) Public utility means an electrical corporation, as defined in Section 218 of the Public Utilities Code, or a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code.26451. (a) The commission shall develop and implement a grant program pursuant to this division for local governments to develop community energy resilience plans and expedite permit review of distributed energy resources. A community choice aggregator or other regional energy collaborative may apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. resources by local governments.(b) Before dispersing grant funds pursuant to this division, the commission shall do all both of the following:(1) Develop and adopt solicitation and evaluation procedures for applicants to submit a community energy resilience plan funding proposal to do both of the following:(A) Develop a community energy resilience plan and for overall plan structure and content, including development of a formula for prioritizing funds for critical facilities in low-income or disadvantaged communities that are most likely to experience future electrical grid deenergization events, power outages, followed in priority by other critical facilities statewide. in the planning area.(B) Develop a process for the expedited permit review of distributed energy resources. resources by local governments.(2) Conduct two public meetings to consider public comment.(c) The project plan solicitation and evaluation procedures shall prioritize proposals for funding that would support both of the following:(1)Equitable equitable collaboration between public utilities, local governments, community-based organizations, and state agencies to yield plans that not only help achieve local energy resilience objectives, but also state renewable energy goals.(2)Integration of available mobile storage resources that may become available through transportation electrification.(d) A community energy resiliency plan shall be consistent with the city, county, or city and county general plan and other local government planning documents. The plan may include provisions to facilitate the expedited local permitting of community energy resilience projects identified in the plan. distributed energy resources.(e) The commission shall fund technical assistance providers to assist in plan development, including all of the following:(1) Identifying and coordinating with appropriate local government staff and outside consultants capable of drafting the plan. A local government may hire a resilience manager to manage the plan development process and the implementation of any specific projects identified in the plan.(2) Convening and facilitating one or more community workshops enlisting local stakeholders, including, but not limited to, labor representatives, representatives from community-based organizations, community members, representatives from related technology vendors, local government staff in departments relating to emergency services, planning, and public works, disability rights advocates, and representatives from special districts, load-serving entities, school districts, environmental justice communities, communities of color, and other marginalized groups, to ensure that a diversity of perspectives and input is incorporated into the plan.(3) Soliciting and utilizing input from public utility operational and technical subject matter experts, including relevant data to enable local governments to design their plans to make efficient use of existing distribution infrastructure and support grid operation. experts.(4) Providing guidance and support to each local government receiving plan funds for the local government to designate a diverse plan steering committee to ensure robust and meaningful public participation.(f) A plan for which a local government, community choice aggregator, or regional energy collaborative government receives grant funding shall do all of the following:(1) Identify critical facilities, including facilities that can serve as community resilience hubs to accommodate and provide basic services to people who have lost power to their homes.(2)Identify areas most likely to experience a loss of electrical service based on public utility determinations of remote or hazardous areas likely to be subject to a planned deenergization of the electrical grid.(3)Identify electrical distribution system improvements that can be undertaken by a public utility and that will reduce the risk of deenergization for communities and critical facilities.(4)Identify projects that can be combined to share engineering costs and achieve scalability of projects across like facilities to create the most value for a community.(5)(2) Identify locations and facilities where the construction of microgrids could meet local resilience needs.(6)(3) Identify critical facilities that are in greatest need of backup energy generation and potential backup energy systems that may meet the needs of those facilities.(7)(4) Identify potential funding sources for implementation of projects included in the plan.(g)Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative pursuant to this division may be expended to complete environmental clearance of community energy resilience projects identified in the plan. (h)(g) Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative government pursuant to this division does not affect the entitys eligibility to receive other incentives available from federal, state, or other local governments, public utilities, or any other source, or to leverage the grant funding awarded pursuant to this division with any other incentive.(i)A public utility shall share information identifying critical facilities and areas most likely to experience a loss of electricity with a local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan.26452. (a) The commission shall maintain a publicly available and searchable database of all local governments, community choice aggregators, or regional energy collaboratives governments receiving grant funding pursuant to this division, including information on specific plan projects. division. The database shall include relevant metrics to be determined by the commission.(b) As a condition of receiving grant funding, within six months of completing its plan, a local government, community choice aggregator, or regional energy collaborative government shall submit the plan and a report of project expenditures to the commission.(c) (1) The commission shall prepare an annual summary of statewide program expenditures and hire an independent, third-party evaluator to quantify and evaluate the effects of the grant program.(2) Pursuant to Section 9795 of the Government Code, the commission shall annually report the information it receives to the Legislature and post the report on its internet website.
76+SEC. 2. Division 16.7 (commencing with Section 26450) is added to the Public Resources Code, to read:DIVISION 16.7. Community Energy Resilience Planning26450. For the purposes of this division, the following terms have the following meanings:(a) Commission means the State Energy Resources Conservation and Development Commission, commonly known as the California Energy Commission.(b) Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code. (c) Community energy resilience plan means a planning document prepared by a local government or government, community choice aggregator aggregator, or regional energy collaborative pursuant to this division that sets forth a strategy and identifies specific projects for maintaining a reliable supply of electricity during both reducing the adverse impacts associated with electrical power interruptions resulting from scheduled and unintended outages. Unless the context requires otherwise, plan means a community energy resilience plan.(d) Critical facility means the types of facilities described in Public Utilities Commission Decision 19-05-042, Decision Adopting De-Energization Guidelines, or any subsequent amendments to that decision by the Public Utilities Commission, and other facilities identified by a local government. (d)(e) Local government means a city, county, city and county, or community choice aggregator. or California Native American tribe, as defined in Section 21073.(e)(f) Public utility means an electrical corporation, as defined in Section 218 of the Public Utilities Code, or a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code.26451. (a) The commission shall develop and implement a grant program pursuant to this division for local governments to develop community energy resilience plans. plans and expedite permit review of distributed energy resources. A community choice aggregator or other regional energy collaborative may apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government.(b) Before dispersing grant funds pursuant to this division, the commission shall do both all of the following:(1) Develop and adopt project solicitation and evaluation guidelines procedures for applicants to submit a community energy resilience plan funding proposal to develop to do both of the following:(A) Develop a community energy resilience plan and for overall plan structure and content, including development of a formula for prioritizing funds for critical facilities in low-income or disadvantaged communities that are most likely to experience future electrical grid deenergization events, followed in priority by other critical facilities statewide.(B) Develop a process for the expedited permit review of distributed energy resources.(2) Conduct two public meetings to consider public comment.(c) The project solicitation and evaluation guidelines procedures shall prioritize proposals for funding that would support all both of the following:(1) Equitable collaboration between public utilities, local governments, community-based organizations, and state agencies to yield plans that not only help achieve local energy resilience objectives, but also state renewable energy goals.(2) Integration of available mobile storage resources that may become available through transportation electrification.(3)Integration of community energy resilience plans with other existing local government planning documents, including general plans and climate action plans, with an assumption that, upon completion, a community energy resilience plan would be incorporated by the local government into the existing general plan.(d) A community energy resiliency plan shall be consistent with the city, county, or city and county general plan and other local government planning documents. The plan may include provisions to facilitate the expedited local permitting of community energy resilience projects identified in the plan. (d)(e) The commission shall fund technical assistance providers to assist in plan development, including all of the following:(1) Identifying and coordinating with appropriate local government staff and outside consultants capable of drafting the plan. A local government may hire a resilience manager to manage the plan development process and the implementation of any specific projects identified in the plan.(2) Convening and facilitating one or more community workshops enlisting local stakeholders, including, but not limited to, labor representatives, representatives from community-based organizations, community members, representatives from related technology vendors, local government staff in departments relating to emergency services, planning, and public works, disability rights advocates, and representatives from special districts, load-serving entities, school districts, environmental justice communities, communities of color, and other marginalized groups, to ensure that a diversity of perspectives and input is incorporated into the plan.