Texas 2017 - 85th Regular

Texas Senate Bill SB1506 Latest Draft

Bill / Introduced Version Filed 03/08/2017

                            85R2003 BEE-F
 By: Hinojosa S.B. No. 1506


 A BILL TO BE ENTITLED
 AN ACT
 relating to mechanic's, contractor's, or materialman's liens;
 authorizing a fee; changing the eligibility for community
 supervision.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  Section 3503.051(3), Insurance Code, is amended
 to read as follows:
 (3)  "Notice of claim" means a written notification by
 a claimant who makes a claim for payment from the surety
 company.  The term does not include a routine statutory notice
 required by [Section 53.056(b), 53.057, 53.058, 53.252(b), or
 53.253, Property Code, or] Section 2253.047, Government Code.
 SECTION 2.  Section 53.001, Property Code, is amended by
 amending Subdivisions (2), (12), (13), and (14) and adding
 Subdivisions (2-a), (3-a), (5-a), (5-b), (5-c), (7-a), and (7-b) to
 read as follows:
 (2)  "Improved" means, in reference to real property,
 having an improvement, as defined by this section.
 (2-a)  "Improvement" means a house, building, or other
 improvement to the real property of an owner.  The term includes:
 (A)  improvements constructed adjacent to the
 real property under an original contract with the owner, including
 [abutting] sidewalks and streets and utilities in or on those
 sidewalks and streets;
 (B)  clearing, grubbing, draining, or fencing of
 land;
 (C)  wells, cisterns, tanks, reservoirs, or
 artificial lakes or pools made for supplying or storing water;
 (D)  pumps, siphons, and windmills or other
 machinery or apparatuses used for raising water for stock, domestic
 use, or irrigation; [and]
 (E)  planting orchard trees, grubbing out
 orchards and replacing trees, and pruning of orchard trees;
 (F)  levees or embankments erected for the
 reclamation of overflow land along a river or creek; and
 (G)  railroads.
 (3-a)  "Lien website" means the Internet website
 established under Subchapter A-1.
 (5-a)  "Notice of commencement" means a notice
 described by Section 53.125.
 (5-b)  "Notice of demand" means a notice described by
 Section 53.0521.
 (5-c)  "Notice of furnishing" is a notice required
 under Section 53.0561.
 (7-a)  "Owner" means a person who owns any interest in
 real property or an authorized agent, trustee, or receiver of the
 person.
 (7-b)  "Reputed owner" means a person who is:
 (A)  identified as an owner in a notice of
 commencement required under this chapter or in an original contract
 for an improvement; or
 (B)  generally considered or reputed to be the
 owner of the real property being improved.
 (12)  "Specially fabricated material" means material
 fabricated for use as a component of the construction or repair of
 an improvement so as to be reasonably unsuitable for use elsewhere.
 (13)  "Subcontractor" means a person who has furnished
 labor or materials to fulfill an obligation to an original
 contractor or to a subcontractor of any tier to perform all or part
 of the work required by an original contract.
 (14)  "Work" means any part of labor done, material
 furnished, or materials specially fabricated for the construction
 or repair of an improvement performed under an original contract.
 SECTION 3.  Section 53.003, Property Code, is amended by
 amending Subsections (a) and (c) and adding Subsection (e) to read
 as follows:
 (a)  This section applies to notices required by this chapter
 [Subchapters B through G and K].  In this section, "notice" includes
 any written communication required under this chapter.
 (c)  If a notice is sent by registered or certified mail,
 deposit or mailing of the notice in the United States mail in the
 form required constitutes compliance with the notice requirement.
 The effective date of the notice is the date the notice is deposited
 in the United States mail.  This subsection does not apply if the
 law requires receipt of the notice by the person to whom it is
 directed.
 (e)  A notice to an owner may be filed on the lien website
 under the protocols established for the website for receipt of the
 notice.  A notice may be sent by an owner by filing the notice on the
 lien website or by e-mail with an electronic record of delivery to
 the e-mail address provided to the owner in a notice of furnishing
 by a person required to be provided with the notice.  The effective
 date of the notice is the date the notice is sent to the lien website
 under the website's protocols or the date the e-mail is sent.  An
 e-mail sent to a recipient is prima facie evidence of delivery of a
 message to an e-mail address to which it is sent.
 SECTION 4.  Subchapter A, Chapter 53, Property Code, is
 amended by adding Section 53.004 to read as follows:
 Sec. 53.004.  COMPUTATION OF TIME.  In computing the period
 of days in which to provide a notice or to take an action required
 under this chapter, if the last day of the period is a Saturday,
 Sunday, or legal holiday, the period is extended to include the next
 day that is not a Saturday, Sunday, or legal holiday.
 SECTION 5.  Chapter 53, Property Code, is amended by adding
 Subchapter A-1 to read as follows:
 SUBCHAPTER A-1. LIEN WEBSITE
 Sec. 53.011.  LIEN WEBSITE. (a)  The secretary of state
 shall establish and maintain a lien website through the state
 electronic Internet portal, as defined by Section 2054.003,
 Government Code.
 (b)  The secretary of state may adopt rules and forms
 necessary to implement this subchapter.
 Sec. 53.012.  POSTING ON LIEN WEBSITE. The lien website must
 provide an online form for each notice or written communication
 required by this chapter that complies with the content
 requirements of this chapter for the notice or communication.  The
 lien website must allow a person to electronically obtain a form and
 post the notice or written communication on the lien website.
 Sec. 53.013.  SEARCHING LIEN WEBSITE. The lien website must
 allow a person to search the notices and written communications
 posted on the website with a full or partial:
 (1)  owner name;
 (2)  project name;
 (3)  project address;
 (4)  project real property legal description;
 (5)  original contractor name; or
 (6)  name of person posting a notice or written
 communication.
 Sec. 53.014.  FEES.  (a)  Notwithstanding Section 2054.2591,
 Government Code, and except as provided by Subsection (b), the
 secretary of state may not charge a fee for a person to:
 (1)  electronically obtain a form or post a notice or
 written communication on the lien website; or
 (2)  use the search functions of the lien website.
 (b)  The secretary of state may charge a fee for a person to
 post a notice of commencement on the lien website.
 SECTION 6.  Section 53.021(a), Property Code, is amended to
 read as follows:
 (a)  A person has a lien if:
 (1)  the person labors, specially fabricates material,
 or furnishes labor or materials for construction or repair in this
 state of an[:
 [(A)  a house, building, or] improvement;
 [(B)     a levee or embankment to be erected for the
 reclamation of overflow land along a river or creek; or
 [(C)  a railroad;] and
 (2)  the person labors, specially fabricates the
 material, or furnishes the labor or materials under or arising out
 [by virtue] of an express [a] contract or contract implied by law
 between the person and [with] the owner or the owner's agent,
 trustee, receiver, contractor, or subcontractor.
