8 | | - | ONCERNING MEASURES TO REDUCE THE COST OF USE OF NATURAL GAS |
---|
9 | | - | INFRASTRUCTURE |
---|
10 | | - | , AND, IN CONNECTION THEREWITH , MAKING AN |
---|
11 | | - | APPROPRIATION |
---|
12 | | - | . |
---|
13 | | - | |
---|
14 | | - | Be it enacted by the General Assembly of the State of Colorado: |
---|
15 | | - | SECTION 1. In Colorado Revised Statutes, add article 3.3 to title |
---|
16 | | - | 40 as follows: |
---|
17 | | - | ARTICLE 3.3 |
---|
18 | | - | Gas Infrastructure Planning |
---|
19 | | - | 40-3.3-101. Definitions. A |
---|
20 | | - | S USED IN THIS ARTICLE 3.3, UNLESS THE |
---|
21 | | - | CONTEXT OTHERWISE REQUIRES |
---|
22 | | - | : |
---|
23 | | - | (1) "A |
---|
24 | | - | LTERNATIVE ENERGY SERVICE " MEANS A LOW - OR |
---|
25 | | - | NOTE: This bill has been prepared for the signatures of the appropriate legislative |
---|
26 | | - | officers and the Governor. To determine whether the Governor has signed the bill |
---|
27 | | - | or taken other action on it, please consult the legislative status sheet, the legislative |
---|
28 | | - | history, or the Session Laws. |
---|
29 | | - | ________ |
---|
30 | | - | Capital letters or bold & italic numbers indicate new material added to existing law; dashes |
---|
31 | | - | through words or numbers indicate deletions from existing law and such material is not part of |
---|
32 | | - | the act. ZERO-CARBON RESIDENTIAL, COMMERCIAL, OR INDUSTRIAL ENERGY SERVICE |
---|
33 | | - | THAT IS ABLE TO MEET A CUSTOMER |
---|
34 | | - | 'S END USE NEED AND DOES NOT |
---|
35 | | - | COMBUST METHANE |
---|
36 | | - | -, PROPANE-, OR PETROLEUM-DERIVED GAS ON SITE IN |
---|
37 | | - | DOING SO |
---|
38 | | - | . |
---|
39 | | - | (2) "C |
---|
40 | | - | OLORADO ENERGY OFFICE" MEANS THE COLORADO ENERGY |
---|
41 | | - | OFFICE CREATED IN SECTION |
---|
42 | | - | 24-38.5-101. |
---|
43 | | - | (3) "D |
---|
44 | | - | ISTRIBUTION SYSTEM" HAS THE MEANING SET FORTH IN |
---|
45 | | - | SECTION |
---|
46 | | - | 40-2-115 (2)(b) AND INCLUDES THE PIPING AND ASSOCIATED |
---|
47 | | - | FACILITIES USED TO DELIVER GEOLOGICAL GAS OR RECOVERED METHANE |
---|
48 | | - | . |
---|
49 | | - | (4) "D |
---|
50 | | - | UAL-FUEL UTILITY" MEANS AN INVESTOR-OWNED UTILITY IN |
---|
51 | | - | WHICH ONE COMPANY OR A SUBSIDIARY OF THE SAME COMPANY OPERATES |
---|
52 | | - | BOTH AN ELECTRIC AND A GAS UTILITY THAT HAVE SERVICE TERRITORIES IN |
---|
53 | | - | THE STATE WHERE GREATER THAN FIFTY PERCENT OF ALL CUSTOMERS IN |
---|
54 | | - | THOSE TERRITORIES RECEIVE BOTH GAS AND ELECTRIC SERVICE FROM A |
---|
55 | | - | UTILITY OPERATED BY THAT COMPANY OR A SUBSIDIARY OF THE SAME |
---|
56 | | - | COMPANY |
---|
57 | | - | . |
---|
58 | | - | (5) "G |
---|
59 | | - | AS" MEANS NATURAL OR GEOLOGICAL GAS , RECOVERED |
---|
60 | | - | METHANE |
---|
61 | | - | , OR ANY MIXTURE OF NATURAL OR GEOLOGICAL GAS OR |
---|
62 | | - | RECOVERED METHANE THAT IS TRANSPORTED BY A COMMON CARRIER OR |
---|
63 | | - | DEDICATED PIPELINE |
---|
64 | | - | , INCLUDING FLAMMABLE GAS ; MANUFACTURED GAS; |
---|
65 | | - | PETROLEUM OR OTHER HYDROCARBON GASES , SUCH AS PROPANE; OR ANY |
---|
66 | | - | MIXTURE OF FOSSIL GASES THAT IS INJECTED INTO A PIPELINE AND |
---|
67 | | - | TRANSMITTED |
---|
68 | | - | , DISTRIBUTED, OR FURNISHED BY A UTILITY. |
---|
69 | | - | (6) "G |
---|
70 | | - | AS INFRASTRUCTURE PLAN" MEANS A REQUIREMENT FOR GAS |
---|
71 | | - | UTILITIES ESTABLISHED BY THE COMMISSION THAT IS DESIGNED TO |
---|
72 | | - | ESTABLISH A PROCESS TO DETERMINE THE NEED FOR |
---|
73 | | - | , AND POTENTIAL |
---|
74 | | - | ALTERNATIVES TO |
---|
75 | | - | , CAPITAL INVESTMENT, CONSISTENT WITH THE OBJECTIVES |
---|
76 | | - | OF MAINTAINING JUST AND REASONABLE RATES |
---|
77 | | - | ; ENSURING SYSTEM SAFETY, |
---|
78 | | - | RELIABILITY, AND RESILIENCY; AND PROTECTING INCOME-QUALIFIED UTILITY |
---|
79 | | - | CUSTOMERS AND DISPROPORTIONATELY IMPACTED COMMUNITIES |
---|
80 | | - | . |
---|
81 | | - | (7) "G |
---|
82 | | - | AS PLANNING PILOT COMMUNITY " MEANS A LOCAL |
---|
83 | | - | GOVERNMENT IN WHICH CONSTITUENTS HAVE GAS SERVICE PROVIDED BY A |
---|
84 | | - | DUAL |
---|
85 | | - | -FUEL UTILITY AND AN ACTIVE FRANCHISE AGREEMENT WITH THE |
---|
86 | | - | DUAL |
---|
87 | | - | -FUEL UTILITY, WHICH LOCAL GOVERNMENT FORMALLY INDICATES AN |
---|
88 | | - | PAGE 2-HOUSE BILL 24-1370 INTEREST IN WORKING WITH THE DUAL-FUEL UTILITY TO MUTUALLY EXPLORE |
---|
89 | | - | OPPORTUNITIES FOR NEIGHBORHOOD |
---|
90 | | - | -SCALE ALTERNATIVES PROJECTS , |
---|
91 | | - | INCLUDING THROUGH THE EXCHANGE OF UTILITY GAS INFRASTRUCTURE |
---|
92 | | - | DATA AND COMMUNITY DEVELOPMENT PLANS |
---|
93 | | - | . |
---|
94 | | - | (8) "G |
---|
95 | | - | REENHOUSE GAS REDUCTION GOALS " MEANS THE STATE'S |
---|
96 | | - | GREENHOUSE GAS REDUCTION GOALS DESCRIBED IN SECTION |
---|
97 | | - | 25-7-102 |
---|
98 | | - | (2)(g). |
---|
99 | | - | (9) "I |
---|
100 | | - | NCOME-QUALIFIED UTILITY CUSTOMER" HAS THE MEANING SET |
---|
101 | | - | FORTH IN SECTION |
---|
102 | | - | 40-3-106 (1)(d)(II). |
---|
103 | | - | (10) "L |
---|
104 | | - | OCAL GOVERNMENT " MEANS A HOME RULE OR STATUTORY |
---|
105 | | - | COUNTY |
---|
106 | | - | , CITY, OR CITY AND COUNTY. |
---|
107 | | - | (11) "N |
---|
108 | | - | EIGHBORHOOD-SCALE ALTERNATIVES PROJECT " MEANS A |
---|
109 | | - | PROJECT IN A GAS PLANNING PILOT COMMUNITY |
---|
110 | | - | : |
---|
111 | | - | (a) W |
---|
112 | | - | HERE A DUAL-FUEL UTILITY: |
---|
113 | | - | (I) P |
---|
114 | | - | ROVIDES BOTH GAS AND ELECTRIC SERVICE ; |
---|
115 | | - | (II) P |
---|
116 | | - | ROVIDES GAS SERVICE AND A MUNICIPALLY OWNED UTILITY |
---|
117 | | - | OPERATED BY THE GAS PLANNING PILOT COMMUNITY PROVIDES ELECTRIC |
---|
118 | | - | SERVICE |
---|
119 | | - | ; OR |
---|
120 | | - | (III) PROVIDES GAS SERVICE AND A COOPERATIVE ELECTRIC |
---|
121 | | - | ASSOCIATION THAT SERVES A GAS PLANNING PILOT COMMUNITY HAS |
---|
122 | | - | VOLUNTARILY PARTNERED WITH THE DUAL |
---|
123 | | - | -FUEL UTILITY; AND |
---|
124 | | - | (b) THAT GEOGRAPHICALLY TARGETS DECOMMISSIONING A PORTION |
---|
125 | | - | OF THE GAS DISTRIBUTION SYSTEM OR AVOIDS EXPANDING THE GAS |
---|
126 | | - | DISTRIBUTION SYSTEM IN ORDER TO SERVE NEW CONSTRUCTION PROJECTS |
---|
127 | | - | AND PROVIDES ALTERNATIVE ENERGY SERVICE TO BUILDINGS WITHIN THE |
---|
128 | | - | PROJECT AREA THAT REDUCES FUTURE GREENHOUSE GAS EMISSIONS |
---|
129 | | - | REQUIRED TO SERVE BUILDINGS |
---|
130 | | - | . |
---|
131 | | - | (12) "N |
---|
132 | | - | ONEMITTING THERMAL RESOURCE " MEANS EFFICIENT |
---|
133 | | - | THERMAL ENERGY FOR HEATING |
---|
134 | | - | , COOLING, OR HOT WATER, WHICH ENERGY |
---|
135 | | - | DOES NOT REQUIRE COMBUSTION OF GAS |
---|
136 | | - | , SUCH AS AN AIR-SOURCE HEAT |
---|
137 | | - | PAGE 3-HOUSE BILL 24-1370 PUMP, AS DEFINED IN SECTION 39-22-554 (2)(a); A GROUND-SOURCE HEAT |
---|
138 | | - | PUMP |
---|
139 | | - | , AS DEFINED IN SECTION 39-22-554 (2)(g); A HEAT PUMP WATER |
---|
140 | | - | HEATER |
---|
141 | | - | ; A THERMAL ENERGY SYSTEM ; OR A THERMAL ENERGY NETWORK . |
---|
142 | | - | (13) "P |
---|
143 | | - | IPELINE SEGMENT" MEANS A DISCRETE PORTION OF THE |
---|
144 | | - | DISTRIBUTION SYSTEM AND ALL ANCILLARY STRUCTURES |
---|
145 | | - | , VALVES, AND |
---|
146 | | - | OTHER SYSTEMS NEEDED TO DISTRIBUTE GAS |
---|
147 | | - | . A PIPELINE SEGMENT MUST BE |
---|
148 | | - | THE SMALLEST INCREMENTAL UNIT POSSIBLE |
---|
149 | | - | , AS DEFINED BY PIPELINE |
---|
150 | | - | MATERIALS |
---|
151 | | - | , GEOGRAPHICAL FEATURES , AND THE DESIGN OF THE |
---|
152 | | - | DISTRIBUTION SYSTEM |
---|
153 | | - | . |
---|
154 | | - | (14) "T |
---|
155 | | - | HERMAL ENERGY NETWORK " HAS THE MEANING SET FORTH |
---|
156 | | - | IN SECTION |
---|
157 | | - | 40-3.2-108 (2)(s). |
---|
158 | | - | (15) "T |
---|
159 | | - | HERMAL ENERGY SYSTEM " HAS THE MEANING SET FORTH IN |
---|
160 | | - | SECTION |
---|
161 | | - | 40-3.2-108 (2)(t). |
---|
162 | | - | 40-3.3-102. Request for information - gas planning pilot |
---|
163 | | - | community - disclosures - repeal. (1) (a) B |
---|
164 | | - | Y DECEMBER 1, 2024, THE |
---|
165 | | - | COLORADO ENERGY OFFICE SHALL ISSUE A REQUEST FOR INFORMATION TO |
---|
166 | | - | IDENTIFY LOCAL GOVERNMENTS WHOSE RESIDENTS ARE SERVED BY A |
---|
167 | | - | DUAL |
---|
168 | | - | -FUEL UTILITY THAT ARE INTERESTED IN BECOMING A GAS PLANNING |
---|
169 | | - | PILOT COMMUNITY |
---|
170 | | - | . |
---|
171 | | - | (b) T |
---|
172 | | - | HE COLORADO ENERGY OFFICE SHALL INCLUDE IN THE REQUEST |
---|
173 | | - | FOR INFORMATION THE MINIMUM CRITERIA THAT A LOCAL GOVERNMENT |
---|
174 | | - | MUST MEET IN ORDER TO BECOME A GAS PLANNING PILOT COMMUNITY |
---|
175 | | - | , |
---|
176 | | - | INCLUDING: |
---|
177 | | - | (I) A |
---|
178 | | - | DEMONSTRATION THAT DESIGNATION AS A GAS PLANNING PILOT |
---|
179 | | - | COMMUNITY WOULD ALIGN WITH THE LOCAL GOVERNMENT |
---|
180 | | - | 'S CLIMATE AND |
---|
181 | | - | ENERGY AFFORDABILITY GOALS |
---|
182 | | - | ; |
---|
183 | | - | (II) A |
---|
184 | | - | WILLINGNESS TO PROMOTE NEIGHBORHOOD -SCALE |
---|
185 | | - | ALTERNATIVES PROJECTS AND TO SUPPORT |
---|
186 | | - | , ENGAGE, AND EDUCATE |
---|
187 | | - | RESIDENTS WITHIN A COMMUNITY FOR WHICH A NEIGHBORHOOD |
---|
188 | | - | -SCALE |
---|
189 | | - | ALTERNATIVES PROJECT IS PROPOSED PRIOR TO APPROVAL BY THE |
---|
190 | | - | COMMISSION |
---|
191 | | - | ; AND |
---|
192 | | - | (III) A COMMITMENT OF INTERNAL OR EXTERNAL STAFF RESOURCES |
---|
193 | | - | PAGE 4-HOUSE BILL 24-1370 TO IDENTIFY AND IMPLEMENT NEIGHBORHOOD -SCALE ALTERNATIVES |
---|
194 | | - | PROJECTS |
---|
195 | | - | . |
---|
196 | | - | (c) A |
---|
197 | | - | T LEAST THIRTY DAYS PRIOR TO ISSUING THE REQUEST FOR |
---|
198 | | - | INFORMATION |
---|
199 | | - | , THE COLORADO ENERGY OFFICE SHALL PUBLISH A DRAFT OF |
---|
200 | | - | THE REQUEST FOR INFORMATION ON ITS WEBSITE AND PROVIDE AN |
---|
201 | | - | OPPORTUNITY FOR THE PUBLIC TO SUBMIT WRITTEN COMMENTS |
---|
202 | | - | . |
---|
203 | | - | (2) (a) B |
---|
204 | | - | Y APRIL 30, 2025, THE COLORADO ENERGY OFFICE AND A |
---|
205 | | - | DUAL |
---|
206 | | - | -FUEL UTILITY SHALL JOINTLY FILE WITH THE COMMISSION THE RESULTS |
---|
207 | | - | OF THE REQUEST FOR INFORMATION REQUIRED BY SUBSECTION |
---|
208 | | - | (1)(a) OF THIS |
---|
209 | | - | SECTION |
---|
210 | | - | , IDENTIFYING UP TO FIVE PROPOSED GAS PLANNING PILOT |
---|
211 | | - | COMMUNITIES |
---|
212 | | - | . IN IDENTIFYING PROPOSED GAS PLANNING PILOT |
---|
213 | | - | COMMUNITIES |
---|
214 | | - | , THE COLORADO ENERGY OFFICE AND A DUAL -FUEL UTILITY |
---|
215 | | - | SHALL PRIORITIZE LOCAL GOVERNMENTS THAT ARE INTERESTED IN PURSUING |
---|
216 | | - | THERMAL ENERGY NETWORK OR GEOTHERMAL ENERGY PROJECTS AS PART |
---|
217 | | - | OF THE PROPOSED GAS PLANNING PILOT COMMUNITY |
---|
218 | | - | 'S EVALUATION OF ANY |
---|
219 | | - | POTENTIAL NEIGHBORHOOD |