(3) Soliciting and utilizing input from public utility operational and technical subject matter experts, including relevant data to enable local governments to design their plans to make efficient use of existing distribution infrastructure and support grid operation. (4) Providing guidance and support to each local government receiving plan funds for the local government to designate a diverse plan steering committee to ensure robust and meaningful public participation.(e)(f) A plan for which a local government government, community choice aggregator, or regional energy collaborative receives grant funding shall do all of the following:(1) Identify critical facilities, including facilities that can serve as community resilience hubs. hubs to accommodate and provide basic services to people who have lost power to their homes.(2) Identify areas most likely to experience a loss of electrical service based on public utility determinations of remote or hazardous areas likely to be subject to a planned deenergization of the electrical grid.(3)Include a preliminary feasibility analysis of expected costs and benefits for anticipated projects within the local jurisdiction. A proposed plan shall also include an analysis of multiple project options for each location, including distribution segmentation and microgrids.(3) Identify electrical distribution system improvements that can be undertaken by a public utility and that will reduce the risk of deenergization for communities and critical facilities.(4) Identify projects that can be combined to share engineering costs and achieve scalability of projects across like facilities to create the most value for a community.(5) Identify locations and facilities where the construction of microgrids could meet local resilience needs.(6) Identify critical facilities that are in greatest need of backup energy generation and potential backup energy systems that may meet the needs of those facilities.(7) Identify potential funding sources for implementation of projects included in the plan.(g) Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative pursuant to this division may be expended to complete environmental clearance of community energy resilience projects identified in the plan. (f)(h) Grant funding awarded to a local government local government, community choice aggregator, or regional energy collaborative pursuant to this division does not affect the entitys eligibility to receive other incentives available from federal, state, or other local governments, public utilities, or any other source, or to leverage the grant funding awarded pursuant to this division with any other incentive.(i) A public utility shall share information identifying critical facilities and areas most likely to experience a loss of electricity with a local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan.26452. (a) The commission shall maintain a publicly available and searchable database of all local governments local governments, community choice aggregators, or regional energy collaboratives receiving grant funding pursuant to this division, including information on specific plan projects. The database shall include relevant metrics to be determined by the commission.(b) As a condition of receiving grant funding, within six months of completing its plan, a local government government, community choice aggregator, or regional energy collaborative shall submit the plan and a report of project expenditures to the commission.(c) (1) The commission shall prepare an annual summary of statewide program expenditures and hire an independent, third-party evaluator to quantify and evaluate the effects of the grant program.(2) Pursuant to Section 9795 of the Government Code, the commission shall annually report the information it receives to the Legislature and post the report on its internet website.
9277
9378 SEC. 2. Division 16.7 (commencing with Section 26450) is added to the Public Resources Code, to read:
9479
9580 ### SEC. 2.
9681
97-DIVISION 16.7. Community Energy Resilience Planning26450. For the purposes of this division, the following terms have the following meanings:(a) Commission means the State Energy Resources Conservation and Development Commission, commonly known as the California Energy Commission.(b)Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code. (c)(b) Community energy resilience plan means a planning document prepared by a local government, community choice aggregator, or regional energy collaborative government pursuant to this division that sets forth a strategy and identifies specific projects for reducing the adverse impacts associated with electrical power interruptions resulting from scheduled and unintended outages. Unless the context requires otherwise, plan means a community energy resilience plan.(d)Critical facility means the types of facilities described in Public Utilities Commission Decision 19-05-042, Decision Adopting De-Energization Guidelines, or any subsequent amendments to that decision by the Public Utilities Commission, and other facilities identified by a local government. (e)(c) Local government means a city, county, city and county, or California Native American tribe, as defined in Section 21073.(f)(d) Public utility means an electrical corporation, as defined in Section 218 of the Public Utilities Code, or a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code.26451. (a) The commission shall develop and implement a grant program pursuant to this division for local governments to develop community energy resilience plans and expedite permit review of distributed energy resources. A community choice aggregator or other regional energy collaborative may apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. resources by local governments.(b) Before dispersing grant funds pursuant to this division, the commission shall do all both of the following:(1) Develop and adopt solicitation and evaluation procedures for applicants to submit a community energy resilience plan funding proposal to do both of the following:(A) Develop a community energy resilience plan and for overall plan structure and content, including development of a formula for prioritizing funds for critical facilities in low-income or disadvantaged communities that are most likely to experience future electrical grid deenergization events, power outages, followed in priority by other critical facilities statewide. in the planning area.(B) Develop a process for the expedited permit review of distributed energy resources. resources by local governments.(2) Conduct two public meetings to consider public comment.(c) The project plan solicitation and evaluation procedures shall prioritize proposals for funding that would support both of the following:(1)Equitable equitable collaboration between public utilities, local governments, community-based organizations, and state agencies to yield plans that not only help achieve local energy resilience objectives, but also state renewable energy goals.(2)Integration of available mobile storage resources that may become available through transportation electrification.(d) A community energy resiliency plan shall be consistent with the city, county, or city and county general plan and other local government planning documents. The plan may include provisions to facilitate the expedited local permitting of community energy resilience projects identified in the plan. distributed energy resources.(e) The commission shall fund technical assistance providers to assist in plan development, including all of the following:(1) Identifying and coordinating with appropriate local government staff and outside consultants capable of drafting the plan. A local government may hire a resilience manager to manage the plan development process and the implementation of any specific projects identified in the plan.(2) Convening and facilitating one or more community workshops enlisting local stakeholders, including, but not limited to, labor representatives, representatives from community-based organizations, community members, representatives from related technology vendors, local government staff in departments relating to emergency services, planning, and public works, disability rights advocates, and representatives from special districts, load-serving entities, school districts, environmental justice communities, communities of color, and other marginalized groups, to ensure that a diversity of perspectives and input is incorporated into the plan.(3) Soliciting and utilizing input from public utility operational and technical subject matter experts, including relevant data to enable local governments to design their plans to make efficient use of existing distribution infrastructure and support grid operation. experts.(4) Providing guidance and support to each local government receiving plan funds for the local government to designate a diverse plan steering committee to ensure robust and meaningful public participation.(f) A plan for which a local government, community choice aggregator, or regional energy collaborative government receives grant funding shall do all of the following:(1) Identify critical facilities, including facilities that can serve as community resilience hubs to accommodate and provide basic services to people who have lost power to their homes.(2)Identify areas most likely to experience a loss of electrical service based on public utility determinations of remote or hazardous areas likely to be subject to a planned deenergization of the electrical grid.(3)Identify electrical distribution system improvements that can be undertaken by a public utility and that will reduce the risk of deenergization for communities and critical facilities.(4)Identify projects that can be combined to share engineering costs and achieve scalability of projects across like facilities to create the most value for a community.(5)(2) Identify locations and facilities where the construction of microgrids could meet local resilience needs.(6)(3) Identify critical facilities that are in greatest need of backup energy generation and potential backup energy systems that may meet the needs of those facilities.(7)(4) Identify potential funding sources for implementation of projects included in the plan.(g)Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative pursuant to this division may be expended to complete environmental clearance of community energy resilience projects identified in the plan. (h)(g) Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative government pursuant to this division does not affect the entitys eligibility to receive other incentives available from federal, state, or other local governments, public utilities, or any other source, or to leverage the grant funding awarded pursuant to this division with any other incentive.(i)A public utility shall share information identifying critical facilities and areas most likely to experience a loss of electricity with a local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan.26452. (a) The commission shall maintain a publicly available and searchable database of all local governments, community choice aggregators, or regional energy collaboratives governments receiving grant funding pursuant to this division, including information on specific plan projects. division. The database shall include relevant metrics to be determined by the commission.(b) As a condition of receiving grant funding, within six months of completing its plan, a local government, community choice aggregator, or regional energy collaborative government shall submit the plan and a report of project expenditures to the commission.(c) (1) The commission shall prepare an annual summary of statewide program expenditures and hire an independent, third-party evaluator to quantify and evaluate the effects of the grant program.(2) Pursuant to Section 9795 of the Government Code, the commission shall annually report the information it receives to the Legislature and post the report on its internet website.
