8 | | - | ONCERNING THE DEPLOYMENT OF BROADBAND THROUGH GRANTS |
---|
9 | | - | ADMINISTERED BY THE |
---|
10 | | - | COLORADO BROADBAND OFFICE , AND, IN |
---|
11 | | - | CONNECTION THEREWITH |
---|
12 | | - | , REDUCING AN APPROPRIATION. |
---|
13 | | - | |
---|
14 | | - | Be it enacted by the General Assembly of the State of Colorado: |
---|
15 | | - | SECTION 1. In Colorado Revised Statutes, 24-34-104, repeal |
---|
16 | | - | (25)(a)(VI); and add (31)(a)(XII) as follows: |
---|
17 | | - | 24-34-104. General assembly review of regulatory agencies and |
---|
18 | | - | functions for repeal, continuation, or reestablishment - legislative |
---|
19 | | - | declaration - repeal. (25) (a) The following agencies, functions, or both, |
---|
20 | | - | are scheduled for repeal on September 1, 2024: |
---|
21 | | - | (VI) The functions of the broadband deployment board created in |
---|
22 | | - | section 24-37.5-119; |
---|
23 | | - | NOTE: This bill has been prepared for the signatures of the appropriate legislative |
---|
24 | | - | officers and the Governor. To determine whether the Governor has signed the bill |
---|
25 | | - | or taken other action on it, please consult the legislative status sheet, the legislative |
---|
26 | | - | history, or the Session Laws. |
---|
27 | | - | ________ |
---|
28 | | - | Capital letters or bold & italic numbers indicate new material added to existing law; dashes |
---|
29 | | - | through words or numbers indicate deletions from existing law and such material is not part of |
---|
30 | | - | the act. (31) (a) The following agencies, functions, or both, are scheduled |
---|
31 | | - | for repeal on September 1, 2030: |
---|
32 | | - | (XII) T |
---|
33 | | - | HE FUNCTIONS OF THE BROADBAND OFFICE IN ADMINISTERING |
---|
34 | | - | THE BROADBAND DEPLOYMENT GRANT PROGRAM CREATED IN SECTION |
---|
35 | | - | 24-37.5-905. |
---|
36 | | - | SECTION 2. In Colorado Revised Statutes, repeal 24-37.5-119. |
---|
37 | | - | SECTION 3. In Colorado Revised Statutes, add 24-37.5-905 as |
---|
38 | | - | follows: |
---|
39 | | - | 24-37.5-905. Broadband deployment - grant program - high cost |
---|
40 | | - | support mechanism money - broadband office administrative fund - |
---|
41 | | - | creation - criteria - rules - reports - definitions - repeal. (1) A |
---|
42 | | - | S USED IN |
---|
43 | | - | THIS SECTION |
---|
44 | | - | , UNLESS THE CONTEXT OTHERWISE REQUIRES : |
---|
45 | | - | (a) "B |
---|
46 | | - | ROADBAND" HAS THE MEANING SET FORTH IN SECTION |
---|
47 | | - | 40-15-102. |
---|
| 15 | + | ONCERNING THE DEPLOYMENT OF BROADBAND THROUGH GRANTS101 |
---|
| 16 | + | ADMINISTERED BY THE COLORADO BROADBAND |
---|
| 17 | + | OFFICE, AND, IN102 |
---|
| 18 | + | CONNECTION THEREWITH , REDUCING AN APPROPRIATION .103 |
---|
| 19 | + | Bill Summary |
---|
| 20 | + | (Note: This summary applies to this bill as introduced and does |
---|
| 21 | + | not reflect any amendments that may be subsequently adopted. If this bill |
---|
| 22 | + | passes third reading in the house of introduction, a bill summary that |
---|
| 23 | + | applies to the reengrossed version of this bill will be available at |
---|
| 24 | + | http://leg.colorado.gov/ |
---|
| 25 | + | .) |
---|
| 26 | + | Sunset Process - House Transportation, Housing, and Local |
---|
| 27 | + | Government Committee. The "Connect Colorado to Enhance Economic |
---|
| 28 | + | Development, Telehealth, Education, and Safety Act" (act), which created |
---|
| 29 | + | the broadband deployment board (board) in the governor's office of |
---|
| 30 | + | information technology and tasked the board with awarding grant money |
---|
| 31 | + | SENATE |
---|
| 32 | + | 3rd Reading Unamended |
---|
| 33 | + | May 1, 2024 |
---|
| 34 | + | SENATE |
---|
| 35 | + | Amended 2nd Reading |
---|
| 36 | + | April 30, 2024 |
---|
| 37 | + | HOUSE |
---|
| 38 | + | 3rd Reading Unamended |
---|
| 39 | + | April 17, 2024 |
---|
| 40 | + | HOUSE |
---|
| 41 | + | Amended 2nd Reading |
---|
| 42 | + | April 15, 2024 |
---|
| 43 | + | HOUSE SPONSORSHIP |
---|
| 44 | + | Parenti and Weinberg, Boesenecker, Kipp, Lindsay, Lukens, Titone |
---|
| 45 | + | SENATE SPONSORSHIP |
---|
| 46 | + | Rodriguez and Priola, Bridges, Buckner, Cutter, Fields, Jaquez Lewis, Michaelson Jenet |
---|
| 47 | + | Shading denotes HOUSE amendment. Double underlining denotes SENATE amendment. |
---|
| 48 | + | Capital letters or bold & italic numbers indicate new material to be added to existing law. |
---|
| 49 | + | Dashes through the words or numbers indicate deletions from existing law. from the high cost support mechanism (HCSM) for broadband |
---|
| 50 | + | deployment in unserved areas of the state, is scheduled for repeal on |
---|
| 51 | + | September 1, 2024. The department of regulatory agencies, as part of its |
---|
| 52 | + | sunset process, reviewed the act and board and recommended that they be |
---|
| 53 | + | extended for 5 years. The bill, instead, repeals the act and board, transfers |
---|
| 54 | + | the function of awarding grant money from the HCSM to the Colorado |
---|
| 55 | + | broadband office (office), and authorizes the office to award grants for |
---|
| 56 | + | unserved and underserved areas of the state. |
---|
| 57 | + | Be it enacted by the General Assembly of the State of Colorado:1 |
---|
| 58 | + | SECTION 1. In Colorado Revised Statutes, 24-34-104, repeal2 |
---|
| 59 | + | (25)(a)(VI); and add (31)(a)(XI) as follows:3 |
---|
| 60 | + | 24-34-104. General assembly review of regulatory agencies4 |
---|
| 61 | + | and functions for repeal, continuation, or reestablishment - legislative5 |
---|
| 62 | + | declaration - repeal. (25) (a) The following agencies, functions, or both,6 |
