14+A bill to be entitled 1
1515 An act relating to temporary underground power panels; 2
1616 creating ss. 125.488 and 166.0484, F.S.; prohibiting 3
1717 counties and certain municipalities from enacting 4
1818 ordinances, regulations, or policies that prevent 5
1919 certain electric utilities from installing temporary 6
2020 underground power panels and from requiring subsequent 7
2121 inspections of such panels as a condition of a 8
2222 Certificate of Occupancy under specified conditions ; 9
2323 defining the term "temporary underground power panel"; 10
2424 providing an effective date. 11
2525 12
2626 Be It Enacted by the Legislature of the State of Florida: 13
2727 14
2828 Section 1. Section 125.488, Florida Statutes, is created 15
2929 to read: 16
3030 125.488 Ordinances, regulations, a nd policies concerning 17
3131 temporary underground power panels. — 18
3232 (1) A county may not enact any ordinance, regulation, or 19
3333 policy that prevents or has the effect of preventing an electric 20
3434 utility, as defined in s. 366.02(2), from installing a temporary 21
3535 underground power panel if the temporary underground power panel 22
3636 meets the requirements of Article 590 of the National Electrical 23
3737 Code, 2020 edition, during the construction and installation of 24
3838 the temporary underground power panel. After the county has 25
39-ENROLLED
40-CS/HB 481, Engrossed 1 2022 Legislature
39+
40+CS/HB 481, Engrossed 1 2022
4141
4242
4343
4444 CODING: Words stricken are deletions; words underlined are additions.
45-hb0481-03-er
45+hb0481-02-e1
4646 Page 2 of 3
4747 F L O R I D A H O U S E O F R E P R E S E N T A T I V E S
4848
4949
5050
5151 conducted an inspection of the temporary underground power 26
5252 panel, the county may not require a subsequent inspection of the 27
5353 temporary underground power panel as a condition of issuance of 28
5454 the Certificate of Occupancy. 29
5555 (2) As used in this section, the term "tempor ary 30
5656 underground power panel" means a permanent meter base that 31
5757 includes a meter socket, meter, and downpipe, to which power is 32
5858 provided through an underground service line by an electric 33
5959 utility pursuant to its tariffs or service standards, that is 34
6060 permanently attached to a block residential structure, provides 35
6161 temporary power for construction of the residential structure, 36
6262 and is intended for use in providing permanent service to the 37
6363 residential structure upon issuance of the Certificate of 38
6464 Occupancy. 39
6565 Section 2. Section 166.0484, Florida Statutes, is created 40
6666 to read: 41
6767 166.0484 Ordinances, regulations, and policies concerning 42
6868 temporary underground power panels. — 43
6969 (1) A municipality may not enact any ordinance, 44
7070 regulation, or policy that prevents or has the effect of 45
7171 preventing an electric utility, as defined in s. 366.02(2), from 46
7272 installing a temporary underground power panel if the temporary 47
7373 underground power panel meets the requirements of Article 590 of 48
7474 the National Electrical Code, 2020 edition, duri ng the 49
7575 construction and installation of the temporary underground power 50
76-ENROLLED
77-CS/HB 481, Engrossed 1 2022 Legislature
76+
77+CS/HB 481, Engrossed 1 2022
7878
7979
8080
8181 CODING: Words stricken are deletions; words underlined are additions.
82-hb0481-03-er
82+hb0481-02-e1
8383 Page 3 of 3
8484 F L O R I D A H O U S E O F R E P R E S E N T A T I V E S
8585
8686
8787
8888 panel. After the municipality has conducted an inspection of the 51
8989 temporary underground power panel, the municipality may not 52
9090 require a subsequent inspection of the temporary undergroun d 53
9191 power panel as a condition of issuance of the Certificate of 54
9292 Occupancy. 55
9393 (2) As used in this section, the term "temporary 56
9494 underground power panel" means a permanent meter base that 57
9595 includes a meter socket, meter, and downpipe, to which power is 58
9696 provided through an underground service line by an electric 59
9797 utility pursuant to its tariffs or service standards, that is 60
9898 permanently attached to a block residential structure, provides 61
9999 temporary power for construction of the residential structure, 62
100100 and is intended for use in providing permanent service to the 63
101101 residential structure upon issuance of the Certificate of 64
102102 Occupancy. 65
103103 (3) Subsections (1) and (2) do not apply to a municipality 66
104104 that owns or operates an electric utility with 100,000 customers 67
105105 or less and the municipality's ordinance, regulation, or policy 68
106106 applies only to its operations as an electric utility. 69
107107 Section 3. This act shall take effect July 1, 2022. 70