82+DIVISION 16.7. Community Energy Resilience Planning26450. For the purposes of this division, the following terms have the following meanings:(a) Commission means the State Energy Resources Conservation and Development Commission, commonly known as the California Energy Commission.(b) Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code. (c) Community energy resilience plan means a planning document prepared by a local government or government, community choice aggregator aggregator, or regional energy collaborative pursuant to this division that sets forth a strategy and identifies specific projects for maintaining a reliable supply of electricity during both reducing the adverse impacts associated with electrical power interruptions resulting from scheduled and unintended outages. Unless the context requires otherwise, plan means a community energy resilience plan.(d) Critical facility means the types of facilities described in Public Utilities Commission Decision 19-05-042, Decision Adopting De-Energization Guidelines, or any subsequent amendments to that decision by the Public Utilities Commission, and other facilities identified by a local government. (d)(e) Local government means a city, county, city and county, or community choice aggregator. or California Native American tribe, as defined in Section 21073.(e)(f) Public utility means an electrical corporation, as defined in Section 218 of the Public Utilities Code, or a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code.26451. (a) The commission shall develop and implement a grant program pursuant to this division for local governments to develop community energy resilience plans. plans and expedite permit review of distributed energy resources. A community choice aggregator or other regional energy collaborative may apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government.(b) Before dispersing grant funds pursuant to this division, the commission shall do both all of the following:(1) Develop and adopt project solicitation and evaluation guidelines procedures for applicants to submit a community energy resilience plan funding proposal to develop to do both of the following:(A) Develop a community energy resilience plan and for overall plan structure and content, including development of a formula for prioritizing funds for critical facilities in low-income or disadvantaged communities that are most likely to experience future electrical grid deenergization events, followed in priority by other critical facilities statewide.(B) Develop a process for the expedited permit review of distributed energy resources.(2) Conduct two public meetings to consider public comment.(c) The project solicitation and evaluation guidelines procedures shall prioritize proposals for funding that would support all both of the following:(1) Equitable collaboration between public utilities, local governments, community-based organizations, and state agencies to yield plans that not only help achieve local energy resilience objectives, but also state renewable energy goals.(2) Integration of available mobile storage resources that may become available through transportation electrification.(3)Integration of community energy resilience plans with other existing local government planning documents, including general plans and climate action plans, with an assumption that, upon completion, a community energy resilience plan would be incorporated by the local government into the existing general plan.(d) A community energy resiliency plan shall be consistent with the city, county, or city and county general plan and other local government planning documents. The plan may include provisions to facilitate the expedited local permitting of community energy resilience projects identified in the plan. (d)(e) The commission shall fund technical assistance providers to assist in plan development, including all of the following:(1) Identifying and coordinating with appropriate local government staff and outside consultants capable of drafting the plan. A local government may hire a resilience manager to manage the plan development process and the implementation of any specific projects identified in the plan.(2) Convening and facilitating one or more community workshops enlisting local stakeholders, including, but not limited to, labor representatives, representatives from community-based organizations, community members, representatives from related technology vendors, local government staff in departments relating to emergency services, planning, and public works, disability rights advocates, and representatives from special districts, load-serving entities, school districts, environmental justice communities, communities of color, and other marginalized groups, to ensure that a diversity of perspectives and input is incorporated into the plan.(3) Soliciting and utilizing input from public utility operational and technical subject matter experts, including relevant data to enable local governments to design their plans to make efficient use of existing distribution infrastructure and support grid operation. (4) Providing guidance and support to each local government receiving plan funds for the local government to designate a diverse plan steering committee to ensure robust and meaningful public participation.(e)(f) A plan for which a local government government, community choice aggregator, or regional energy collaborative receives grant funding shall do all of the following:(1) Identify critical facilities, including facilities that can serve as community resilience hubs. hubs to accommodate and provide basic services to people who have lost power to their homes.(2) Identify areas most likely to experience a loss of electrical service based on public utility determinations of remote or hazardous areas likely to be subject to a planned deenergization of the electrical grid.(3)Include a preliminary feasibility analysis of expected costs and benefits for anticipated projects within the local jurisdiction. A proposed plan shall also include an analysis of multiple project options for each location, including distribution segmentation and microgrids.(3) Identify electrical distribution system improvements that can be undertaken by a public utility and that will reduce the risk of deenergization for communities and critical facilities.(4) Identify projects that can be combined to share engineering costs and achieve scalability of projects across like facilities to create the most value for a community.(5) Identify locations and facilities where the construction of microgrids could meet local resilience needs.(6) Identify critical facilities that are in greatest need of backup energy generation and potential backup energy systems that may meet the needs of those facilities.(7) Identify potential funding sources for implementation of projects included in the plan.(g) Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative pursuant to this division may be expended to complete environmental clearance of community energy resilience projects identified in the plan. (f)(h) Grant funding awarded to a local government local government, community choice aggregator, or regional energy collaborative pursuant to this division does not affect the entitys eligibility to receive other incentives available from federal, state, or other local governments, public utilities, or any other source, or to leverage the grant funding awarded pursuant to this division with any other incentive.(i) A public utility shall share information identifying critical facilities and areas most likely to experience a loss of electricity with a local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan.26452. (a) The commission shall maintain a publicly available and searchable database of all local governments local governments, community choice aggregators, or regional energy collaboratives receiving grant funding pursuant to this division, including information on specific plan projects. The database shall include relevant metrics to be determined by the commission.(b) As a condition of receiving grant funding, within six months of completing its plan, a local government government, community choice aggregator, or regional energy collaborative shall submit the plan and a report of project expenditures to the commission.(c) (1) The commission shall prepare an annual summary of statewide program expenditures and hire an independent, third-party evaluator to quantify and evaluate the effects of the grant program.(2) Pursuant to Section 9795 of the Government Code, the commission shall annually report the information it receives to the Legislature and post the report on its internet website.