---|
| 63 | + | are scheduled for repeal on September 1, 2024:7 |
---|
| 64 | + | (VI) The functions of the broadband deployment board created in8 |
---|
| 65 | + | section 24-37.5-119;9 |
---|
| 66 | + | (31) (a) The following agencies, functions, or both, are scheduled10 |
---|
| 67 | + | for repeal on September 1, 2030:11 |
---|
| 68 | + | (XI) THE FUNCTIONS OF THE BROADBAND OFFICE IN12 |
---|
| 69 | + | ADMINISTERING THE BROADBAND DEPLOYMENT GRANT PROGRAM13 |
---|
| 70 | + | CREATED IN SECTION 24-37.5-905.14 |
---|
| 71 | + | SECTION 2. In Colorado Revised Statutes, repeal 24-37.5-119.15 |
---|
| 72 | + | SECTION 3. In Colorado Revised Statutes, add 24-37.5-905 as16 |
---|
| 73 | + | follows:17 |
---|
| 74 | + | 24-37.5-905. Broadband deployment - grant program - high18 |
---|
| 75 | + | cost support mechanism money - broadband office administrative19 |
---|
| 76 | + | fund - creation - criteria - rules - reports - definitions - repeal. (1) A S20 |
---|
| 77 | + | USED IN THIS SECTION, UNLESS THE CONTEXT OTHERWISE REQUIRES :21 |
---|
| 78 | + | 1336-2- (a) "BROADBAND" HAS THE MEANING SET FORTH IN SECTION1 |
---|
| 79 | + | 40-15-102.2 |
---|
83 | | - | HE BROADBAND OFFICE MAY ALLOCATE MONEY FROM THE |
---|
84 | | - | HCSM FOR THE DEPLOYMENT OF BROADBAND IN UNSERVED AND |
---|
85 | | - | UNDERSERVED AREAS OF THE STATE PURSUANT TO THIS SECTION AND |
---|
86 | | - | SECTION |
---|
87 | | - | 40-15-208 THROUGH THE USE OF THE HCSM SURCHARGE AND |
---|
88 | | - | SURCHARGE RATE IN EFFECT ON |
---|
89 | | - | JANUARY 1, 2018. IN DETERMINING THE |
---|
90 | | - | DEFINITION OF UNSERVED AND UNDERSERVED AREAS |
---|
91 | | - | , THE STANDARDS USED |
---|
92 | | - | BY THE BROADBAND OFFICE MUST BE CONSISTENT WITH BR OADBAND |
---|
93 | | - | BENCHMARK STANDARDS AND ANY REVISIONS TO THE STANDARDS |
---|
94 | | - | , AS |
---|
95 | | - | DETERMINED BY THE FEDERAL COMMUNICATIONS COMMISSION AND THE |
---|
96 | | - | NATIONAL TELECOMMUNICATIONS AND INFORMATION ADMINISTRATION IN |
---|
97 | | - | THE |
---|
98 | | - | UNITED STATES DEPARTMENT OF COMMERCE . PURSUANT TO SECTIONS |
---|
99 | | - | 40-15-207 AND 40-15-208, THE COMMISSION SHALL DETERMINE THE FUNDS |
---|
100 | | - | AVAILABLE FOR BROADBAND DEPLOYMENT FROM THE |
---|
101 | | - | HCSM MONEY. THE |
---|
102 | | - | HCSM THIRD-PARTY CONTRACTOR SHALL MAINTAIN AND HOLD THE MONEY |
---|
103 | | - | AVAILABLE FOR BROADBAND DEPLOYMENT IN A SEPARATE ACCOUNT FROM |
---|
104 | | - | THE MONEY USED FOR BASIC VOICE SERVICE |
---|
105 | | - | . MONEY HELD FOR BROADBAND |
---|
106 | | - | DEPLOYMENT MUST NOT BE DISBURSED FOR BASIC VOICE SERVICE |
---|
107 | | - | , AND |
---|
108 | | - | MONEY HELD FOR BASIC VOICE SERVICE MUST NOT BE DISBURSED FOR |
---|
109 | | - | BROADBAND DEPLOYMENT |
---|
110 | | - | . |
---|
| 104 | + | HE BROADBAND OFFICE MAY ALLOCATE MONEY FROM THE21 |
---|
| 105 | + | HCSM |
---|
| 106 | + | FOR THE DEPLOYMENT OF BROADBAND IN UNSERVED AND22 |
---|
| 107 | + | UNDERSERVED AREAS OF THE STATE PURSUANT TO THIS SECTION AND23 |
---|
| 108 | + | SECTION 40-15-208 THROUGH THE USE OF THE HCSM SURCHARGE AND24 |
---|
| 109 | + | SURCHARGE RATE IN EFFECT ON JANUARY 1, 2018. IN DETERMINING THE |
---|
| 110 | + | 25 |
---|
| 111 | + | DEFINITION OF UNSERVED AND UNDERSERVED AREAS , THE STANDARDS26 |
---|
| 112 | + | USED BY THE BROADBAND OFFICE MUST BE CONSISTENT WITH BR OADBAND27 |
---|
| 113 | + | 1336 |
---|
| 114 | + | -3- BENCHMARK STANDARDS AND ANY REVISIONS TO THE STANDARDS , AS1 |
---|
| 115 | + | DETERMINED BY THE FEDERAL COMMUNICATIONS COMMISSION AND THE2 |
---|
| 116 | + | NATIONAL TELECOMMUNICATIONS AND INFORMATION ADMINISTRATION IN3 |
---|
| 117 | + | THE UNITED STATES DEPARTMENT OF COMMERCE . PURSUANT TO SECTIONS4 |
---|
| 118 | + | 40-15-207 |
---|
| 119 | + | AND 40-15-208, THE COMMISSION SHALL DETERMINE THE5 |
---|
| 120 | + | FUNDS AVAILABLE FOR BROADB AND DEPLOYMENT FROM THE HCSM6 |
---|
| 121 | + | MONEY. THE HCSM THIRD-PARTY CONTRACTOR SHALL MAINTAIN AND7 |
---|
| 122 | + | HOLD THE MONEY AVAILABLE FOR BROADBAND DEPLOYMENT IN A8 |
---|
| 123 | + | SEPARATE ACCOUNT FROM THE MONEY USED FOR BASIC VOICE SERVICE .9 |
---|
| 124 | + | M |
---|
| 125 | + | ONEY HELD FOR BROADBAND DEPLOYMENT MUST NOT BE DISBURSED10 |
---|
| 126 | + | FOR BASIC VOICE SERVICE, AND MONEY HELD FOR BASIC VOICE SERVICE11 |
---|
| 127 | + | MUST NOT BE DISBURSED FOR BROADBAND DEPLOYMENT .12 |
---|
112 | | - | O MAXIMIZE THE EFFICACY OF THE GRANT PROGRAM , THE |
---|
113 | | - | BROADBAND OFFICE MAY USE |
---|
114 | | - | HCSM MONEY ALLOCATED FOR BROADBAND |
---|
115 | | - | DEPLOYMENT PURSUANT TO THIS SUBSECTION |
---|
116 | | - | (2) AND SECTION 40-15-208 |
---|
117 | | - | IN ORDER TO CONDUCT, OR CAUSE TO BE CONDUCTED, STUDIES TO ASSESS |
---|
118 | | - | BROADBAND NEEDS IN THE STATE |
---|
119 | | - | . |
---|
120 | | - | (3) (a) U |
---|
121 | | - | P TO FIVE PERCENT OF THE MONEY ALLOCATED FROM THE |
---|
122 | | - | HCSM FOR BROADBAND DEPLOYMENT MAY BE USED TO COVER THE |
---|
123 | | - | BROADBAND OFFICE |
---|
124 | | - | 'S DIRECT AND INDIRECT COSTS TO ADMINISTER THE |
---|
125 | | - | GRANT PROGRAM |
---|
126 | | - | , INCLUDING TO COVER STAFFING COSTS FOR THE GRANT |
---|
127 | | - | PROGRAM |
---|
128 | | - | . MONEY THAT IS ALLOCATED FOR SUCH PURPOSES IS CREDITED TO |
---|
129 | | - | THE BROADBAND OFFICE ADMINISTRATIVE FUND |
---|
130 | | - | , WHICH FUND IS CREATED |
---|
131 | | - | IN THE STATE TREASURY |
---|
132 | | - | . THE FUND CONSISTS OF ALL MONEY ALLOCATED |
---|
133 | | - | FROM THE |
---|
134 | | - | HCSM FOR THE BROADBAND OFFICE'S ADMINISTRATION OF THE |
---|
135 | | - | GRANT PROGRAM AND ALL MONEY THAT THE GENERAL ASSEMBLY MAY |
