1-HOUSE OF REPRESENTATIVES H.B. NO. 1140 THIRTY-FIRST LEGISLATURE, 2021 H.D. 1 STATE OF HAWAII A BILL FOR AN ACT RELATING TO ELECTRIC VEHICLES. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
1+HOUSE OF REPRESENTATIVES H.B. NO. 1140 THIRTY-FIRST LEGISLATURE, 2021 STATE OF HAWAII A BILL FOR AN ACT RELATING TO ELECTRIC VEHICLES. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
22
33 HOUSE OF REPRESENTATIVES H.B. NO. 1140
4-THIRTY-FIRST LEGISLATURE, 2021 H.D. 1
4+THIRTY-FIRST LEGISLATURE, 2021
55 STATE OF HAWAII
66
77 HOUSE OF REPRESENTATIVES
88
99 H.B. NO.
1010
1111 1140
1212
1313 THIRTY-FIRST LEGISLATURE, 2021
1414
15-H.D. 1
15+
1616
1717 STATE OF HAWAII
1818
1919
2020
2121
2222
2323
2424
2525
2626
2727
2828
2929
3030
3131 A BILL FOR AN ACT
3232
3333
3434
3535
3636
3737 RELATING TO ELECTRIC VEHICLES.
3838
3939
4040
4141
4242
4343 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
4444
4545
4646
47- SECTION 1. The legislature finds that Hawaii currently has over one million gasolinepowered vehicles on its roads, which emit nearly five million metric tons of climatechanging carbon pollution annually. The legislature also finds that Hawaii residents, businesses, and visitors spent over $1,700,000,000 on gasoline in 2019. Electric vehicles play an integral role in Hawaii's clean energy future. The legislature further finds that electric vehicles are much less expensive to power per mile than gasoline-powered vehicles. By using stored electrical energy, electric vehicles can take advantage of intermittent solar, wind, and other clean energy resources. With the continued growth of an intelligent electricity grid, electric vehicles become an essential component to electricity load and clean energy resource balancing. Electric vehicles also provide clean mobility solutions for Hawaii residents and visitors. The legislature finds that just over one per cent of all registered vehicles in Hawaii are electric. This number is expected to rise exponentially as more electric vehicles come to market, vehicle ranges increase, and the cost of electric vehicles decreases. In fact, the number of registered electric vehicles in Hawaii increased about twenty per cent during 2020, while the number of registered gasolinepowered vehicles decreased about three per cent. While there is growing interest in electric vehicles among Hawaii residents, the lack of adequate vehicle charging infrastructure presents a key barrier to their acquisition. The International Energy Agency has found that the availability of chargers emerged as one of the key factors for contributing to the market penetration of electric vehicles. More than eighty per cent of electric vehicle drivers charge their cars at home or at work; however, a large share of Hawaii's population lives in high density, multi-family dwellings, and the vast majority of parking facilities in these buildings currently are not being built to accommodate electric vehicle chargers. The legislature further finds that requiring that all new parking stalls be electric vehicle ready will result in significant long-term savings for residents. When electric vehicle readiness is considered in the design of a building or parking area, decisions about the lowest cost layout can be made, thereby allowing building owners and operators to reduce the financial burden of modifying or upgrading electrical systems later. It also helps to avoid additional construction costs and the means of trenching or boring to lay conduit for electric vehicle charger installation. Realizing that residents would save about ninety per cent on electric vehicle charger installation costs if parking stalls were built in advance to be electric vehicle charger ready, rather than retrofitted postconstruction, the city of Vancouver, British Columbia, required that all nonvisitor parking stalls be electric vehicle charger ready starting January 2019. To be electric vehicle charger ready, parking stalls need sufficient wire, conduit, electrical panel service capacity, overcurrent protection devices, and suitable termination points to connect to an electric vehicle charger. Vancouver's law allows for an energy management system to control the overall electricity demand from the electric vehicle charging, thereby reducing the upfront electrical capacity investment. In addition, electric vehicle charger ready buildings in the public domain are essential for individuals who visit government buildings for public services and who work there. The legislature also finds that electric vehicle charging infrastructure in state buildings will help pave the way for addressing current and future growing electric vehicle charging needs. The purpose of this Act is to prohibit the issuance of building permits for certain new multi-family residential building and commercial building applications and new state building applications initiated on or after January l, 2022, unless the building's parking stalls are electric vehicle charger ready. SECTION 2. Chapter 103, Hawaii Revised Statutes, is amended by adding a new section to part