9883
99-DIVISION 16.7. Community Energy Resilience Planning26450. For the purposes of this division, the following terms have the following meanings:(a) Commission means the State Energy Resources Conservation and Development Commission, commonly known as the California Energy Commission.(b)Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code. (c)(b) Community energy resilience plan means a planning document prepared by a local government, community choice aggregator, or regional energy collaborative government pursuant to this division that sets forth a strategy and identifies specific projects for reducing the adverse impacts associated with electrical power interruptions resulting from scheduled and unintended outages. Unless the context requires otherwise, plan means a community energy resilience plan.(d)Critical facility means the types of facilities described in Public Utilities Commission Decision 19-05-042, Decision Adopting De-Energization Guidelines, or any subsequent amendments to that decision by the Public Utilities Commission, and other facilities identified by a local government. (e)(c) Local government means a city, county, city and county, or California Native American tribe, as defined in Section 21073.(f)(d) Public utility means an electrical corporation, as defined in Section 218 of the Public Utilities Code, or a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code.26451. (a) The commission shall develop and implement a grant program pursuant to this division for local governments to develop community energy resilience plans and expedite permit review of distributed energy resources. A community choice aggregator or other regional energy collaborative may apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. resources by local governments.(b) Before dispersing grant funds pursuant to this division, the commission shall do all both of the following:(1) Develop and adopt solicitation and evaluation procedures for applicants to submit a community energy resilience plan funding proposal to do both of the following:(A) Develop a community energy resilience plan and for overall plan structure and content, including development of a formula for prioritizing funds for critical facilities in low-income or disadvantaged communities that are most likely to experience future electrical grid deenergization events, power outages, followed in priority by other critical facilities statewide. in the planning area.(B) Develop a process for the expedited permit review of distributed energy resources. resources by local governments.(2) Conduct two public meetings to consider public comment.(c) The project plan solicitation and evaluation procedures shall prioritize proposals for funding that would support both of the following:(1)Equitable equitable collaboration between public utilities, local governments, community-based organizations, and state agencies to yield plans that not only help achieve local energy resilience objectives, but also state renewable energy goals.(2)Integration of available mobile storage resources that may become available through transportation electrification.(d) A community energy resiliency plan shall be consistent with the city, county, or city and county general plan and other local government planning documents. The plan may include provisions to facilitate the expedited local permitting of community energy resilience projects identified in the plan. distributed energy resources.(e) The commission shall fund technical assistance providers to assist in plan development, including all of the following:(1) Identifying and coordinating with appropriate local government staff and outside consultants capable of drafting the plan. A local government may hire a resilience manager to manage the plan development process and the implementation of any specific projects identified in the plan.(2) Convening and facilitating one or more community workshops enlisting local stakeholders, including, but not limited to, labor representatives, representatives from community-based organizations, community members, representatives from related technology vendors, local government staff in departments relating to emergency services, planning, and public works, disability rights advocates, and representatives from special districts, load-serving entities, school districts, environmental justice communities, communities of color, and other marginalized groups, to ensure that a diversity of perspectives and input is incorporated into the plan.(3) Soliciting and utilizing input from public utility operational and technical subject matter experts, including relevant data to enable local governments to design their plans to make efficient use of existing distribution infrastructure and support grid operation. experts.(4) Providing guidance and support to each local government receiving plan funds for the local government to designate a diverse plan steering committee to ensure robust and meaningful public participation.(f) A plan for which a local government, community choice aggregator, or regional energy collaborative government receives grant funding shall do all of the following:(1) Identify critical facilities, including facilities that can serve as community resilience hubs to accommodate and provide basic services to people who have lost power to their homes.(2)Identify areas most likely to experience a loss of electrical service based on public utility determinations of remote or hazardous areas likely to be subject to a planned deenergization of the electrical grid.(3)Identify electrical distribution system improvements that can be undertaken by a public utility and that will reduce the risk of deenergization for communities and critical facilities.(4)Identify projects that can be combined to share engineering costs and achieve scalability of projects across like facilities to create the most value for a community.(5)(2) Identify locations and facilities where the construction of microgrids could meet local resilience needs.(6)(3) Identify critical facilities that are in greatest need of backup energy generation and potential backup energy systems that may meet the needs of those facilities.(7)(4) Identify potential funding sources for implementation of projects included in the plan.(g)Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative pursuant to this division may be expended to complete environmental clearance of community energy resilience projects identified in the plan. (h)(g) Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative government pursuant to this division does not affect the entitys eligibility to receive other incentives available from federal, state, or other local governments, public utilities, or any other source, or to leverage the grant funding awarded pursuant to this division with any other incentive.(i)A public utility shall share information identifying critical facilities and areas most likely to experience a loss of electricity with a local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan.26452. (a) The commission shall maintain a publicly available and searchable database of all local governments, community choice aggregators, or regional energy collaboratives governments receiving grant funding pursuant to this division, including information on specific plan projects. division. The database shall include relevant metrics to be determined by the commission.(b) As a condition of receiving grant funding, within six months of completing its plan, a local government, community choice aggregator, or regional energy collaborative government shall submit the plan and a report of project expenditures to the commission.(c) (1) The commission shall prepare an annual summary of statewide program expenditures and hire an independent, third-party evaluator to quantify and evaluate the effects of the grant program.(2) Pursuant to Section 9795 of the Government Code, the commission shall annually report the information it receives to the Legislature and post the report on its internet website.