---|
136 | | - | PAGE 3-HOUSE BILL 24-1336 APPROPRIATE OR TRANSFER TO THE FUND . THE MONEY IN THE FUND IS |
---|
137 | | - | CONTINUOUSLY APPROPRIATED FOR THE PURPOSES SET FORTH IN THIS |
---|
138 | | - | SECTION |
---|
139 | | - | . ALL INTEREST EARNED FROM THE INVESTMENT OF MONEY IN THE |
---|
140 | | - | FUND IS CREDITED TO THE FUND |
---|
141 | | - | . ALL MONEY NOT EXPENDED AT THE END OF |
---|
142 | | - | A STATE FISCAL YEAR REMAINS IN THE FUND AND DOES NOT REVERT TO THE |
---|
143 | | - | GENERAL FUND OR ANY OTHER FUND |
---|
144 | | - | . |
---|
145 | | - | (b) E |
---|
146 | | - | XCEPT AS REQUIRED TO COMPLY WITH SUBSECTIONS (2)(b)(II) |
---|
147 | | - | AND (3)(a) OF THIS SECTION, THE BROADBAND OFFICE SHALL NOT AWARD |
---|
148 | | - | ITSELF MONEY FROM THE |
---|
149 | | - | HCSM. |
---|
| 129 | + | O MAXIMIZE THE EFFICACY OF THE GRANT PROGRAM , THE13 |
---|
| 130 | + | BROADBAND OFFICE MAY USE HCSM MONEY ALLOCATED FOR14 |
---|
| 131 | + | BROADBAND DEPLOYMENT PURSUANT TO THIS SUBSECTION (2) AND15 |
---|
| 132 | + | SECTION 40-15-208 IN ORDER TO CONDUCT, OR CAUSE TO BE CONDUCTED,16 |
---|
| 133 | + | STUDIES TO ASSESS BROADBAND NEEDS IN THE STATE .17 |
---|
| 134 | + | (3) |
---|
| 135 | + | (a) UP TO FIVE PERCENT OF THE MONEY ALLOCATED FROM THE18 |
---|
| 136 | + | HCSM |
---|
| 137 | + | FOR BROADBAND DEPLOYMENT MAY BE USED TO COVER THE19 |
---|
| 138 | + | BROADBAND OFFICE'S DIRECT AND INDIRECT COSTS TO ADMINISTER THE20 |
---|
| 139 | + | GRANT PROGRAM, INCLUDING TO COVER STAFFING COSTS FOR THE GRANT21 |
---|
| 140 | + | PROGRAM. MONEY THAT IS ALLOCATED FOR SUCH PURPOSES IS CREDITED22 |
---|
| 141 | + | TO THE BROADBAND OFFICE ADMINISTRATIVE FUND , WHICH FUND IS23 |
---|
| 142 | + | CREATED IN THE STATE TREASURY . THE FUND CONSISTS OF ALL MONEY24 |
---|
| 143 | + | ALLOCATED FROM THE HCSM FOR THE BROADBAND OFFICE 'S25 |
---|
| 144 | + | ADMINISTRATION OF THE GRANT PROGRAM AND ALL MONEY THAT THE26 |
---|
| 145 | + | GENERAL ASSEMBLY MAY APPROPRIATE OR TRANSFER TO THE FUND . THE27 |
---|
| 146 | + | 1336 |
---|
| 147 | + | -4- MONEY IN THE FUND IS CONTINUOUSLY APPROPRIATED FOR THE PURPOSES1 |
---|
| 148 | + | SET FORTH IN THIS SECTION . ALL INTEREST EARNED FROM THE2 |
---|
| 149 | + | INVESTMENT OF MONEY IN THE FUND IS CREDITED TO THE FUND . ALL3 |
---|
| 150 | + | MONEY NOT EXPENDED AT THE END OF A STATE FISCAL YEAR REMAINS IN4 |
---|
| 151 | + | THE FUND AND DOES NOT REVERT TO THE GENERAL FUND OR ANY OTHER5 |
---|
| 152 | + | FUND.6 |
---|
| 153 | + | (b) EXCEPT AS REQUIRED TO COMPLY WITH SUBSECTIONS (2)(b)(II)7 |
---|
| 154 | + | AND (3)(a) OF THIS SECTION, THE BROADBAND OFFICE SHALL NOT AWARD8 |
---|
| 155 | + | ITSELF MONEY FROM THE HCSM.9 |
---|
| 156 | + | (c) THE BROADBAND OFFICE SHALL PROHIBIT GRANT RECIPIENTS10 |
---|
| 157 | + | FROM USING GRANT MONEY TO SUBSIDIZE EXPENSES ASSOCIATED WITH11 |
---|
| 158 | + | TELECOMMUNICATIONS OPERATIONAL EXPENSES, WITH THE EXCEPTION OF12 |
---|
| 159 | + | A ONE-TIME TECHNOLOGY AND INNOVATION EXPENSE AND REGULATORY13 |
---|
| 160 | + | COMPLIANCE.14 |
---|
| 161 | + | (4) O |
---|
| 162 | + | N OR BEFORE DECEMBER 31, 2024, THE BROADBAND OFFICE15 |
---|
| 163 | + | SHALL ESTABLISH GRANT PROGRAM CRITERIA AND GUIDELINES FOR16 |
---|
| 164 | + | AWARDING HCSM MONEY FOR NEW PROJECTS TO EXPAND BROADBAND17 |
---|
| 165 | + | ACCESS AND TO INCREASE BR OADBAND AFFORDABILITY IN THE STATE ,18 |
---|
| 166 | + | WHICH CRITERIA AND GUIDELINES MUST INCLUDE :19 |
---|
| 167 | + | (a) T |
---|
| 168 | + | HE ESTABLISHMENT OF A TWO-TIERED GRANT PROGRAM THAT20 |
---|
| 169 | + | PRIORITIZES FUNDING AS FOLLOWS:21 |
---|
| 170 | + | (I) U |
---|
| 171 | + | P TO SIXTY PERCENT OF AVAILABLE GRANT MONEY MUST BE22 |
---|
| 172 | + | USED TO FINANCE TIER ONE PROJECTS FOR MIDDLE MILE INFRASTRUCTURE ;23 |
---|
| 173 | + | AND24 |
---|
| 174 | + | (II) U |
---|
| 175 | + | P TO FORTY PERCENT OF AVAILABLE GRANT MONEY MUST BE25 |
---|
| 176 | + | USED TO FINANCE TIER TWO PROJECTS AND OTHERWISE UNDERFUNDED26 |
---|
| 177 | + | BROADBAND NEEDS, INCLUDING, BUT NOT LIMITED TO:27 |
---|
| 178 | + | 1336 |
---|
| 179 | + | -5- (A) POLE REPLACEMENTS AND ATTACHMENTS , LINE EXTENSIONS,1 |
---|
| 180 | + | LONG DROPS, NETWORK UPGRADES THAT STRENGTHEN CYBERSECURITY ,2 |
---|
| 181 | + | AND NETWORK INFRASTRUCTURE , INCLUDING WIRELINE AND WIRELESS3 |
---|
| 182 | + | FACILITIES SUCH AS TOWERS AND SATELLITE INFRASTRUCTURE ; AND4 |
---|
| 183 | + | (B) D |
---|
| 184 | + | IGITAL EQUITY INITIATIVES TO HELP CLOSE THE DIGITAL5 |
---|
| 185 | + | DIVIDE IN THE STATE, INCLUDING INITIATIVES FOR BASIC INTERNET6 |
---|
| 186 | + | ACCESS, COMPUTER AND DEVICE DISTRIBUTION , DIGITAL LITERACY7 |
---|
| 187 | + | TRAINING, AND BROADBAND WORKFORCE DEVELOPMENT TRAINING ;8 |
---|
| 188 | + | (b) T |
---|
| 189 | + | HE FOLLOWING MINIMUM REQUIREMENTS FOR PROJECTS THAT9 |
---|
| 190 | + | ARE AWARDED GRANT MONEY :10 |
---|
| 191 | + | (I) S |
---|
| 192 | + | UPPORT FOR BROADBAND DEPLOYMENT IN UNSERVED OR11 |
---|
| 193 | + | UNDERSERVED AREAS;12 |
---|
| 194 | + | (II) S |
---|
| 195 | + | PEED REQUIREMENTS;13 |
---|
| 196 | + | (III) M |
---|
| 197 | + | ATCHING FUNDING REQUIREMENTS ;14 |
---|
| 198 | + | (IV) A |
---|
| 199 | + | PPLICANT ELIGIBILITY REQUIREMENTS;15 |
---|
| 200 | + | (V) G |
---|
| 201 | + | ENERALLY ACCEPTED INDUSTRY RELIABILITY AND16 |
---|
| 202 | + | PERFORMANCE STANDARDS ;17 |
---|
| 203 | + | (VI) T |
---|
| 204 | + | IMELINES FOR COMPLETION OF A PROJECT;18 |
---|
| 205 | + | (VII) R |
---|
| 206 | + | EASONABLE COST REQUIREMENTS FOR A PROJECT ;19 |
---|
| 207 | + | (VIII) C |
---|
| 208 | + | OMPLIANCE STANDARDS ; AND20 |
---|
| 209 | + | (IX) R |
---|