II to be appropriately designated and to read as follows: "§103- Electric vehicle charger ready; new state buildings. (a) On or after January 1, 2022, no building permit shall be issued for any new state building, unless the building's parking stalls are electric vehicle charger ready as defined in this section; provided that this section shall not apply to building permits issued for applications that were initiated prior to January 1, 2022. (b) Buildings subject to the requirements of subsection (a) may implement an electric vehicle energy management system; provided that the electric vehicle energy management system is capable of providing no less than 3.4 kilowatts of electricity to each parking stall. (c) As used in this section: "Electric vehicle charger ready" means having sufficient wire, conduit, raceway, termination point to support a minimum of 40-ampere, 208 or 240-volt branch circuit, and electrical panel capacity suitable to provide Level 2 charging consistent with an "alternating current Level 2 charging station" as that term is defined in section 26972. "Electric vehicle energy management system" means a system used to control electric vehicle charger loads through the process of connecting, disconnecting, increasing, or reducing electric power to the loads." SECTION 3. Chapter 196, Hawaii Revised Statutes, is amended by adding a new section to part I to be appropriately designated and to read as follows: "§196- Electric vehicle charger ready; new multi-family residential buildings and new commercial buildings. (a) On or after January 1, 2022, no building permit shall be issued for any new: (1) Multifamily residential building that has ten or more parking stalls; or (2) Commercial building that has twenty or more parking stalls, unless the building's parking stalls are electric vehicle charger ready as defined in this chapter; provided that this section shall not apply to building permits issued for applications that were initiated prior to January 1, 2022. (b) Buildings subject to the requirements of subsection (a) may implement an electric vehicle energy management system; provided that the electric vehicle energy management system is capable of providing no less than 3.4 kilowatts of electricity to each parking stall." SECTION 4. Section 196-2, Hawaii Revised Statutes, is amended by adding two new definitions to be appropriately inserted and to read as follows: ""Electric vehicle charger ready" means having sufficient wire, conduit, raceway, termination point to support a minimum of 40-ampere, 208 or 240-volt branch circuit, and electrical panel capacity suitable to provide Level 2 charging consistent with an "alternating current Level 2 charging station" as that term is defined in section 26972. "Electric vehicle energy management system" means a system used to control electric vehicle charger loads through the process of connecting, disconnecting, increasing, or reducing electric power to the loads." SECTION 5. Section 269-72, Hawaii Revised Statutes, is amended by amending subsection (j) to read as follows: "(j) As used in this section: "Alternating current Level 2 charging station", commonly referred to as "Level 2 charging station", means an electric vehicle charging system that utilizes alternating current electricity providing at least three kilowatts and means a system that: (1) Is capable of providing electricity from a non-vehicle source to charge the batteries of one or more electric vehicles; (2) Meets recognized standards and protocols including, but not limited to, Society of Automotive Engineers (SAE) J1772 of SAE International [and] or Tesla protocol; and (3) Is designed and installed in compliance with article 625 of the National Electrical Code to appropriate Nationally Recognized Testing Laboratories' standards. "Applicant" means an individual; non-profit or for-profit corporation; local, state, or federal government agency; homeowner association; or any other eligible entity as defined under rules adopted for the electric vehicle charging system rebate program. "Direct current fast charging system", commonly referred to as "DC fast charging system", means an electric vehicle charging system that utilizes direct current electricity providing forty kilowatts or greater and: (1) Is capable of providing electricity from a non-vehicle source to charge the batteries of one or more electric vehicles; (2) Meets recognized standards and protocols, including, but not limited to, Society of Automotive Engineers (SAE) J1772 of SAE International, Tesla protocol, [and] or CHAdeMO protocol; and (3) Is designed and installed in compliance with article 625 of the National Electrical Code to appropriate Nationally Recognized Testing Laboratories' standards. "Electric vehicle charging system" has the same meaning as Electric Vehicle Supply Equipment as defined in article 625.2 of the National Electrical Code, as amended." SECTION 6. Statutory material to be repealed is bracketed and stricken. New statutory material is underscored. SECTION 7. This Act shall take effect on July 1, 2050.
