15 | 15 | | An act relating to temporary underground power panels; 2 |
---|
16 | 16 | | creating ss. 125.488 and 166.0484, F.S.; prohibiting 3 |
---|
17 | 17 | | counties and certain municipalities from enacting 4 |
---|
18 | 18 | | ordinances, regulations, or policies that prevent 5 |
---|
19 | 19 | | certain electric utilities from installing temporary 6 |
---|
20 | 20 | | underground power panels and from requiring subsequent 7 |
---|
21 | 21 | | inspections of such panels as a condition of a 8 |
---|
22 | 22 | | Certificate of Occupancy under specified conditions ; 9 |
---|
23 | 23 | | defining the term "temporary underground power panel"; 10 |
---|
24 | 24 | | providing an effective date. 11 |
---|
25 | 25 | | 12 |
---|
26 | 26 | | Be It Enacted by the Legislature of the State of Florida: 13 |
---|
27 | 27 | | 14 |
---|
28 | 28 | | Section 1. Section 125.488, Florida Statutes, is created 15 |
---|
29 | 29 | | to read: 16 |
---|
30 | 30 | | 125.488 Ordinances, regulations, a nd policies concerning 17 |
---|
31 | 31 | | temporary underground power panels. — 18 |
---|
32 | 32 | | (1) A county may not enact any ordinance, regulation, or 19 |
---|
33 | 33 | | policy that prevents or has the effect of preventing an electric 20 |
---|
34 | 34 | | utility, as defined in s. 366.02(2), from installing a temporary 21 |
---|
35 | 35 | | underground power panel if the temporary underground power panel 22 |
---|
36 | 36 | | meets the requirements of Article 590 of the National Electrical 23 |
---|
37 | 37 | | Code, 2020 edition, during the construction and installation of 24 |
---|
38 | 38 | | the temporary underground power panel. After the county has 25 |
---|
46 | 46 | | Page 2 of 3 |
---|
47 | 47 | | F L O R I D A H O U S E O F R E P R E S E N T A T I V E S |
---|
48 | 48 | | |
---|
49 | 49 | | |
---|
50 | 50 | | |
---|
51 | 51 | | conducted an inspection of the temporary underground power 26 |
---|
52 | 52 | | panel, the county may not require a subsequent inspection of the 27 |
---|
53 | 53 | | temporary underground power panel as a condition of issuance of 28 |
---|
54 | 54 | | the Certificate of Occupancy. 29 |
---|
55 | 55 | | (2) As used in this section, the term "tempor ary 30 |
---|
56 | 56 | | underground power panel" means a permanent meter base that 31 |
---|
57 | 57 | | includes a meter socket, meter, and downpipe, to which power is 32 |
---|
58 | 58 | | provided through an underground service line by an electric 33 |
---|
59 | 59 | | utility pursuant to its tariffs or service standards, that is 34 |
---|
60 | 60 | | permanently attached to a block residential structure, provides 35 |
---|
61 | 61 | | temporary power for construction of the residential structure, 36 |
---|
62 | 62 | | and is intended for use in providing permanent service to the 37 |
---|
63 | 63 | | residential structure upon issuance of the Certificate of 38 |
---|
64 | 64 | | Occupancy. 39 |
---|
65 | 65 | | Section 2. Section 166.0484, Florida Statutes, is created 40 |
---|
66 | 66 | | to read: 41 |
---|
67 | 67 | | 166.0484 Ordinances, regulations, and policies concerning 42 |
---|
68 | 68 | | temporary underground power panels. — 43 |
---|
69 | 69 | | (1) A municipality may not enact any ordinance, 44 |
---|
70 | 70 | | regulation, or policy that prevents or has the effect of 45 |
---|
71 | 71 | | preventing an electric utility, as defined in s. 366.02(2), from 46 |
---|
72 | 72 | | installing a temporary underground power panel if the temporary 47 |
---|
73 | 73 | | underground power panel meets the requirements of Article 590 of 48 |
---|
74 | 74 | | the National Electrical Code, 2020 edition, duri ng the 49 |
---|
75 | 75 | | construction and installation of the temporary underground power 50 |
---|
83 | 83 | | Page 3 of 3 |
---|
84 | 84 | | F L O R I D A H O U S E O F R E P R E S E N T A T I V E S |
---|
85 | 85 | | |
---|
86 | 86 | | |
---|
87 | 87 | | |
---|
88 | 88 | | panel. After the municipality has conducted an inspection of the 51 |
---|
89 | 89 | | temporary underground power panel, the municipality may not 52 |
---|
90 | 90 | | require a subsequent inspection of the temporary undergroun d 53 |
---|
91 | 91 | | power panel as a condition of issuance of the Certificate of 54 |
---|
92 | 92 | | Occupancy. 55 |
---|
93 | 93 | | (2) As used in this section, the term "temporary 56 |
---|
94 | 94 | | underground power panel" means a permanent meter base that 57 |
---|
95 | 95 | | includes a meter socket, meter, and downpipe, to which power is 58 |
---|
96 | 96 | | provided through an underground service line by an electric 59 |
---|
97 | 97 | | utility pursuant to its tariffs or service standards, that is 60 |
---|
98 | 98 | | permanently attached to a block residential structure, provides 61 |
---|
99 | 99 | | temporary power for construction of the residential structure, 62 |
---|
100 | 100 | | and is intended for use in providing permanent service to the 63 |
---|
101 | 101 | | residential structure upon issuance of the Certificate of 64 |
---|
102 | 102 | | Occupancy. 65 |
---|
103 | 103 | | (3) Subsections (1) and (2) do not apply to a municipality 66 |
---|
104 | 104 | | that owns or operates an electric utility with 100,000 customers 67 |
---|
105 | 105 | | or less and the municipality's ordinance, regulation, or policy 68 |
---|
106 | 106 | | applies only to its operations as an electric utility. 69 |
---|
107 | 107 | | Section 3. This act shall take effect July 1, 2022. 70 |
---|