| 210 | + | EPORTING AND ACCOUNTABILITY REQUIREMENTS ; AND21 |
---|
151 | | - | HE BROADBAND OFFICE SHALL PROHIBIT GRANT RECIPIENTS |
---|
152 | | - | FROM USING GRANT MONEY TO SUBSIDIZE EXPENSES ASSOCIATED WITH |
---|
153 | | - | TELECOMMUNICATIONS OPERATIONAL EXPENSES |
---|
154 | | - | , WITH THE EXCEPTION OF |
---|
155 | | - | A ONE |
---|
156 | | - | -TIME TECHNOLOGY AND INNOVATION EXPENSE AND REGULATORY |
---|
157 | | - | COMPLIANCE |
---|
158 | | - | . |
---|
159 | | - | (4) O |
---|
160 | | - | N OR BEFORE DECEMBER 31, 2024, THE BROADBAND OFFICE |
---|
161 | | - | SHALL ESTABLISH GRANT PROGRAM CRITERIA AND GUIDELINES FOR |
---|
162 | | - | AWARDING |
---|
163 | | - | HCSM MONEY FOR NEW PROJECTS TO EXPAND BROADBAND |
---|
164 | | - | ACCESS AND TO INCREASE BR OADBAND AFFORDABILITY IN THE STATE |
---|
165 | | - | , |
---|
166 | | - | WHICH CRITERIA AND GUIDELINES MUST INCLUDE : |
---|
| 212 | + | HE FOLLOWING CRITERIA FOR REVIEWING AND PRIORITIZING22 |
---|
| 213 | + | APPLICANTS' PROPOSED PROJECTS:23 |
---|
| 214 | + | (I) T |
---|
| 215 | + | HE PURPOSE AND PROJECT IMPACTS;24 |
---|
| 216 | + | (II) T |
---|
| 217 | + | HE GEOGRAPHIC DISTRIBUTION OF BROADBAND DEPLOYMENT ;25 |
---|
| 218 | + | (III) B |
---|
| 219 | + | ROADBAND NETWORK REDUNDANCY , DIVERSITY, AND26 |
---|
| 220 | + | LATENCY;27 |
---|
| 221 | + | 1336 |
---|
| 222 | + | -6- (IV) BROADBAND NETWORK SPEEDS ;1 |
---|
| 223 | + | (V) T |
---|
| 224 | + | HE AMOUNT OF MATCHING MONEY AVAILABLE ;2 |
---|
| 225 | + | (VI) T |
---|
| 226 | + | HE COST-EFFECTIVENESS OF THE PROJECT;3 |
---|
| 227 | + | (VII) T |
---|
| 228 | + | HE AMOUNT OF SUPPORT THE PROJECT WOULD PROVIDE FOR4 |
---|
| 229 | + | LOW-INCOME HOUSEHOLDS; AND5 |
---|
| 230 | + | (VIII) T |
---|
| 231 | + | HE EXTENT TO WHICH THE PROJECT WOULD SUPPORT6 |
---|
| 232 | + | CRITICALLY UNSERVED AREAS.7 |
---|
| 233 | + | (5) I |
---|
| 234 | + | N ESTABLISHING THE GRANT PROGRAM , THE BROADBAND8 |
---|
| 235 | + | OFFICE SHALL:9 |
---|
| 236 | + | (a) S |
---|
| 237 | + | OLICIT INPUT FROM THE GENERAL PUBLIC AND VARIOUS10 |
---|
| 238 | + | STAKEHOLDERS, INCLUDING AT LEAST THE FOLLOWING GROUPS OF11 |
---|
| 239 | + | STAKEHOLDERS:12 |
---|
| 240 | + | (I) I |
---|
| 241 | + | NDUSTRY ASSOCIATIONS;13 |
---|
| 242 | + | (II) L |
---|
| 243 | + | OCAL GOVERNMENTS ;14 |
---|
| 244 | + | (III) T |
---|
| 245 | + | RIBAL GOVERNMENTS;15 |
---|
| 246 | + | (IV) O |
---|
| 247 | + | THER STATE AGENCIES;16 |
---|
| 248 | + | (V) F |
---|
| 249 | + | EDERAL AGENCIES;17 |
---|
| 250 | + | (VI) B |
---|
| 251 | + | ROADBAND CONSUMERS ; AND18 |
---|
| 252 | + | (VII) O |
---|
| 253 | + | THER KEY STAKEHOLDERS THAT THE BROADBAND OFFICE19 |
---|
| 254 | + | IDENTIFIES;20 |
---|
| 255 | + | (b) C |
---|
| 256 | + | REATE A WORK |
---|
| 257 | + | GROUP, INCLUDING THE EXTERNAL21 |
---|
| 258 | + | STAKEHOLDERS IDENTIFIED IN SUBSECTION (5)(a) OF THIS SECTION, TO22 |
---|
| 259 | + | HELP REVIEW GRANT APPLICATIONS AND RECOMMEND PROJECTS FOR23 |
---|
| 260 | + | GRANT AWARDS;24 |
---|
| 261 | + | (c) E |
---|
| 262 | + | STABLISH A FORMAL APPEALS PROCESS FOR GRANT25 |
---|
| 263 | + | APPLICATIONS THAT ARE NOT AWARDED GRANTS . THE SOLE REMEDY FOR26 |
---|
| 264 | + | AN APPLICANT THAT PREVAILS ON APPEAL IS THE FINANCING OF THE27 |
---|
| 265 | + | 1336 |
---|
| 266 | + | -7- APPLICANT'S PROPOSED PROJECT IN THE CURRENT OR NEXT FISCAL YEAR ,1 |
---|
| 267 | + | SUBJECT TO THE AVAILABILITY OF MONEY IN THE HCSM.2 |
---|
| 268 | + | (d) AS PART OF A GRANT APPLICATION THAT AN APPLICANT FILES3 |
---|
| 269 | + | OR AS PART OF AN APPEAL OF A GRANT DECISION THAT AN APPELLANT4 |
---|
| 270 | + | FILES, REQUIRE THAT THE APPLICANT OR APPELLANT INCLUDE A SPEED5 |
---|
| 271 | + | TEST PERFORMED:6 |
---|
| 272 | + | (I) ON AN INCUMBENT PROVIDER'S BROADBAND NETWORK ; AND7 |
---|
| 273 | + | (II) IN ACCORDANCE WITH INDUSTRY -STANDARD SPEED-TEST8 |
---|
| 274 | + | PROTOCOLS IDENTIFIED BY THE FEDERAL COMMUNICATIONS COMMISSION;9 |
---|
| 275 | + | (e) INCLUDE A FORMAL PROCESS BY WHICH THE BROADBAND10 |
---|
| 276 | + | OFFICE, ELIGIBLE APPLICANTS, AND INCUMBENT PROVIDERS MAY11 |
---|
| 277 | + | CHALLENGE OR APPEAL AN APPLICANT'S DATA INCLUDED IN THE12 |
---|
| 278 | + | APPLICATION TO PREVENT THE FINANCING OF PROJECTS THAT WOULD13 |
---|
| 279 | + | CAUSE OVERBUILD OR DUPLICATION OF FEDERAL OR OTHER STATE14 |
---|
| 280 | + | FUNDING; AND15 |
---|
| 281 | + | (f) ESTABLISH A PROCESS FOR ENSURING THAT PROJECTS THAT ARE16 |
---|
| 282 | + | AWARDED GRANTS COMPLY WITH ALL STATE AND FEDERAL BROADBAND17 |
---|
| 283 | + | DEPLOYMENT REPORTING OBLIGATIONS .18 |
---|
| 284 | + | (6) P |
---|
| 285 | + | URSUANT TO SECTION 24-37.5-106 (4), THE CHIEF19 |
---|
| 286 | + | INFORMATION OFFICER MAY PROMULGATE RULES TO IMPLEMENT THIS20 |
---|
| 287 | + | SECTION AND SHALL SPECIFICALLY CONSIDER PROMULGATING RULES TO |
---|
| 288 | + | 21 |
---|
| 289 | + | IMPLEMENT SUBSECTIONS (2), (4), AND (5) OF THIS SECTION.22 |
---|
| 290 | + | (7) T |
---|
| 291 | + | HE BROADBAND OFFICE MAY CONTRACT WITH A THIRD PARTY23 |
---|
| 292 | + | TO PERFORM ADMINISTRATIVE FUNCTIONS RELATED TO ADMINISTERING24 |
---|
| 293 | + | THE GRANT PROGRAM.25 |
---|
| 294 | + | (8) N |
---|
| 295 | + | OTWITHSTANDING SECTION 24-1-136 (11)(a)(I), ON OR26 |
---|
| 296 | + | BEFORE JANUARY 1, 2025, AND ON OR BEFORE JANUARY 1 OF EACH YEAR27 |
---|
| 297 | + | 1336 |
---|
| 298 | + | -8- THEREAFTER, THE BROADBAND OFFICE SHALL SUBMIT AN AN NUAL REPORT1 |
---|
| 299 | + | TO THE JOINT BUDGET COMMITTEE AND THE JOINT TECHNOLOGY2 |
---|
| 300 | + | COMMITTEE, OR THEIR SUCCESSOR COMMITTEES , SUMMARIZING FOR THE3 |
---|
| 301 | + | PREVIOUS CALENDAR YEAR :4 |
---|