47+ SECTION 1. The legislature finds that Hawaii currently has over one million gasolinepowered vehicles on its roads, which emit nearly five million metric tons of climatechanging carbon pollution annually. The legislature also finds that Hawaii residents, businesses, and visitors spent over $1,700,000,000 on gasoline in 2019. Electric vehicles play an integral role in Hawaii's clean energy future. The legislature finds that electric vehicles are much less expensive to power per mile than gasoline-powered vehicles. By using stored electrical energy, electric vehicles can take advantage of intermittent solar, wind, and other clean energy resources. With the continued growth of an intelligent electricity grid, electric vehicles become an essential component to electricity load and clean energy resource balancing. Electric vehicles also provide clean mobility solutions for Hawaii residents and visitors. The legislature finds that just over one per cent of all registered vehicles in Hawaii are electric. This number is expected to rise exponentially as more electric vehicles come to market, vehicle ranges increase, and the cost of electric vehicles decreases. In fact, the number of registered electric vehicles in Hawaii increased about twenty per cent during 2020, while the number of registered gasolinepowered vehicles decreased about three per cent. While there is growing interest in electric vehicles among Hawaii residents, the lack of adequate vehicle charging infrastructure presents a key barrier to their acquisition. The International Energy Agency has found that the availability of chargers emerged as one of the key factors for contributing to the market penetration of electric vehicles. More than eighty per cent of electric vehicle drivers charge their cars at home or at work; however, a large share of Hawaii's population lives in high density, multi-family dwellings, and the vast majority of parking facilities in these buildings currently are not being built to accommodate electric vehicle chargers. The legislature further finds that requiring that all new parking stalls be electric vehicle ready will result in significant long-term savings for residents. When electric vehicle readiness is considered in the design of a building or parking area, decisions about the lowest cost layout can be made, thereby allowing building owners and operators to reduce the financial burden of modifying or upgrading electrical systems later. It also helps to avoid additional construction costs and the means of trenching or boring to lay conduit for electric vehicle charger installation. Realizing that residents would save about ninety per cent on electric vehicle charger installation costs if parking stalls were built in advance to be electric vehicle charger ready, rather than retrofitted postconstruction, the city of Vancouver, British Columbia, required that all nonvisitor parking stalls be electric vehicle charger ready starting January 2019. To be electric vehicle charger ready, parking stalls need sufficient wire, conduit, electrical panel service capacity, overcurrent protection devices, and suitable termination points to connect to an electric vehicle charger. Vancouver's law allows for an energy management system to control the overall electricity demand from the electric vehicle charging, thereby reducing the upfront electrical capacity investment. In addition, electric vehicle charger ready buildings in the public domain are essential for individuals who visit government buildings for public services and who work there. The legislature finds that electric vehicle charging infrastructure in state buildings will help pave the way for addressing current and future growing electric vehicle charging needs. The purpose of this Act is to prohibit the issuance of building permits for certain new multi-family residential building and commercial building applications and new state building applications initiated on or after January l, 2022, unless the building's parking stalls are electric vehicle charger ready. SECTION 2. Chapter 103, Hawaii Revised Statutes, is amended by adding a new section to part II to be appropriately designated and to read as follows: "§103- Electric vehicle charger ready; new state buildings. (a) On or after January 1, 2022, no building permit shall be issued for any new state building, unless the building's parking stalls are electric vehicle charger ready as defined in this section; provided that this section shall not apply to building permits issued for applications that were initiated prior to January 1, 2022. (b) Buildings subject to the requirements of subsection (a) may implement an electric vehicle energy management system; provided that the electric vehicle energy management system is capable of providing no less than forty kilowatt-hours of electricity to each parking stall over a twentyfourhour period. (c) As used in this section: "Electric vehicle charger ready" means having sufficient wire, conduit, raceway, termination point, and electrical panel capacity suitable to provide Level 2 charging consistent