| 1 | + | 103RD GENERAL ASSEMBLY State of Illinois 2023 and 2024 HB1616 Introduced , by Rep. Lawrence "Larry" Walsh, Jr. SYNOPSIS AS INTRODUCED: 415 ILCS 5/22.60 Amends the Environmental Protection Act. Requires permitting and construction to commence prior to July 1, 2027 (rather than 2025) before a pilot project allowing for a pyrolysis or gasification facility is permitted for a locally zoned and approved site in either Will County or Grundy County. Makes a conforming change to language regarding repealing the provisions. Effective immediately. LRB103 25587 CPF 51936 b A BILL FOR 103RD GENERAL ASSEMBLY State of Illinois 2023 and 2024 HB1616 Introduced , by Rep. Lawrence "Larry" Walsh, Jr. SYNOPSIS AS INTRODUCED: 415 ILCS 5/22.60 415 ILCS 5/22.60 Amends the Environmental Protection Act. Requires permitting and construction to commence prior to July 1, 2027 (rather than 2025) before a pilot project allowing for a pyrolysis or gasification facility is permitted for a locally zoned and approved site in either Will County or Grundy County. Makes a conforming change to language regarding repealing the provisions. Effective immediately. LRB103 25587 CPF 51936 b LRB103 25587 CPF 51936 b A BILL FOR |
---|
| 2 | + | 103RD GENERAL ASSEMBLY State of Illinois 2023 and 2024 HB1616 Introduced , by Rep. Lawrence "Larry" Walsh, Jr. SYNOPSIS AS INTRODUCED: |
---|
| 3 | + | 415 ILCS 5/22.60 415 ILCS 5/22.60 |
---|
| 4 | + | 415 ILCS 5/22.60 |
---|
| 5 | + | Amends the Environmental Protection Act. Requires permitting and construction to commence prior to July 1, 2027 (rather than 2025) before a pilot project allowing for a pyrolysis or gasification facility is permitted for a locally zoned and approved site in either Will County or Grundy County. Makes a conforming change to language regarding repealing the provisions. Effective immediately. |
---|
| 6 | + | LRB103 25587 CPF 51936 b LRB103 25587 CPF 51936 b |
---|
| 7 | + | LRB103 25587 CPF 51936 b |
---|
| 8 | + | A BILL FOR |
---|
| 9 | + | HB1616LRB103 25587 CPF 51936 b HB1616 LRB103 25587 CPF 51936 b |
---|
| 10 | + | HB1616 LRB103 25587 CPF 51936 b |
---|
3 | 11 | | 1 AN ACT concerning safety. |
---|
4 | 12 | | 2 Be it enacted by the People of the State of Illinois, |
---|
5 | 13 | | 3 represented in the General Assembly: |
---|
6 | 14 | | 4 Section 5. The Environmental Protection Act is amended by |
---|
7 | 15 | | 5 changing Section 22.60 as follows: |
---|
8 | 16 | | 6 (415 ILCS 5/22.60) |
---|
9 | 17 | | 7 (For Section repeal see subsection (e)) |
---|
10 | 18 | | 8 Sec. 22.60. Pilot project for Will County and Grundy |
---|
11 | 19 | | 9 County pyrolysis or gasification facility. |
---|
12 | 20 | | 10 (a) As used in this Section: |
---|
13 | 21 | | 11 "Plastics" means polystyrene or any other synthetic |
---|
14 | 22 | | 12 organic polymer that can be molded into shape under heat and |
---|
15 | 23 | | 13 pressure and then set into a rigid or slightly elastic form. |
---|
16 | 24 | | 14 "Plastics gasification facility" means a manufacturing |
---|
17 | 25 | | 15 facility that: |
---|
18 | 26 | | 16 (1) receives only uncontaminated plastics that have |
---|
19 | 27 | | 17 been processed prior to receipt at the facility into a |
---|
20 | 28 | | 18 feedstock meeting the facility's specifications for a |
