Minnesota 2025-2026 Regular Session

Minnesota Senate Bill SF1455 Latest Draft

Bill / Introduced Version Filed 02/13/2025

                            1.1	A bill for an act​
1.2 relating to energy; modifying the definition of large energy facility; amending​
1.3 Minnesota Statutes 2024, section 216B.2421, subdivision 2.​
1.4BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:​
1.5 Section 1. Minnesota Statutes 2024, section 216B.2421, subdivision 2, is amended to read:​
1.6 Subd. 2.Large energy facility."Large energy facility" means:​
1.7 (1) any electric power generating plant or combination of plants at a single site with a​
1.8combined capacity of 50,000 kilowatts or more and transmission lines directly associated​
1.9with the plant that are necessary to interconnect the plant to the transmission system;​
1.10 (2) any high-voltage transmission line with a capacity of 300 kilovolts or more and​
1.11greater than one mile in length in Minnesota;​
1.12 (3) any high-voltage transmission line with a capacity of 100 kilovolts or more with​
1.13more than ten miles of its length in Minnesota;​
1.14 (4) any pipeline greater than six inches in diameter and having more than 50 miles of​
1.15its length in Minnesota used for the transportation of coal, crude petroleum or petroleum​
1.16fuels or oil, or their derivatives;​
1.17 (5) any pipeline for transporting natural or synthetic gas at pressures in excess of 200​
1.18pounds per square inch with more than 50 miles of its length in Minnesota;​
1.19 (6) any facility designed for or capable of storing on a single site more than 100,000​
1.201,000,000 gallons of liquefied natural gas or synthetic gas;​
1.21 (7) any underground gas storage facility requiring a permit pursuant to section 103I.681;​
1​Section 1.​
25-02995 as introduced​02/05/25 REVISOR RSI/MI​
SENATE​
STATE OF MINNESOTA​
S.F. No. 1455​NINETY-FOURTH SESSION​
(SENATE AUTHORS: HOFFMAN and Rarick)​
OFFICIAL STATUS​D-PG​DATE​
Introduction and first reading​02/17/2025​
Referred to Energy, Utilities, Environment, and Climate​ 2.1 (8) any nuclear fuel processing or nuclear waste storage or disposal facility; and​
2.2 (9) any facility intended to convert any material into any other combustible fuel and​
2.3having the capacity to process in excess of 75 tons of the material per hour.​