---|
220 | | - | -SCALE ALTERNATIVES PROJECT PURSUANT TO |
---|
221 | | - | SECTION |
---|
222 | | - | 40-3.3-103. THE COLORADO ENERGY OFFICE AND THE DUAL -FUEL |
---|
223 | | - | UTILITY SHALL ALSO JOINTLY FILE A DRAFT AGREEMENT BETWEEN THE |
---|
224 | | - | DUAL |
---|
225 | | - | -FUEL UTILITY AND ANY PROPOSED GAS PLANNING PILOT COMMUNITY , |
---|
226 | | - | WHICH DRAFT AGREEMENT MUST : |
---|
227 | | - | (I) I |
---|
228 | | - | DENTIFY THE ROLES AND RESPONSIBILITIES OF THE DUAL -FUEL |
---|
229 | | - | UTILITY AND THE PROPOSED GAS PLANNING PILOT COMMUNITY IN |
---|
230 | | - | IDENTIFYING NEIGHBORHOOD |
---|
231 | | - | -SCALE ALTERNATIVES PROJECTS; |
---|
232 | | - | (II) I |
---|
233 | | - | DENTIFY TIME FRAMES FOR EACH PARTY TO FURNISH DATA OR |
---|
234 | | - | RESPOND TO REQUESTS FOR DATA FROM THE OTHER PARTY |
---|
235 | | - | ; |
---|
236 | | - | (III) I |
---|
237 | | - | NCLUDE ANY NECESSARY WAIVERS OF COMMISSION RULES TO |
---|
238 | | - | FACILITATE DATA TRANSFER BETWEEN THE PARTIES |
---|
239 | | - | ; |
---|
240 | | - | (IV) I |
---|
241 | | - | NCLUDE A PROCESS TO ADDRESS CONFLICTS BETWEEN THE TWO |
---|
242 | | - | PARTIES |
---|
243 | | - | ; AND |
---|
244 | | - | (V) INDICATE WHETHER THE PROPOSED GAS PLANNING PILOT |
---|
245 | | - | COMMUNITY HAS DEMONSTRATED AN INTEREST IN PURSUING THERMAL |
---|
246 | | - | ENERGY NETWORK OR GEOTHERMAL ENERGY PROJECTS |
---|
247 | | - | . |
---|
248 | | - | PAGE 5-HOUSE BILL 24-1370 (b) THE COMMISSION SHALL PROVIDE AN OPPORTUNITY FOR THE |
---|
249 | | - | PUBLIC TO SUBMIT WRITTEN COMMENTS ON THE FILING |
---|
250 | | - | . |
---|
251 | | - | (c) B |
---|
252 | | - | Y JUNE 30, 2025, THE COMMISSION SHALL APPROVE OR MODIFY |
---|
253 | | - | THE LIST OF PROPOSED GAS PLANNING PILOT COMMUNITIES |
---|
254 | | - | ; EXCEPT THAT |
---|
255 | | - | THE COMMISSION SHALL NOT INCREASE THE NUMBER OF PROPOSED GAS |
---|
256 | | - | PLANNING PILOT COMMUNITIES BEYOND FIVE |
---|
257 | | - | . |
---|
258 | | - | (3) B |
---|
259 | | - | Y OCTOBER 1, 2025, A DUAL-FUEL UTILITY SHALL ENTER INTO |
---|
260 | | - | AN AGREEMENT WITH EACH LOCAL GOVERNMENT THAT HAS BEEN APPROVED |
---|
261 | | - | AS A GAS PLANNING PILOT COMMUNITY AND SHALL SUBMIT TO THE |
---|
262 | | - | COMMISSION A LIST OF THE GAS PLANNING PILOT COMMUNITIES WITH WHICH |
---|
263 | | - | THE DUAL |
---|
264 | | - | -FUEL UTILITY HAS ESTABLISHED AN AGREEMENT . THE DUAL-FUEL |
---|
265 | | - | UTILITY AND LOCAL GOVERNMENT MAY AGREE TO EXTEND THIS DEADLINE |
---|
266 | | - | . |
---|
267 | | - | (4) S |
---|
268 | | - | UBSECTIONS (1) TO (3) OF THIS SECTION ARE REPEALED , |
---|
269 | | - | EFFECTIVE JUNE 1, 2028. |
---|
270 | | - | (5) (a) U |
---|
271 | | - | NLESS OTHERWISE DIRECTED BY THE COMMISSION OR |
---|
272 | | - | REQUESTED BY THE GAS PLANNING PILOT COMMUNITY |
---|
273 | | - | , A DUAL-FUEL UTILITY |
---|
274 | | - | SHALL PROVIDE EACH GAS PLANNING PILOT COMMUNITY |
---|
275 | | - | , THE COMMISSION, |
---|
276 | | - | AND THE COLORADO ENERGY OFFICE WITH DATA AND INFORMATION TO |
---|
277 | | - | INFORM THE EVALUATION OF POTENTIAL NEIGHBORHOOD |
---|
278 | | - | -SCALE |
---|
279 | | - | ALTERNATIVES PROJECTS THAT INCLUDES |
---|
280 | | - | : |
---|
281 | | - | (I) T |
---|
282 | | - | HE LOCATION OF ANY PLANNED GAS INFRASTRUCTURE PROJECTS |
---|
283 | | - | IN THE GAS PLANNING PILOT COMMUNITY WITHIN THE SIX |
---|
284 | | - | -YEAR GAS PROJECT |
---|
285 | | - | PLANNING FORECAST IN THE DUAL |
---|
286 | | - | -FUEL UTILITY'S MOST RECENTLY |
---|
287 | | - | APPROVED GAS INFRASTRUCTURE PLAN OR IDENTIFIED BY THE DUAL |
---|
288 | | - | -FUEL |
---|
289 | | - | UTILITY FOR INCLUSION IN A FUTURE GAS INFRASTRUCTURE PLAN TO THE |
---|
290 | | - | EXTENT AVAILABLE |
---|
291 | | - | ; AND |
---|
292 | | - | (II) THE FOLLOWING INFORMATION REGARDING THE PLANNED GAS |
---|
293 | | - | INFRASTRUCTURE PROJECTS DESCRIBED IN SUBSECTION |
---|
294 | | - | (5)(a)(I) OF THIS |
---|
295 | | - | SECTION |
---|
296 | | - | : |
---|
297 | | - | (A) T |
---|
298 | | - | HE PROJECT NAME; |
---|
299 | | - | (B) T |
---|
300 | | - | HE PROJECT CATEGORY , CONSISTENT WITH THE PLANNED |
---|
301 | | - | PROJECTS CATEGORIES DESCRIBED IN APPLICABLE COMMISSION RULES |
---|
302 | | - | ; |
---|
303 | | - | PAGE 6-HOUSE BILL 24-1370 (C) A DESCRIPTION OF THE GENERAL SCOPE OF WORK AND AN |
---|
304 | | - | EXPLANATION OF THE NEED FOR THE PROJECT |
---|
305 | | - | , INCLUDING ANY APPLICABLE |
---|
306 | | - | CODE REQUIREMENTS OF THE |
---|
307 | | - | UNITED STATES DEPARTMENT OF |
---|
308 | | - | TRANSPORTATION |
---|
309 | | - | 'S PIPELINE AND HAZARDOUS MATERIALS SAFETY |
---|
310 | | - | ADMINISTRATION |
---|
311 | | - | ; |
---|
312 | | - | (D) T |
---|
313 | | - | HE PROJECTED LIFE OF THE PROJECT; |
---|
314 | | - | (E) A |
---|
315 | | - | N INDICATION OF WHETHER THE PROJECT IS PRESENTED AS A |
---|
316 | | - | GAS INFRASTRUCTURE PLAN ACTION PERIOD PROJECT OR A GAS |
---|
317 | | - | INFRASTRUCTURE PLAN INFORMATIONAL PERIOD PROJECT PURSUANT TO |
---|
318 | | - | APPLICABLE COMMISSION RULES |
---|
319 | | - | ; |
---|
320 | | - | (F) T |
---|
321 | | - | HE ANTICIPATED: CONSTRUCTION START DATE FOR THE |
---|
322 | | - | PROJECT |
---|
323 | | - | ; CONSTRUCTION PERIOD FOR THE PROJECT , INCLUDING AN |
---|
324 | | - | INDICATION OF ANY CONSTRUCTION PHASES |
---|
325 | | - | ; AND IN-SERVICE DATE FOR THE |
---|
326 | | - | PROJECT |
---|
327 | | - | ; |
---|
328 | | - | (G) T |
---|
329 | | - | HE COST-ESTIMATE CLASSIFICATION FOR THE PROJECT , USING |
---|
330 | | - | THE DUAL |
---|
331 | | - | -FUEL UTILITY'S OR AN INDUSTRY-ACCEPTED COST-ESTIMATE |
---|
332 | | - | CLASSIFICATION INDEX |
---|
333 | | - | ; SUPPORT FOR THE COST-ESTIMATE CLASSIFICATION; |
---|
334 | | - | AND THE TOTAL COST ESTIMATE FOR THE PROJECT ; |
---|
335 | | - | (H) T |
---|
336 | | - | HE TECHNICAL DETAILS OF THE PROJECT , SUCH AS THE |
---|
337 | | - | PHYSICAL EQUIPMENT CHARACTERISTICS OF THE PROPOSED FACILITIES |
---|
338 | | - | , |
---|
339 | | - | PIPELINE LENGTH, PIPELINE DIAMETER, PROJECT MATERIALS, AND MAXIMUM |
---|
340 | | - | ALLOWABLE OPERATING PRESSURE |
---|
341 | | - | ; |
---|
342 | | - | (I) T |
---|
343 | | - | HE PROJECT LOCATION AND AN ILLUSTRATIVE MAP OF THE GAS |
---|
344 | | - | DISTRIBUTION SYSTEM FACILITIES |
---|
345 | | - | , SUBJECT TO NECESSARY |
---|
346 | | - | CONFIDENTIALITY PROVISIONS |
---|
347 | | - | , INCLUDING: THE PRESSURE DISTRICT OR |
---|
348 | | - | GEOGRAPHIC AREA THAT REQUIRES THE PROPOSED FACILITIES |
---|
349 | | - | , THE EXISTING |
---|
350 | | - | AND PROPOSED REGULATOR STATIONS AND EXISTING AND PROPOSED |
---|
351 | | - | DISTRIBUTION PIPING AND HIGHER CAPACITY PIPELINES SERVED BY OR |
---|
352 | | - | REPRESENTING THE PROPOSED FACILITIES |
---|
353 | | - | , THE LOCATIONS OF ANY NEARBY |
---|
354 | | - | DISPROPORTIONATELY IMPACTED COMMUNITIES |
---|
355 | | - | , AND ANY OTHER |
---|
356 | | - | INFORMATION NECESSARY TO ALLOW THE LOCAL GOVERNMENT TO MAKE A |
---|
357 | | - | THOROUGH EVALUATION OF THE PROJECT |
---|
358 | | - | ; |
---|
359 | | - | (J) T |
---|
360 | | - | O THE EXTENT PRACTICABLE , THE NUMBER OF CUSTOMERS , |
---|
361 | | - | PAGE 7-HOUSE BILL 24-1370 ANNUAL SALES , AND DESIGN PEAK DEM AND REQUIREMENTS , |
---|
362 | | - | DISAGGREGATED BY CUSTOMER CLASS , POTENTIALLY DIRECTLY IMPACTED |
---|
363 | | - | OR SERVED BY THE PROJECT |
---|
364 | | - | ; |
---|
365 | | - | (K) A |
---|
366 | | - | NY PERMITS REQUIRED FOR WORK ON THE PROJECT TO BEGIN ; |
---|
367 | | - | AND |
---|
368 | | - | (L) ANY ENVIRONMENTAL REQUIREMENTS ASSOCIATED WITH |
---|
369 | | - | COMPLETION OF THE PROJECT |
---|
370 | | - | . |
---|
371 | | - | (b) A |
---|
372 | | - | DUAL-FUEL UTILITY SHALL PROVIDE GAS PLANNING PILOT |
---|
373 | | - | COMMUNITY STAFF AND CONSULTANTS |
---|
374 | | - | , WHO HAVE SIGNED APPROPRIATE |
---|
375 | | - | NONDISCLOSURE AGREEMENTS |
---|
376 | | - | , WITH ALL REQUESTED GAS AND ELECTRIC |
---|
377 | | - | CUSTOMER USAGE AND DESIGN PEAK DEMAND DATA |
---|
378 | | - | , TO THE EXTENT |
---|
379 | | - | AVAILABLE AND DISAGGREGATED TO THE INDIVIDUAL CUSTOMER |
---|
380 | | - | , FOR ALL |
---|
381 | | - | PLANNED GAS INFRASTRUCTURE PROJECTS LOCATED IN A GAS PLANNING |
---|
382 | | - | PILOT COMMUNITY WITHIN THE SIX |
---|
383 | | - | -YEAR GAS PROJECT PLANNING FORECAST |
---|
384 | | - | IN THE DUAL |
---|
385 | | - | -FUEL UTILITY'S MOST RECENTLY APPROVED GAS |
---|
386 | | - | INFRASTRUCTURE PLAN OR IDENTIFIED BY THE DUAL |
---|
387 | | - | -FUEL UTILITY FOR |
---|
388 | | - | INCLUSION IN A FUTURE GAS INFRASTRUCTURE PLAN |
---|
389 | | - | . THE DUAL-FUEL |
---|
390 | | - | UTILITY SHALL PROVIDE SUCH INFORMATION WITHIN THE RELEVANT TIME |
---|
391 | | - | FRAME ESTABLISHED PURSUANT TO SUBSECTION |
---|
392 | | - | (2)(a)(II) OF THIS SECTION. |
---|
393 | | - | (c) T |
---|
394 | | - | HE INFORMATION DESCRIBED IN SUBSECTIONS (5)(a) AND (5)(b) |
---|
395 | | - | OF THIS SECTION IS EXEMPT FROM THE "COLORADO OPEN RECORDS ACT", |
---|
396 | | - | PART 2 OF ARTICLE 72 OF TITLE 24. |
---|
397 | | - | 40-3.3-103. Neighborhood-scale alternatives projects - cost |
---|
398 | | - | recovery - reporting requirement. (1) A |
---|
399 | | - | DUAL-FUEL UTILITY SHALL WORK |
---|
400 | | - | WITH A GAS PLANNING PILOT COMMUNITY TO RANK AND PRIORITIZE |
---|
401 | | - | NEIGHBORHOOD |
---|
402 | | - | -SCALE ALTERNATIVES PROJECTS WITHIN EACH GAS |
---|
403 | | - | PLANNING PILOT COMMUNITY BASED ON LOCAL GOVERNMENT INPUT AND |
---|
404 | | - | CONSIDERATION OF |
---|
405 | | - | : |
---|
406 | | - | (a) T |
---|
407 | | - | HE NUMBER AND CUSTOMER CLASS SERVED BY EACH PIPELINE |
---|
408 | | - | SEGMENT INCLUDED IN A NEIGHBORHOOD |
---|
409 | | - | -SCALE ALTERNATIVES PROJECT; |
---|
410 | | - | (b) T |
---|
411 | | - | HE DEGREE OF SUPPORT FOR THE NEIGHBORHOOD -SCALE |
---|
412 | | - | ALTERNATIVES PROJECT FROM CUSTOMERS POTENTIALLY IMPACTED BY THE |
---|
413 | | - | PROJECT |
---|
414 | | - | , WITH PREFERENCE GIVEN TO THOSE PROJECTS THAT HAVE FULL |
---|
415 | | - | PAGE 8-HOUSE BILL 24-1370 SUPPORT FROM POTENTIALLY IMPACTED CUSTOMERS ; |
---|
416 | | - | (c) T |
---|
417 | | - | HE COST-EFFECTIVENESS OF THE NEIGHBORHOOD -SCALE |
---|
418 | | - | ALTERNATIVES PROJECT |
---|
419 | | - | , USING THE COST-BENEFIT HANDBOOK FROM THE |
---|
420 | | - | DUAL |
---|
421 | | - | -FUEL UTILITY'S MOST RECENT GAS INFRASTRUCTURE PLAN ; |
---|
422 | | - | (d) T |
---|
423 | | - | HE NET COST TO CUSTOMERS POTENTIALLY PARTICIPATING IN |
---|
424 | | - | THE NEIGHBORHOOD |
---|
425 | | - | -SCALE ALTERNATIVES PROJECT; |
---|
426 | | - | (e) T |
---|
427 | | - | HE AVAILABILITY OF ALTERNATIVE ENERGY SERVICE , |
---|
428 | | - | INCLUDING FOR SCENARIOS WITH ENHANCED GAS AND ELECTRIC DEMAND |
---|
429 | | - | RESPONSE OR DEMAND FLEXIBILITY |
---|
430 | | - | ; |
---|
431 | | - | (f) T |
---|
432 | | - | HE ABILITY OF THERMAL ENERGY NETWORKS TO SERVE THE |
---|
433 | | - | AREA COVERED BY THE NEIGHBORHOOD |
---|
434 | | - | -SCALE ALTERNATIVES PROJECT , |