84+DIVISION 16.7. Community Energy Resilience Planning26450. For the purposes of this division, the following terms have the following meanings:(a) Commission means the State Energy Resources Conservation and Development Commission, commonly known as the California Energy Commission.(b) Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code. (c) Community energy resilience plan means a planning document prepared by a local government or government, community choice aggregator aggregator, or regional energy collaborative pursuant to this division that sets forth a strategy and identifies specific projects for maintaining a reliable supply of electricity during both reducing the adverse impacts associated with electrical power interruptions resulting from scheduled and unintended outages. Unless the context requires otherwise, plan means a community energy resilience plan.(d) Critical facility means the types of facilities described in Public Utilities Commission Decision 19-05-042, Decision Adopting De-Energization Guidelines, or any subsequent amendments to that decision by the Public Utilities Commission, and other facilities identified by a local government. (d)(e) Local government means a city, county, city and county, or community choice aggregator. or California Native American tribe, as defined in Section 21073.(e)(f) Public utility means an electrical corporation, as defined in Section 218 of the Public Utilities Code, or a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code.26451. (a) The commission shall develop and implement a grant program pursuant to this division for local governments to develop community energy resilience plans. plans and expedite permit review of distributed energy resources. A community choice aggregator or other regional energy collaborative may apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government.(b) Before dispersing grant funds pursuant to this division, the commission shall do both all of the following:(1) Develop and adopt project solicitation and evaluation guidelines procedures for applicants to submit a community energy resilience plan funding proposal to develop to do both of the following:(A) Develop a community energy resilience plan and for overall plan structure and content, including development of a formula for prioritizing funds for critical facilities in low-income or disadvantaged communities that are most likely to experience future electrical grid deenergization events, followed in priority by other critical facilities statewide.(B) Develop a process for the expedited permit review of distributed energy resources.(2) Conduct two public meetings to consider public comment.(c) The project solicitation and evaluation guidelines procedures shall prioritize proposals for funding that would support all both of the following:(1) Equitable collaboration between public utilities, local governments, community-based organizations, and state agencies to yield plans that not only help achieve local energy resilience objectives, but also state renewable energy goals.(2) Integration of available mobile storage resources that may become available through transportation electrification.(3)Integration of community energy resilience plans with other existing local government planning documents, including general plans and climate action plans, with an assumption that, upon completion, a community energy resilience plan would be incorporated by the local government into the existing general plan.(d) A community energy resiliency plan shall be consistent with the city, county, or city and county general plan and other local government planning documents. The plan may include provisions to facilitate the expedited local permitting of community energy resilience projects identified in the plan. (d)(e) The commission shall fund technical assistance providers to assist in plan development, including all of the following:(1) Identifying and coordinating with appropriate local government staff and outside consultants capable of drafting the plan. A local government may hire a resilience manager to manage the plan development process and the implementation of any specific projects identified in the plan.(2) Convening and facilitating one or more community workshops enlisting local stakeholders, including, but not limited to, labor representatives, representatives from community-based organizations, community members, representatives from related technology vendors, local government staff in departments relating to emergency services, planning, and public works, disability rights advocates, and representatives from special districts, load-serving entities, school districts, environmental justice communities, communities of color, and other marginalized groups, to ensure that a diversity of perspectives and input is incorporated into the plan.(3) Soliciting and utilizing input from public utility operational and technical subject matter experts, including relevant data to enable local governments to design their plans to make efficient use of existing distribution infrastructure and support grid operation. (4) Providing guidance and support to each local government receiving plan funds for the local government to designate a diverse plan steering committee to ensure robust and meaningful public participation.(e)(f) A plan for which a local government government, community choice aggregator, or regional energy collaborative receives grant funding shall do all of the following:(1) Identify critical facilities, including facilities that can serve as community resilience hubs. hubs to accommodate and provide basic services to people who have lost power to their homes.(2) Identify areas most likely to experience a loss of electrical service based on public utility determinations of remote or hazardous areas likely to be subject to a planned deenergization of the electrical grid.(3)Include a preliminary feasibility analysis of expected costs and benefits for anticipated projects within the local jurisdiction. A proposed plan shall also include an analysis of multiple project options for each location, including distribution segmentation and microgrids.(3) Identify electrical distribution system improvements that can be undertaken by a public utility and that will reduce the risk of deenergization for communities and critical facilities.(4) Identify projects that can be combined to share engineering costs and achieve scalability of projects across like facilities to create the most value for a community.(5) Identify locations and facilities where the construction of microgrids could meet local resilience needs.(6) Identify critical facilities that are in greatest need of backup energy generation and potential backup energy systems that may meet the needs of those facilities.(7) Identify potential funding sources for implementation of projects included in the plan.(g) Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative pursuant to this division may be expended to complete environmental clearance of community energy resilience projects identified in the plan. (f)(h) Grant funding awarded to a local government local government, community choice aggregator, or regional energy collaborative pursuant to this division does not affect the entitys eligibility to receive other incentives available from federal, state, or other local governments, public utilities, or any other source, or to leverage the grant funding awarded pursuant to this division with any other incentive.(i) A public utility shall share information identifying critical facilities and areas most likely to experience a loss of electricity with a local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan.26452. (a) The commission shall maintain a publicly available and searchable database of all local governments local governments, community choice aggregators, or regional energy collaboratives receiving grant funding pursuant to this division, including information on specific plan projects. The database shall include relevant metrics to be determined by the commission.(b) As a condition of receiving grant funding, within six months of completing its plan, a local government government, community choice aggregator, or regional energy collaborative shall submit the plan and a report of project expenditures to the commission.(c) (1) The commission shall prepare an annual summary of statewide program expenditures and hire an independent, third-party evaluator to quantify and evaluate the effects of the grant program.(2) Pursuant to Section 9795 of the Government Code, the commission shall annually report the information it receives to the Legislature and post the report on its internet website.
10085
10186 DIVISION 16.7. Community Energy Resilience Planning
10287
10388 DIVISION 16.7. Community Energy Resilience Planning
10489
105-26450. For the purposes of this division, the following terms have the following meanings:(a) Commission means the State Energy Resources Conservation and Development Commission, commonly known as the California Energy Commission.(b)Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code. (c)(b) Community energy resilience plan means a planning document prepared by a local government, community choice aggregator, or regional energy collaborative government pursuant to this division that sets forth a strategy and identifies specific projects for reducing the adverse impacts associated with electrical power interruptions resulting from scheduled and unintended outages. Unless the context requires otherwise, plan means a community energy resilience plan.(d)Critical facility means the types of facilities described in Public Utilities Commission Decision 19-05-042, Decision Adopting De-Energization Guidelines, or any subsequent amendments to that decision by the Public Utilities Commission, and other facilities identified by a local government. (e)(c) Local government means a city, county, city and county, or California Native American tribe, as defined in Section 21073.(f)(d) Public utility means an electrical corporation, as defined in Section 218 of the Public Utilities Code, or a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code.
90+26450. For the purposes of this division, the following terms have the following meanings:(a) Commission means the State Energy Resources Conservation and Development Commission, commonly known as the California Energy Commission.(b) Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code. (c) Community energy resilience plan means a planning document prepared by a local government or government, community choice aggregator aggregator, or regional energy collaborative pursuant to this division that sets forth a strategy and identifies specific projects for maintaining a reliable supply of electricity during both reducing the adverse impacts associated with electrical power interruptions resulting from scheduled and unintended outages. Unless the context requires otherwise, plan means a community energy resilience plan.(d) Critical facility means the types of facilities described in Public Utilities Commission Decision 19-05-042, Decision Adopting De-Energization Guidelines, or any subsequent amendments to that decision by the Public Utilities Commission, and other facilities identified by a local government. (d)(e) Local government means a city, county, city and county, or community choice aggregator. or California Native American tribe, as defined in Section 21073.(e)(f) Public utility means an electrical corporation, as defined in Section 218 of the Public Utilities Code, or a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code.