168 | | - | HE ESTABLISHMENT OF A TWO-TIERED GRANT PROGRAM THAT |
---|
169 | | - | PRIORITIZES FUNDING AS FOLLOWS |
---|
170 | | - | : |
---|
171 | | - | (I) U |
---|
172 | | - | P TO SIXTY PERCENT OF AVAILABLE GRANT MONEY MUST BE |
---|
173 | | - | USED TO FINANCE TIER ONE PROJECTS FOR MIDDLE MILE INFRASTRUCTURE |
---|
174 | | - | ; |
---|
175 | | - | AND |
---|
176 | | - | (II) UP TO FORTY PERCENT OF AVAILABLE GRANT MONEY MUST BE |
---|
177 | | - | USED TO FINANCE TIER TWO PROJECTS AND OTHERWISE UNDERFUNDED |
---|
178 | | - | BROADBAND NEEDS |
---|
179 | | - | , INCLUDING, BUT NOT LIMITED TO: |
---|
180 | | - | (A) P |
---|
181 | | - | OLE REPLACEMENTS AND ATTACHMENTS , LINE EXTENSIONS, |
---|
182 | | - | LONG DROPS, NETWORK UPGRADES THAT STRENGTHEN CYBERSECURITY , AND |
---|
183 | | - | NETWORK INFRASTRUCTURE |
---|
184 | | - | , INCLUDING WIRELINE AND WIRELESS FACILITIES |
---|
185 | | - | SUCH AS TOWERS AND SATELLITE INFRASTRUCTURE |
---|
186 | | - | ; AND |
---|
187 | | - | (B) DIGITAL EQUITY INITIATIVES TO HELP CLOSE THE DIGITAL DIVIDE |
---|
188 | | - | PAGE 4-HOUSE BILL 24-1336 IN THE STATE, INCLUDING INITIATIVES FOR BASIC INTERNET ACCESS , |
---|
189 | | - | COMPUTER AND DEVICE DISTRIBUTION , DIGITAL LITERACY TRAINING, AND |
---|
190 | | - | BROADBAND WORKFORCE DEVELOPMENT TRAINING |
---|
191 | | - | ; |
---|
192 | | - | (b) T |
---|
193 | | - | HE FOLLOWING MINIMUM REQUIREMENTS FOR PROJECTS THAT |
---|
194 | | - | ARE AWARDED GRANT MONEY |
---|
195 | | - | : |
---|
196 | | - | (I) S |
---|
197 | | - | UPPORT FOR BROADBAND DEPLOYMENT IN UNSERVED OR |
---|
198 | | - | UNDERSERVED AREAS |
---|
199 | | - | ; |
---|
200 | | - | (II) S |
---|
201 | | - | PEED REQUIREMENTS; |
---|
202 | | - | (III) M |
---|
203 | | - | ATCHING FUNDING REQUIREMENTS ; |
---|
204 | | - | (IV) A |
---|
205 | | - | PPLICANT ELIGIBILITY REQUIREMENTS; |
---|
206 | | - | (V) G |
---|
207 | | - | ENERALLY ACCEPTED INDUSTRY RELIABILITY AND |
---|
208 | | - | PERFORMANCE STANDARDS |
---|
209 | | - | ; |
---|
210 | | - | (VI) T |
---|
211 | | - | IMELINES FOR COMPLETION OF A PROJECT; |
---|
212 | | - | (VII) R |
---|
213 | | - | EASONABLE COST REQUIREMENTS FOR A PROJECT ; |
---|
214 | | - | (VIII) C |
---|
215 | | - | OMPLIANCE STANDARDS ; AND |
---|
216 | | - | (IX) REPORTING AND ACCOUNTABILITY REQUIREMENTS ; AND |
---|
217 | | - | (c) THE FOLLOWING CRITERIA FOR REVIEWING AND PRIORITIZING |
---|
218 | | - | APPLICANTS |
---|
219 | | - | ' PROPOSED PROJECTS: |
---|
220 | | - | (I) T |
---|
221 | | - | HE PURPOSE AND PROJECT IMPACTS; |
---|
222 | | - | (II) T |
---|
223 | | - | HE GEOGRAPHIC DISTRIBUTION OF BROADBAND DEPLOYMENT ; |
---|
224 | | - | (III) B |
---|
225 | | - | ROADBAND NETWORK REDUNDANCY , DIVERSITY, AND |
---|
226 | | - | LATENCY |
---|
227 | | - | ; |
---|
228 | | - | (IV) B |
---|
229 | | - | ROADBAND NETWORK SPEEDS ; |
---|
230 | | - | (V) T |
---|
231 | | - | HE AMOUNT OF MATCHING MONEY AVAILABLE ; |
---|
232 | | - | PAGE 5-HOUSE BILL 24-1336 (VI) THE COST-EFFECTIVENESS OF THE PROJECT; |
---|
233 | | - | (VII) T |
---|
234 | | - | HE AMOUNT OF SUPPORT THE PROJECT WOULD PROVIDE FOR |
---|
235 | | - | LOW |
---|
236 | | - | -INCOME HOUSEHOLDS; AND |
---|
237 | | - | (VIII) THE EXTENT TO WHICH THE PROJECT WOULD SUPPORT |
---|
238 | | - | CRITICALLY UNSERVED AREAS |
---|
239 | | - | . |
---|
240 | | - | (5) I |
---|
241 | | - | N ESTABLISHING THE GRANT PROGRAM , THE BROADBAND OFFICE |
---|
242 | | - | SHALL |
---|
243 | | - | : |
---|
244 | | - | (a) S |
---|
245 | | - | OLICIT INPUT FROM THE GENERAL PUBLIC AND VARIOUS |
---|
246 | | - | STAKEHOLDERS |
---|
247 | | - | , INCLUDING AT LEAST THE FOLLOWING GROUPS OF |
---|
248 | | - | STAKEHOLDERS |
---|
249 | | - | : |
---|
250 | | - | (I) I |
---|
251 | | - | NDUSTRY ASSOCIATIONS; |
---|
252 | | - | (II) L |
---|
253 | | - | OCAL GOVERNMENTS; |
---|
254 | | - | (III) T |
---|
255 | | - | RIBAL GOVERNMENTS; |
---|
256 | | - | (IV) O |
---|
257 | | - | THER STATE AGENCIES; |
---|
258 | | - | (V) F |
---|
259 | | - | EDERAL AGENCIES; |
---|
260 | | - | (VI) B |
---|
261 | | - | ROADBAND CONSUMERS ; AND |
---|
262 | | - | (VII) OTHER KEY STAKEHOLDERS THAT THE BROADBAND OFFICE |
---|
263 | | - | IDENTIFIES |
---|
264 | | - | ; |
---|
265 | | - | (b) C |
---|
266 | | - | REATE A WORK GROUP , INCLUDING THE EXTERNAL |
---|
267 | | - | STAKEHOLDERS IDENTIFIED IN SUBSECTION |
---|
268 | | - | (5)(a) OF THIS SECTION, TO HELP |
---|
269 | | - | REVIEW GRANT APPLICATIONS AND RECOMMEND PROJECTS FOR GRANT |
---|
270 | | - | AWARDS |
---|
271 | | - | ; |
---|
272 | | - | (c) E |
---|
273 | | - | STABLISH A FORMAL APPEALS PROCESS FOR GRANT |
---|
274 | | - | APPLICATIONS THAT ARE NOT AWARDED GRANTS |
---|
275 | | - | . THE SOLE REMEDY FOR AN |
---|
276 | | - | APPLICANT THAT PREVAILS ON APPEAL IS THE FINANCING OF THE |
---|
277 | | - | APPLICANT |
---|
278 | | - | 'S PROPOSED PROJECT IN THE CURRENT OR NEXT FISCAL YEAR , |
---|
279 | | - | SUBJECT TO THE AVAILABILITY OF MONEY IN THE HCSM. |
---|
280 | | - | PAGE 6-HOUSE BILL 24-1336 (d) AS PART OF A GRANT APPLICATION THAT AN APPLICANT FILES OR |
---|
281 | | - | AS PART OF AN APPEAL OF A GRANT DECISION THAT AN APPELLANT FILES |
---|
282 | | - | , |
---|
283 | | - | REQUIRE THAT THE APPLICANT OR APPELLANT INCLUDE A SPEED TEST |
---|
284 | | - | PERFORMED |
---|
285 | | - | : |
---|
286 | | - | (I) O |
---|
287 | | - | N AN INCUMBENT PROVIDER'S BROADBAND NETWORK ; AND |
---|
288 | | - | (II) IN ACCORDANCE WITH I NDUSTRY -STANDARD SPEED-TEST |
---|
289 | | - | PROTOCOLS IDENTIFIED BY THE FEDERAL COMMUNICATIONS COMMISSION |
---|
290 | | - | ; |
---|
291 | | - | (e) I |
---|
292 | | - | NCLUDE A FORMAL PROCESS BY WHICH THE BROADBAND OFFICE , |
---|