---|
435 | | - | WITH PRIORITY GIVEN TO PROJECTS THAT INCLUDE A THERMAL ENERGY |
---|
436 | | - | NETWORK OR A GEOTHERMAL ENERGY PROJECT |
---|
437 | | - | ; |
---|
438 | | - | (g) W |
---|
439 | | - | HETHER THE NEIGHBORHOOD -SCALE ALTERNATIVES PROJECT |
---|
440 | | - | IS PART OF A NEW DEVELOPMENT OR WOULD SERVE EXISTING CUSTOMERS |
---|
441 | | - | , |
---|
442 | | - | OR BOTH; |
---|
443 | | - | (h) T |
---|
444 | | - | HE PRIORITIZATION OF PIPELINE SEGMENTS THAT ARE PART OF |
---|
445 | | - | PROJECTS INCLUDED IN A DUAL |
---|
446 | | - | -FUEL UTILITY'S GAS INFRASTRUCTURE PLAN |
---|
447 | | - | OR OTHERWISE IDENTIFIED BY THE DUAL |
---|
448 | | - | -FUEL UTILITY FOR INCLUSION IN A |
---|
449 | | - | FUTURE GAS INFRASTRUCTURE PLAN |
---|
450 | | - | , TO THE EXTENT THIS INFORMATION IS |
---|
451 | | - | AVAILABLE |
---|
452 | | - | ; AND |
---|
453 | | - | (i) THE LOCATION OF ANY NEARBY DISPROPORTIONATELY IMPACTED |
---|
454 | | - | COMMUNITY OR PIPELINE SEGMENTS THAT SERVE DISPROPORTIONATELY |
---|
455 | | - | IMPACTED COMMUNITIES |
---|
456 | | - | . |
---|
457 | | - | (2) (a) (I) P |
---|
458 | | - | RIOR TO JUNE 1, 2026, A DUAL-FUEL UTILITY AND LOCAL |
---|
459 | | - | GOVERNMENT SHALL JOINTLY SUBMIT FOR APPROVAL AT LEAST ONE INITIAL |
---|
460 | | - | NEIGHBORHOOD |
---|
461 | | - | -SCALE ALTERNATIVES PROJECT, TO BE LOCATED WITHIN A |
---|
462 | | - | GAS PLANNING PILOT COMMUNITY |
---|
463 | | - | , TO THE COMMISSION IF THE |
---|
464 | | - | NEIGHBORHOOD |
---|
465 | | - | -SCALE ALTERNATIVES PROJECT HAS THE FULL SUPPORT OF |
---|
466 | | - | POTENTIALLY AFFECTED CUSTOMERS |
---|
467 | | - | . THE FILING MUST ALSO CONTAIN A |
---|
468 | | - | LIST OF POTENTIAL PROJECTS THAT ARE RANKED HIGHLY BUT DO NOT HAVE |
---|
469 | | - | FULL CUSTOMER SUPPORT AT THE TIME OF THE FILING |
---|
470 | | - | . |
---|
471 | | - | PAGE 9-HOUSE BILL 24-1370 (II) PRIOR TO JUNE 1, 2027, A DUAL-FUEL UTILITY AND A LOCAL |
---|
472 | | - | GOVERNMENT SHALL JOINTLY SUBMIT FOR COMMISSION APPROVAL THE |
---|
473 | | - | NEIGHBORHOOD |
---|
474 | | - | -SCALE ALTERNATIVES PROJECTS INCLUDED ON THE LIST IN |
---|
475 | | - | THE FILING SUBMITTED PURSUANT TO SUBSECTION |
---|
476 | | - | (2)(a)(I) OF THIS SECTION |
---|
477 | | - | AND THAT WILL BE PURSUED IN A GAS PLANNING PILOT COMMUNITY |
---|
478 | | - | , WHICH |
---|
479 | | - | PROJECTS MAY LACK FULL CUSTOMER SUPPORT IF THE LOCAL GOVERNMENT |
---|
480 | | - | HAS DETERMINED THAT A REASONABLE MAJORITY OF CUSTOMERS SUPPORTS |
---|
481 | | - | THE PROJECT |
---|
482 | | - | . THE LOCAL GOVERNMENT SHALL DETERMINE WHAT |
---|
483 | | - | CONSTITUTES A REASONABLE MAJORITY |
---|
484 | | - | . THE DETERMINATION OF A |
---|
485 | | - | REASONABLE MAJORITY OF CUSTOMER SUPPORT AND EFFORTS TO OBTAIN |
---|
486 | | - | CUSTOMER CONSENT MUST BE SUPPORTED BY A SWORN AFFIDAVIT OR |
---|
487 | | - | TESTIMONY FROM AN OFFICIAL EMPLOYEE OF THE LOCAL GOVERNMENT AS |
---|
488 | | - | PART OF THE JOINT APPLICATION TO THE COMMISSION |
---|
489 | | - | . THE JOINT |
---|
490 | | - | APPLICATION MUST ALSO INCLUDE THE NET COSTS OF THE PROJECTS |
---|
491 | | - | , |
---|
492 | | - | INCLUDING ANY: |
---|
493 | | - | (A) S |
---|
494 | | - | TATE OR FEDERAL FUNDING OR TAX CREDITS ; |
---|
495 | | - | (B) G |
---|
496 | | - | AS PLANNING PILOT COMMUNITY INCENTIVES OR FUNDING ; |
---|
497 | | - | (C) E |
---|
498 | | - | XISTING DUAL-FUEL UTILITY PROGRAM FUNDING ; |
---|
499 | | - | (D) A |
---|
500 | | - | DDITIONAL DUAL-FUEL UTILITY INCENTIVES OR FUNDING; |
---|
501 | | - | (E) C |
---|
502 | | - | USTOMER CONTRIBUTIONS ; AND |
---|
503 | | - | (F) ANTICIPATED TOTAL CAPITAL EXPENDITURES BY THE DUAL -FUEL |
---|
504 | | - | UTILITY AND CUSTOMERS |
---|
505 | | - | , AVOIDED UTILITY CAPITAL EXPENDITURES , AND |
---|
506 | | - | FUTURE DISCOUNTED CUSTOMER UTILITY BILL SAVINGS OR EXPENSES |
---|
507 | | - | . |
---|
508 | | - | (III) I |
---|
509 | | - | F A DUAL-FUEL UTILITY WILL NOT PURSUE A |
---|
510 | | - | NEIGHBORHOOD |
---|
511 | | - | -SCALE ALTERNATIVES PROJECT IN ONE OR MORE GAS |
---|
512 | | - | PLANNING PILOT COMMUNITIES |
---|
513 | | - | , THE DUAL-FUEL UTILITY AND LOCAL |
---|
514 | | - | GOVERNMENT |
---|
515 | | - | , PRIOR TO JUNE 1, 2027, SHALL JOINTLY FILE A REPORT WITH |
---|
516 | | - | THE COMMISSION EXPLAINING WHY A NEIGHBORHOOD |
---|
517 | | - | -SCALE ALTERNATIVES |
---|
518 | | - | PROJECT WILL NOT BE PURSUED IN THAT COMMUNITY |
---|
519 | | - | . |
---|
520 | | - | (b) T |
---|
521 | | - | HE COMMISSION SHALL PROVIDE AN OPPORTUNITY FOR PUBLIC |
---|
522 | | - | COMMENT REGARDING THE DUAL |
---|
523 | | - | -FUEL UTILITY'S SUBMISSION PURSUANT TO |
---|
524 | | - | SUBSECTION |
---|
525 | | - | (2)(a)(III) OF THIS SECTION. |
---|
526 | | - | PAGE 10-HOUSE BILL 24-1370 (c) THE COMMISSION SHALL APPROVE A NEIGHBORHOOD -SCALE |
---|
527 | | - | ALTERNATIVES PROJECT APPLICATION SUBMITTED BY A DUAL |
---|
528 | | - | -FUEL UTILITY |
---|
529 | | - | IF |
---|
530 | | - | : |
---|
531 | | - | (I) T |
---|
532 | | - | HE PROJECT IS SUPPORTED BY A LOCAL GOVERNMENT |
---|
533 | | - | ORDINANCE |
---|
534 | | - | , PROCLAMATION, OR RESOLUTION; |
---|
535 | | - | (II) T |
---|
536 | | - | HE COMMISSION FINDS THAT THE PROJECT IS: |
---|
537 | | - | (A) C |
---|
538 | | - | ONSISTENT WITH THE STATE'S GREENHOUSE GAS REDUCTION |
---|
539 | | - | GOALS |
---|
540 | | - | ; AND |
---|
541 | | - | (B) IN THE PUBLIC INTEREST, CONSIDERING COSTS AND BENEFITS TO |
---|
542 | | - | THE GAS PLANNING PILOT COMMUNITY |
---|
543 | | - | , PARTICIPATING CUSTOMERS, AND |
---|
544 | | - | RATEPAYERS WITHIN THE DUAL |
---|
545 | | - | -FUEL UTILITY'S GAS SERVICE TERRITORY AND |
---|
546 | | - | ANY COST SHIFT BETWEEN PARTICIPATING CUSTOMERS AND ALL RATEPAYERS |
---|
547 | | - | OF THE DUAL |
---|
548 | | - | -FUEL UTILITY, WITH PREFERENCE GIVEN TO PROJECTS THAT |
---|
549 | | - | RESULT IN NO COST SHIFT TO NONPARTICIPATING CUSTOMERS |
---|
550 | | - | ; |
---|
551 | | - | (III) T |
---|
552 | | - | HE APPROVED PORTFOLIO OF NEIGHBORHOOD -SCALE |
---|
553 | | - | ALTERNATIVES PROJECTS PROVIDES AN APPROPRIATE MIX OF TECHNOLOGIES |
---|
554 | | - | , |
---|
555 | | - | CUSTOMER CLASSES, AND NEW CONSTRUCTION AND EXISTING BUILDINGS |
---|
556 | | - | AND INCLUDES THE USE OF THERMAL ENERGY NETWORKS OR GEOTHERMAL |
---|
557 | | - | ENERGY PROJECTS |
---|
558 | | - | ; AND |
---|
559 | | - | (IV) THE COMMISSION FINDS THAT ALTERNATIVE ENERGY SERVICE |
---|
560 | | - | IS AVAILABLE TO ALL CUSTOMERS WITHIN THE PROJECT AREA AND CAN |
---|
561 | | - | REASONABLY BE IMPLEMENTED WITHIN THE PROJECT AREA |
---|
562 | | - | . IN MAKING THIS |
---|
563 | | - | FINDING |
---|
564 | | - | , THE COMMISSION SHALL CONSIDER: |
---|
565 | | - | (A) T |
---|
566 | | - | HE COST OF END USES POWERED BY DIFFERENT FUELS , IMPACTS |
---|
567 | | - | ON INCOME |
---|
568 | | - | -QUALIFIED UTILITY CUSTOMERS AND CUSTOMERS LIVING IN |
---|
569 | | - | DISPROPORTIONATELY IMPACTED COMMUNITIES |
---|
570 | | - | , AND THE STATE 'S |
---|
571 | | - | GREENHOUSE GAS EMISSION REDUCTION GOALS |
---|
572 | | - | ; |
---|
573 | | - | (B) E |
---|
574 | | - | XISTING UTILITY OR OTHER INCENTIVES TO SUPPORT CUSTOMER |
---|
575 | | - | ADOPTION OF THE ALTERNATIVE ENERGY SERVICE |
---|
576 | | - | ; AND |
---|
577 | | - | (C) THE DEGREE OF CUSTOMER SUPPORT FOR THE PROJECT , |
---|
578 | | - | CONSIDERING THE INFORMATION PROVIDED PURSUANT TO SUBSECTION (1)(b) |
---|
579 | | - | PAGE 11-HOUSE BILL 24-1370 OF THIS SECTION, AND WITH PRIORITY GIVEN TO PROJECTS THAT HAVE THE |
---|
580 | | - | FULL SUPPORT OF POTENTIALLY AFFECTED CUSTOMERS |
---|
581 | | - | . |
---|
582 | | - | (3) (a) T |
---|
583 | | - | HE COMMISSION SHALL ALLOW A DUAL -FUEL UTILITY TO |
---|
584 | | - | CURRENTLY RECOVER THE COSTS INCURRED DURING THE DEVELOPMENT OF |
---|
585 | | - | A NEIGHBORHOOD |
---|
586 | | - | -SCALE ALTERNATIVES PROJECT , INCLUDING COSTS TO |
---|
587 | | - | TRANSITION THE DISTRIBUTION SYSTEM |
---|
588 | | - | , INVEST IN ELECTRIC |
---|
589 | | - | INFRASTRUCTURE |
---|
590 | | - | , AND PROVIDE CUSTOMER INCENTIVES . SUCH COSTS ARE |
---|
591 | | - | FULLY RECOVERABLE REGARDLESS OF THE PERFORMANCE OF THE |
---|
592 | | - | ALTERNATIVE ENERGY SERVICE |
---|
593 | | - | . THE COMMISSION SHALL ALSO PERMIT COST |
---|
594 | | - | RECOVERY FOR PERSONNEL TO WORK ON THE DEVELOPMENT |
---|
595 | | - | , IN WHOLE OR |
---|
596 | | - | IN PART |
---|
597 | | - | , OF NEIGHBORHOOD-SCALE ALTERNATIVES PROJECTS. |
---|
598 | | - | (b) T |
---|
599 | | - | HE DUAL-FUEL UTILITY SHALL PROPOSE TO THE COMMISSION |
---|
600 | | - | HOW COSTS WILL BE RECOVERED ACROSS THE DUAL |
---|
601 | | - | -FUEL UTILITY'S |
---|
602 | | - | ELECTRIC AND GAS BUSINESS |
---|
603 | | - | . |
---|
604 | | - | (c) F |
---|
605 | | - | OR GAS PLANNING PILOT COMMUNITIES THAT RECEIVE GAS |
---|
606 | | - | SERVICE FROM A DUAL |
---|
607 | | - | -FUEL UTILITY BUT ARE NOT SERVED BY THE ELECTRIC |
---|
608 | | - | UTILITY THAT IS PART OF THE DUAL |
---|
609 | | - | -FUEL UTILITY, THE COMMISSION SHALL |
---|
610 | | - | CONSIDER A COST |
---|
611 | | - | -SHARING AGREEMENT, AS NECESSARY TO IMPLEMENT A |
---|
612 | | - | NEIGHBORHOOD |
---|
613 | | - | -SCALE ALTERNATIVES PROJECT , WHICH AGREEMENT THE |
---|
614 | | - | DUAL |
---|
615 | | - | -FUEL UTILITY PROPOSES TO ENTER INTO WITH A LOCAL COOPERATIVE |
---|
616 | | - | ELECTRIC ASSOCIATION OR MUNICIPALLY OWNED ELECTRIC UTILITY TO MAKE |
---|
617 | | - | THE INCUMBENT GAS UTILITY THAT IS PART OF THE DUAL |
---|
618 | | - | -FUEL UTILITY AND |
---|
619 | | - | ITS CUSTOMERS WHOLE FOR ANY PROJECTS APPROVED BY THE COMMISSION |
---|
620 | | - | WHEN THERE IS A COST SHIFT |
---|
621 | | - | . THIS SUBSECTION (3)(c) SHALL NOT BE |
---|
622 | | - | CONSTRUED TO SUBJECT A LOCAL COOPERATIVE ELECTRIC ASSOCIATION OR |
---|
623 | | - | MUNICIPALLY OWNED ELECTRIC UTILITY ENTERING INTO SUCH AN |
---|
624 | | - | AGREEMENT WITH A DUAL |
---|
625 | | - | -FUEL UTILITY TO THE JURISDICTION OF THE |
---|
626 | | - | COMMISSION |
---|
627 | | - | . ANY FEDERAL, STATE, OR LOCAL FUNDING MADE AVAILABLE |
---|
628 | | - | FOR A PROJECT SHALL BE APPLIED PRIOR TO APPLICATION OF UTILITY |
---|
629 | | - | PROGRAMMATIC FUNDS |
---|
630 | | - | , SUCH AS DEMAND-SIDE MANAGEMENT, BENEFICIAL |
---|
631 | | - | ELECTRIFICATION |
---|
632 | | - | , OR OTHER EXISTING OR FUTURE CUSTOMER -SITED |
---|
633 | | - | PROGRAMS |
---|
634 | | - | , INCENTIVES, REBATES, AND FINANCING. |
---|
635 | | - | (4) I |
---|
636 | | - | N APPROVING A NEIGHBORHOOD -SCALE ALTERNATIVES PROJECT |
---|
637 | | - | IN A GAS PLANNING PILOT COMMUNITY |
---|
638 | | - | , THE COMMISSION MAY MODIFY THE |
---|
639 | | - | GAS UTILITY |
---|
640 | | - | 'S SERVICE REQUIREMENT FOR SELECT PREMISES WITH AN |
---|
641 | | - | ALTERNATIVE ENERGY SERVICE REQUIREMENT |
---|
642 | | - | . NOTWITHSTANDING ANY |
---|
643 | | - | PAGE 12-HOUSE BILL 24-1370 PROVISION OF LAW TO THE CONTRARY , NOTHING IN THIS SECTION AFFECTS |
---|
644 | | - | OR ABRIDGES A DUAL |
