11
22
33 EXPLANATION: CAPITALS INDICATE MAT TER ADDED TO EXISTIN G LAW.
44 [Brackets] indicate matter deleted from existing law.
55 *sb0640*
66
77 SENATE BILL 640
88 C5 5lr3076
99 CF HB 742
1010 By: Senator Gallion
1111 Introduced and read first time: January 25, 2025
1212 Assigned to: Education, Energy, and the Environment
1313
1414 A BILL ENTITLED
1515
1616 AN ACT concerning 1
1717
1818 Public Utilities – Solar Energy Generating Stations – Eminent Domain 2
1919
2020 FOR the purpose of prohibiting a person constructing a solar energy generating station 3
2121 from exercising a right of condemnation in connection with that construction; and 4
2222 generally relating to the construction of solar energy generating stations. 5
2323
2424 BY repealing and reenacting, with amendments, 6
2525 Article – Public Utilities 7
2626 Section 7–207(b)(2) 8
2727 Annotated Code of Maryland 9
2828 (2020 Replacement Volume and 2024 Supplement) 10
2929
3030 BY repealing and reenacting, without amendments, 11
3131 Article – Public Utilities 12
3232 Section 7–207.1(c)(1), 7–207.2(b), and 7–208(b) 13
3333 Annotated Code of Maryland 14
3434 (2020 Replacement Volume and 2024 Supplement) 15
3535
3636 BY adding to 16
3737 Article – Public Utilities 17
3838 Section 7–207.1(h), 7–207.2(e), and 7–208(k) 18
3939 Annotated Code of Maryland 19
4040 (2020 Replacement Volume and 2024 Supplement) 20
4141
4242 SECTION 1. BE IT ENACTED BY THE GENERAL ASSEMBLY OF MARYLAND, 21
4343 That the Laws of Maryland read as follows: 22
4444
4545 Article – Public Utilities 23
4646
4747 7–207. 24
4848 2 SENATE BILL 640
4949
5050
5151 (b) (2) (I) Unless a certificate of public convenience and necessity for the 1
5252 construction is first obtained from the Commission, and the Commission has found that the 2
5353 capacity is necessary to ensure a sufficient supply of electricity to customers in the State, a 3
5454 person may not exercise a right of condemnation in connection with the construction of a 4
5555 generating station. 5
5656
5757 (II) NOTWITHSTANDING SUBPA RAGRAPH (I) OF THIS 6
5858 PARAGRAPH , A PERSON MAY NOT EXE RCISE A RIGHT OF CONDEMNATION IN 7
5959 CONNECTION WITH THE CONSTRUCTION OF A SO LAR ENERGY GENERATIN G STATION 8
6060 UNDER THIS SECTION . 9
6161
6262 7–207.1. 10
6363
6464 (c) (1) The Commission shall require a person that is exempted from the 11
6565 requirement to obtain a certificate of public convenience and necessity to obtain approval 12
6666 from the Commission under this section before the person may construct a generating 13
6767 station described in subsection (b) of this section. 14
6868
6969 (H) A PERSON MAY NOT EXERC ISE A RIGHT OF CONDE MNATION IN 15
7070 CONNECTION WITH THE CONSTRUCTION OF A SOLAR ENERGY GENER ATING STATION 16
7171 UNDER THIS SECTION . 17
7272
7373 7–207.2. 18
7474
7575 (b) This section applies to a person who constructs a generating station that: 19
7676
7777 (1) has the capacity to produce more than 2 megawatts of electricity, as 20
7878 measured by the alternating current rating of the system’s inverter, from a solar 21
7979 photovoltaic system; and 22
8080
8181 (2) is exempted under § 7–207(b)(1)(ii) of this subtitle from the requirement 23
8282 to obtain a certificate of public convenience and necessity. 24
8383
8484 (E) A PERSON MAY NOT EXERC ISE A RIGHT O F CONDEMNATION IN 25
8585 CONNECTION WITH THE CONSTRUCTION OF A SO LAR PHOTOVOLTAIC SYS TEM 26
8686 UNDER THIS SECTION . 27
8787
8888 7–208. 28
8989
9090 (b) This section applies to any person: 29
9191
9292 (1) constructing a generating station and its associated overhead 30
9393 transmission lines designed to carry a voltage in excess of 69,000 volts; 31
9494
9595 (2) exercising the right of condemnation in connection with the 32
9696 construction; or 33 SENATE BILL 640 3
9797
9898
9999
100100 (3) constructing a qualified submerged renewable energy line. 1
101101
102102 (K) A PERSON MAY NOT EXERC ISE A RIGHT OF CONDE MNATION IN 2
103103 CONNECTION WITH THE CONSTRUCTION OF A SO LAR ENERGY GENERATIN G STATION 3
104104 UNDER THIS SECTION . 4
105105
106106 SECTION 2. AND BE IT FURTHER ENACTED, That this Act shall take effect 5
107107 October 1, 2025. 6
108108