293 | | - | ELIGIBLE APPLICANTS, AND INCUMBENT PROVIDERS MAY CHALLENGE OR |
---|
294 | | - | APPEAL AN APPLICANT |
---|
295 | | - | 'S DATA INCLUDED IN THE APPLICATION TO PREVENT |
---|
296 | | - | THE FINANCING OF PROJECTS THAT WOULD CAUSE OVERBUILD OR |
---|
297 | | - | DUPLICATION OF FEDERAL OR OTHER STATE FUNDING |
---|
298 | | - | ; AND |
---|
299 | | - | (f) ESTABLISH A PROCESS FOR ENSURING THAT PROJECTS THAT ARE |
---|
300 | | - | AWARDED GRANTS COMPLY WITH ALL STATE AND FEDERAL BROADBAND |
---|
301 | | - | DEPLOYMENT REPORTING OBLIGATIONS |
---|
302 | | - | . |
---|
303 | | - | (6) P |
---|
304 | | - | URSUANT TO SECTION 24-37.5-106 (4), THE CHIEF INFORMATION |
---|
305 | | - | OFFICER MAY PROMULGATE RULES TO IMPLEMENT THIS SECTION AND SHALL |
---|
306 | | - | SPECIFICALLY CONSIDER PROMULGATING RULES TO IMPLEMENT SUBSECTIONS |
---|
307 | | - | (2), (4), AND (5) OF THIS SECTION. |
---|
308 | | - | (7) T |
---|
309 | | - | HE BROADBAND OFFICE MAY CONTRACT WITH A THIRD PARTY |
---|
310 | | - | TO PERFORM ADMINISTRATIVE FUNCTIONS RELATED TO ADMINISTERING THE |
---|
311 | | - | GRANT PROGRAM |
---|
312 | | - | . |
---|
313 | | - | (8) N |
---|
314 | | - | OTWITHSTANDING SECTION 24-1-136 (11)(a)(I), ON OR BEFORE |
---|
315 | | - | JANUARY 1, 2025, AND ON OR BEFORE JANUARY 1 OF EACH YEAR |
---|
316 | | - | THEREAFTER |
---|
317 | | - | , THE BROADBAND OFFICE SHALL SUBMIT AN ANNUAL REPORT |
---|
318 | | - | TO THE JOINT BUDGET COMMITTEE AND THE JOINT TEC HNOLOGY COMMITTEE |
---|
319 | | - | , |
---|
320 | | - | OR THEIR SUCCESSOR COMMITTEES , SUMMARIZING FOR THE PREVIOUS |
---|
321 | | - | CALENDAR YEAR |
---|
322 | | - | : |
---|
323 | | - | (a) T |
---|
324 | | - | HE BROADBAND OFFICE'S GRANT ACTIVITIES; AND |
---|
325 | | - | (b) HCSM EXPENDITURES MADE FOR BROADBAND DEPLOYMENT . |
---|
326 | | - | PAGE 7-HOUSE BILL 24-1336 (9) THIS SECTION IS REPEALED, EFFECTIVE SEPTEMBER 1, 2030. |
---|
327 | | - | B |
---|
328 | | - | EFORE THE REPEAL, THIS SECTION IS SCHEDULED FOR REVIEW IN |
---|
329 | | - | ACCORDANCE WITH SECTION |
---|
330 | | - | 24-34-104. |
---|
331 | | - | SECTION 4. In Colorado Revised Statutes, 6-26-101, amend (1) |
---|
332 | | - | and (3) as follows: |
---|
333 | | - | 6-26-101. Complaints to federal trade commission - attorney |
---|
334 | | - | general to provide guidance. (1) The attorney general or the attorney |
---|
| 303 | + | HE BROADBAND OFFICE'S GRANT ACTIVITIES; AND5 |
---|
| 304 | + | (b) HCSM |
---|
| 305 | + | EXPENDITURES MADE FOR BROADBAND DEPLOYMENT .6 |
---|
| 306 | + | (9) THIS SECTION IS REPEALED, EFFECTIVE SEPTEMBER 1, 2030.7 |
---|
| 307 | + | BEFORE THE REPEAL, THIS SECTION IS SCHEDULED FOR REVIEW IN8 |
---|
| 308 | + | ACCORDANCE WITH SECTION 24-34-104.9 |
---|
| 309 | + | SECTION 4. In Colorado Revised Statutes, 6-26-101, amend (1)10 |
---|
| 310 | + | and (3) as follows:11 |
---|
| 311 | + | 6-26-101. Complaints to federal trade commission - attorney12 |
---|
| 312 | + | general to provide guidance. (1) The attorney general or the attorney13 |
---|
344 | | - | OLORADO |
---|
345 | | - | broadband deployment board OFFICE, shall update the written guidance as |
---|
346 | | - | needed. |
---|
347 | | - | SECTION 5. In Colorado Revised Statutes, 24-37.5-106, amend |
---|
348 | | - | (4) as follows: |
---|
349 | | - | 24-37.5-106. Chief information officer - duties and |
---|
350 | | - | responsibilities - rules. (4) The chief information officer may promulgate |
---|
351 | | - | as rules pursuant to article 4 of this title 24 all of the policies, procedures, |
---|
352 | | - | standards, specifications, guidelines, or criteria that are developed or |
---|
353 | | - | approved pursuant to section 24-37.5-105 (4) and |
---|
354 | | - | RULES to establish |
---|
355 | | - | accessibility standards for individuals with a disability pursuant to section |
---|
356 | | - | 24-85-103 |
---|
357 | | - | AND TO IMPLEMENT THE BROADBAND DEPLOYMENT GRANT |
---|
358 | | - | PROGRAM PURSUANT TO SECTION |
---|
359 | | - | 24-37.5-905. |
---|
360 | | - | SECTION 6. In Colorado Revised Statutes, 24-72-202, repeal |
---|
361 | | - | (6)(b)(XV) as follows: |
---|
362 | | - | 24-72-202. Definitions. As used in this part 2, unless the context |
---|
363 | | - | otherwise requires: |
---|
364 | | - | (6) (b) "Public records" does not include: |
---|
365 | | - | PAGE 8-HOUSE BILL 24-1336 (XV) Granular coverage data, as defined in and submitted to the |
---|
366 | | - | office of information technology pursuant to section 24-37.5-119 (9)(m); |
---|
367 | | - | SECTION 7. In Colorado Revised Statutes, 40-15-208, amend |
---|
368 | | - | (2)(a)(I)(B) as follows: |
---|
369 | | - | 40-15-208. High cost support mechanism - Colorado high cost |
---|
370 | | - | administration fund - creation - purpose - operation - rules - report - |
---|
371 | | - | repeal. (2) (a) (I) The commission is hereby authorized to establish a |
---|
372 | | - | mechanism for the support of universal service, also referred to in this |
---|
373 | | - | section as the "high cost support mechanism", which must operate in |
---|
374 | | - | accordance with rules adopted by the commission. The primary purpose of |
---|
375 | | - | the high cost support mechanism is to provide financial assistance as a |
---|
376 | | - | support mechanism to: |
---|
| 323 | + | OLORADO21 |
---|
| 324 | + | broadband deployment board |
---|
| 325 | + | OFFICE, shall update the written guidance22 |
---|
| 326 | + | as needed.23 |
---|
| 327 | + | SECTION 5. In Colorado Revised Statutes, 24-37.5-106, amend24 |
---|
| 328 | + | (4) as follows:25 |
---|
| 329 | + | 24-37.5-106. Chief information officer - duties and26 |
---|