---|
645 | | - | -FUEL UTILITY'S SERVICE REQUIREMENTS IN AREAS |
---|
646 | | - | OUTSIDE THE NEIGHBORHOOD |
---|
647 | | - | -SCALE ALTERNATIVES PROJECT AREA . THE |
---|
648 | | - | COMMISSION MAY IMPOSE AN ALTERNATIVE ENERGY SERVICE REQUIREMENT |
---|
649 | | - | FOR ANY CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY GRANTED |
---|
650 | | - | TO THE GAS UTILITY TO PROVIDE SERVICE TO THE TARGETED AREA THAT IS |
---|
651 | | - | THE SUBJECT OF THE NEIGHBORHOOD |
---|
652 | | - | -SCALE ALTERNATIVES PROJECT IF THE |
---|
653 | | - | COMMISSION FINDS THAT ALTERNATIVE ENERGY SERVICE IS AVAILABLE |
---|
654 | | - | . |
---|
655 | | - | (5) (a) A |
---|
656 | | - | S PART OF A NEIGHBORHOOD -SCALE ALTERNATIVES |
---|
657 | | - | PROJECT |
---|
658 | | - | , A DUAL-FUEL UTILITY MAY PROPOSE TO FUND CONVERSION OF |
---|
659 | | - | EXISTING GAS APPLIANCES OR EQUIPMENT TO NONEMITTING THERMAL |
---|
660 | | - | RESOURCES |
---|
661 | | - | , INCLUDING OFFERING INCREMENTAL INCENTIVES OR FINANCING |
---|
662 | | - | ABOVE THAT APPROVED FOR CLEAN HEAT PLANS |
---|
663 | | - | , AS DEFINED IN SECTION |
---|
664 | | - | 40-3.2-108; BENEFICIAL ELECTRIFICATION PLANS, AS DEFINED IN SECTION |
---|
665 | | - | 40-3.2-109; DEMAND-SIDE MANAGEMENT PROGRAMS , AS DEFINED IN |
---|
666 | | - | SECTION |
---|
667 | | - | 40-1-102; OR OTHER RELATED FILINGS. |
---|
668 | | - | (b) A |
---|
669 | | - | DUAL-FUEL UTILITY MAY ALSO PROPOSE TO OFFER NEW RATE |
---|
670 | | - | STRUCTURES TO PAY FOR THERMAL ENERGY NETWORKS OR OTHER |
---|
671 | | - | NONEMITTING THERMAL RESOURCES AS AN ALTERNATIVE ENERGY SERVICE |
---|
672 | | - | , |
---|
673 | | - | UNDER WHICH RATE STRUCTURES CUSTOMERS PAY THE UTILITY FOR |
---|
674 | | - | THERMAL ENERGY NETWORK SERVICES TO OFFSET THE INITIAL COST OF NEW |
---|
675 | | - | APPLIANCES OR OTHER EQUIPMENT |
---|
676 | | - | . IF A DUAL-FUEL UTILITY PROPOSES TO |
---|
677 | | - | OFFER SUCH A RATE |
---|
678 | | - | , THE COMMISSION SHALL NOT GRANT THE DUAL -FUEL |
---|
679 | | - | UTILITY CURRENT COST RECOVERY PURSUANT TO SUBSECTION |
---|
680 | | - | (3)(a) OF THIS |
---|
681 | | - | SECTION |
---|
682 | | - | . A DUAL-FUEL UTILITY SHALL HAVE THE RIGHT OF FIRST REFUSAL |
---|
683 | | - | TO OFFER THERMAL ENERGY NETWORK SERVICE OR ALTERNATIVE ENERGY |
---|
684 | | - | SERVICE AS PART OF A NEIGHBORHOOD |
---|
685 | | - | -SCALE ALTERNATIVES PROJECT, IF |
---|
686 | | - | THE DUAL |
---|
687 | | - | -FUEL UTILITY SETS FORTH ITS INTENTION TO EXERCISE ITS RIGHT |
---|
688 | | - | OF FIRST REFUSAL AND DEFINES THE SCOPE OF SUCH EXERCISE IN THE |
---|
689 | | - | APPLICATION TO THE COMMISSION AND SUCH RIGHT OF FIRST REFUSAL |
---|
690 | | - | : |
---|
691 | | - | (I) I |
---|
692 | | - | S LIMITED TO NEIGHBORHOOD-SCALE ALTERNATIVES PROJECTS |
---|
693 | | - | IN GAS PLANNING PILOT COMMUNITIES |
---|
694 | | - | ; AND |
---|
695 | | - | (II) IS EXERCISED WITHIN TWO YEARS AFTER APPROVAL BY THE |
---|
696 | | - | COMMISSION |
---|
697 | | - | . |
---|
698 | | - | (6) I |
---|
699 | | - | F A NEIGHBORHOOD-SCALE ALTERNATIVES PROJECT QUALIFIES |
---|
700 | | - | PAGE 13-HOUSE BILL 24-1370 AS AN ENERGY SECTOR PUBLIC WORKS PROJECT , AS DEFINED IN SECTION |
---|
701 | | - | 24-92-303, A DUAL-FUEL UTILITY SHALL COMPLY WITH ALL REQUIREMENTS |
---|
702 | | - | SET FORTH IN PART |
---|
703 | | - | 3 OF ARTICLE 92 OF TITLE 24. THE DUAL-FUEL UTILITY |
---|
704 | | - | SHALL UTILIZE UTILITY EMPLOYEES OR CONTRACTORS THAT MEET THE |
---|
705 | | - | APPRENTICESHIP UTILIZATION REQUIREMENTS SET FORTH IN SECTION |
---|
706 | | - | 24-92-115 TO SERVICE AND MAINTAIN ANY THERMAL ENERGY OR |
---|
707 | | - | GEOTHERMAL ENERGY PROJECTS OWNED BY THE DUAL |
---|
708 | | - | -FUEL UTILITY AND |
---|
709 | | - | APPROVED BY THE COMMISSION UNDER THIS SECTION |
---|
710 | | - | . |
---|
711 | | - | (7) B |
---|
712 | | - | Y JUNE 1 OF EACH YEAR FOLLOWING APPROVAL OF A |
---|
713 | | - | NEIGHBORHOOD |
---|
714 | | - | -SCALE ALTERNATIVES PROJECT , A DUAL-FUEL UTILITY |
---|
715 | | - | SHALL SUBMIT A REPORT TO THE COMMISSION ON THE IMPLEMENTATION OF |
---|
716 | | - | THE NEIGHBORHOOD |
---|
717 | | - | -SCALE ALTERNATIVES PROJECT . THE REPORT MUST |
---|
718 | | - | INCLUDE |
---|
719 | | - | , AT A MINIMUM: |
---|
720 | | - | (a) A |
---|
721 | | - | N UPDATE ON PROJECT IMPLEMENTATION , INCLUDING THE |
---|
722 | | - | DEGREE OF CUSTOMER SUPPORT FOR THE PROJECT |
---|
723 | | - | ; |
---|
724 | | - | (b) A |
---|
725 | | - | N EXPLANATION OF CUSTOMER SATISFACTION WITH |
---|
726 | | - | ALTERNATIVE ENERGY SERVICE |
---|
727 | | - | ; |
---|
728 | | - | (c) A |
---|
729 | | - | CTUAL NET PROJECT COSTS INCURRED , INCLUDING ANY: |
---|
730 | | - | (I) S |
---|
731 | | - | TATE OR FEDERAL FUNDING OR TAX CREDITS ; |
---|
732 | | - | (II) G |
---|
733 | | - | AS PLANNING PILOT COMMUNITY INCENTIVES OR FUNDING ; |
---|
734 | | - | (III) E |
---|
735 | | - | XISTING DUAL-FUEL UTILITY PROGRAM FUNDING ; |
---|
736 | | - | (IV) A |
---|
737 | | - | DDITIONAL DUAL-FUEL UTILITY INCENTIVES OR FUNDING; |
---|
738 | | - | (V) C |
---|
739 | | - | USTOMER CONTRIBUTIONS ; |
---|
740 | | - | (VI) A |
---|
741 | | - | NTICIPATED TOTAL CAPITAL EXPENDITURES BY THE |
---|
742 | | - | DUAL |
---|
743 | | - | -FUEL UTILITY AND CUSTOMERS , AVOIDED UTILITY CAPITAL |
---|
744 | | - | EXPENDITURES |
---|
745 | | - | , AND FUTURE DISCOUNTED CUSTOMER UTILITY BILL SAVINGS |
---|
746 | | - | OR EXPENSES |
---|
747 | | - | ; AND |
---|
748 | | - | (VII) ESTIMATED OVERALL PROJECT COSTS IF NO INCENTIVES OR TAX |
---|
749 | | - | CREDITS HAD BEEN AVAILABLE FOR THE PROJECT |
---|
750 | | - | ; |
---|
751 | | - | PAGE 14-HOUSE BILL 24-1370 (d) THE IMPACT ON TOTAL ENERGY BILL AND ENERGY RELIABILITY |
---|
752 | | - | FOR CUSTOMERS RECEIVING ALTERNATIVE ENERGY SERVICE |
---|
753 | | - | ; |
---|
754 | | - | (e) A |
---|
755 | | - | NY ENCOUNTERED BARRIERS TO PROJECT IMPLEMENTATION , |
---|
756 | | - | INCLUDING TECHNOLOGICAL OR WORKFORCE BARRIERS , AND THE LESSONS |
---|
757 | | - | LEARNED IN OVERCOMING THOSE BARRIERS |
---|
758 | | - | ; |
---|
759 | | - | (f) T |
---|
760 | | - | HE IMPACT ON INCOME-QUALIFIED UTILITY CUSTOMERS AND |
---|
761 | | - | CUSTOMERS LIVING IN DISPROPORTIONATELY IMPACTED COMMUNITIES |
---|
762 | | - | ; AND |
---|
763 | | - | (g) ANY OTHER INFORMATION REQUIRED BY THE COMMISSION . |
---|
764 | | - | (8) B |
---|
765 | | - | Y JULY 1, 2028, OR ANOTHER TIME DETERMINED BY THE |
---|
766 | | - | COMMISSION |
---|
767 | | - | , THE COMMISSION SHALL HIRE A THIRD-PARTY CONSULTANT TO |
---|
768 | | - | CONDUCT AN ANALYSIS OF ALL APPROVED AND PROPOSED |
---|
769 | | - | NEIGHBORHOOD |
---|
770 | | - | -SCALE ALTERNATIVES PROJECTS AND PRESENT THE |
---|
771 | | - | FINDINGS OF THE ANALYSIS TO THE COMMISSION AND THE GENERAL |
---|
772 | | - | ASSEMBLY |
---|
773 | | - | . THE ANALYSIS MUST INCLUDE: |
---|
774 | | - | (a) F |
---|
775 | | - | OR EACH PROJECT, THE INFORMATION SET FORTH IN SUBSECTION |
---|
776 | | - | (7) OF THIS SECTION; |
---|
777 | | - | (b) A |
---|
778 | | - | COMPARATIVE ANALYSIS OF NET COSTS INCURRED BY ALL |
---|
779 | | - | PARTIES IN A NEIGHBORHOOD |
---|
780 | | - | -SCALE ALTERNATIVES PROJECT , COMPARED |
---|
781 | | - | WITH THE COST OF THE GAS INFRASTRUCTURE PROJECT THAT WAS AVOIDED |
---|
782 | | - | , |
---|
783 | | - | INCLUDING ANY: |
---|
784 | | - | (I) S |
---|
785 | | - | TATE OR FEDERAL FUNDING OR TAX CREDITS ; |
---|
786 | | - | (II) G |
---|
787 | | - | AS PLANNING PILOT COMMUNITY INCENTIVES OR FUNDING ; |
---|
788 | | - | (III) E |
---|
789 | | - | XISTING DUAL-FUEL UTILITY PROGRAM FUNDING ; |
---|
790 | | - | (IV) A |
---|
791 | | - | DDITIONAL DUAL-FUEL UTILITY INCENTIVES OR FUNDING; |
---|
792 | | - | (V) C |
---|
793 | | - | USTOMER CONTRIBUTIONS ; |
---|
794 | | - | (VI) A |
---|
795 | | - | NTICIPATED TOTAL CAPITAL EXPENDITURES BY THE |
---|
796 | | - | DUAL |
---|
797 | | - | -FUEL UTILITY AND CUSTOMERS , AVOIDED UTILITY CAPITAL |
---|
798 | | - | EXPENDITURES |
---|
799 | | - | , AND FUTURE DISCOUNTED CUSTOMER UTILITY BILL SAVINGS |
---|
800 | | - | PAGE 15-HOUSE BILL 24-1370 OR EXPENSES; AND |
---|
801 | | - | (VII) ESTIMATED OVERALL PROJECT COSTS IF NO INCENTIVES OR TAX |
---|
802 | | - | CREDITS HAD BEEN AVAILABLE FOR THE PROJECT |
---|
803 | | - | ; |
---|
804 | | - | (c) T |
---|
805 | | - | HE ABILITY OF EACH PROJECT TO DEFER OR AVOID GAS |
---|
806 | | - | INFRASTRUCTURE INVESTMENTS |
---|
807 | | - | ; |
---|
808 | | - | (d) T |
---|
809 | | - | HE CUSTOMER ECONOMICS OF NONEMITTING THERMAL |
---|
810 | | - | RESOURCES COMPARED WITH GAS ALTERNATIVES |
---|
811 | | - | ; |
---|
812 | | - | (e) A |
---|
813 | | - | N ANALYSIS OF ANY SUPPLY CHAIN CHALLENGES ; |
---|
814 | | - | (f) T |
---|
815 | | - | HE OVERALL LESSONS LEARNED FROM THE PROJECTS ; |
---|
816 | | - | (g) T |
---|
817 | | - | HE PERSPECTIVES OF THE GAS PLANNING PILOT COMMUNITIES |
---|
818 | | - | REGARDING THE COLLABORATIVE PROCESS WITH A DUAL |
---|
819 | | - | -FUEL UTILITY AND |
---|
820 | | - | ANY LESSONS LEARNED FOR IMPROVING THE PROCESS |
---|
821 | | - | ; |
---|
822 | | - | (h) T |
---|
823 | | - | HE NET IMPACTS TO THE UTILITY WORKFORCE ; AND |
---|
824 | | - | (i) ANY OTHER INFORMATION REQUIRED BY THE COMMISSION . |
---|
825 | | - | SECTION 2. Appropriation. (1) For the 2024-25 state fiscal year, |
---|
826 | | - | $43,650 is appropriated to the office of the governor for use by the |
---|
827 | | - | Colorado energy office. This appropriation is from the general fund, and is |
---|
828 | | - | based on an assumption that the office will require an additional 0.4 FTE. |
---|
829 | | - | To implement this act, the office may use this appropriation for program |
---|
830 | | - | administration. |
---|
831 | | - | (2) For the 2024-25 state fiscal year, $29,678 is appropriated to the |
---|
832 | | - | department of regulatory agencies for use by the public utilities |
---|
833 | | - | commission. This appropriation is from the public utilities commission |
---|
834 | | - | fixed utility fund created in section 40-2-114 (1)(b)(II), C.R.S. To |
---|
835 | | - | implement this act, the commission may use this appropriation as follows: |
---|
836 | | - | (a) $22,752 for personal services, which amount is based on an |
---|
837 | | - | assumption that the commission will require an additional 0.2 FTE; and |
---|
838 | | - | (b) $6,926 for operating expenses. |
---|
839 | | - | PAGE 16-HOUSE BILL 24-1370 SECTION 3. Act subject to petition - effective date. This act |
---|
840 | | - | takes effect at 12:01 a.m. on the day following the expiration of the |
---|
841 | | - | ninety-day period after final adjournment of the general assembly; except |
---|
842 | | - | that, if a referendum petition is filed pursuant to section 1 (3) of article V |
---|
843 | | - | of the state constitution against this act or an item, section, or part of this act |
---|
844 | | - | within such period, then the act, item, section, or part will not take effect |
---|