with an "alternating current Level 2 charging station" as that term is defined in section 26972. "Electric vehicle energy management system" means a system used to control electric vehicle charger loads through the process of connecting, disconnecting, increasing, or reducing electric power to the loads." SECTION 3. Chapter 196, Hawaii Revised Statutes, is amended by adding a new section to part I to be appropriately designated and to read as follows: "§196- Electric vehicle charger ready; new multi-family residential buildings and new commercial buildings. (a) On or after January 1, 2022, no building permit shall be issued for any new: (1) Multifamily residential building that has ten or more parking stalls; or (2) Commercial building that has twenty or more parking stalls, unless the building's parking stalls are electric vehicle charger ready as defined in this chapter; provided that this section shall not apply to building permits issued for applications that were initiated prior to January 1, 2022. (b) Buildings subject to the requirements of subsection (a) may implement an electric vehicle energy management system; provided that the electric vehicle energy management system is capable of providing no less than forty kilowatt-hours of electricity to each parking stall over a twentyfourhour period." SECTION 4. Section 196-2, Hawaii Revised Statutes, is amended by adding two new definitions to be appropriately inserted and to read as follows: ""Electric vehicle charger ready" means having sufficient wire, conduit, raceway, termination point, and electrical panel capacity suitable to provide Level 2 charging consistent with an "alternating current Level 2 charging station" as that term is defined in section 26972. "Electric vehicle energy management system" means a system used to control electric vehicle charger loads through the process of connecting, disconnecting, increasing, or reducing electric power to the loads." SECTION 5. New statutory material is underscored. SECTION 6. This Act shall take effect on July 1, 2021. INTRODUCED BY: _____________________________
4848
4949 SECTION 1. The legislature finds that Hawaii currently has over one million gasolinepowered vehicles on its roads, which emit nearly five million metric tons of climatechanging carbon pollution annually. The legislature also finds that Hawaii residents, businesses, and visitors spent over $1,700,000,000 on gasoline in 2019.
5050
51- Electric vehicles play an integral role in Hawaii's clean energy future. The legislature further finds that electric vehicles are much less expensive to power per mile than gasoline-powered vehicles. By using stored electrical energy, electric vehicles can take advantage of intermittent solar, wind, and other clean energy resources.
51+ Electric vehicles play an integral role in Hawaii's clean energy future. The legislature finds that electric vehicles are much less expensive to power per mile than gasoline-powered vehicles. By using stored electrical energy, electric vehicles can take advantage of intermittent solar, wind, and other clean energy resources.
5252
5353 With the continued growth of an intelligent electricity grid, electric vehicles become an essential component to electricity load and clean energy resource balancing. Electric vehicles also provide clean mobility solutions for Hawaii residents and visitors.
5454
5555 The legislature finds that just over one per cent of all registered vehicles in Hawaii are electric. This number is expected to rise exponentially as more electric vehicles come to market, vehicle ranges increase, and the cost of electric vehicles decreases. In fact, the number of registered electric vehicles in Hawaii increased about twenty per cent during 2020, while the number of registered gasolinepowered vehicles decreased about three per cent.
5656
5757 While there is growing interest in electric vehicles among Hawaii residents, the lack of adequate vehicle charging infrastructure presents a key barrier to their acquisition. The International Energy Agency has found that the availability of chargers emerged as one of the key factors for contributing to the market penetration of electric vehicles. More than eighty per cent of electric vehicle drivers charge their cars at home or at work; however, a large share of Hawaii's population lives in high density, multi-family dwellings, and the vast majority of parking facilities in these buildings currently are not being built to accommodate electric vehicle chargers.
5858
5959 The legislature further finds that requiring that all new parking stalls be electric vehicle ready will result in significant long-term savings for residents. When electric vehicle readiness is considered in the design of a building or parking area, decisions about the lowest cost layout can be made, thereby allowing building owners and operators to reduce the financial burden of modifying or upgrading electrical systems later. It also helps to avoid additional construction costs and the means of trenching or boring to lay conduit for electric vehicle charger installation.
