Introduced Version SENATE CONCURRENT RESOLUTION No. _____ DIGEST OF INTRODUCED RESOLUTION A CONCURRENT RESOLUTION congratulating the Indiana Department of Transportation, HNTB Corporation, Walsh Construction, and their many partners on having a portion of Interstate 69 Finish Line, located in Martinsville and Morgan County, Indiana, recognized as the top roadway project in the United States for 2022. BRAY , read first time and referred to Committee on 2023 RC 1524/DI SM Introduced First Regular Session 123rd General Assembly (2023) SENATE CONCURRENT RESOLUTION No. _____ 1 A CONCURRENT RESOLUTION congratulating the 2 Indiana Department of Transportation, HNTB Corporation, 3 Walsh Construction, and their many partners on having a 4 portion of Interstate 69 Finish Line, located in Martinsville and 5 Morgan County, Indiana, recognized as the top roadway project 6 in the United States for 2022. 7 Whereas, The Interstate 69 (I-69) Finish Line is a 8 realization of 75 years of community studies and discussions to 9 connect Evansville to Indianapolis through 142 miles of an 10 improved, multi-lane highway system; 11 Whereas, The final 26 mile section of interstate, spanning 12 from Martinsville to Indianapolis, was split into five 13 construction contracts to create 35 lane miles of local access 14 roads and 39 new bridges, rehabilitate 35 existing bridges, and 15 remove 14 traffic signals in order to reduce regional annual 16 crash numbers by 1,300 and generate $4.1 billion in economic 17 impact over the next twenty years; 18 Whereas, The I-69 Finish Line's Contract 2 was awarded 19 to Walsh Construction and focused on six miles of State Road 20 37 through Martinsville that serves as a crucial road in the city 21 and includes heavily-used access points to multiple businesses, 22 and was the only I-69 contract that had to remove an existing 23 highway passing through a city to replace it with an interstate; 24 Whereas, State, county, and municipal stakeholders 25 coordinated to fully close the corridor during construction, 26 which ensured the safety of workers and motorists, accelerated 2023 RC 1524/DI SM 2 1 road completion of Contract 2 by a full year, and assisted 2 Contract 4, which was awarded to Reith-Riley Construction 3 and encompassed the area from Martinsville to State Road 144, 4 to be accelerated due to lower traffic volumes; 5 Whereas, The planning and construction phases of 6 Contract 2 experienced multiple challenges, including the need 7 to reevaluate stormwater drainage patterns and management 8 to support the abundance and quality of groundwater, moving 9 and locating various utility lines from at least sixteen different 10 utility companies, keeping open communication with businesses 11 and Indiana University to limit impacts, and engaging with a 12 new local administration regarding the project's background 13 and upcoming activities; 14 Whereas, The project team gave particular attention to 15 creating community cohesiveness by constructing gateway 16 monuments reminiscent of the Morgan County Courthouse 17 Clock Tower inside the interchanges of State Roads 39 and 44, 18 and replicated the brick samples of the Morgan County 19 Courthouse into nearly 1.4 miles of noise barriers; 20 Whereas, Collaborative planning by hundreds of engineers, 21 planners, and the local community resulted in a final product 22 that not only serves the transportation needs of Hoosiers, but 23 also aesthetically reflects the historic character of Martinsville 24 and Morgan County; and 25 Whereas, Portions of the I-69 Finish Line were completed 26 and opened to traffic by December 21, 2021, exhibiting a high 27 quality of design, construction, and traffic maintenance that 28 resulted in Roads and Bridges magazine recognizing it as the 29 top roadway project in the United States during its 2022 annual 30 review of major construction projects and enhancing Indiana's 31 reputation as the "Crossroads of America": Therefore, 32 Be it resolved by the Senate of the General Assembly 33 of the State of Indiana, the House of Representatives 34 concurring: 35 SECTION 1. That the Indiana General Assembly 2023 RC 1524/DI SM 3 1 congratulates the Indiana Department of Transportation, HNTB 2 Corporation, Walsh Construction, and their many partners on 3 having a portion of Interstate 69 Finish Line, located in 4 Martinsville and Morgan County, Indiana, recognized as the top 5 roadway project in the United States for 2022. 6 SECTION 2. The Secretary of the Senate is hereby directed 7 to transmit copies of this Resolution to Michael Smith, 8 Commissioner of the Indiana Department of Transportation 9 (INDOT), the INDOT Central Office, INDOT Major Projects 10 Division, INDOT Seymour District office, Butler, Fairman, & 11 Seufert Inc., CDM Smith, Corradino LLC, Crawford, Murphy, 12 & Tilly Inc., HNTB Corporation, Lochmueller Group, Rieth- 13 Riley Construction, Walsh Construction, and WSP. 2023 RC 1524/DI SM