845 | | - | unless approved by the people at the general election to be held in |
---|
846 | | - | November 2024 and, in such case, will take effect on the date of the official |
---|
847 | | - | declaration of the vote thereon by the governor. |
---|
848 | | - | ____________________________ ____________________________ |
---|
849 | | - | Julie McCluskie Steve Fenberg |
---|
850 | | - | SPEAKER OF THE HOUSE PRESIDENT OF |
---|
851 | | - | OF REPRESENTATIVES THE SENATE |
---|
852 | | - | ____________________________ ____________________________ |
---|
853 | | - | Robin Jones Cindi L. Markwell |
---|
854 | | - | CHIEF CLERK OF THE HOUSE SECRETARY OF |
---|
855 | | - | OF REPRESENTATIVES THE SENATE |
---|
856 | | - | APPROVED________________________________________ |
---|
857 | | - | (Date and Time) |
---|
858 | | - | _________________________________________ |
---|
859 | | - | Jared S. Polis |
---|
860 | | - | GOVERNOR OF THE STATE OF COLORADO |
---|
861 | | - | PAGE 17-HOUSE BILL 24-1370 |
---|
| 14 | + | ONCERNING MEASURES TO REDUCE THE COST OF USE OF NATURAL101 |
---|
| 15 | + | GAS |
---|
| 16 | + | INFRASTRUCTURE, AND, IN CONNECTION THEREWITH,102 |
---|
| 17 | + | MAKING AN APPROPRIATION .103 |
---|
| 18 | + | Bill Summary |
---|
| 19 | + | (Note: This summary applies to this bill as introduced and does |
---|
| 20 | + | not reflect any amendments that may be subsequently adopted. If this bill |
---|
| 21 | + | passes third reading in the house of introduction, a bill summary that |
---|
| 22 | + | applies to the reengrossed version of this bill will be available at |
---|
| 23 | + | http://leg.colorado.gov |
---|
| 24 | + | .) |
---|
| 25 | + | The bill requires the Colorado energy office to issue a request for |
---|
| 26 | + | information by December 1, 2024, to solicit interest from local |
---|
| 27 | + | governments that are served by a dual-fuel utility (utility) in becoming a |
---|
| 28 | + | gas planning priority community (community). A gas planning priority |
---|
| 29 | + | community is defined in the bill as a local government in which |
---|
| 30 | + | SENATE |
---|
| 31 | + | 3rd Reading Unamended |
---|
| 32 | + | May 4, 2024 |
---|
| 33 | + | SENATE |
---|
| 34 | + | 2nd Reading Unamended |
---|
| 35 | + | May 3, 2024 |
---|
| 36 | + | HOUSE |
---|
| 37 | + | 3rd Reading Unamended |
---|
| 38 | + | April 25, 2024 |
---|
| 39 | + | HOUSE |
---|
| 40 | + | Amended 2nd Reading |
---|
| 41 | + | April 24, 2024 |
---|
| 42 | + | HOUSE SPONSORSHIP |
---|
| 43 | + | Kipp and Willford, Boesenecker, Brown, Epps, Garcia, Herod, Jodeh, Joseph, Lindsay, |
---|
| 44 | + | Mabrey, Marvin, Ortiz, Parenti, Ricks, Rutinel, Sirota, Story, Valdez, Vigil, Woodrow |
---|
| 45 | + | SENATE SPONSORSHIP |
---|
| 46 | + | Winter F., Buckner, Cutter, Hansen, Jaquez Lewis, Michaelson Jenet, Priola |
---|
| 47 | + | Shading denotes HOUSE amendment. Double underlining denotes SENATE amendment. |
---|
| 48 | + | Capital letters or bold & italic numbers indicate new material to be added to existing law. |
---|
| 49 | + | Dashes through the words or numbers indicate deletions from existing law. constituents have gas service provided by a dual-fuel utility that formally |
---|
| 50 | + | indicates an interest in working with the utility to mutually explore |
---|
| 51 | + | opportunities for neighborhood-scale alternatives projects. A |
---|
| 52 | + | neighborhood-scale alternatives project geographically targets |
---|
| 53 | + | decommissioning of a portion of the gas distribution system or avoids |
---|
| 54 | + | expanding the gas distribution system in order to serve new construction |
---|
| 55 | + | projects and provides substitute energy service to buildings within the |
---|
| 56 | + | project area that is cost-effective and reduces future greenhouse gas |
---|
| 57 | + | emissions required to serve buildings. |
---|
| 58 | + | By April 30, 2025, the Colorado energy office and the utility must |
---|
| 59 | + | jointly file with the public utilities commission (commission) the results |
---|
| 60 | + | of the request for information, identifying any proposed communities. |
---|
| 61 | + | The Colorado energy office and the utility must also file a draft |
---|
| 62 | + | agreement between the utility and a proposed community to identify and |
---|
| 63 | + | pursue a neighborhood-scale alternatives project. The commission must |
---|
| 64 | + | approve or modify the list of proposed communities by June 30, 2025. |
---|
| 65 | + | By October 1, 2025, a utility and each approved community must |
---|
| 66 | + | enter into an agreement, and the utility must submit to the commission a |
---|
| 67 | + | list of the communities with which the utility has entered into an |
---|
| 68 | + | agreement. For each approved community, the utility is required to |
---|
| 69 | + | disclose certain information to the Colorado energy office, the |
---|
| 70 | + | commission, and the community, including a map with information |
---|
| 71 | + | regarding the utility's gas distribution and electric systems and operations |
---|
| 72 | + | within the community. |
---|
| 73 | + | The bill requires the utility to work with an approved community |
---|
| 74 | + | to rank neighborhood-scale alternatives projects and, before June 1, 2026, |
---|
| 75 | + | to submit at least one neighborhood-scale alternatives project in each |
---|
| 76 | + | community to the commission for approval or an explanation of why no |
---|
| 77 | + | neighborhood-scale alternatives project will be pursued in a community. |
---|
| 78 | + | By June 1 of each year following approval of a neighborhood-scale |
---|
| 79 | + | alternatives project, a utility is required to submit a report to the |
---|
| 80 | + | commission on the implementation of any approved neighborhood-scale |
---|
| 81 | + | alternatives projects. The commission must allow the utility to recover |
---|
| 82 | + | costs incurred from the implementation of a neighborhood-scale |
---|
| 83 | + | alternatives project. |
---|
| 84 | + | Be it enacted by the General Assembly of the State of Colorado:1 |
---|
| 85 | + | SECTION 1. In Colorado Revised Statutes, add article 3.3 to title2 |
---|
| 86 | + | 40 as follows:3 |
---|
| 87 | + | ARTICLE 3.34 |
---|
| 88 | + | Gas Infrastructure Planning5 |
---|
| 89 | + | 1370-2- 40-3.3-101. Definitions. AS USED IN THIS ARTICLE 3.3, UNLESS1 |
---|
| 90 | + | THE CONTEXT OTHERWISE REQUIRES :2 |
---|
| 91 | + | (1) "ALTERNATIVE ENERGY SERVICE" MEANS A LOW- OR3 |
---|
| 92 | + | ZERO-CARBON RESIDENTIAL, COMMERCIAL, OR INDUSTRIAL ENERGY4 |
---|
| 93 | + | SERVICE THAT IS ABLE TO MEET A CUSTOMER'S END USE NEED AND DOES5 |
---|
| 94 | + | NOT COMBUST METHANE-, PROPANE-, OR PETROLEUM-DERIVED GAS ON6 |
---|
| 95 | + | SITE IN DOING SO.7 |
---|
| 96 | + | (2) "COLORADO ENERGY OFFICE" MEANS THE COLORADO ENERGY8 |
---|
| 97 | + | OFFICE CREATED IN SECTION 24-38.5-101.9 |
---|
| 98 | + | (3) "DISTRIBUTION SYSTEM" HAS THE MEANING SET FORTH IN10 |
---|
| 99 | + | SECTION 40-2-115 (2)(b) AND INCLUDES THE PIPING AND ASSOCIATED11 |
---|
| 100 | + | FACILITIES USED TO DELIVER GEOLOGICAL GAS OR RECOVERED METHANE.12 |
---|
| 101 | + | (4) "DUAL-FUEL UTILITY" MEANS AN INVESTOR-OWNED UTILITY IN13 |
---|
| 102 | + | WHICH ONE COMPANY OR A SUBSIDIARY OF THE SAME COMPANY OPERATES14 |
---|
| 103 | + | BOTH AN ELECTRIC AND A GAS UTILITY THAT HAVE SERVICE TERRITORIES15 |
---|
| 104 | + | IN THE STATE WHERE GREATER THAN FIFTY PERCENT OF ALL CUSTOMERS16 |
---|
| 105 | + | IN THOSE TERRITORIES RECEIVE BOTH GAS AND ELECTRIC SERVICE FROM17 |
---|
| 106 | + | A UTILITY OPERATED BY THAT COMPANY OR A SUBSIDIARY OF THE SAME18 |
---|
| 107 | + | COMPANY.19 |
---|
| 108 | + | (5) "GAS" MEANS NATURAL OR GEOLOGICAL GAS , RECOVERED20 |
---|
| 109 | + | METHANE, OR ANY MIXTURE OF NATURAL OR GEOLOGICAL GAS OR21 |
---|
| 110 | + | RECOVERED METHANE THAT IS TRANSPORTED BY A COMMON CARRIER OR22 |
---|
| 111 | + | DEDICATED PIPELINE, INCLUDING FLAMMABLE GAS; MANUFACTURED GAS;23 |
---|
| 112 | + | PETROLEUM OR OTHER HYDROCARBON GASES, SUCH AS PROPANE; OR ANY24 |
---|
| 113 | + | MIXTURE OF FOSSIL GASES THAT IS INJECTED INTO A PIPELINE AND25 |
---|
| 114 | + | TRANSMITTED, DISTRIBUTED, OR FURNISHED BY A UTILITY.26 |
---|
| 115 | + | (6) "GAS INFRASTRUCTURE PLAN" MEANS A REQUIREMENT FOR GAS27 |
---|
| 116 | + | 1370 |
---|
| 117 | + | -3- UTILITIES ESTABLISHED BY THE COMMISSION THAT IS DESIGNED TO1 |
---|
| 118 | + | ESTABLISH A PROCESS TO DETERMINE THE NEED FOR , AND POTENTIAL2 |
---|
| 119 | + | ALTERNATIVES TO, CAPITAL INVESTMENT, CONSISTENT WITH THE3 |
---|
| 120 | + | OBJECTIVES OF MAINTAINING JUST AND REASONABLE RATES ; ENSURING4 |
---|
| 121 | + | SYSTEM SAFETY, RELIABILITY, AND RESILIENCY; AND PROTECTING5 |
---|
| 122 | + | INCOME-QUALIFIED UTILITY CUSTOMERS AND DISPROPORTIONATELY6 |
---|
| 123 | + | IMPACTED COMMUNITIES.7 |
---|
| 124 | + | (7) "GAS PLANNING PILOT COMMUNITY" MEANS A LOCAL8 |
---|
| 125 | + | GOVERNMENT IN WHICH CONSTITUENTS HAVE GAS SERVICE PROVIDED BY9 |
---|
| 126 | + | A DUAL-FUEL UTILITY AND AN ACTIVE FRANCHISE AGREEMENT WITH THE10 |
---|
| 127 | + | DUAL-FUEL UTILITY, WHICH LOCAL GOVERNMENT FORMALLY INDICATES11 |
---|
| 128 | + | AN INTEREST IN WORKING WITH THE DUAL-FUEL UTILITY TO MUTUALLY12 |
---|
| 129 | + | EXPLORE OPPORTUNITIES FOR NEIGHBORHOOD-SCALE ALTERNATIVES13 |
---|
| 130 | + | PROJECTS, INCLUDING THROUGH THE EXCHANGE OF UTILITY GAS14 |
---|
| 131 | + | INFRASTRUCTURE DATA AND COMMUNITY DEVELOPMENT PLANS .15 |
---|
| 132 | + | (8) "GREENHOUSE GAS REDUCTION GOALS" MEANS THE STATE'S16 |
---|
| 133 | + | GREENHOUSE GAS REDUCTION GOALS DESCRIBED IN SECTION 25-7-10217 |
---|
| 134 | + | (2)(g).18 |
---|
| 135 | + | (9) "INCOME-QUALIFIED UTILITY CUSTOMER" HAS THE MEANING19 |
---|
| 136 | + | SET FORTH IN SECTION 40-3-106 (1)(d)(II).20 |
---|
| 137 | + | (10) "LOCAL GOVERNMENT" MEANS A HOME RULE OR STATUTORY21 |
---|
| 138 | + | COUNTY, CITY, OR CITY AND COUNTY.22 |
---|
| 139 | + | (11) "NEIGHBORHOOD-SCALE ALTERNATIVES PROJECT" MEANS A23 |
---|
| 140 | + | PROJECT IN A GAS PLANNING PILOT COMMUNITY :24 |
---|
| 141 | + | (a) WHERE A DUAL-FUEL UTILITY:25 |
---|
| 142 | + | (I) PROVIDES BOTH GAS AND ELECTRIC SERVICE ;26 |
---|
| 143 | + | (II) PROVIDES GAS SERVICE AND A MUNICIPALLY OWNED UTILITY27 |
---|
| 144 | + | 1370 |
---|
| 145 | + | -4- OPERATED BY THE GAS PLANNING PILOT COMMUNITY PROVIDES ELECTRIC1 |
---|
| 146 | + | SERVICE; OR2 |
---|
| 147 | + | (III) PROVIDES GAS SERVICE AND A COOPERATIVE ELECTRIC3 |
---|
| 148 | + | ASSOCIATION THAT SERVES A GAS PLANNING PILOT COMMUNITY HAS4 |
---|
| 149 | + | VOLUNTARILY PARTNERED WITH THE DUAL -FUEL UTILITY; AND5 |
---|
| 150 | + | (b) THAT GEOGRAPHICALLY TARGETS DECOMMISSIONING A6 |
---|
| 151 | + | PORTION OF THE GAS DISTRIBUTION SYSTEM OR AVOIDS EXPANDING THE7 |
---|
| 152 | + | GAS DISTRIBUTION SYSTEM IN ORDER TO SERVE NEW CONSTRUCTION8 |
---|
| 153 | + | PROJECTS AND PROVIDES ALTERNATIVE ENERGY SERVICE TO BUILDINGS9 |
---|
| 154 | + | WITHIN THE PROJECT AREA THAT REDUCES FUTURE GREENHOUSE GAS10 |