 SECTION 7.  Section 53.022, Property Code, is amended by
 amending Subsection (a) and adding Subsections (b-1) and (e) to
 read as follows:
 (a)  The lien extends to the interest of the owner or the
 owner's successor in interest to the real property in the house,
 building, fixtures, or improvements, the land reclaimed from
 overflow, or the railroad and all of its properties, and to each lot
 of land necessarily connected or reclaimed.
 (b-1)  If an improvement is constructed on real property that
 is adjacent to the real property of the owner who entered into the
 original contract for the improvements and the adjacent property is
 not owned by the owner, the lien extends only to the real property
 of the owner and not to the adjacent property.
 (e)  A lien arising from work performed on common elements of
 a condominium governed by Chapter 81 or 82 extends to each unit
 owning an interest in the common elements being improved, and is
 apportioned based on the relative ownership interests of each unit
 in the common elements being improved, if:
 (1)  the inception of the lien is after the date the
 declaration establishing the condominium was recorded; and
 (2)  the work was performed under a contract with the
 council of owners, the unit owners' association of the condominium,
 or all of the owners of the units owning an interest in the common
 elements being improved.
 SECTION 8.  Section 53.024, Property Code, is amended to
 read as follows:
 Sec. 53.024.  LIMITATION ON SUBCONTRACTOR'S LIEN.  The
 amount of a lien claimed by a subcontractor may not exceed:
 (1)  an amount equal to the proportion of the total
 subcontract price, including all additional amounts to which the
 subcontractor is entitled as an adjustment to the subcontract, that
 the sum of the labor performed, materials furnished, materials
 specially fabricated, reasonable overhead costs incurred, and
 proportionate profit margin bears to the total subcontract price;
 minus
 (2)  the sum of previous payments received by the
 claimant on the subcontract.
 SECTION 9.  Section 53.026(a), Property Code, is amended to
 read as follows:
 (a)  Except as provided by Section 53.0561, a [A] person who
 labors, specially fabricates materials, or furnishes labor or
 materials under a direct contractual relationship with another
 person is considered to be in direct contractual relationship with
 the owner and has a lien as an original contractor, if:
 (1)  the owner [contracted with the other person for
 the construction or repair of a house, building, or improvements
 and the owner] can effectively control that other person or that
 other person can effectively control the owner through ownership of
 voting stock, interlocking directorships, or otherwise; or
 (2)  the owner contracted with the other person for the
 construction or repair of a house, building, or improvements [and
 that other person can effectively control the owner through
 ownership of voting stock, interlocking directorships, or
 otherwise; or
 [(3)     the owner contracted with the other person for
 the construction or repair of a house, building, or improvements]
 and the contract was made without good faith intention of the
 parties that the other person was to perform the contract.
 SECTION 10.  Section 53.052, Property Code, is amended to
 read as follows:
 Sec. 53.052.  FILING OF LIEN CLAIM AFFIDAVIT.  (a)  Except as
 provided by Subsection (b) or Section 53.0521, an original
 contractor or subcontractor [the person] claiming a [the] lien
 under this chapter must file a lien claim [an] affidavit as provided
 by Subsection (c) [with the county clerk of the county in which the
 property is located or into which the railroad extends] not later
 than the 15th day of the fourth calendar month after the date the
 work under the original contract is completed or the original
 contract is terminated [day on which the indebtedness accrues].
 (b)  Except as provided by Section 53.0521, an original
 contractor or subcontractor [A person] claiming a lien on [arising
 from] a residential construction project must file a lien claim
 [an] affidavit as provided by Subsection (c) [with the county clerk
 of the county in which the property is located] not later than the
 15th day of the third calendar month after the date the work under
 the original contract is completed or the original contract is
 terminated [day on which the indebtedness accrues].
 (c)  A lien claim affidavit must be filed with the county
 clerk of the county in which the property is located or into which
 the railroad extends. The county clerk shall record the affidavit
 in records kept for that purpose and shall index and cross-index the
 affidavit in the names of the claimant, the original contractor,
 and the owner. Failure of the county clerk to properly record or
 index a filed affidavit does not invalidate the lien.
 (d)  For purposes of this section, an original contract is
 terminated on the date an owner posts a notice of termination on the
 lien website.  If a notice of commencement has not been filed and
 posted as required by Section 53.125, the owner must send a notice
 of termination to each person who has filed a notice of furnishing.
 SECTION 11.  Subchapter C, Chapter 53, Property Code, is
 amended by adding Section 53.0521 to read as follows:
 Sec. 53.0521.  NOTICE OF DEMAND.  (a)  If work under an
 original contract has been completed or the original contract has
 been terminated, an owner may send a notice of demand to the
 original contractor or subcontractor requesting the contractor or
 subcontractor to file a lien claim affidavit.  If the notice is
 based on the termination of the original contract, the notice must
 state that the original contract was terminated and the date of the
 termination.  An owner may not send the notice before the original
 contract has been terminated.  A notice sent before work under the
 original contract has been completed is effective only as to a
 claimant that has completed the claimant's work and is void as to
 any other claimant.
 (b)  For purposes of this section, an original contract is
 terminated on the date an owner posts a notice of termination on the
 lien website.  If a notice of commencement has not been filed and
 posted as required by Section 53.125, the owner must send a notice
 of termination to each person who has filed a notice of furnishing.
 (c)  Notwithstanding Section 53.003, a notice of demand must
 be sent by registered or certified mail to a subcontractor at the
 subcontractor's address provided by the notice of furnishing or to
 an original contractor at the original contractor's last known
 address.
 (d)  If an owner sends a notice of demand, a claimant that has
 completed the claimant's work must, not later than the 30th day
 after the date the notice of demand is sent, file a lien claim
 affidavit for a claim the claimant has not included in a previously
 filed lien claim affidavit.
 (e)  A claimant that has not completed the claimant's work on
 the date the owner sends a notice of demand must file a lien claim
 affidavit as provided by Section 53.052(a) or (b), as applicable.
 (f)  An original contractor or subcontractor waives any
 statutory lien rights that have not been perfected if the
 contractor or subcontractor does not comply with this section.
 (g)  A notice of demand must be conspicuously printed in bold
 type and in all capital letters not smaller than 10-point type and
 must state the following:
 "NOTICE OF DEMAND
 "WARNING: THIS NOTICE BRIEFLY SUMMARIZES LEGAL REQUIREMENTS
 STATED BY SECTION 53.0521, PROPERTY CODE. YOU SHOULD CONSULT AN
 ATTORNEY TO FULLY UNDERSTAND YOUR RIGHTS AND OBLIGATIONS.