10691
10792
10893
10994 26450. For the purposes of this division, the following terms have the following meanings:
11095
11196 (a) Commission means the State Energy Resources Conservation and Development Commission, commonly known as the California Energy Commission.
11297
11398 (b) Community choice aggregator has the same meaning as defined in Section 331.1 of the Public Utilities Code.
11499
100+(c) Community energy resilience plan means a planning document prepared by a local government or government, community choice aggregator aggregator, or regional energy collaborative pursuant to this division that sets forth a strategy and identifies specific projects for maintaining a reliable supply of electricity during both reducing the adverse impacts associated with electrical power interruptions resulting from scheduled and unintended outages. Unless the context requires otherwise, plan means a community energy resilience plan.
115101
102+(d) Critical facility means the types of facilities described in Public Utilities Commission Decision 19-05-042, Decision Adopting De-Energization Guidelines, or any subsequent amendments to that decision by the Public Utilities Commission, and other facilities identified by a local government.
116103
117-(c)
104+(d)
118105
119106
120107
121-(b) Community energy resilience plan means a planning document prepared by a local government, community choice aggregator, or regional energy collaborative government pursuant to this division that sets forth a strategy and identifies specific projects for reducing the adverse impacts associated with electrical power interruptions resulting from scheduled and unintended outages. Unless the context requires otherwise, plan means a community energy resilience plan.
122-
123-(d)Critical facility means the types of facilities described in Public Utilities Commission Decision 19-05-042, Decision Adopting De-Energization Guidelines, or any subsequent amendments to that decision by the Public Utilities Commission, and other facilities identified by a local government.
124-
125-
108+(e) Local government means a city, county, city and county, or community choice aggregator. or California Native American tribe, as defined in Section 21073.
126109
127110 (e)
128111
129112
130113
131-(c) Local government means a city, county, city and county, or California Native American tribe, as defined in Section 21073.
114+(f) Public utility means an electrical corporation, as defined in Section 218 of the Public Utilities Code, or a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code.
132115
133-(f)
116+26451. (a) The commission shall develop and implement a grant program pursuant to this division for local governments to develop community energy resilience plans. plans and expedite permit review of distributed energy resources. A community choice aggregator or other regional energy collaborative may apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government.(b) Before dispersing grant funds pursuant to this division, the commission shall do both all of the following:(1) Develop and adopt project solicitation and evaluation guidelines procedures for applicants to submit a community energy resilience plan funding proposal to develop to do both of the following:(A) Develop a community energy resilience plan and for overall plan structure and content, including development of a formula for prioritizing funds for critical facilities in low-income or disadvantaged communities that are most likely to experience future electrical grid deenergization events, followed in priority by other critical facilities statewide.(B) Develop a process for the expedited permit review of distributed energy resources.(2) Conduct two public meetings to consider public comment.(c) The project solicitation and evaluation guidelines procedures shall prioritize proposals for funding that would support all both of the following:(1) Equitable collaboration between public utilities, local governments, community-based organizations, and state agencies to yield plans that not only help achieve local energy resilience objectives, but also state renewable energy goals.(2) Integration of available mobile storage resources that may become available through transportation electrification.(3)Integration of community energy resilience plans with other existing local government planning documents, including general plans and climate action plans, with an assumption that, upon completion, a community energy resilience plan would be incorporated by the local government into the existing general plan.(d) A community energy resiliency plan shall be consistent with the city, county, or city and county general plan and other local government planning documents. The plan may include provisions to facilitate the expedited local permitting of community energy resilience projects identified in the plan. (d)(e) The commission shall fund technical assistance providers to assist in plan development, including all of the following:(1) Identifying and coordinating with appropriate local government staff and outside consultants capable of drafting the plan. A local government may hire a resilience manager to manage the plan development process and the implementation of any specific projects identified in the plan.(2) Convening and facilitating one or more community workshops enlisting local stakeholders, including, but not limited to, labor representatives, representatives from community-based organizations, community members, representatives from related technology vendors, local government staff in departments relating to emergency services, planning, and public works, disability rights advocates, and representatives from special districts, load-serving entities, school districts, environmental justice communities, communities of color, and other marginalized groups, to ensure that a diversity of perspectives and input is incorporated into the plan.(3) Soliciting and utilizing input from public utility operational and technical subject matter experts, including relevant data to enable local governments to design their plans to make efficient use of existing distribution infrastructure and support grid operation. (4) Providing guidance and support to each local government receiving plan funds for the local government to designate a diverse plan steering committee to ensure robust and meaningful public participation.(e)(f) A plan for which a local government government, community choice aggregator, or regional energy collaborative receives grant funding shall do all of the following:(1) Identify critical facilities, including facilities that can serve as community resilience hubs. hubs to accommodate and provide basic services to people who have lost power to their homes.(2) Identify areas most likely to experience a loss of electrical service based on public utility determinations of remote or hazardous areas likely to be subject to a planned deenergization of the electrical grid.(3)Include a preliminary feasibility analysis of expected costs and benefits for anticipated projects within the local jurisdiction. A proposed plan shall also include an analysis of multiple project options for each location, including distribution segmentation and microgrids.(3) Identify electrical distribution system improvements that can be undertaken by a public utility and that will reduce the risk of deenergization for communities and critical facilities.(4) Identify projects that can be combined to share engineering costs and achieve scalability of projects across like facilities to create the most value for a community.(5) Identify locations and facilities where the construction of microgrids could meet local resilience needs.(6) Identify critical facilities that are in greatest need of backup energy generation and potential backup energy systems that may meet the needs of those facilities.(7) Identify potential funding sources for implementation of projects included in the plan.(g) Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative pursuant to this division may be expended to complete environmental clearance of community energy resilience projects identified in the plan. (f)(h) Grant funding awarded to a local government local government, community choice aggregator, or regional energy collaborative pursuant to this division does not affect the entitys eligibility to receive other incentives available from federal, state, or other local governments, public utilities, or any other source, or to leverage the grant funding awarded pursuant to this division with any other incentive.(i) A public utility shall share information identifying critical facilities and areas most likely to experience a loss of electricity with a local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan.
134117
135118
136119
137-(d) Public utility means an electrical corporation, as defined in Section 218 of the Public Utilities Code, or a local publicly owned electric utility, as defined in Section 224.3 of the Public Utilities Code.
120+26451. (a) The commission shall develop and implement a grant program pursuant to this division for local governments to develop community energy resilience plans. plans and expedite permit review of distributed energy resources. A community choice aggregator or other regional energy collaborative may apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government.