---|
| 155 | + | EMISSIONS REQUIRED TO SERVE BUILDINGS .11 |
---|
| 156 | + | (12) "NONEMITTING THERMAL RESOURCE" MEANS EFFICIENT12 |
---|
| 157 | + | THERMAL ENERGY FOR HEATING, COOLING, OR HOT WATER, WHICH13 |
---|
| 158 | + | ENERGY DOES NOT REQUIRE COMBUSTION OF GAS , SUCH AS AN AIR-SOURCE14 |
---|
| 159 | + | HEAT PUMP, AS DEFINED IN SECTION 39-22-554 (2)(a); A GROUND-SOURCE15 |
---|
| 160 | + | HEAT PUMP, AS DEFINED IN SECTION 39-22-554 (2)(g); A HEAT PUMP16 |
---|
| 161 | + | WATER HEATER; A THERMAL ENERGY SYSTEM; OR A THERMAL ENERGY17 |
---|
| 162 | + | NETWORK.18 |
---|
| 163 | + | (13) "PIPELINE SEGMENT" MEANS A DISCRETE PORTION OF THE19 |
---|
| 164 | + | DISTRIBUTION SYSTEM AND ALL ANCILLARY STRUCTURES, VALVES, AND20 |
---|
| 165 | + | OTHER SYSTEMS NEEDED TO DISTRIBUTE GAS. A PIPELINE SEGMENT MUST21 |
---|
| 166 | + | BE THE SMALLEST INCREMENTAL UNIT POSSIBLE, AS DEFINED BY PIPELINE22 |
---|
| 167 | + | MATERIALS, GEOGRAPHICAL FEATURES, AND THE DESIGN OF THE23 |
---|
| 168 | + | DISTRIBUTION SYSTEM.24 |
---|
| 169 | + | (14) "THERMAL ENERGY NETWORK" HAS THE MEANING SET FORTH25 |
---|
| 170 | + | IN SECTION 40-3.2-108 (2)(s).26 |
---|
| 171 | + | (15) "THERMAL ENERGY SYSTEM" HAS THE MEANING SET FORTH27 |
---|
| 172 | + | 1370 |
---|
| 173 | + | -5- IN SECTION 40-3.2-108 (2)(t).1 |
---|
| 174 | + | 40-3.3-102. Request for information - gas planning pilot2 |
---|
| 175 | + | community - disclosures - repeal. (1) (a) BY DECEMBER 1, 2024, THE3 |
---|
| 176 | + | COLORADO ENERGY OFFICE SHALL ISSUE A REQUEST FOR INFORMATION TO4 |
---|
| 177 | + | IDENTIFY LOCAL GOVERNMENTS WHOSE RESIDENTS ARE SERVED BY A5 |
---|
| 178 | + | DUAL-FUEL UTILITY THAT ARE INTERESTED IN BECOMING A GAS PLANNING6 |
---|
| 179 | + | PILOT COMMUNITY.7 |
---|
| 180 | + | (b) THE COLORADO ENERGY OFFICE SHALL INCLUDE IN THE8 |
---|
| 181 | + | REQUEST FOR INFORMATION THE MINIMUM CRITERIA THAT A LOCAL9 |
---|
| 182 | + | GOVERNMENT MUST MEET IN ORDER TO BECOME A GAS PLANNING PILOT10 |
---|
| 183 | + | COMMUNITY, INCLUDING:11 |
---|
| 184 | + | (I) A DEMONSTRATION THAT DESIGNATION AS A GAS PLANNING12 |
---|
| 185 | + | PILOT COMMUNITY WOULD ALIGN WITH THE LOCAL GOVERNMENT'S13 |
---|
| 186 | + | CLIMATE AND ENERGY AFFORDABILITY GOALS ;14 |
---|
| 187 | + | (II) A WILLINGNESS TO PROMOTE NEIGHBORHOOD -SCALE15 |
---|
| 188 | + | ALTERNATIVES PROJECTS AND TO SUPPORT, ENGAGE, AND EDUCATE16 |
---|
| 189 | + | RESIDENTS WITHIN A COMMUNITY FOR WHICH A NEIGHBORHOOD -SCALE17 |
---|
| 190 | + | ALTERNATIVES PROJECT IS PROPOSED PRIOR TO APPROVAL BY THE18 |
---|
| 191 | + | COMMISSION; AND19 |
---|
| 192 | + | (III) A COMMITMENT OF INTERNAL OR EXTERNAL STAFF20 |
---|
| 193 | + | RESOURCES TO IDENTIFY AND IMPLEMENT NEIGHBORHOOD -SCALE21 |
---|
| 194 | + | ALTERNATIVES PROJECTS.22 |
---|
| 195 | + | (c) AT LEAST THIRTY DAYS PRIOR TO ISSUING THE REQUEST FOR23 |
---|
| 196 | + | INFORMATION, THE COLORADO ENERGY OFFICE SHALL PUBLISH A DRAFT24 |
---|
| 197 | + | OF THE REQUEST FOR INFORMATION ON ITS WEBSITE AND PROVIDE AN25 |
---|
| 198 | + | OPPORTUNITY FOR THE PUBLIC TO SUBMIT WRITTEN COMMENTS .26 |
---|
| 199 | + | (2) (a) BY APRIL 30, 2025, THE COLORADO ENERGY OFFICE AND A27 |
---|
| 200 | + | 1370 |
---|
| 201 | + | -6- DUAL-FUEL UTILITY SHALL JOINTLY FILE WITH THE COMMISSION THE1 |
---|
| 202 | + | RESULTS OF THE REQUEST FOR INFORMATION REQUIRED BY SUBSECTION2 |
---|
| 203 | + | (1)(a) OF THIS SECTION, IDENTIFYING UP TO FIVE PROPOSED GAS PLANNING3 |
---|
| 204 | + | PILOT COMMUNITIES. IN IDENTIFYING PROPOSED GAS PLANNING PILOT4 |
---|
| 205 | + | COMMUNITIES, THE COLORADO ENERGY OFFICE AND A DUAL-FUEL UTILITY5 |
---|
| 206 | + | SHALL PRIORITIZE LOCAL GOVERNMENTS THAT ARE INTERESTED IN6 |
---|
| 207 | + | PURSUING THERMAL ENERGY NETWORK OR GEOTHERMAL ENERGY7 |
---|
| 208 | + | PROJECTS AS PART OF THE PROPOSED GAS PLANNING PILOT COMMUNITY'S8 |
---|
| 209 | + | EVALUATION OF ANY POTENTIAL NEIGHBORHOOD-SCALE ALTERNATIVES9 |
---|
| 210 | + | PROJECT PURSUANT TO SECTION 40-3.3-103. THE COLORADO ENERGY10 |
---|
| 211 | + | OFFICE AND THE DUAL-FUEL UTILITY SHALL ALSO JOINTLY FILE A DRAFT11 |
---|
| 212 | + | AGREEMENT BETWEEN THE DUAL -FUEL UTILITY AND ANY PROPOSED GAS12 |
---|
| 213 | + | PLANNING PILOT COMMUNITY , WHICH DRAFT AGREEMENT MUST :13 |
---|
| 214 | + | (I) IDENTIFY THE ROLES AND RESPONSIBILITIES OF THE DUAL-FUEL14 |
---|
| 215 | + | UTILITY AND THE PROPOSED GAS PLANNING PILOT COMMUNITY IN15 |
---|
| 216 | + | IDENTIFYING NEIGHBORHOOD -SCALE ALTERNATIVES PROJECTS;16 |
---|
| 217 | + | (II) IDENTIFY TIME FRAMES FOR EACH PARTY TO FURNISH DATA OR17 |
---|
| 218 | + | RESPOND TO REQUESTS FOR DATA FROM THE OTHER PARTY ;18 |
---|
| 219 | + | (III) INCLUDE ANY NECESSARY WAIVERS OF COMMISSION RULES TO19 |
---|
| 220 | + | FACILITATE DATA TRANSFER BETWEEN THE PARTIES ;20 |
---|
| 221 | + | (IV) INCLUDE A PROCESS TO ADDRESS CONFLICTS BETWEEN THE21 |
---|
| 222 | + | TWO PARTIES; AND22 |
---|
| 223 | + | (V) INDICATE WHETHER THE PROPOSED GAS PLANNING PILOT23 |
---|
| 224 | + | COMMUNITY HAS DEMONSTRATED AN INTEREST IN PURSUING THERMAL24 |
---|
| 225 | + | ENERGY NETWORK OR GEOTHERMAL ENERGY PROJECTS .25 |
---|
| 226 | + | (b) THE COMMISSION SHALL PROVIDE AN OPPORTUNITY FOR THE26 |
---|
| 227 | + | PUBLIC TO SUBMIT WRITTEN COMMENTS ON THE FILING .27 |
---|
| 228 | + | 1370 |
---|
| 229 | + | -7- (c) BY JUNE 30, 2025, THE COMMISSION SHALL APPROVE OR1 |
---|
| 230 | + | MODIFY THE LIST OF PROPOSED GAS PLANNING PILOT COMMUNITIES;2 |
---|
| 231 | + | EXCEPT THAT THE COMMISSION SHALL NOT INCREASE THE NUMBER OF3 |
---|
| 232 | + | PROPOSED GAS PLANNING PILOT COMMUNITIES BEYOND FIVE .4 |
---|
| 233 | + | (3) BY OCTOBER 1, 2025, A DUAL-FUEL UTILITY SHALL ENTER INTO5 |
---|
| 234 | + | AN AGREEMENT WITH EACH LOCAL GOVERNMENT THAT HAS BEEN6 |
---|
| 235 | + | APPROVED AS A GAS PLANNING PILOT COMMUNITY AND SHALL SUBMIT TO7 |
---|
| 236 | + | THE COMMISSION A LIST OF THE GAS PLANNING PILOT COMMUNITIES WITH8 |
---|
| 237 | + | WHICH THE DUAL-FUEL UTILITY HAS ESTABLISHED AN AGREEMENT . THE9 |
---|
| 238 | + | DUAL-FUEL UTILITY AND LOCAL GOVERNMENT MAY AGREE TO EXTEND10 |
---|
| 239 | + | THIS DEADLINE.11 |
---|
| 240 | + | (4) SUBSECTIONS (1) TO (3) OF THIS SECTION ARE REPEALED,12 |
---|
| 241 | + | EFFECTIVE JUNE 1, 2028.13 |
---|
| 242 | + | (5) (a) UNLESS OTHERWISE DIRECTED BY THE COMMISSION OR14 |
---|
| 243 | + | REQUESTED BY THE GAS PLANNING PILOT COMMUNITY, A DUAL-FUEL15 |
---|
| 244 | + | UTILITY SHALL PROVIDE EACH GAS PLANNING PILOT COMMUNITY, THE16 |
---|
| 245 | + | COMMISSION, AND THE COLORADO ENERGY OFFICE WITH DATA AND17 |
---|
| 246 | + | INFORMATION TO INFORM THE EVALUATION OF POTENTIAL18 |
---|
| 247 | + | NEIGHBORHOOD-SCALE ALTERNATIVES PROJECTS THAT INCLUDES :19 |
---|
| 248 | + | (I) THE LOCATION OF ANY PLANNED GAS INFRASTRUCTURE20 |
---|
| 249 | + | PROJECTS IN THE GAS PLANNING PILOT COMMUNITY WITHIN THE SIX-YEAR21 |
---|
| 250 | + | GAS PROJECT PLANNING FORECAST IN THE DUAL -FUEL UTILITY'S MOST22 |
---|
| 251 | + | RECENTLY APPROVED GAS INFRASTRUCTURE PLAN OR IDENTIFIED BY THE23 |
---|
| 252 | + | DUAL-FUEL UTILITY FOR INCLUSION IN A FUTURE GAS INFRASTRUCTURE24 |
---|
| 253 | + | PLAN TO THE EXTENT AVAILABLE; AND25 |
---|
| 254 | + | (II) THE FOLLOWING INFORMATION REGARDING THE PLANNED GAS26 |
---|
| 255 | + | INFRASTRUCTURE PROJECTS DESCRIBED IN SUBSECTION (5)(a)(I) OF THIS27 |
---|
| 256 | + | 1370 |
---|
| 257 | + | -8- SECTION:1 |
---|
| 258 | + | (A) THE PROJECT NAME;2 |
---|
| 259 | + | (B) THE PROJECT CATEGORY, CONSISTENT WITH THE PLANNED3 |
---|
| 260 | + | PROJECTS CATEGORIES DESCRIBED IN APPLICABLE COMMISSION RULES ;4 |
---|
| 261 | + | (C) A DESCRIPTION OF THE GENERAL SCOPE OF WORK AND AN5 |
---|
| 262 | + | EXPLANATION OF THE NEED FOR THE PROJECT, INCLUDING ANY6 |
---|
| 263 | + | APPLICABLE CODE REQUIREMENTS OF THE UNITED STATES DEPARTMENT7 |
---|
| 264 | + | OF TRANSPORTATION'S PIPELINE AND HAZARDOUS MATERIALS SAFETY8 |
---|
| 265 | + | ADMINISTRATION;9 |
---|
| 266 | + | (D) THE PROJECTED LIFE OF THE PROJECT;10 |
---|
| 267 | + | (E) AN INDICATION OF WHETHER THE PROJECT IS PRESENTED AS A11 |
---|
| 268 | + | GAS INFRASTRUCTURE PLAN ACTION PERIOD PROJECT OR A GAS12 |
---|
| 269 | + | INFRASTRUCTURE PLAN INFORMATIONAL PERIOD PROJECT PURSUANT TO13 |
---|
| 270 | + | APPLICABLE COMMISSION RULES ;14 |
---|
| 271 | + | (F) THE ANTICIPATED: CONSTRUCTION START DATE FOR THE15 |
---|
| 272 | + | PROJECT; CONSTRUCTION PERIOD FOR THE PROJECT, INCLUDING AN16 |
---|
| 273 | + | INDICATION OF ANY CONSTRUCTION PHASES; AND IN-SERVICE DATE FOR17 |
---|
| 274 | + | THE PROJECT;18 |
---|
| 275 | + | (G) THE COST-ESTIMATE CLASSIFICATION FOR THE PROJECT, USING19 |
---|
| 276 | + | THE DUAL-FUEL UTILITY'S OR AN INDUSTRY-ACCEPTED COST-ESTIMATE20 |
---|
| 277 | + | CLASSIFICATION INDEX ; SUPPORT FOR THE COST -ESTIMATE21 |
---|
| 278 | + | CLASSIFICATION; AND THE TOTAL COST ESTIMATE FOR THE PROJECT ;22 |
---|
| 279 | + | (H) THE TECHNICAL DETAILS OF THE PROJECT, SUCH AS THE23 |
---|
| 280 | + | PHYSICAL EQUIPMENT CHARACTERISTICS OF THE PROPOSED FACILITIES ,24 |
---|
| 281 | + | PIPELINE LENGTH, PIPELINE DIAMETER, PROJECT MATERIALS, AND25 |
---|
| 282 | + | MAXIMUM ALLOWABLE OPERATING PRESSURE ;26 |
---|
| 283 | + | (I) THE PROJECT LOCATION AND AN ILLUSTRATIVE MAP OF THE GAS27 |
---|
| 284 | + | 1370 |
---|
| 285 | + | -9- DISTRIBUTION SYSTEM FACILITIES , SUBJECT TO NECESSARY1 |
---|
| 286 | + | CONFIDENTIALITY PROVISIONS, INCLUDING: THE PRESSURE DISTRICT OR2 |
---|
| 287 | + | GEOGRAPHIC AREA THAT REQUIRES THE PROPOSED FACILITIES, THE3 |
---|
| 288 | + | EXISTING AND PROPOSED REGULATOR STATIONS AND EXISTING AND4 |
---|
| 289 | + | PROPOSED DISTRIBUTION PIPING AND HIGHER CAPACITY PIPELINES SERVED5 |
---|
| 290 | + | BY OR REPRESENTING THE PROPOSED FACILITIES, THE LOCATIONS OF ANY6 |
---|
| 291 | + | NEARBY DISPROPORTIONATELY IMPACTED COMMUNITIES , AND ANY OTHER7 |
---|
| 292 | + | INFORMATION NECESSARY TO ALLOW THE LOCAL GOVERNMENT TO MAKE8 |
---|
| 293 | + | A THOROUGH EVALUATION OF THE PROJECT ;9 |
---|
| 294 | + | (J) TO THE EXTENT PRACTICABLE, THE NUMBER OF CUSTOMERS,10 |
---|
| 295 | + | ANNUAL SALES , AND DESIGN PEAK DEM AND REQUIREMENTS ,11 |
---|
| 296 | + | DISAGGREGATED BY CUSTOMER CLASS , POTENTIALLY DIRECTLY IMPACTED12 |
---|
| 297 | + | OR SERVED BY THE PROJECT;13 |
---|
| 298 | + | (K) ANY PERMITS REQUIRED FOR WORK ON THE PROJECT TO BEGIN;14 |
---|
| 299 | + | AND15 |
---|
| 300 | + | (L) ANY ENVIRONMENTAL REQUIREMENTS ASSOCIATED WITH16 |
---|
| 301 | + | COMPLETION OF THE PROJECT.17 |
---|
| 302 | + | (b) A DUAL-FUEL UTILITY SHALL PROVIDE GAS PLANNING PILOT18 |
---|
| 303 | + | COMMUNITY STAFF AND CONSULTANTS, WHO HAVE SIGNED APPROPRIATE19 |
---|
| 304 | + | NONDISCLOSURE AGREEMENTS, WITH ALL REQUESTED GAS AND ELECTRIC20 |
---|
| 305 | + | CUSTOMER USAGE AND DESIGN PEAK DEMAND DATA , TO THE EXTENT21 |
---|
| 306 | + | AVAILABLE AND DISAGGREGATED TO THE INDIVIDUAL CUSTOMER, FOR ALL22 |
---|
| 307 | + | PLANNED GAS INFRASTRUCTURE PROJECTS LOCATED IN A GAS PLANNING23 |
---|