 "THE OWNER IS DEMANDING THAT YOU FILE A LIEN CLAIM AFFIDAVIT
 NOT LATER THAN THE 30TH DAY AFTER THE DATE THIS NOTICE WAS SENT TO
 YOU. IF THE ORIGINAL CONTRACT HAS BEEN TERMINATED OR IF YOU HAVE
 COMPLETED YOUR WORK, YOU ARE REQUIRED, NOT LATER THAN THE 30TH DAY
 AFTER THE DATE THIS NOTICE WAS SENT TO YOU, TO FILE YOUR LIEN CLAIM
 AFFIDAVIT FOR ANY CLAIMS YOU HAVE NOT INCLUDED IN A LIEN CLAIM
 AFFIDAVIT YOU HAVE PREVIOUSLY FILED OR YOU MAY LOSE ANY STATUTORY
 LIEN RIGHTS THAT YOU HAVE NOT PREVIOUSLY PERFECTED.
 "IF THE ORIGINAL CONTRACT IS NOT TERMINATED OR YOU HAVE NOT
 COMPLETED YOUR WORK, THE DEADLINE TO FILE YOUR LIEN CLAIM AFFIDAVIT
 IS PROVIDED BY SECTION 53.052(a) OR (b), PROPERTY CODE."
 SECTION 12.  The heading to Section 53.054, Property Code,
 is amended to read as follows:
 Sec. 53.054.  CONTENTS OF LIEN CLAIM AFFIDAVIT.
 SECTION 13.  Section 53.054, Property Code, is amended by
 amending Subsections (a) and (c) to read as follows:
 (a)  The lien claim affidavit must be signed by the person
 claiming the lien or by another person on the claimant's behalf and
 must contain substantially:
 (1)  a sworn statement of the amount of the claim;
 (2)  the name and last known address of the owner or
 reputed owner;
 (3)  a general statement of the kind of work done and
 materials furnished by the claimant [and, for a claimant other than
 an original contractor, a statement of each month in which the work
 was done and materials furnished for which payment is requested];
 (4)  the name and last known address of the person by
 whom the claimant was employed or to whom the claimant furnished the
 materials or labor;
 (5)  the name and last known address of the original
 contractor;
 (6)  a description, legally sufficient for
 identification, of the property sought to be charged with the lien;
 (7)  the claimant's name, mailing address, and, if
 different, physical address; and
 (8)  for a claimant other than an original contractor,
 a statement identifying the date each notice of furnishing [the
 claim] was sent to the owner [and the method by which the notice was
 sent].
 (c)  The affidavit is not required to set forth individual
 items of work done or material furnished or specially fabricated.
 The affidavit may use any broad descriptive terms, abbreviations,
 or symbols customary in the trade to describe the work done or
 material furnished.
 SECTION 14.  Section 53.055, Property Code, is amended to
 read as follows:
 Sec. 53.055.  NOTICE OF FILED LIEN CLAIM AFFIDAVIT.  (a)  A
 person who files a lien claim [an] affidavit must send a copy of the
 affidavit by registered or certified mail to the owner or reputed
 owner at the owner's last known business or residence address or
 file a copy with the lien website not later than the 10th [fifth]
 day after the date the affidavit is filed with the county clerk.
 (b)  If the person is not an original contractor, and the
 person has not filed a copy of the affidavit with the lien website
 under Subsection (a), the person must also send a copy of the
 affidavit to the original contractor at the original contractor's
 last known business or residence address in [within] the same
 manner and time that the affidavit must be sent to the owner under
 Subsection (a) [period].
 SECTION 15.  Subchapter C, Chapter 53, Property Code, is
 amended by adding Section 53.0561 to read as follows:
 Sec. 53.0561.  NOTICE OF FURNISHING.  (a) A person who
 contracts with a person other than the owner and who has a lien as an
 original contractor under Section 53.026(a) must give a notice of
 furnishing to the owner or reputed owner for the lien to be valid.  A
 claimant other than an original contractor must give a notice of
 furnishing to the owner or reputed owner and the original
 contractor for the claimant's lien to be valid.
 (b)  The notice of furnishing must include:
 (1)  a general description of the labor or material
 furnished or to be furnished by the claimant and, for specially
 fabricated material, a separate description of the specially
 fabricated material, that may include a list of individual items of
 work or material or use terms, abbreviations, or symbols customary
 in the trade;
 (2)  the name, address, and telephone number of the
 claimant;
 (3)  the e-mail address of the claimant, if the
 claimant wants to receive notices of filings on the lien website;
 (4)  the name, address, and telephone number of the
 person with whom the claimant contracted to furnish the labor or
 material;
 (5)  a legal description, street address, or other
 description that identifies the real property to which the labor or
 material was furnished or will be furnished; and
 (6)  a conspicuous statement in bold type as follows:
 "THIS IS NOT A LIEN OR A CLAIM FOR A LIEN. THIS IS ONLY A
 NOTICE TO THE OWNER THAT A CONTRACTOR IS FURNISHING OR INTENDS TO
 FURNISH LABOR OR MATERIAL TO THE PROJECT. THIS NOTICE IS REQUIRED TO
 PRESERVE THE CONTRACTOR'S LIEN RIGHTS UNDER CHAPTER 53, PROPERTY
 CODE."
 (c)  Except as provided by Subsection (d), the notice of
 furnishing does not preserve a lien right for labor performed or
 material furnished or specially fabricated earlier than 45 days
 before the date the notice is provided as required by this section.
 (d)  If the owner has filed and posted a notice of
 commencement as required by Section 53.125 before the subcontractor
 begins performing labor or furnishing or specially fabricating
 material, the notice of furnishing does not preserve a lien right
 for labor performed or material furnished or specially fabricated
 by the subcontractor earlier than 15 days before the date the notice
 of furnishing is provided.
 (e)  Only one notice of furnishing to an owner is required
 for all labor or material furnished or to be furnished by each
 subcontractor. If a subcontractor contracts to perform work for
 the improvement of the owner's property under more than one
 original contract, the subcontractor must identify each original
 contract in the notice of furnishing or must furnish separate
 notices of furnishing for each original contract.
 (f)  The notice of furnishing is not invalid if, after the
 date of the notice, the subcontractor furnishes labor or material
 that is not within the scope of the notice's general description of
 the labor and material furnished or to be furnished.
 (g)  A notice of furnishing that does not include the
 subcontractor's e-mail address is not invalid.