| 330 | + | responsibilities - rules. (4) The chief information officer may27 |
---|
| 331 | + | 1336 |
---|
| 332 | + | -9- promulgate as rules pursuant to article 4 of this title 24 all of the policies,1 |
---|
| 333 | + | procedures, standards, specifications, guidelines, or criteria that are2 |
---|
| 334 | + | developed or approved pursuant to section 24-37.5-105 (4) and RULES to3 |
---|
| 335 | + | establish accessibility standards for individuals with a disability pursuant4 |
---|
| 336 | + | to section 24-85-103 AND TO IMPLEMENT THE BROADBAND DEPLOYMENT5 |
---|
| 337 | + | GRANT PROGRAM PURSUANT TO SECTION 24-37.5-905.6 |
---|
| 338 | + | SECTION 6. In Colorado Revised Statutes, 24-72-202, repeal7 |
---|
| 339 | + | (6)(b)(XV) as follows:8 |
---|
| 340 | + | 24-72-202. Definitions. As used in this part 2, unless the context9 |
---|
| 341 | + | otherwise requires:10 |
---|
| 342 | + | (6) (b) "Public records" does not include:11 |
---|
| 343 | + | (XV) Granular coverage data, as defined in and submitted to the12 |
---|
| 344 | + | office of information technology pursuant to section 24-37.5-119 (9)(m);13 |
---|
| 345 | + | SECTION 7. In Colorado Revised Statutes, 40-15-208, amend14 |
---|
| 346 | + | (2)(a)(I)(B) as follows:15 |
---|
| 347 | + | 40-15-208. High cost support mechanism - Colorado high cost16 |
---|
| 348 | + | administration fund - creation - purpose - operation - rules - report17 |
---|
| 349 | + | - repeal. (2) (a) (I) The commission is hereby authorized to establish a18 |
---|
| 350 | + | mechanism for the support of universal service, also referred to in this19 |
---|
| 351 | + | section as the "high cost support mechanism", which must operate in20 |
---|
| 352 | + | accordance with rules adopted by the commission. The primary purpose21 |
---|
| 353 | + | of the high cost support mechanism is to provide financial assistance as22 |
---|
| 354 | + | a support mechanism to:23 |
---|
397 | | - | OFFICE that a federal agency has issued a final order or |
---|
398 | | - | entered into a settlement or consent decree regarding, or a court of |
---|
399 | | - | competent jurisdiction has issued a final judgment against, an internet |
---|
400 | | - | service provider and that the board |
---|
401 | | - | OFFICE has determined from the order, |
---|
402 | | - | decree, or judgment that the internet service provider has engaged in |
---|
403 | | - | conduct specified in subsection (1) of this section, the commission shall |
---|
404 | | - | issue a written order to the internet service provider requiring the internet |
---|
405 | | - | service provider to fully refund any money that the internet service provider |
---|
406 | | - | PAGE 9-HOUSE BILL 24-1336 received in the twenty-four months preceding the board's OFFICE'S |
---|
407 | | - | determination from the high cost support mechanism pursuant to a grant |
---|
408 | | - | awarded by the C |
---|
| 376 | + | OFFICE that a federal agency has issued a final order or11 |
---|
| 377 | + | entered into a settlement or consent decree regarding, or a court of12 |
---|
| 378 | + | competent jurisdiction has issued a final judgment against, an internet13 |
---|
| 379 | + | service provider and that the board OFFICE has determined from the order,14 |
---|
| 380 | + | decree, or judgment that the internet service provider has engaged in15 |
---|
| 381 | + | conduct specified in subsection (1) of this section, the commission shall16 |
---|
| 382 | + | issue a written order to the internet service provider requiring the internet17 |
---|
| 383 | + | service provider to fully refund any money that the internet service18 |
---|
| 384 | + | provider received in the twenty-four months preceding the board's19 |
---|
| 385 | + | OFFICE'S determination from the high cost support mechanism pursuant20 |
---|
| 386 | + | to a grant awarded by the C |
---|
410 | | - | OFFICE under |
---|
411 | | - | section 24-37.5-119 24-37.5-905. |
---|
412 | | - | (c) The third-party contractor that maintains the high cost support |
---|
413 | | - | mechanism shall allocate any money refunded to the high cost support |
---|
414 | | - | mechanism pursuant to this subsection (2) to the high cost support |
---|
415 | | - | mechanism account dedicated to broadband deployment, which account is |
---|
416 | | - | described in section 24-37.5-119 (3) |
---|
417 | | - | 24-37.5-905. |
---|
418 | | - | SECTION 9. In Colorado Revised Statutes, 40-15-502, amend |
---|
419 | | - | (5)(a) as follows: |
---|
420 | | - | 40-15-502. Expressions of state policy. (5) Universal service |
---|
421 | | - | support mechanisms. (a) In order to accomplish the goals of universal |
---|
422 | | - | basic service, universal access to advanced service under section |
---|
423 | | - | 24-37.5-119 |
---|
424 | | - | 24-37.5-905, and any revision of the definition of basic service |
---|
425 | | - | under subsection (2) of this section, the commission shall create a system |
---|
426 | | - | of support mechanisms to assist in the provision of basic service and |
---|
427 | | - | advanced service in high-cost areas. The commission shall fund these |
---|
428 | | - | support mechanisms equitably and on a nondiscriminatory, competitively |
---|
429 | | - | neutral basis through assessments, which may include a rate element, on all |
---|
430 | | - | telecommunications providers in Colorado. A provider's eligibility to |
---|
431 | | - | receive support for basic service under the support mechanisms is |
---|
432 | | - | conditioned upon the provider's offering basic service throughout an entire |
---|
433 | | - | support area. |
---|
434 | | - | SECTION 10. Appropriation - adjustments to 2024 long bill. |
---|