| 308 | + | PILOT COMMUNITY WITHIN THE SIX-YEAR GAS PROJECT PLANNING24 |
---|
| 309 | + | FORECAST IN THE DUAL-FUEL UTILITY'S MOST RECENTLY APPROVED GAS25 |
---|
| 310 | + | INFRASTRUCTURE PLAN OR IDENTIFIED BY THE DUAL-FUEL UTILITY FOR26 |
---|
| 311 | + | INCLUSION IN A FUTURE GAS INFRASTRUCTURE PLAN. THE DUAL-FUEL27 |
---|
| 312 | + | 1370 |
---|
| 313 | + | -10- UTILITY SHALL PROVIDE SUCH INFORMATION WITHIN THE RELEVANT TIME1 |
---|
| 314 | + | FRAME ESTABLISHED PURSUANT TO SUBSECTION (2)(a)(II) OF THIS2 |
---|
| 315 | + | SECTION.3 |
---|
| 316 | + | (c) THE INFORMATION DESCRIBED IN SUBSECTIONS (5)(a) AND4 |
---|
| 317 | + | (5)(b) OF THIS SECTION IS EXEMPT FROM THE "COLORADO OPEN RECORDS5 |
---|
| 318 | + | ACT", PART 2 OF ARTICLE 72 OF TITLE 24.6 |
---|
| 319 | + | 40-3.3-103. Neighborhood-scale alternatives projects - cost7 |
---|
| 320 | + | recovery - reporting requirement. (1) A DUAL-FUEL UTILITY SHALL8 |
---|
| 321 | + | WORK WITH A GAS PLANNING PILOT COMMUNITY TO RANK AND PRIORITIZE9 |
---|
| 322 | + | NEIGHBORHOOD-SCALE ALTERNATIVES PROJECTS WITHIN EACH GAS10 |
---|
| 323 | + | PLANNING PILOT COMMUNITY BASED ON LOCAL GOVERNMENT INPUT AND11 |
---|
| 324 | + | CONSIDERATION OF:12 |
---|
| 325 | + | (a) THE NUMBER AND CUSTOMER CLASS SERVED BY EACH PIPELINE13 |
---|
| 326 | + | SEGMENT INCLUDED IN A NEIGHBORHOOD -SCALE ALTERNATIVES PROJECT;14 |
---|
| 327 | + | (b) THE DEGREE OF SUPPORT FOR THE NEIGHBORHOOD -SCALE15 |
---|
| 328 | + | ALTERNATIVES PROJECT FROM CUSTOMERS POTENTIALLY IMPACTED BY16 |
---|
| 329 | + | THE PROJECT, WITH PREFERENCE GIVEN TO THOSE PROJECTS THAT HAVE17 |
---|
| 330 | + | FULL SUPPORT FROM POTENTIA LLY IMPACTED CUSTOMERS ;18 |
---|
| 331 | + | (c) THE COST-EFFECTIVENESS OF THE NEIGHBORHOOD -SCALE19 |
---|
| 332 | + | ALTERNATIVES PROJECT, USING THE COST-BENEFIT HANDBOOK FROM THE20 |
---|
| 333 | + | DUAL-FUEL UTILITY'S MOST RECENT GAS INFRASTRUCTURE PLAN ;21 |
---|
| 334 | + | (d) THE NET COST TO CUSTOMERS POTENTIALLY PARTICIPATING IN22 |
---|
| 335 | + | THE NEIGHBORHOOD-SCALE ALTERNATIVES PROJECT;23 |
---|
| 336 | + | (e) THE AVAILABILITY OF ALTERNATIVE ENERGY SERVICE,24 |
---|
| 337 | + | INCLUDING FOR SCENARIOS WITH ENHANCED GAS AND ELECTRIC DEMAND25 |
---|
| 338 | + | RESPONSE OR DEMAND FLEXIBILITY ;26 |
---|
| 339 | + | (f) THE ABILITY OF THERMAL ENERGY NETWORKS TO SERVE THE27 |
---|
| 340 | + | 1370 |
---|
| 341 | + | -11- AREA COVERED BY THE NEIGHBORHOOD-SCALE ALTERNATIVES PROJECT,1 |
---|
| 342 | + | WITH PRIORITY GIVEN TO PROJECTS THAT INCLUDE A THERMAL ENERGY2 |
---|
| 343 | + | NETWORK OR A GEOTHERMAL ENERGY PROJECT ;3 |
---|
| 344 | + | (g) WHETHER THE NEIGHBORHOOD -SCALE ALTERNATIVES PROJECT4 |
---|
| 345 | + | IS PART OF A NEW DEVELOPMENT OR WOULD SERVE EXISTING CUSTOMERS,5 |
---|
| 346 | + | OR BOTH;6 |
---|
| 347 | + | (h) THE PRIORITIZATION OF PIPELINE SEGMENTS THAT ARE PART OF7 |
---|
| 348 | + | PROJECTS INCLUDED IN A DUAL-FUEL UTILITY'S GAS INFRASTRUCTURE8 |
---|
| 349 | + | PLAN OR OTHERWISE IDENTIFIED BY THE DUAL -FUEL UTILITY FOR9 |
---|
| 350 | + | INCLUSION IN A FUTURE GAS INFRASTRUCTURE PLAN, TO THE EXTENT THIS10 |
---|
| 351 | + | INFORMATION IS AVAILABLE; AND11 |
---|
| 352 | + | (i) THE LOCATION OF ANY NEARBY DISPROPORTIONATELY12 |
---|
| 353 | + | IMPACTED COMMUNITY OR PIPELINE SEGMENTS THAT SERVE13 |
---|
| 354 | + | DISPROPORTIONATELY IMPACTED COMMUNITIES .14 |
---|
| 355 | + | (2) (a) (I) PRIOR TO JUNE 1, 2026, A DUAL-FUEL UTILITY AND15 |
---|
| 356 | + | LOCAL GOVERNMENT SHALL JOINTLY SUBMIT FOR APPR OVAL AT LEAST ONE16 |
---|
| 357 | + | INITIAL NEIGHBORHOOD-SCALE ALTERNATIVES PROJECT, TO BE LOCATED17 |
---|
| 358 | + | WITHIN A GAS PLANNING PILOT COMMUNITY , TO THE COMMISSION IF THE18 |
---|
| 359 | + | NEIGHBORHOOD-SCALE ALTERNATIVES PROJECT HAS THE FULL SUPPORT OF19 |
---|
| 360 | + | POTENTIALLY AFFECTED CUSTOMERS. THE FILING MUST ALSO CONTAIN A20 |
---|
| 361 | + | LIST OF POTENTIAL PROJECTS THAT ARE RANKED HIGHLY BUT DO NOT21 |
---|
| 362 | + | HAVE FULL CUSTOMER SUPPORT AT THE TIME OF THE FILING .22 |
---|
| 363 | + | (II) PRIOR TO JUNE 1, 2027, A DUAL-FUEL UTILITY AND A LOCAL23 |
---|
| 364 | + | GOVERNMENT SHALL JOINTLY SUBMIT FOR COMMISSION APPROVAL THE24 |
---|
| 365 | + | NEIGHBORHOOD-SCALE ALTERNATIVES PROJECTS INCLUDED ON THE LIST25 |
---|
| 366 | + | IN THE FILING SUBMITTED PURSUANT TO SUBSECTION (2)(a)(I) OF THIS26 |
---|
| 367 | + | SECTION AND THAT WILL BE PURSUED IN A GAS PLANNING PILOT27 |
---|
| 368 | + | 1370 |
---|
| 369 | + | -12- COMMUNITY, WHICH PROJECTS MAY LACK FULL CUSTOMER SUPPORT IF THE1 |
---|
| 370 | + | LOCAL GOVERNMENT HAS D ETERMINED THAT A REASONABLE MAJORITY OF2 |
---|
| 371 | + | CUSTOMERS SUPPORTS THE PROJECT. THE LOCAL GOVERNMENT SHALL3 |
---|
| 372 | + | DETERMINE WHAT CONSTITUTES A REASONABLE MAJORITY. THE4 |
---|
| 373 | + | DETERMINATION OF A REASONABLE MAJORITY OF CUSTOMER SUPPORT AND5 |
---|
| 374 | + | EFFORTS TO OBTAIN CUSTOMER CONSENT MUST BE SUPPORTED BY A6 |
---|
| 375 | + | SWORN AFFIDAVIT OR TESTIMONY FROM AN OFFICIAL EMPLOYEE OF THE7 |
---|
| 376 | + | LOCAL GOVERNMENT AS PART OF THE JOINT APPLICATION TO THE8 |
---|
| 377 | + | COMMISSION. THE JOINT APPLICATION MUST ALSO INCLUDE THE NET COSTS9 |
---|
| 378 | + | OF THE PROJECTS, INCLUDING ANY:10 |
---|
| 379 | + | (A) STATE OR FEDERAL FUNDING OR TAX CREDITS ;11 |
---|
| 380 | + | (B) GAS PLANNING PILOT COMMUNITY INCENTIVES OR FUNDING ;12 |
---|
| 381 | + | (C) EXISTING DUAL-FUEL UTILITY PROGRAM FUNDING ;13 |
---|
| 382 | + | (D) ADDITIONAL DUAL-FUEL UTILITY INCENTIVES OR FUNDING;14 |
---|
| 383 | + | (E) CUSTOMER CONTRIBUTIONS ; AND15 |
---|
| 384 | + | (F) ANTICIPATED TOTAL CAPITAL EXPENDITURES BY THE16 |
---|
| 385 | + | DUAL-FUEL UTILITY AND CUSTOMERS, AVOIDED UTILITY CAPITAL17 |
---|
| 386 | + | EXPENDITURES, AND FUTURE DISCOUNTED CUSTOMER UTILITY BILL18 |
---|
| 387 | + | SAVINGS OR EXPENSES.19 |
---|
| 388 | + | (III) IF A DUAL-FUEL UTILITY WILL NOT PURSUE A20 |
---|
| 389 | + | NEIGHBORHOOD-SCALE ALTERNATIVES PROJECT IN ONE OR MORE GAS21 |
---|
| 390 | + | PLANNING PILOT COMMUNITIES, THE DUAL-FUEL UTILITY AND LOCAL22 |
---|
| 391 | + | GOVERNMENT, PRIOR TO JUNE 1, 2027, SHALL JOINTLY FILE A REPORT WITH23 |
---|
| 392 | + | THE COMMISSION EXPLAINING WHY A NEIGHBORHOOD -SCALE24 |
---|
| 393 | + | ALTERNATIVES PROJECT WILL NOT BE PURSUED IN THAT COMMUNITY .25 |
---|
| 394 | + | (b) THE COMMISSION SHALL PROVIDE AN OPPORTUNITY FOR PUBLIC26 |
---|
| 395 | + | COMMENT REGARDING THE DUAL-FUEL UTILITY'S SUBMISSION PURSUANT27 |
---|
| 396 | + | 1370 |
---|
| 397 | + | -13- TO SUBSECTION (2)(a)(III) OF THIS SECTION.1 |
---|
| 398 | + | (c) THE COMMISSION SHALL APPROVE A NEIGHBORHOOD-SCALE2 |
---|
| 399 | + | ALTERNATIVES PROJECT APPLICATION SUBMITTED BY A DUAL -FUEL3 |
---|
| 400 | + | UTILITY IF:4 |
---|
| 401 | + | (I) THE PROJECT IS SUPPORTED BY A LOCAL GOVERNMENT5 |
---|
| 402 | + | ORDINANCE, PROCLAMATION, OR RESOLUTION;6 |
---|
| 403 | + | (II) THE COMMISSION FINDS THAT THE PROJECT IS:7 |
---|
| 404 | + | (A) CONSISTENT WITH THE STATE'S GREENHOUSE GAS REDUCTION8 |
---|
| 405 | + | GOALS; AND9 |
---|
| 406 | + | (B) IN THE PUBLIC INTEREST, CONSIDERING COSTS AND BENEFITS10 |
---|
| 407 | + | TO THE GAS PLANNING PILOT COMMUNITY , PARTICIPATING CUSTOMERS,11 |
---|
| 408 | + | AND RATEPAYERS WITHIN THE DUAL-FUEL UTILITY'S GAS SERVICE12 |
---|
| 409 | + | TERRITORY AND ANY COST SHIFT BETWEEN PARTICIPATING CUSTOMERS13 |
---|
| 410 | + | AND ALL RATEPAYERS OF THE DUAL -FUEL UTILITY, WITH PREFERENCE14 |
---|
| 411 | + | GIVEN TO PROJECTS THAT RESULT IN NO COST SHIFT TO NONPARTICIPATING15 |
---|
| 412 | + | CUSTOMERS;16 |
---|
| 413 | + | (III) THE APPROVED PORTFOLIO OF NEIGHBORHOOD -SCALE17 |
---|
| 414 | + | ALTERNATIVES PROJECTS PROVIDES AN APPROPRIATE MIX OF18 |
---|
| 415 | + | TECHNOLOGIES, CUSTOMER CLASSES, AND NEW CONSTRUCTION AND19 |
---|
| 416 | + | EXISTING BUILDINGS AND INCLUDES THE USE OF THERMAL ENERGY20 |
---|
| 417 | + | NETWORKS OR GEOTHERMAL ENERGY PROJECTS ; AND21 |
---|
| 418 | + | (IV) THE COMMISSION FINDS THAT ALTERNATIVE ENERGY SERVICE22 |
---|
| 419 | + | IS AVAILABLE TO ALL CUSTOMERS WITHIN THE PROJECT AREA AND CAN23 |
---|
| 420 | + | REASONABLY BE IMPLEMENTED WITHIN THE PROJECT AREA. IN MAKING24 |
---|
| 421 | + | THIS FINDING, THE COMMISSION SHALL CONSIDER:25 |
---|
| 422 | + | (A) THE COST OF END USES POWERED BY DIFFERENT FUELS,26 |
---|
| 423 | + | IMPACTS ON INCOME-QUALIFIED UTILITY CUSTOMERS AND CUSTOMERS27 |
---|
| 424 | + | 1370 |
---|
| 425 | + | -14- LIVING IN DISPROPORTIONATELY IMPACTED COMMUNITIES, AND THE1 |
---|
| 426 | + | STATE'S GREENHOUSE GAS EMISSION REDUCTION GOALS ;2 |
---|
| 427 | + | (B) EXISTING UTILITY OR OTHER INCENTIVES TO SUPPORT3 |
---|
| 428 | + | CUSTOMER ADOPTION OF THE ALTERNATIVE ENERGY SERVICE ; AND4 |
---|
| 429 | + | (C) THE DEGREE OF CUSTOMER SUPPORT FOR THE PROJECT ,5 |
---|
| 430 | + | CONSIDERING THE INFORMATION PROVIDED PURSUANT TO SUBSECTION6 |
---|
| 431 | + | (1)(b) OF THIS SECTION, AND WITH PRIORITY GIVEN TO PROJECTS THAT7 |
---|
| 432 | + | HAVE THE FULL SUPPORT OF POTENTIALLY AFFECTED CUSTOMERS .8 |
---|
| 433 | + | (3) (a) THE COMMISSION SHALL ALLOW A DUAL-FUEL UTILITY TO9 |
---|
| 434 | + | CURRENTLY RECOVER THE COSTS INCURRED DURING THE DEVELOPMENT10 |
---|
| 435 | + | OF A NEIGHBORHOOD-SCALE ALTERNATIVES PROJECT, INCLUDING COSTS11 |
---|
| 436 | + | TO TRANSITION THE DISTRIBUTION SYSTEM, INVEST IN ELECTRIC12 |
---|
| 437 | + | INFRASTRUCTURE, AND PROVIDE CUSTOMER INCENTIVES. SUCH COSTS ARE13 |
---|
| 438 | + | FULLY RECOVERABLE REGARDLESS OF THE PERFORMANCE OF THE14 |
---|
| 439 | + | ALTERNATIVE ENERGY SERVICE. THE COMMISSION SHALL ALSO PERMIT15 |
---|
| 440 | + | COST RECOVERY FOR PERSONNEL TO WORK ON THE DEVELOPMENT, IN16 |
---|
| 441 | + | WHOLE OR IN PART, OF NEIGHBORHOOD-SCALE ALTERNATIVES PROJECTS.17 |
---|
| 442 | + | (b) THE DUAL-FUEL UTILITY SHALL PROPOSE TO THE COMMISSION18 |
---|
| 443 | + | HOW COSTS WILL BE RECOVERED ACROSS THE DUAL-FUEL UTILITY'S19 |
---|
| 444 | + | ELECTRIC AND GAS BUSINESS.20 |
---|
| 445 | + | (c) FOR GAS PLANNING PILOT COMMUNITIES THAT RECEIVE GAS21 |
---|
| 446 | + | SERVICE FROM A DUAL-FUEL UTILITY BUT ARE NOT SERVED BY THE22 |
---|
| 447 | + | ELECTRIC UTILITY THAT IS PART OF THE DUAL-FUEL UTILITY, THE23 |
---|
| 448 | + | COMMISSION SHALL CONSIDER A COST -SHARING AGREEMENT, AS24 |
---|
| 449 | + | NECESSARY TO IMPLEMENT A NEIGHBORHOOD-SCALE ALTERNATIVES25 |
---|
| 450 | + | PROJECT, WHICH AGREEMENT THE DUAL-FUEL UTILITY PROPOSES TO ENTER26 |
---|
| 451 | + | INTO WITH A LOCAL COOPERATIVE ELECTRIC ASSOCIATION OR27 |
---|
| 452 | + | 1370 |
---|
| 453 | + | -15- MUNICIPALLY OWNED ELECTRIC UTILITY TO MAKE THE INCUMBENT GAS1 |
---|
| 454 | + | UTILITY THAT IS PART OF THE DUAL-FUEL UTILITY AND ITS CUSTOMERS2 |
---|
| 455 | + | WHOLE FOR ANY PROJECTS APPROVED BY THE COMMISSION WHEN THERE3 |
---|
| 456 | + | IS A COST SHIFT. THIS SUBSECTION (3)(c) SHALL NOT BE CONSTRUED TO4 |
---|
| 457 | + | SUBJECT A LOCAL COOPERATIVE ELECTRIC ASSOCIATION OR MUNICIPALLY5 |
---|