 SECTION 16.  Subchapter C, Chapter 53, Property Code, is
 amended by adding Section 53.059 to read as follows:
 Sec. 53.059.  NOTICE OF COMPLETION. (a)  If an owner has
 filed or has posted on the lien website a notice of commencement as
 required by Section 53.125 and the work under an original contract
 has been completed or the original contract has been terminated,
 the owner may file a notice of completion with the county clerk of
 the county in which the owner's property is located and post the
 notice on the lien website.  The notice must contain:
 (1)  the name and address of the owner;
 (2)  the name and address of each original contractor
 covered by the notice;
 (3)  a description, legally sufficient for
 identification, of the real property on which the improvements are
 located;
 (4)  a description of the work furnished under an
 original contract covered by the notice;
 (5)  a statement that the work under an original
 contract covered by the notice has been completed or that the
 original contract was terminated; and
 (6)  the date of the completion or termination.
 (b)  Not later than the 10th day after the notice of
 completion is posted on the lien website, the owner must send a copy
 of the notice:
 (1)  to each original contractor identified in the
 notice; and
 (2)  by e-mail to each claimant that has sent a notice
 of furnishing to the owner and has provided an e-mail address to the
 owner.
 (c)  For purposes of Section 53.052, the later of the date
 the notice of completion is filed or the date the notice is posted
 on the lien website is considered the date the work under an
 original contract identified in the notice is completed or the
 original contract is terminated.  This subsection does not apply to
 a person to whom the notice of completion was not sent as required
 by this section.
 (d)  Except as provided by Subsection (e), the notice of
 completion must contain the following statement in bold type in all
 capital letters:
 "A CLAIMANT WILL LOSE THE RIGHT TO PERFECT A LIEN IF THE
 CLAIMANT DOES NOT FILE A LIEN CLAIM AFFIDAVIT ON OR BEFORE THE 15TH
 DAY OF THE FOURTH MONTH AFTER THE DATE OF COMPLETION OF THE WORK."
 (e)  The notice of completion for a residential construction
 project must contain the following statement in bold type in all
 capital letters:
 "A CLAIMANT WILL LOSE THE RIGHT TO PERFECT A LIEN IF THE
 CLAIMANT DOES NOT FILE A LIEN CLAIM AFFIDAVIT ON OR BEFORE THE 15TH
 DAY OF THE THIRD MONTH AFTER THE DATE OF COMPLETION OF THE WORK."
 SECTION 17.  Section 53.081, Property Code, is amended to
 read as follows:
 Sec. 53.081.  AUTHORITY TO WITHHOLD FUNDS FOR BENEFIT OF
 CLAIMANTS.  [(a)] If a lien claim affidavit is filed by a
 subcontractor or if an owner receives notice under Section 53.055
 [53.056, 53.057, 53.058, 53.252, or 53.253], the owner may withhold
 from payments due or to become due to the original contractor an
 amount necessary to pay the claim stated in the lien claim
 affidavit, except to the extent that the owner is already
 withholding payment for the amount of the claim from the original
 contractor as retainage or otherwise [for which he receives
 notice].
 [(b)     If notice is sent in a form that substantially complies
 with Section 53.056 or 53.252, the owner may withhold the funds
 immediately on receipt of the notice.
 [(c)     If notice is sent under Section 53.057, the owner may
 withhold funds immediately on receipt of a copy of the claimant's
 affidavit prepared in accordance with Sections 53.052 through
 53.055.
 [(d)     If notice is sent under Section 53.058, the owner may
 withhold funds immediately on receipt of the notices sent under
 Subsection (e) of that section. If notice is sent as provided by
 Section 53.253(b), the owner may withhold funds immediately on
 receipt of the notice sent as required by Section 53.252.]
 SECTION 18.  Section 53.082, Property Code, is amended to
 read as follows:
 Sec. 53.082.  TIME FOR WHICH FUNDS ARE WITHHELD.  The owner
 may retain funds under Section 53.081 until [Unless] payment is
 made under Section 53.0831 [53.083] or the claim is otherwise
 settled or [,] discharged [, indemnified against] under Section
 53.157 [Subchapter H or I,] or determined to be invalid by a final
 judgment of a court[, the owner shall retain the funds withheld
 until:
 [(1)     the time for filing the affidavit of mechanic's
 lien has passed; or
 [(2)     if a lien affidavit has been filed, until the lien
 claim has been satisfied or released].
 SECTION 19.  Subchapter D, Chapter 53, Property Code, is
 amended by adding Section 53.0831 to read as follows:
 Sec. 53.0831.  DEMAND FOR NOTICE OF DISPUTE; PAYMENT OF
 CLAIM.  (a)  If a lien claim affidavit is filed by a claimant, the
 owner may demand in writing that the original contractor notify the
 owner of whether the original contractor intends to dispute the
 claim.  The owner shall send a copy of the demand to the claimant and
 shall furnish the original contractor with a copy of the lien claim
 affidavit.
 (b)  If the original contractor does not give the owner and
 the claimant written notice of the original contractor's intent to
 dispute the claim before the 30th day after the date of receipt of
 the demand, the original contractor is considered to agree to the
 demand and the owner may pay the claim when the claim becomes due.
 SECTION 20.  Subchapter D, Chapter 53, Property Code, is
 amended by adding Section 53.0841 to read as follows:
 Sec. 53.0841.  PERSONAL LIABILITY FOR LIENS.  (a)  Except as
 provided by Subsection (b), an owner is personally liable for the
 aggregate amount of the liens perfected on the owner's property
 under this chapter.  An owner's personal liability is not affected
 by a subsequent foreclosure or other transfer of the owner's
 interest in all or part of the property.
 (b)  Subject to Section 53.122(b), the aggregate amount of
 liens of the original contractor and the subcontractors may not
 exceed the contract price of the original contract, as may be
 modified, for the work.  Duplicated claims asserted by claimants
 within the same chain of contract may not be added more than once in
 determining the aggregate amount of liens.  For purposes of this
 section, a payment by the owner to the original contractor does not
 reduce the aggregate liability of the owner for liens.
 (c)  A purchaser of property subject to a lien claim under
 this chapter is not personally liable for the lien claim in a
 foreclosure action brought by a claimant, except the purchaser may
 be held liable for costs and attorney's fees awarded under Section
 53.156.
 SECTION 21.  The heading to Section 53.085, Property Code,
 is amended to read as follows:
 Sec. 53.085.  BILLS-PAID AFFIDAVIT REQUIRED.