138121
139-26451. (a) The commission shall develop and implement a grant program pursuant to this division for local governments to develop community energy resilience plans and expedite permit review of distributed energy resources. A community choice aggregator or other regional energy collaborative may apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. resources by local governments.(b) Before dispersing grant funds pursuant to this division, the commission shall do all both of the following:(1) Develop and adopt solicitation and evaluation procedures for applicants to submit a community energy resilience plan funding proposal to do both of the following:(A) Develop a community energy resilience plan and for overall plan structure and content, including development of a formula for prioritizing funds for critical facilities in low-income or disadvantaged communities that are most likely to experience future electrical grid deenergization events, power outages, followed in priority by other critical facilities statewide. in the planning area.(B) Develop a process for the expedited permit review of distributed energy resources. resources by local governments.(2) Conduct two public meetings to consider public comment.(c) The project plan solicitation and evaluation procedures shall prioritize proposals for funding that would support both of the following:(1)Equitable equitable collaboration between public utilities, local governments, community-based organizations, and state agencies to yield plans that not only help achieve local energy resilience objectives, but also state renewable energy goals.(2)Integration of available mobile storage resources that may become available through transportation electrification.(d) A community energy resiliency plan shall be consistent with the city, county, or city and county general plan and other local government planning documents. The plan may include provisions to facilitate the expedited local permitting of community energy resilience projects identified in the plan. distributed energy resources.(e) The commission shall fund technical assistance providers to assist in plan development, including all of the following:(1) Identifying and coordinating with appropriate local government staff and outside consultants capable of drafting the plan. A local government may hire a resilience manager to manage the plan development process and the implementation of any specific projects identified in the plan.(2) Convening and facilitating one or more community workshops enlisting local stakeholders, including, but not limited to, labor representatives, representatives from community-based organizations, community members, representatives from related technology vendors, local government staff in departments relating to emergency services, planning, and public works, disability rights advocates, and representatives from special districts, load-serving entities, school districts, environmental justice communities, communities of color, and other marginalized groups, to ensure that a diversity of perspectives and input is incorporated into the plan.(3) Soliciting and utilizing input from public utility operational and technical subject matter experts, including relevant data to enable local governments to design their plans to make efficient use of existing distribution infrastructure and support grid operation. experts.(4) Providing guidance and support to each local government receiving plan funds for the local government to designate a diverse plan steering committee to ensure robust and meaningful public participation.(f) A plan for which a local government, community choice aggregator, or regional energy collaborative government receives grant funding shall do all of the following:(1) Identify critical facilities, including facilities that can serve as community resilience hubs to accommodate and provide basic services to people who have lost power to their homes.(2)Identify areas most likely to experience a loss of electrical service based on public utility determinations of remote or hazardous areas likely to be subject to a planned deenergization of the electrical grid.(3)Identify electrical distribution system improvements that can be undertaken by a public utility and that will reduce the risk of deenergization for communities and critical facilities.(4)Identify projects that can be combined to share engineering costs and achieve scalability of projects across like facilities to create the most value for a community.(5)(2) Identify locations and facilities where the construction of microgrids could meet local resilience needs.(6)(3) Identify critical facilities that are in greatest need of backup energy generation and potential backup energy systems that may meet the needs of those facilities.(7)(4) Identify potential funding sources for implementation of projects included in the plan.(g)Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative pursuant to this division may be expended to complete environmental clearance of community energy resilience projects identified in the plan. (h)(g) Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative government pursuant to this division does not affect the entitys eligibility to receive other incentives available from federal, state, or other local governments, public utilities, or any other source, or to leverage the grant funding awarded pursuant to this division with any other incentive.(i)A public utility shall share information identifying critical facilities and areas most likely to experience a loss of electricity with a local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan.
122+(b) Before dispersing grant funds pursuant to this division, the commission shall do both all of the following:
123+
124+(1) Develop and adopt project solicitation and evaluation guidelines procedures for applicants to submit a community energy resilience plan funding proposal to develop to do both of the following:
125+
126+(A) Develop a community energy resilience plan and for overall plan structure and content, including development of a formula for prioritizing funds for critical facilities in low-income or disadvantaged communities that are most likely to experience future electrical grid deenergization events, followed in priority by other critical facilities statewide.
127+
128+(B) Develop a process for the expedited permit review of distributed energy resources.
129+
130+(2) Conduct two public meetings to consider public comment.
131+
132+(c) The project solicitation and evaluation guidelines procedures shall prioritize proposals for funding that would support all both of the following:
133+
134+(1) Equitable collaboration between public utilities, local governments, community-based organizations, and state agencies to yield plans that not only help achieve local energy resilience objectives, but also state renewable energy goals.
135+
136+(2) Integration of available mobile storage resources that may become available through transportation electrification.
137+
138+(3)Integration of community energy resilience plans with other existing local government planning documents, including general plans and climate action plans, with an assumption that, upon completion, a community energy resilience plan would be incorporated by the local government into the existing general plan.
140139
141140
142141
143-26451. (a) The commission shall develop and implement a grant program pursuant to this division for local governments to develop community energy resilience plans and expedite permit review of distributed energy resources. A community choice aggregator or other regional energy collaborative may apply for funding and prepare a community energy resilience plan on behalf of one or more of the local governments it serves upon request of that local government. resources by local governments.
142+(d) A community energy resiliency plan shall be consistent with the city, county, or city and county general plan and other local government planning documents. The plan may include provisions to facilitate the expedited local permitting of community energy resilience projects identified in the plan.
144143
145-(b) Before dispersing grant funds pursuant to this division, the commission shall do all both of the following:
146-
147-(1) Develop and adopt solicitation and evaluation procedures for applicants to submit a community energy resilience plan funding proposal to do both of the following:
148-
149-(A) Develop a community energy resilience plan and for overall plan structure and content, including development of a formula for prioritizing funds for critical facilities in low-income or disadvantaged communities that are most likely to experience future electrical grid deenergization events, power outages, followed in priority by other critical facilities statewide. in the planning area.
150-
151-(B) Develop a process for the expedited permit review of distributed energy resources. resources by local governments.
152-
153-(2) Conduct two public meetings to consider public comment.
154-
155-(c) The project plan solicitation and evaluation procedures shall prioritize proposals for funding that would support both of the following:
156-
157-(1)Equitable equitable collaboration between public utilities, local governments, community-based organizations, and state agencies to yield plans that not only help achieve local energy resilience objectives, but also state renewable energy goals.
158-
159-(2)Integration of available mobile storage resources that may become available through transportation electrification.
144+(d)
160145
161146
162-
163-(d) A community energy resiliency plan shall be consistent with the city, county, or city and county general plan and other local government planning documents. The plan may include provisions to facilitate the expedited local permitting of community energy resilience projects identified in the plan. distributed energy resources.
164147
165148 (e) The commission shall fund technical assistance providers to assist in plan development, including all of the following:
166149
167150 (1) Identifying and coordinating with appropriate local government staff and outside consultants capable of drafting the plan. A local government may hire a resilience manager to manage the plan development process and the implementation of any specific projects identified in the plan.