---|
21 | 29 | | 19 gasification feedstock; and |
---|
22 | 30 | | 20 (2) uses heat in an oxygen-deficient atmosphere to |
---|
23 | 31 | | 21 process the feedstock into fuels, chemicals, or chemical |
---|
24 | 32 | | 22 feedstocks that are returned to the economic mainstream in |
---|
25 | 33 | | 23 the form of raw materials or products. |
---|
26 | 34 | | |
---|
27 | 35 | | |
---|
28 | 36 | | |
---|
34 | 68 | | 1 "Plastics pyrolysis facility" means a manufacturing |
---|
35 | 69 | | 2 facility that: |
---|
36 | 70 | | 3 (1) receives only uncontaminated plastics that have |
---|
37 | 71 | | 4 been processed prior to receipt at the facility into a |
---|
38 | 72 | | 5 feedstock meeting the facility's specifications for a |
---|
39 | 73 | | 6 pyrolysis feedstock; and |
---|
40 | 74 | | 7 (2) uses heat in the absence of oxygen to process the |
---|
41 | 75 | | 8 uncontaminated plastics into fuels, chemicals, or chemical |
---|
42 | 76 | | 9 feedstocks that are returned to the economic mainstream in |
---|
43 | 77 | | 10 the form of raw materials or products. |
---|
44 | 78 | | 11 (b) Provided that permitting and construction has |
---|
45 | 79 | | 12 commenced prior to July 1, 2027 2025, a pilot project allowing |
---|
46 | 80 | | 13 for a pyrolysis or gasification facility in accordance with |
---|
47 | 81 | | 14 this Section is permitted for a locally zoned and approved |
---|
48 | 82 | | 15 site in either Will County or Grundy County. |
---|
49 | 83 | | 16 (c) To the extent allowed by federal law, uncontaminated |
---|
50 | 84 | | 17 plastics that have been processed into a feedstock meeting |
---|
51 | 85 | | 18 feedstock specifications for a plastics gasification facility |
---|
52 | 86 | | 19 or plastics pyrolysis facility, and that are further processed |
---|
53 | 87 | | 20 by such a facility and returned to the economic mainstream in |
---|
54 | 88 | | 21 the form of raw materials or products, are considered recycled |
---|
55 | 89 | | 22 and are not subject to regulation as waste. |
---|
56 | 90 | | 23 (d) The Agency may propose to the Board for adoption, and |
---|
57 | 91 | | 24 the Board may adopt, rules establishing standards for |
---|
58 | 92 | | 25 materials accepted as feedstocks by plastics gasification |
---|
59 | 93 | | 26 facilities and plastics pyrolysis facilities, rules |
---|
60 | 94 | | |
---|
61 | 95 | | |
---|
62 | 96 | | |
---|
63 | 97 | | |
---|
64 | 98 | | |
---|
70 | 104 | | 1 establishing standards for the management of feedstocks at |
---|
71 | 105 | | 2 plastics gasification facilities and plastics pyrolysis |
---|
72 | 106 | | 3 facilities, and any other rules, as may be necessary to |
---|
73 | 107 | | 4 implement and administer this Section. |
---|
74 | 108 | | 5 (e) If permitting and construction for the pilot project |
---|
75 | 109 | | 6 under subsection (b) has not commenced by July 1, 2027 2025, |
---|
76 | 110 | | 7 this Section is repealed. |
---|
77 | 111 | | 8 (Source: P.A. 101-141, eff. 7-1-20; 102-558, eff. 8-20-21.) |
---|
78 | 112 | | 9 Section 99. Effective date. This Act takes effect upon |
---|
79 | 113 | | 10 becoming law. |
---|
80 | 114 | | |
---|
81 | 115 | | |
---|
82 | 116 | | |
---|
83 | 117 | | |
---|
84 | 118 | | |
---|