 SECTION 22.  Section 53.085, Property Code, is amended by
 amending Subsections (a), (b), (c), and (d) to read as follows:
 (a)  Any person who performs work [furnishes labor or
 materials for the construction of improvements on real property]
 shall, if requested and as a condition of payment for such work
 [labor or materials], provide to the requesting party, or the
 party's agent, a bills-paid [an] affidavit acknowledging the amount
 claimed for payment and stating that the person has paid each of the
 person's subcontractors, laborers, or materialmen in full for all
 labor and materials provided to the person for the construction. In
 the event, however, that the person has not paid each of the
 person's subcontractors, laborers, or materialmen in full, the
 person shall state in the affidavit the amount owed and the name
 and, if known, the address and telephone number of each
 subcontractor, laborer, or materialman to whom the payment is owed.
 (b)  The seller of any real property shall, upon request by
 the purchaser or the purchaser's agent prior to closing of the
 purchase of the real property, provide to the purchaser or the
 purchaser's agent, a written affidavit stating that the seller has
 paid each of the seller's contractors, laborers, or materialmen in
 full for all labor done and materials provided to the seller through
 the date specified in the affidavit for any construction or repair
 of improvements on the real property and that the seller is not
 indebted to any person, firm, or corporation by reason of any such
 construction or repair through the date specified in the affidavit.
 In the event that the seller has not paid each of the seller's
 contractors, laborers, or materialmen in full for labor done and
 material provided through the date specified in the affidavit, the
 seller shall state in the affidavit the amount owed and the name
 and, if known, the address and telephone number of each contractor,
 laborer, or materialman to whom the payment is owed.
 (c)  The affidavit may include:
 (1)  a waiver or release of lien rights or payment bond
 claims by the affiant that is conditioned on the receipt of actual
 payment or collection of funds when payment is made by check or
 draft, as provided by Subchapter L;
 (2)  a warranty or representation that certain bills or
 classes of bills will be paid by the affiant from funds paid in
 reliance on the affidavit and an identification of the specific
 bills that the affiant will not pay from the fund; and
 (3)  an indemnification by the affiant for any loss or
 expense resulting from false or incorrect information in the
 affidavit.
 (d)  A person, including a seller, commits an offense if the
 person intentionally, knowingly, or recklessly makes a false or
 misleading statement in an affidavit under this section. An
 offense under this section is a misdemeanor. A person adjudged
 guilty of an offense under this section shall be punished by a fine
 not to exceed $4,000 or confinement in jail for a term not to exceed
 one year or both a fine and confinement. [A person may not receive
 community supervision for the offense.]
 SECTION 23.  Section 53.122(a), Property Code, is amended to
 read as follows:
 (a)  Perfected [Except as provided by Subchapter E and
 Section 53.124(e), perfected] mechanic's liens that have the same
 inception date are on equal footing without reference to the date of
 filing the lien claim affidavit [claiming the lien].
 SECTION 24.  Section 53.124, Property Code, is amended by
 amending Subsections (a), (c), (d), and (e) and adding Subsection
 (f) to read as follows:
 (a)  Except as provided by Subsection (c) or (e), for
 purposes of Section 53.123, the time of inception of a mechanic's
 lien is the commencement of construction or repair of improvements
 or delivery of materials to the land on which the improvements are
 to be located and on which the materials are to be used.
 (c)  The later of the date the notice of commencement is
 filed or is posted on the lien website is the time of inception of a
 mechanic's lien for the work or material described by the notice
 that is performed or furnished on or after the later of the date the
 notice is filed or posted.  For work or material performed or
 furnished before the date a notice of commencement is filed or
 posted and for work excluded by the notice of commencement, the time
 of inception of a mechanic's lien is provided by Subsection (a).
 For work under an original contract entered into after a notice of
 completion is filed and posted under Section 53.059, the time of
 inception of a mechanic's lien is the date provided by Subsection
 (a) or the date a new notice of commencement is posted.  [An owner
 and original contractor may jointly file an affidavit of
 commencement with the county clerk of the county in which the land
 is located not later than the 30th day after the date of actual
 commencement of construction of the improvements or delivery of
 materials to the land. The affidavit must contain:
 [(1)  the name and address of the owner;
 [(2)     the name and address of each original contractor,
 known at the time to the owner, that is furnishing labor, service,
 or materials for the construction of the improvements;
 [(3)     a description, legally sufficient for
 identification, of the property being improved;
 [(4)  the date the work actually commenced; and
 [(5)  a general description of the improvement.]
 (d)  If a lien, encumbrance, or mortgage securing an interest
 in the land is filed with the county clerk on or before the date the
 notice is posted, the lien, encumbrance, or mortgage has priority
 over a mechanic's lien with a time of inception that is the date of
 the notice, regardless of the order in which the instruments are
 filed with the county clerk.  [An affidavit filed in compliance with
 this section is prima facie evidence of the date of the commencement
 of the improvement described in the affidavit. The time of
 inception of a mechanic's lien arising from work described in an
 affidavit of commencement is the date of commencement of the work
 stated in the affidavit.]
 (e)  The time of inception of a lien that is created under
 Section 53.021(c)[, (d), or (e)] is the date of recording of a lien
 claim [an] affidavit [of lien] under Section 53.052. The priority
 of a lien claimed by a person entitled to a lien under Section
 53.021(c)[, (d), or (e)] with respect to other mechanic's liens is
 determined by the date of recording. A lien created under Section
 53.021(c)[, (d), or (e)] is not valid or enforceable against a
 grantee or purchaser who acquires an interest in the real property
 before the time of inception of the lien.
 (f)  Unless the landscaping work for which a person may have
 a lien under Section 53.021(d) or the demolition services for which
 a person may have a lien under Section 53.021(e) are included in a
 notice of commencement, the time of inception of a lien under
 Section 53.021(d) or (e) is the date of recording of a lien claim
 affidavit under Section 53.052, and priority is determined by the
 date of recording. Except as provided by this subsection, a lien
 created under Section 53.021(d) or (e) is not valid against a
 grantee or purchaser who acquires an interest in the real property
 before the time of inception of the lien.
 SECTION 25.  Subchapter F, Chapter 53, Property Code, is
 amended by adding Section 53.125 to read as follows:
 Sec. 53.125.  NOTICE OF COMMENCEMENT.  (a)  An owner must
 file a notice of commencement with the county clerk of the county in
 which the real property being improved under an original contract
 is located and post the notice on the lien website.  The notice must
 be acknowledged and be in a form that substantially complies with
 the following:
 "NOTICE OF COMMENCEMENT
 "Improvements will be made to certain real property, and in
 accordance with Chapter 53, Property Code, the following
 information is provided by this notice of commencement:
 "(1)  Legal description and, if applicable, street
 address of property: _______________.
 "(2)  Brief description of work to be performed or
 materials to be furnished: _______________.