6060
6161 Realizing that residents would save about ninety per cent on electric vehicle charger installation costs if parking stalls were built in advance to be electric vehicle charger ready, rather than retrofitted postconstruction, the city of Vancouver, British Columbia, required that all nonvisitor parking stalls be electric vehicle charger ready starting January 2019. To be electric vehicle charger ready, parking stalls need sufficient wire, conduit, electrical panel service capacity, overcurrent protection devices, and suitable termination points to connect to an electric vehicle charger. Vancouver's law allows for an energy management system to control the overall electricity demand from the electric vehicle charging, thereby reducing the upfront electrical capacity investment.
6262
63- In addition, electric vehicle charger ready buildings in the public domain are essential for individuals who visit government buildings for public services and who work there. The legislature also finds that electric vehicle charging infrastructure in state buildings will help pave the way for addressing current and future growing electric vehicle charging needs.
63+ In addition, electric vehicle charger ready buildings in the public domain are essential for individuals who visit government buildings for public services and who work there. The legislature finds that electric vehicle charging infrastructure in state buildings will help pave the way for addressing current and future growing electric vehicle charging needs.
6464
6565 The purpose of this Act is to prohibit the issuance of building permits for certain new multi-family residential building and commercial building applications and new state building applications initiated on or after January l, 2022, unless the building's parking stalls are electric vehicle charger ready.
6666
6767 SECTION 2. Chapter 103, Hawaii Revised Statutes, is amended by adding a new section to part II to be appropriately designated and to read as follows:
6868
6969 "§103- Electric vehicle charger ready; new state buildings. (a) On or after January 1, 2022, no building permit shall be issued for any new state building, unless the building's parking stalls are electric vehicle charger ready as defined in this section; provided that this section shall not apply to building permits issued for applications that were initiated prior to January 1, 2022.
7070
71- (b) Buildings subject to the requirements of subsection (a) may implement an electric vehicle energy management system; provided that the electric vehicle energy management system is capable of providing no less than 3.4 kilowatts of electricity to each parking stall.
71+ (b) Buildings subject to the requirements of subsection (a) may implement an electric vehicle energy management system; provided that the electric vehicle energy management system is capable of providing no less than forty kilowatt-hours of electricity to each parking stall over a twentyfourhour period.
7272
7373 (c) As used in this section:
7474
75- "Electric vehicle charger ready" means having sufficient wire, conduit, raceway, termination point to support a minimum of 40-ampere, 208 or 240-volt branch circuit, and electrical panel capacity suitable to provide Level 2 charging consistent with an "alternating current Level 2 charging station" as that term is defined in section 26972.
75+ "Electric vehicle charger ready" means having sufficient wire, conduit, raceway, termination point, and electrical panel capacity suitable to provide Level 2 charging consistent with an "alternating current Level 2 charging station" as that term is defined in section 26972.
7676
7777 "Electric vehicle energy management system" means a system used to control electric vehicle charger loads through the process of connecting, disconnecting, increasing, or reducing electric power to the loads."
7878
7979 SECTION 3. Chapter 196, Hawaii Revised Statutes, is amended by adding a new section to part I to be appropriately designated and to read as follows:
8080
8181 "§196- Electric vehicle charger ready; new multi-family residential buildings and new commercial buildings. (a) On or after January 1, 2022, no building permit shall be issued for any new:
8282
8383 (1) Multifamily residential building that has ten or more parking stalls; or
8484
8585 (2) Commercial building that has twenty or more parking stalls,
8686
8787 unless the building's parking stalls are electric vehicle charger ready as defined in this chapter; provided that this section shall not apply to building permits issued for applications that were initiated prior to January 1, 2022.
8888
89- (b) Buildings subject to the requirements of subsection (a) may implement an electric vehicle energy management system; provided that the electric vehicle energy management system is capable of providing no less than 3.4 kilowatts of electricity to each parking stall."
89+ (b) Buildings subject to the requirements of subsection (a) may implement an electric vehicle energy management system; provided that the electric vehicle energy management system is capable of providing no less than forty kilowatt-hours of electricity to each parking stall over a twentyfourhour period."
9090
9191 SECTION 4. Section 196-2, Hawaii Revised Statutes, is amended by adding two new definitions to be appropriately inserted and to read as follows:
9292
93- ""Electric vehicle charger ready" means having sufficient wire, conduit, raceway, termination point to support a minimum of 40-ampere, 208 or 240-volt branch circuit, and electrical panel capacity suitable to provide Level 2 charging consistent with an "alternating current Level 2 charging station" as that term is defined in section 26972.