168151
169152 (2) Convening and facilitating one or more community workshops enlisting local stakeholders, including, but not limited to, labor representatives, representatives from community-based organizations, community members, representatives from related technology vendors, local government staff in departments relating to emergency services, planning, and public works, disability rights advocates, and representatives from special districts, load-serving entities, school districts, environmental justice communities, communities of color, and other marginalized groups, to ensure that a diversity of perspectives and input is incorporated into the plan.
170153
171-(3) Soliciting and utilizing input from public utility operational and technical subject matter experts, including relevant data to enable local governments to design their plans to make efficient use of existing distribution infrastructure and support grid operation. experts.
154+(3) Soliciting and utilizing input from public utility operational and technical subject matter experts, including relevant data to enable local governments to design their plans to make efficient use of existing distribution infrastructure and support grid operation.
172155
173156 (4) Providing guidance and support to each local government receiving plan funds for the local government to designate a diverse plan steering committee to ensure robust and meaningful public participation.
174157
175-(f) A plan for which a local government, community choice aggregator, or regional energy collaborative government receives grant funding shall do all of the following:
158+(e)
176159
177-(1) Identify critical facilities, including facilities that can serve as community resilience hubs to accommodate and provide basic services to people who have lost power to their homes.
160+
161+
162+(f) A plan for which a local government government, community choice aggregator, or regional energy collaborative receives grant funding shall do all of the following:
163+
164+(1) Identify critical facilities, including facilities that can serve as community resilience hubs. hubs to accommodate and provide basic services to people who have lost power to their homes.
178165
179166 (2) Identify areas most likely to experience a loss of electrical service based on public utility determinations of remote or hazardous areas likely to be subject to a planned deenergization of the electrical grid.
167+
168+(3)Include a preliminary feasibility analysis of expected costs and benefits for anticipated projects within the local jurisdiction. A proposed plan shall also include an analysis of multiple project options for each location, including distribution segmentation and microgrids.
180169
181170
182171
183172 (3) Identify electrical distribution system improvements that can be undertaken by a public utility and that will reduce the risk of deenergization for communities and critical facilities.
184173
174+(4) Identify projects that can be combined to share engineering costs and achieve scalability of projects across like facilities to create the most value for a community.
185175
176+(5) Identify locations and facilities where the construction of microgrids could meet local resilience needs.
186177
187-(4)Identify projects that can be combined to share engineering costs and achieve scalability of projects across like facilities to create the most value for a community.
178+(6) Identify critical facilities that are in greatest need of backup energy generation and potential backup energy systems that may meet the needs of those facilities.
179+
180+(7) Identify potential funding sources for implementation of projects included in the plan.
181+
182+(g) Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative pursuant to this division may be expended to complete environmental clearance of community energy resilience projects identified in the plan.
183+
184+(f)
188185
189186
190187
191-(5)
188+(h) Grant funding awarded to a local government local government, community choice aggregator, or regional energy collaborative pursuant to this division does not affect the entitys eligibility to receive other incentives available from federal, state, or other local governments, public utilities, or any other source, or to leverage the grant funding awarded pursuant to this division with any other incentive.
189+
190+(i) A public utility shall share information identifying critical facilities and areas most likely to experience a loss of electricity with a local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan.
191+
192+26452. (a) The commission shall maintain a publicly available and searchable database of all local governments local governments, community choice aggregators, or regional energy collaboratives receiving grant funding pursuant to this division, including information on specific plan projects. The database shall include relevant metrics to be determined by the commission.(b) As a condition of receiving grant funding, within six months of completing its plan, a local government government, community choice aggregator, or regional energy collaborative shall submit the plan and a report of project expenditures to the commission.(c) (1) The commission shall prepare an annual summary of statewide program expenditures and hire an independent, third-party evaluator to quantify and evaluate the effects of the grant program.(2) Pursuant to Section 9795 of the Government Code, the commission shall annually report the information it receives to the Legislature and post the report on its internet website.
192193
193194
194195
195-(2) Identify locations and facilities where the construction of microgrids could meet local resilience needs.
196+26452. (a) The commission shall maintain a publicly available and searchable database of all local governments local governments, community choice aggregators, or regional energy collaboratives receiving grant funding pursuant to this division, including information on specific plan projects. The database shall include relevant metrics to be determined by the commission.
196197
197-(6)
198-
199-
200-
201-(3) Identify critical facilities that are in greatest need of backup energy generation and potential backup energy systems that may meet the needs of those facilities.
202-
203-(7)
204-
205-
206-
207-(4) Identify potential funding sources for implementation of projects included in the plan.
208-
209-(g)Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative pursuant to this division may be expended to complete environmental clearance of community energy resilience projects identified in the plan.
210-
211-
212-
213-(h)
214-
215-
216-
217-(g) Grant funding awarded to a local government, community choice aggregator, or regional energy collaborative government pursuant to this division does not affect the entitys eligibility to receive other incentives available from federal, state, or other local governments, public utilities, or any other source, or to leverage the grant funding awarded pursuant to this division with any other incentive.
218-
219-(i)A public utility shall share information identifying critical facilities and areas most likely to experience a loss of electricity with a local government, community choice aggregator, or regional energy collaborative that is preparing a community energy resilience plan.
220-
221-
222-
223-26452. (a) The commission shall maintain a publicly available and searchable database of all local governments, community choice aggregators, or regional energy collaboratives governments receiving grant funding pursuant to this division, including information on specific plan projects. division. The database shall include relevant metrics to be determined by the commission.(b) As a condition of receiving grant funding, within six months of completing its plan, a local government, community choice aggregator, or regional energy collaborative government shall submit the plan and a report of project expenditures to the commission.(c) (1) The commission shall prepare an annual summary of statewide program expenditures and hire an independent, third-party evaluator to quantify and evaluate the effects of the grant program.(2) Pursuant to Section 9795 of the Government Code, the commission shall annually report the information it receives to the Legislature and post the report on its internet website.
224-
225-
226-
227-26452. (a) The commission shall maintain a publicly available and searchable database of all local governments, community choice aggregators, or regional energy collaboratives governments receiving grant funding pursuant to this division, including information on specific plan projects. division. The database shall include relevant metrics to be determined by the commission.
228-
229-(b) As a condition of receiving grant funding, within six months of completing its plan, a local government, community choice aggregator, or regional energy collaborative government shall submit the plan and a report of project expenditures to the commission.
198+(b) As a condition of receiving grant funding, within six months of completing its plan, a local government government, community choice aggregator, or regional energy collaborative shall submit the plan and a report of project expenditures to the commission.
230199
231200 (c) (1) The commission shall prepare an annual summary of statewide program expenditures and hire an independent, third-party evaluator to quantify and evaluate the effects of the grant program.
232201
233202 (2) Pursuant to Section 9795 of the Government Code, the commission shall annually report the information it receives to the Legislature and post the report on its internet website.