 "(3)  Work or materials not included in this notice of
 commencement: _______________.
 "(4)  Owner information or lessee information if the
 lessee contracted for the work:
 (A)  Name and address: _______________.
 (B)  Interest in property (check appropriate
 box):
 □ Fee simple title
 □ Lease
 □ Other (explain): _______________.
 (C)  Name and address of fee simple titleholder to
 property (if different from owner listed above): _______________.
 "(5)  Original contractor(s) for work or designated
 portions of the work (repeat as necessary):
 (A)  Name and address: _______________.
 (B)  Contractor's phone number: _______________.
 "(6)  Surety or sureties for original contractor (if
 applicable, a copy of the payment bond is attached):
 (A)  Name and address: _______________.
 (B)  Phone number: _______________.
 "(7)  Lender(s) providing financing for the work that
 is securing a mortgage on or a security interest in the property
 (repeat as necessary):
 (A)  Name and address: _______________.
 (B)  Lender's phone number: _______________.
 "(8)  Secretary of state's lien website address:
 _______________.
 "Date: ______________
 "_____________ (Owner name)
 "By:_______________ (Signature)
 "(Insert acknowledgment)."
 (b)  Incorrect information contained in the notice of
 commencement furnished by an owner does not adversely affect the
 rights of a lien claimant reasonably relying on the information
 against the owner or the property of the owner.  If a subcontractor
 performs labor or furnishes materials or specially fabricated
 materials described by the notice of commencement and the notice of
 commencement does not identify the original contractor under which
 the labor was performed or materials were furnished or specially
 fabricated at the time the subcontractor first performs the labor
 or furnishes or specially fabricates the materials, the notice of
 furnishing by the subcontractor preserves the lien claimant's
 rights for the period provided by Section 53.0561(c).
 (c)  The owner shall send a copy of the notice of
 commencement to each subcontractor not later than the fifth day
 after the date the owner receives a written request for a copy from
 the subcontractor, unless the subcontractor has received a physical
 copy of the notice.
 (d)  Unless a notice of commencement has been filed and
 posted as required by this section, a subcontractor who has not
 received a physical copy of the notice may request in writing a copy
 from the original contractor or a subcontractor with whom the
 requesting subcontractor has privity of contract. If the original
 contractor or subcontractor has a copy of the notice, the original
 contractor or subcontractor shall send a copy of the notice to the
 requesting subcontractor not later than the fifth day after the
 date of receipt of the written request. If the requesting
 subcontractor does not receive a copy of the notice as required by
 this section, the person failing to send the copy under this
 subsection is liable to the requesting subcontractor for all actual
 expenses reasonably incurred by the requesting subcontractor in
 obtaining the information that would have been contained in the
 notice.
 (e)  A notice of commencement posted on the lien website may
 be amended by the owner by sending the amended notice to the lien
 website. The effective date of the amended notice is the date the
 amended notice is posted on the lien website. The owner shall send
 notice of the amended notice to contractors who have sent a notice
 of furnishing to the owner before the effective date of the amended
 notice of commencement.
 SECTION 26.  Section 53.151(b), Property Code, is amended to
 read as follows:
 (b)  A surety issuing a payment bond or performance bond in
 connection with the work [improvements] has a priority claim over
 other creditors of its principal to contract funds to the extent of
 any loss it suffers or incurs. That priority does not excuse the
 surety from paying any obligations that it may have under its
 payment bonds.
 SECTION 27.  Section 53.153(a), Property Code, is amended to
 read as follows:
 (a)  If an affidavit claiming a mechanic's lien is filed by a
 person other than the original contractor, the original contractor
 shall defend at the original contractor's [his] own expense a suit
 brought on the claim unless the owner is in breach of the owner's
 contractual obligations to the original contractor under the
 original contract.
 SECTION 28.  Section 53.154, Property Code, is amended to
 read as follows:
 Sec. 53.154.  FORECLOSURE.  (a)  A mechanic's lien may be
 foreclosed only on judgment of a court of competent jurisdiction
 foreclosing the lien and ordering the sale of the property subject
 to the lien.
 (b)  A suit to foreclose the lien must be brought in a court
 of competent jurisdiction in the county in which the real property
 that is subject to the lien is located.
 SECTION 29.  Section 53.157, Property Code, is amended to
 read as follows:
 Sec. 53.157.  DISCHARGE OF LIEN.  A mechanic's lien or
 affidavit claiming a mechanic's lien filed under Section 53.052 may
 be discharged of record by:
 (1)  recording a lien release signed by the claimant
 under Section 53.152;
 (2)  failing to institute suit to foreclose the lien
 [in the county in which the property is located] within the period
 prescribed by Section 53.158, 53.175, or 53.208;
 (3)  recording the original or certified copy of a
 final judgment or decree of a court of competent jurisdiction
 providing for the discharge;
 (4)  filing the bond and notice in compliance with
 Subchapter H;
 (5)  filing the bond in compliance with Subchapter I;
 or
 (6)  recording a certified copy of the order removing
 the lien under Section 53.160 and a certificate from the clerk of
 the court that states that no bond or deposit as described by
 Section 53.161 was filed by the claimant within 30 days after the
 date the order was entered.
 SECTION 30.  Section 53.158, Property Code, is amended to
 read as follows:
 Sec. 53.158.  PERIOD FOR BRINGING SUIT TO FORECLOSE LIEN.
 (a)  Except as provided by Subsection (b), suit must be brought to
 foreclose the lien not later than the first anniversary of [within
 two years after] the last date [day] a claimant may file the lien
 claim affidavit under Section 53.052 [or within one year after
 completion, termination, or abandonment of the work under the
 original contract under which the lien is claimed, whichever is
 later].
 (b)  The period of limitations under Subsection (a) may be
 extended to not later than the second anniversary of the last date
 the claimant may file the affidavit if the claimant enters into a
 written agreement with the then current record owner of the
 property to extend the period and files the written agreement with
 the clerk of the county where all or part of the property is located
 before the expiration of the period provided by Subsection (a).
 [For a claim arising from a residential construction project, suit
 must be brought to foreclose the lien within one year after the last
 day a claimant may file a lien affidavit under Section 53.052 or
 within one year after completion, termination, or abandonment of
 the work under the original contract under which the lien is
 claimed, whichever is later.]