93+ ""Electric vehicle charger ready" means having sufficient wire, conduit, raceway, termination point, and electrical panel capacity suitable to provide Level 2 charging consistent with an "alternating current Level 2 charging station" as that term is defined in section 26972.
9494
9595 "Electric vehicle energy management system" means a system used to control electric vehicle charger loads through the process of connecting, disconnecting, increasing, or reducing electric power to the loads."
9696
97- SECTION 5. Section 269-72, Hawaii Revised Statutes, is amended by amending subsection (j) to read as follows:
97+ SECTION 5. New statutory material is underscored.
9898
99- "(j) As used in this section:
99+ SECTION 6. This Act shall take effect on July 1, 2021.
100100
101- "Alternating current Level 2 charging station", commonly referred to as "Level 2 charging station", means an electric vehicle charging system that utilizes alternating current electricity providing at least three kilowatts and means a system that:
102101
103- (1) Is capable of providing electricity from a non-vehicle source to charge the batteries of one or more electric vehicles;
104102
105- (2) Meets recognized standards and protocols including, but not limited to, Society of Automotive Engineers (SAE) J1772 of SAE International [and] or Tesla protocol; and
103+INTRODUCED BY: _____________________________
106104
107- (3) Is designed and installed in compliance with article 625 of the National Electrical Code to appropriate Nationally Recognized Testing Laboratories' standards.
105+INTRODUCED BY:
108106
109- "Applicant" means an individual; non-profit or for-profit corporation; local, state, or federal government agency; homeowner association; or any other eligible entity as defined under rules adopted for the electric vehicle charging system rebate program.
107+_____________________________
110108
111- "Direct current fast charging system", commonly referred to as "DC fast charging system", means an electric vehicle charging system that utilizes direct current electricity providing forty kilowatts or greater and:
112109
113- (1) Is capable of providing electricity from a non-vehicle source to charge the batteries of one or more electric vehicles;
114110
115- (2) Meets recognized standards and protocols, including, but not limited to, Society of Automotive Engineers (SAE) J1772 of SAE International, Tesla protocol, [and] or CHAdeMO protocol; and
116111
117- (3) Is designed and installed in compliance with article 625 of the National Electrical Code to appropriate Nationally Recognized Testing Laboratories' standards.
118112
119- "Electric vehicle charging system" has the same meaning as Electric Vehicle Supply Equipment as defined in article 625.2 of the National Electrical Code, as amended."
113+ Report Title: Electric Vehicles; Charger Ready Parking Stalls; New Construction Permits Description: Prohibits the issuance of certain new residential multi-family and commercial building application permits and new state building application permits initiated on or after January 1, 2022, unless the building's parking stalls are electric vehicle charger ready. Allows such buildings to implement an electric vehicle energy management system. The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
120114
121- SECTION 6. Statutory material to be repealed is bracketed and stricken. New statutory material is underscored.
122115
123- SECTION 7. This Act shall take effect on July 1, 2050.
124-
125- Report Title: Electric Vehicles; Charger Ready Parking Stalls; New Construction Permits Description: Prohibits the issuance of certain new residential multi-family and commercial building application permits and new state building application permits initiated on or after January 1, 2022, unless the building's parking stalls are electric vehicle charger ready. Allows such buildings to implement an electric vehicle energy management system. Effective 7/1/2050. (HD1) The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.
126116
127117
128118
129119 Report Title:
130120
131121 Electric Vehicles; Charger Ready Parking Stalls; New Construction Permits
132122
133123
134124
135125 Description:
136126
137-Prohibits the issuance of certain new residential multi-family and commercial building application permits and new state building application permits initiated on or after January 1, 2022, unless the building's parking stalls are electric vehicle charger ready. Allows such buildings to implement an electric vehicle energy management system. Effective 7/1/2050. (HD1)
127+Prohibits the issuance of certain new residential multi-family and commercial building application permits and new state building application permits initiated on or after January 1, 2022, unless the building's parking stalls are electric vehicle charger ready. Allows such buildings to implement an electric vehicle energy management system.
138128
139129
140130
141131
142132
143133
144134