435 | | - | (1) To implement this act, appropriations made in the annual general |
---|
436 | | - | appropriation act for the 2024-25 state fiscal year to the office of the |
---|
437 | | - | governor are adjusted as follows: |
---|
438 | | - | (a) The cash funds appropriation from various sources of cash funds |
---|
439 | | - | for the office of information technology for health, life, and dental is |
---|
440 | | - | decreased by $25,826; |
---|
441 | | - | (b) The cash funds appropriation from various sources of cash funds |
---|
442 | | - | for the office of information technology for enterprise solutions is decreased |
---|
443 | | - | by $254,276, and the related FTE is decreased by 2.0 FTE. |
---|
444 | | - | PAGE 10-HOUSE BILL 24-1336 SECTION 11. Act subject to petition - effective date. This act |
---|
445 | | - | takes effect September 1, 2024; except that, if a referendum petition is filed |
---|
446 | | - | pursuant to section 1 (3) of article V of the state constitution against this act |
---|
447 | | - | or an item, section, or part of this act within the ninety-day period after final |
---|
448 | | - | adjournment of the general assembly, then the act, item, section, or part will |
---|
449 | | - | not take effect unless approved by the people at the general election to be |
---|
450 | | - | held in November 2024 and, in such case, will take effect on the date of the |
---|
451 | | - | official declaration of the vote thereon by the governor. |
---|
452 | | - | ____________________________ ____________________________ |
---|
453 | | - | Julie McCluskie Steve Fenberg |
---|
454 | | - | SPEAKER OF THE HOUSE PRESIDENT OF |
---|
455 | | - | OF REPRESENTATIVES THE SENATE |
---|
456 | | - | ____________________________ ____________________________ |
---|
457 | | - | Robin Jones Cindi L. Markwell |
---|
458 | | - | CHIEF CLERK OF THE HOUSE SECRETARY OF |
---|
459 | | - | OF REPRESENTATIVES THE SENATE |
---|
460 | | - | APPROVED________________________________________ |
---|
461 | | - | (Date and Time) |
---|
462 | | - | _________________________________________ |
---|
463 | | - | Jared S. Polis |
---|
464 | | - | GOVERNOR OF THE STATE OF COLORADO |
---|
465 | | - | PAGE 11-HOUSE BILL 24-1336 |
---|
| 388 | + | 21 |
---|
| 389 | + | OFFICE under section 24-37.5-119 24-37.5-905.22 |
---|
| 390 | + | (c) The third-party contractor that maintains the high cost support23 |
---|
| 391 | + | mechanism shall allocate any money refunded to the high cost support24 |
---|
| 392 | + | mechanism pursuant to this subsection (2) to the high cost support25 |
---|
| 393 | + | mechanism account dedicated to broadband deployment, which account26 |
---|
| 394 | + | is described in section 24-37.5-119 (3) 24-37.5-905.27 |
---|
| 395 | + | 1336 |
---|
| 396 | + | -11- SECTION 9. In Colorado Revised Statutes, 40-15-502, amend1 |
---|
| 397 | + | (5)(a) as follows:2 |
---|
| 398 | + | 40-15-502. Expressions of state policy. (5) Universal service3 |
---|
| 399 | + | support mechanisms. (a) In order to accomplish the goals of universal4 |
---|
| 400 | + | basic service, universal access to advanced service under section5 |
---|
| 401 | + | 24-37.5-119 24-37.5-905, and any revision of the definition of basic6 |
---|
| 402 | + | service under subsection (2) of this section, the commission shall create7 |
---|
| 403 | + | a system of support mechanisms to assist in the provision of basic service8 |
---|
| 404 | + | and advanced service in high-cost areas. The commission shall fund these9 |
---|
| 405 | + | support mechanisms equitably and on a nondiscriminatory, competitively10 |
---|
| 406 | + | neutral basis through assessments, which may include a rate element, on11 |
---|
| 407 | + | all telecommunications providers in Colorado. A provider's eligibility to12 |
---|
| 408 | + | receive support for basic service under the support mechanisms is13 |
---|
| 409 | + | conditioned upon the provider's offering basic service throughout an14 |
---|
| 410 | + | entire support area.15 |
---|
| 411 | + | SECTION 10. Appropriation - adjustments to 2024 long bill.16 |
---|
| 412 | + | (1) To implement this act, appropriations made in the annual general17 |
---|
| 413 | + | appropriation act for the 2024-25 state fiscal year to the office of the18 |
---|
| 414 | + | governor are adjusted as follows:19 |
---|
| 415 | + | (a) The cash funds appropriation from various sources of cash20 |
---|
| 416 | + | funds for the office of information technology for health, life, and dental21 |
---|
| 417 | + | is decreased by $25,826;22 |
---|
| 418 | + | (b) The cash funds appropriation from various sources of cash23 |
---|
| 419 | + | funds for the office of information technology for enterprise solutions is24 |
---|
| 420 | + | decreased by $254,276, and the related FTE is decreased by 2.0 FTE.25 |
---|
| 421 | + | 26 |
---|
| 422 | + | SECTION 11. Act subject to petition - effective date. This act27 |
---|
| 423 | + | 1336 |
---|
| 424 | + | -12- takes effect September 1, 2024; except that, if a referendum petition is1 |
---|
| 425 | + | filed pursuant to section 1 (3) of article V of the state constitution against2 |
---|
| 426 | + | this act or an item, section, or part of this act within the ninety-day period3 |
---|
| 427 | + | after final adjournment of the general assembly, then the act, item,4 |
---|
| 428 | + | section, or part will not take effect unless approved by the people at the5 |
---|
| 429 | + | general election to be held in November 2024 and, in such case, will take6 |
---|
| 430 | + | effect on the date of the official declaration of the vote thereon by the7 |
---|
| 431 | + | governor.8 |
---|
| 432 | + | 1336 |
---|
| 433 | + | -13- |
---|