 SECTION 31.  Section 53.159, Property Code, is amended by
 amending Subsections (a), (b), (c), (d), and (f) to read as follows:
 (a)  If a notice of commencement has not been filed and
 posted as required by Section 53.125, an [An] owner, on written
 request, shall furnish the following information within a
 reasonable time, but not later than the 10th day after the date the
 request is received, to any person furnishing labor or materials
 for the project:
 (1)  a description of the real property being improved
 legally sufficient to identify it;
 (2)  whether there is a surety bond and if so, the name
 and last known address of the surety and a copy of the bond;
 (3)  whether there are any prior recorded liens or
 security interests on the real property being improved and if so,
 the name and address of the person having the lien or security
 interest; and
 (4)  the date on which the original contract for the
 project was executed.
 (b)  If a notice of commencement has not been filed and
 posted as required by Section 53.125, an [An] original contractor,
 on written request by a person who furnished work under the original
 contract, shall furnish to the person the following information
 within a reasonable time, but not later than the 10th day after the
 date the request is received:
 (1)  the name and last known address of the person to
 whom the original contractor furnished labor or materials for the
 construction project;
 (2)  whether the original contractor has furnished or
 has been furnished a payment bond for any of the work on the
 construction project and if so, the name and last known address of
 the surety and a copy of the bond; and
 (3)  the date on which the original contract for the
 project was executed.
 (c)  A subcontractor, on written request by an owner of the
 property being improved, the original contractor, a surety on a
 bond covering the original contract, or any person furnishing work
 under the subcontract, shall furnish to the person the following
 information within a reasonable time, but not later than the 10th
 day after the date the request is received:
 (1)  the name and last known address of each person from
 whom the subcontractor purchased labor or materials for the
 construction project, other than those materials that were
 furnished to the project from the subcontractor's inventory;
 (2)  the name and last known address of each person to
 whom the subcontractor furnished labor or materials for the
 construction project; [and]
 (3)  whether the subcontractor has furnished or has
 been furnished a payment bond for any of the work on the
 construction project and if so, the name and last known address of
 the surety and a copy of the bond; and
 (4)  the date the subcontractor first performed labor,
 furnished materials, or specially fabricated materials for the
 construction project for which any claim for payment is being
 sought.
 (d)  Not later than the 30th day after the date a written
 request is received from the owner, the contractor under whom a
 claim of lien or under whom a bond is made, or a surety on a bond on
 which a claim is made, a claimant for a lien or under a bond shall
 furnish to the requesting person a copy of any applicable written
 agreement, purchase order, or contract and any billing, statement,
 or payment request of the claimant reflecting the amount claimed
 and the work performed by the claimant for which the claim is made.
 [If requested, the claimant shall provide the estimated amount due
 for each calendar month in which the claimant has performed labor or
 furnished materials.]
 (f)  A person, other than a claimant requested to furnish
 information under Subsection (d), who fails to furnish information
 as required by this section not posted on the lien website is liable
 to the requesting person for that person's reasonable and necessary
 costs incurred in procuring the requested information.
 SECTION 32.  Section 53.160, Property Code, is amended by
 amending Subsections (b) and (c) to read as follows:
 (b)  The grounds for objecting to the validity or
 enforceability of the claim or lien for purposes of the motion are
 limited to the following:
 (1)  notice of furnishing [claim] was not furnished to
 the owner or original contractor as required by Section 53.0561
 [53.056, 53.057, 53.058, 53.252, or 53.253];
 (2)  a lien claim [an] affidavit [claiming a lien]
 failed to comply with Section 53.054 or was not filed as required by
 Section 53.052;
 (3)  notice of the filed lien claim affidavit was not
 furnished to the owner or original contractor as required by
 Section 53.055 and the owner or original contractor was materially
 prejudiced by the violation;
 (4)  [the deadlines for perfecting a lien claim for
 retainage under this chapter have expired and the owner complied
 with the requirements of Section 53.101 and paid the retainage and
 all other funds owed to the original contractor before:
 [(A)  the claimant perfected the lien claim; and
 [(B)     the owner received a notice of the claim as
 required by this chapter;
 [(5)     all funds subject to the notice of a claim to the
 owner and a notice regarding the retainage have been deposited in
 the registry of the court and the owner has no additional liability
 to the claimant;
 [(6)]  when the lien claim affidavit was filed on
 homestead property:
 (A)  no contract was executed or filed as required
 by Section 53.254; or
 (B)  the lien claim affidavit [claiming a lien]
 failed to contain the notice as required by Section 53.254; [or
 [(C)     the notice of the claim failed to include
 the statement required by Section 53.254;] and
 (5) [(7)]  the claimant executed a valid and
 enforceable waiver or release of the claim or lien claimed in the
 affidavit.
 (c)  The claimant is not required to file a response. The
 claimant and any other party that has appeared in the proceeding
 must be notified not later than the 21st day [by at least 21 days]
 before the date of the hearing on the motion. A motion may not be
 heard before the 21st day after the date the claimant answers or
 appears in the proceeding.
 SECTION 33.  Section 53.161(f), Property Code, is amended to
 read as follows:
 (f)  If the claimant fails to file the bond or the deposit in
 lieu of the bond in compliance with this section, the owner may
 file:
 (1)  a certified copy of the order; and
 (2)  a certificate from the clerk of the court stating
 that:
 (A)  no bond or deposit in lieu of the bond was
 filed before the later of:
 (i)  the 30th day [within 30 days] after the
 date the order was entered by the court; or
 (ii)  the date ordered by the court under
 Subsection (b); and
 (B)  no order staying the order to remove the lien
 was entered by the court.
 SECTION 34.  Section 53.172, Property Code, is amended to
 read as follows:
 Sec. 53.172.  BOND REQUIREMENTS.  The bond must:
 (1)  describe the property on which the liens are
 claimed;
 (2)  refer to each lien claimed in a manner sufficient
 to identify it;
 (3)  be in an amount that is double the amount of the
 liens referred to in the bond unless the total amount claimed in the
 liens exceeds $60,000 [$40,000], in which case the bond must be in
 an amount that is the greater of 1-1/2 times the amount of the liens
 or the sum of $60,000 [$40,000] and the amount of the liens;
 (4)  be payable to the parties claiming the liens;
 (5)  be executed by:
 (A)  the party filing the bond as principal; and
 (B)  a corporate surety authorized and admitted to
 do business under the law in this state and licensed by this state
 to execute the bond as surety, subject to Section 3503.005,
 Insurance Code [1, Chapter 87, Acts of the 56th Legislature,
 Regular Session, 1959 (Article 7.19-1, Vernon's Texas Insurance
 Code)]; and
 (6)  be conditioned substantially that the principal
 and sureties will pay to the named obligees or to their assignees
 the amount that the named obligees would have been entitled to
 recover if their claims had been proved to be valid and enforceable
 liens on the property.