| 458 | + | OWNED ELECTRIC UTILITY ENTERING INTO SUCH AN AGREEMENT WITH A6 |
---|
| 459 | + | DUAL-FUEL UTILITY TO THE JURISDICTION OF THE COMMISSION. ANY7 |
---|
| 460 | + | FEDERAL, STATE, OR LOCAL FUNDING MADE AVAILABLE FOR A PROJECT8 |
---|
| 461 | + | SHALL BE APPLIED PRIOR TO APPLICATION OF UTILITY PROGRAMMATIC9 |
---|
| 462 | + | FUNDS, SUCH AS DEMAND -SIDE MANAGEMENT , BENEFICIAL10 |
---|
| 463 | + | ELECTRIFICATION, OR OTHER EXISTING OR FUTURE CUSTOMER-SITED11 |
---|
| 464 | + | PROGRAMS, INCENTIVES, REBATES, AND FINANCING.12 |
---|
| 465 | + | (4) IN APPROVING A NEIGHBORHOOD -SCALE ALTERNATIVES13 |
---|
| 466 | + | PROJECT IN A GAS PLANNING PILOT COMMUNITY, THE COMMISSION MAY14 |
---|
| 467 | + | MODIFY THE GAS UTILITY'S SERVICE REQUIREMENT FOR SELECT PREMISES15 |
---|
| 468 | + | WITH AN ALTERNATIVE ENERGY SERVICE REQUIREMENT .16 |
---|
| 469 | + | NOTWITHSTANDING ANY PROVISION OF LAW TO THE CONTRARY, NOTHING17 |
---|
| 470 | + | IN THIS SECTION AFFECTS OR ABRIDGES A DUAL-FUEL UTILITY'S SERVICE18 |
---|
| 471 | + | REQUIREMENTS IN AREAS OUTSIDE THE NEIGHBORHOOD -SCALE19 |
---|
| 472 | + | ALTERNATIVES PROJECT AREA. THE COMMISSION MAY IMPOSE AN20 |
---|
| 473 | + | ALTERNATIVE ENERGY SERVICE REQUIREMENT FOR ANY CERTIFICATE OF21 |
---|
| 474 | + | PUBLIC CONVENIENCE AND NECESSITY GRANTED TO THE GAS UTILITY TO22 |
---|
| 475 | + | PROVIDE SERVICE TO THE TARGETED AREA THAT IS THE SUBJECT OF THE23 |
---|
| 476 | + | NEIGHBORHOOD-SCALE ALTERNATIVES PROJECT IF THE COMMISSION FINDS24 |
---|
| 477 | + | THAT ALTERNATIVE ENERGY SERVICE IS AVAILABLE .25 |
---|
| 478 | + | (5) (a) AS PART OF A NEIGHBORHOOD -SCALE ALTERNATIVES26 |
---|
| 479 | + | PROJECT, A DUAL-FUEL UTILITY MAY PROPOSE TO FUND CONVERSION OF27 |
---|
| 480 | + | 1370 |
---|
| 481 | + | -16- EXISTING GAS APPLIANCES OR EQUIPMENT TO NONEMITTING THERMAL1 |
---|
| 482 | + | RESOURCES, INCLUDING OFFERING INCREMENTAL INCENTIVES OR2 |
---|
| 483 | + | FINANCING ABOVE THAT APPROVED FOR CLEAN HEAT PLANS, AS DEFINED3 |
---|
| 484 | + | IN SECTION 40-3.2-108; BENEFICIAL ELECTRIFICATION PLANS, AS DEFINED4 |
---|
| 485 | + | IN SECTION 40-3.2-109; DEMAND-SIDE MANAGEMENT PROGRAMS , AS5 |
---|
| 486 | + | DEFINED IN SECTION 40-1-102; OR OTHER RELATED FILINGS.6 |
---|
| 487 | + | (b) A DUAL-FUEL UTILITY MAY ALSO PROPOSE TO OFFER NEW RATE7 |
---|
| 488 | + | STRUCTURES TO PAY FOR THERMAL ENERGY NETWORKS OR OTHER8 |
---|
| 489 | + | NONEMITTING THERMAL RESOURCES AS AN ALTERNATIVE ENERGY9 |
---|
| 490 | + | SERVICE, UNDER WHICH RATE STRUCTURES CUSTOMERS PAY THE UTILITY10 |
---|
| 491 | + | FOR THERMAL ENERGY NETWORK SERVICES TO OFFSET THE INITIAL COST11 |
---|
| 492 | + | OF NEW APPLIANCES OR OTHER EQUIPMENT. IF A DUAL-FUEL UTILITY12 |
---|
| 493 | + | PROPOSES TO OFFER SUCH A RATE, THE COMMISSION SHALL NOT GRANT13 |
---|
| 494 | + | THE DUAL-FUEL UTILITY CURRENT COST RECOVERY PURSUANT TO14 |
---|
| 495 | + | SUBSECTION (3)(a) OF THIS SECTION. A DUAL-FUEL UTILITY SHALL HAVE15 |
---|
| 496 | + | THE RIGHT OF FIRST REFUSAL TO OFFER THERMAL ENERGY NETWORK16 |
---|
| 497 | + | SERVICE OR ALTERNATIVE ENERGY SERVICE AS PART OF A17 |
---|
| 498 | + | NEIGHBORHOOD-SCALE ALTERNATIVES PROJECT, IF THE DUAL-FUEL18 |
---|
| 499 | + | UTILITY SETS FORTH ITS INTENTION TO EXERCISE ITS RIGHT OF FIRST19 |
---|
| 500 | + | REFUSAL AND DEFINES THE SCOPE OF SUCH EXERCISE IN THE APPLICATION20 |
---|
| 501 | + | TO THE COMMISSION AND SUCH RIGHT OF FIRST REFUSAL :21 |
---|
| 502 | + | (I) IS LIMITED TO NEIGHBORHOOD-SCALE ALTERNATIVES PROJECTS22 |
---|
| 503 | + | IN GAS PLANNING PILOT COMMUNITIES; AND23 |
---|
| 504 | + | (II) IS EXERCISED WITHIN TWO YEARS AFTER APPROVAL BY THE24 |
---|
| 505 | + | COMMISSION.25 |
---|
| 506 | + | (6) IF A NEIGHBORHOOD-SCALE ALTERNATIVES PROJECT QUALIFIES26 |
---|
| 507 | + | AS AN ENERGY SECTOR PUBLIC WORKS PROJECT, AS DEFINED IN SECTION27 |
---|
| 508 | + | 1370 |
---|
| 509 | + | -17- 24-92-303, A DUAL-FUEL UTILITY SHALL COMPLY WITH ALL1 |
---|
| 510 | + | REQUIREMENTS SET FORTH IN PART 3 OF ARTICLE 92 OF TITLE 24. THE2 |
---|
| 511 | + | DUAL-FUEL UTILITY SHALL UTILIZE UTILITY EMPLOYEES OR CONTRACTORS3 |
---|
| 512 | + | THAT MEET THE APPRENTICESHIP UTILIZATION REQUIREMENTS SET FORTH4 |
---|
| 513 | + | IN SECTION 24-92-115 TO SERVICE AND MAINTAIN ANY THERMAL ENERGY5 |
---|
| 514 | + | OR GEOTHERMAL ENERGY PROJECTS OWNED BY THE DUAL-FUEL UTILITY6 |
---|
| 515 | + | AND APPROVED BY THE COMMISSION UNDER THIS SECTION .7 |
---|
| 516 | + | (7) BY JUNE 1 OF EACH YEAR FOLLOWING APPROVAL OF A8 |
---|
| 517 | + | NEIGHBORHOOD-SCALE ALTERNATIVES PROJECT, A DUAL-FUEL UTILITY9 |
---|
| 518 | + | SHALL SUBMIT A REPORT TO THE COMMISSION ON THE IMPLEMENTATION10 |
---|
| 519 | + | OF THE NEIGHBORHOOD-SCALE ALTERNATIVES PROJECT. THE REPORT11 |
---|
| 520 | + | MUST INCLUDE, AT A MINIMUM:12 |
---|
| 521 | + | (a) AN UPDATE ON PROJECT IMPLEMENTATION , INCLUDING THE13 |
---|
| 522 | + | DEGREE OF CUSTOMER SUPPORT FOR THE PROJECT ;14 |
---|
| 523 | + | (b) AN EXPLANATION OF CUSTOMER SATISFACTION WITH15 |
---|
| 524 | + | ALTERNATIVE ENERGY SERVICE ;16 |
---|
| 525 | + | (c) ACTUAL NET PROJECT COSTS INCURRED , INCLUDING ANY:17 |
---|
| 526 | + | (I) STATE OR FEDERAL FUNDING OR TAX CREDITS ;18 |
---|
| 527 | + | (II) GAS PLANNING PILOT COMMUNITY INCENTIVES OR FUNDING ;19 |
---|
| 528 | + | (III) EXISTING DUAL-FUEL UTILITY PROGRAM FUNDING ;20 |
---|
| 529 | + | (IV) ADDITIONAL DUAL-FUEL UTILITY INCENTIVES OR FUNDING;21 |
---|
| 530 | + | (V) CUSTOMER CONTRIBUTIONS ;22 |
---|
| 531 | + | (VI) ANTICIPATED TOTAL CAPITAL EXPENDITURES BY THE23 |
---|
| 532 | + | DUAL-FUEL UTILITY AND CUSTOMERS, AVOIDED UTILITY CAPITAL24 |
---|
| 533 | + | EXPENDITURES, AND FUTURE DISCOUNTED CUSTOMER UTILITY BILL25 |
---|
| 534 | + | SAVINGS OR EXPENSES; AND26 |
---|
| 535 | + | (VII) ESTIMATED OVERALL PROJECT COSTS IF NO INCENTIVES OR27 |
---|
| 536 | + | 1370 |
---|
| 537 | + | -18- TAX CREDITS HAD BEEN AVAILABLE FOR THE PROJECT ;1 |
---|
| 538 | + | (d) THE IMPACT ON TOTAL ENERGY BILL AND ENERGY RELIABILITY2 |
---|
| 539 | + | FOR CUSTOMERS RECEIVING ALTERNATIVE ENERGY SERVICE ;3 |
---|
| 540 | + | (e) ANY ENCOUNTERED BARRIERS TO PROJECT IMPLEMENTATION,4 |
---|
| 541 | + | INCLUDING TECHNOLOGICAL OR WORKFORCE BARRIERS , AND THE LESSONS5 |
---|
| 542 | + | LEARNED IN OVERCOMING THOSE BARRIERS ;6 |
---|
| 543 | + | (f) THE IMPACT ON INCOME-QUALIFIED UTILITY CUSTOMERS AND7 |
---|
| 544 | + | CUSTOMERS LIVING IN DISPROPORTIONATELY IMPACTED COMMUNITIES ;8 |
---|
| 545 | + | AND9 |
---|
| 546 | + | (g) ANY OTHER INFORMATION REQUIRED BY THE COMMISSION .10 |
---|
| 547 | + | (8) BY JULY 1, 2028, OR ANOTHER TIME DETERMINED BY THE11 |
---|
| 548 | + | COMMISSION, THE COMMISSION SHALL HIRE A THIRD-PARTY CONSULTANT12 |
---|
| 549 | + | TO CONDUCT AN ANALYSIS OF ALL APPROVED AND PROPOSED13 |
---|
| 550 | + | NEIGHBORHOOD-SCALE ALTERNATIVES PROJECTS AND PRESENT THE14 |
---|
| 551 | + | FINDINGS OF THE ANALYSIS TO THE COMMISSION AND THE GENERAL15 |
---|
| 552 | + | ASSEMBLY. THE ANALYSIS MUST INCLUDE:16 |
---|
| 553 | + | (a) FOR EACH PROJECT, THE INFORMATION SET FORTH IN17 |
---|
| 554 | + | SUBSECTION (7) OF THIS SECTION;18 |
---|
| 555 | + | (b) A COMPARATIVE ANALYSIS OF NET COSTS INCURRED BY ALL19 |
---|
| 556 | + | PARTIES IN A NEIGHBORHOOD-SCALE ALTERNATIVES PROJECT, COMPARED20 |
---|
| 557 | + | WITH THE COST OF THE GAS INFRASTRUCTURE PROJECT THAT WAS21 |
---|
| 558 | + | AVOIDED, INCLUDING ANY:22 |
---|
| 559 | + | (I) STATE OR FEDERAL FUNDING OR TAX CREDITS ;23 |
---|
| 560 | + | (II) GAS PLANNING PILOT COMMUNITY INCENTIVES OR FUNDING ;24 |
---|
| 561 | + | (III) EXISTING DUAL-FUEL UTILITY PROGRAM FUNDING ;25 |
---|
| 562 | + | (IV) ADDITIONAL DUAL-FUEL UTILITY INCENTIVES OR FUNDING;26 |
---|
| 563 | + | (V) CUSTOMER CONTRIBUTIONS ;27 |
---|
| 564 | + | 1370 |
---|
| 565 | + | -19- (VI) ANTICIPATED TOTAL CAPITAL EXPENDITURES BY THE1 |
---|
| 566 | + | DUAL-FUEL UTILITY AND CUSTOMERS, AVOIDED UTILITY CAPITAL2 |
---|
| 567 | + | EXPENDITURES, AND FUTURE DISCOUNTED CUSTOMER UTILITY BILL3 |
---|
| 568 | + | SAVINGS OR EXPENSES; AND4 |
---|
| 569 | + | (VII) ESTIMATED OVERALL PROJECT COSTS IF NO INCENTIVES OR5 |
---|
| 570 | + | TAX CREDITS HAD BEEN AVAILABLE FOR THE PROJECT ;6 |
---|
| 571 | + | (c) THE ABILITY OF EACH PROJECT TO DEFER OR AVOID GAS7 |
---|
| 572 | + | INFRASTRUCTURE INVESTMENTS ;8 |
---|
| 573 | + | (d) THE CUSTOMER ECONOMICS OF NON -EMITTING THERMAL9 |
---|
| 574 | + | RESOURCES COMPARED WITH GAS ALTERNATIVES ;10 |
---|
| 575 | + | (e) AN ANALYSIS OF ANY SUPPLY CHAIN CHALLENGES ;11 |
---|
| 576 | + | (f) THE OVERALL LESSONS LEARNED FROM THE PROJECTS ;12 |
---|
| 577 | + | (g) THE PERSPECTIVES OF THE GAS PLANNING PILOT COMMUNITIES13 |
---|
| 578 | + | REGARDING THE COLLABORATIVE PROCESS WITH A DUAL -FUEL UTILITY14 |
---|
| 579 | + | AND ANY LESSONS LEARNED FOR IMPROVING THE PROCESS ;15 |
---|
| 580 | + | (h) THE NET IMPACTS TO THE UTILITY WORKFORCE ; AND16 |
---|
| 581 | + | (i) ANY OTHER INFORMATION REQUIRED BY THE COMMISSION .17 |
---|
| 582 | + | SECTION 2. Appropriation. (1) For the 2024-25 state fiscal18 |
---|
| 583 | + | year, $43,650 is appropriated to the office of the governor for use by the19 |
---|
| 584 | + | Colorado energy office. This appropriation is from the general fund, and20 |
---|
| 585 | + | is based on an assumption that the office will require an additional 0.421 |
---|
| 586 | + | FTE. To implement this act, the office may use this appropriation for22 |
---|
| 587 | + | program administration.23 |
---|
| 588 | + | (2) For the 2024-25 state fiscal year, $29,678 is appropriated to24 |
---|
| 589 | + | the department of regulatory agencies for use by the public utilities25 |
---|
| 590 | + | commission. This appropriation is from the public utilities commission26 |
---|
| 591 | + | fixed utility fund created in section 40-2-114 (1)(b)(II), C.R.S. To27 |
---|
| 592 | + | 1370 |
---|
| 593 | + | -20- implement this act, the commission may use this appropriation as follows:1 |
---|
| 594 | + | (a) $22,752 for personal services, which amount is based on an2 |
---|
| 595 | + | assumption that the commission will require an additional 0.2 FTE; and3 |
---|
| 596 | + | (b) $6,926 for operating expenses.4 |
---|
| 597 | + | SECTION 3. Act subject to petition - effective date. This act5 |
---|
| 598 | + | takes effect at 12:01 a.m. on the day following the expiration of the6 |
---|
| 599 | + | ninety-day period after final adjournment of the general assembly; except7 |
---|
| 600 | + | that, if a referendum petition is filed pursuant to section 1 (3) of article V8 |
---|
| 601 | + | of the state constitution against this act or an item, section, or part of this9 |
---|
| 602 | + | act within such period, then the act, item, section, or part will not take10 |
---|
| 603 | + | effect unless approved by the people at the general election to be held in11 |
---|
| 604 | + | November 2024 and, in such case, will take effect on the date of the12 |
---|
| 605 | + | official declaration of the vote thereon by the governor.13 |
---|
| 606 | + | 1370 |
---|