 SECTION 35.  Section 53.201(b), Property Code, is amended to
 read as follows:
 (b)  If a valid bond is filed, a claimant may not file suit
 against the owner or the owner's property and the owner is not
 authorized to withhold funds or pay a claimant on demand [relieved
 of obligations] under Subchapter D [or E].
 SECTION 36.  Section 53.202, Property Code, is amended to
 read as follows:
 Sec. 53.202.  BOND REQUIREMENTS.  The bond must:
 (1)  be in a penal sum at least equal to the total of the
 original contract amount;
 (2)  be in favor of the owner;
 (3)  have the written approval of the owner endorsed on
 it;
 (4)  be executed by:
 (A)  the original contractor as principal; and
 (B)  a corporate surety authorized and admitted to
 do business in this state and licensed by this state to execute
 bonds as surety, subject to Section 3503.005, Insurance Code [1,
 Chapter 87, Acts of the 56th Legislature, Regular Session, 1959
 (Article 7.19-1, Vernon's Texas Insurance Code)];
 (5)  be conditioned on prompt payment for all labor,
 subcontracts, materials, specially fabricated materials, and
 normal and usual extras not exceeding 15 percent of the contract
 price; and
 (6)  clearly and prominently display on the bond or on
 an attachment to the bond:
 (A)  the name, mailing address, physical address,
 and telephone number, including the area code, of the surety
 company to which any notice of claim should be sent; or
 (B)  the toll-free telephone number maintained by
 the Texas Department of Insurance under Subchapter B, Chapter 521,
 Insurance Code, and a statement that the address of the surety
 company to which any notice of claim should be sent may be obtained
 from the Texas Department of Insurance by calling the toll-free
 telephone number.
 SECTION 37.  Section 53.206, Property Code, is amended by
 amending Subsections (a) and (b) to read as follows:
 (a)  To perfect a claim against a bond in a manner other than
 that prescribed by Subchapter C or K for fixing a lien, a person
 must:
 (1)  give to the original contractor a notice of
 furnishing, unless the person has contracted directly with the
 original contractor [all applicable notices under the appropriate
 subchapter]; and
 (2)  give to the surety on the bond a written notice of
 the amount and nature of the claim and a copy of the notice to the
 original contractor within the time period required for filing a
 lien claim affidavit under Section 53.052 [, instead of the owner,
 all notices under the appropriate subchapter required to be given
 to the owner].
 (b)  To perfect a claim under this section, a person is not
 required to [:
 [(1)     give notice to the surety under Section 53.057,
 unless the claimant has a direct contractual relationship with the
 original contractor and the agreed retainage is in excess of 10
 percent of the contract;
 [(2)     give notice to the surety under Section 53.058(b)
 or, if the claim relates to a residential construction project,
 under Section 53.253(c); or
 [(3)]  file any affidavit with the county clerk.
 SECTION 38.  Section 53.255(b), Property Code, is amended to
 read as follows:
 (b)  The disclosure statement must read substantially
 similar to the following:
 "KNOW YOUR RIGHTS AND RESPONSIBILITIES UNDER THE LAW. You
 are about to enter into a transaction to build a new home or remodel
 existing residential property. Texas law requires your contractor
 to provide you with this brief overview of some of your rights,
 responsibilities, and risks in this transaction.
 "CONVEYANCE TO CONTRACTOR NOT REQUIRED. Your contractor may
 not require you to convey your real property to your contractor as a
 condition to the agreement for the construction of improvements on
 your property.
 "KNOW YOUR CONTRACTOR. Before you enter into your agreement
 for the construction of improvements to your real property, make
 sure that you have investigated your contractor. Obtain and verify
 references from other people who have used the contractor for the
 type and size of construction project on your property.
 "GET IT IN WRITING. Make sure that you have a written
 agreement with your contractor that includes: (1) a description of
 the work the contractor is to perform; (2) the required or
 estimated time for completion of the work; (3) the cost of the work
 or how the cost will be determined; and (4) the procedure and
 method of payment, including [provisions for statutory retainage
 and] conditions for final payment. If your contractor made a
 promise, warranty, or representation to you concerning the work the
 contractor is to perform, make sure that promise, warranty, or
 representation is specified in the written agreement. An oral
 promise that is not included in the written agreement may not be
 enforceable under Texas law.
 "READ BEFORE YOU SIGN. Do not sign any document before you
 have read and understood it. NEVER SIGN A DOCUMENT THAT INCLUDES AN
 UNTRUE STATEMENT. Take your time in reviewing documents. If you
 borrow money from a lender to pay for the improvements, you are
 entitled to have the loan closing documents furnished to you for
 review at least one business day before the closing. Do not waive
 this requirement unless a bona fide emergency or another good cause
 exists, and make sure you understand the documents before you sign
 them. If you fail to comply with the terms of the documents, you
 could lose your property. You are entitled to have your own
 attorney review any documents. If you have any question about the
 meaning of a document, consult an attorney.
 "GET A LIST OF SUBCONTRACTORS AND SUPPLIERS. Before
 construction commences, your contractor is required to provide you
 with a list of the subcontractors and suppliers the contractor
 intends to use on your project. Your contractor is required to
 supply updated information on any subcontractors and suppliers
 added after the list is provided. Your contractor is not required
 to supply this information if you sign a written waiver of your
 rights to receive this information.
 "MONITOR THE WORK. Lenders and governmental authorities may
 inspect the work in progress from time to time for their own
 purposes. These inspections are not intended as quality control
 inspections. Quality control is a matter for you and your
 contractor. To ensure that your home is being constructed in
 accordance with your wishes and specifications, you should inspect
 the work yourself or have your own independent inspector review the
 work in progress.
 "MONITOR PAYMENTS. If you use a lender, your lender is
 required to provide you with a periodic statement showing the money
 disbursed by the lender from the proceeds of your loan. Each time
 your contractor requests payment from you or your lender for work
 performed, your contractor is also required to furnish you with a
 disbursement statement that lists the name and address of each
 subcontractor or supplier that the contractor intends to pay from
 the requested funds. Review these statements and make sure that the
 money is being properly disbursed.
 "CLAIMS BY SUBCONTRACTORS AND SUPPLIERS. Under Texas law, if
 a subcontractor or supplier who furnishes labor or materials for
 the construction of improvements on your property is not paid, you
 may be [become] liable and your property may be subject to a lien
 for the unpaid amount, even if you have not contracted directly with
 the subcontractor or supplier. To minimize your [avoid] liability,
 you should take the following actions:
 (1)  If you receive a written notice from a
 subcontractor or supplier that describes the labor or materials to
 be furnished for your improvements (referred to as a "notice of
 furnishing"), you should keep that notice in a safe place for at
 least four months after the completion of your improvements [, you
 should withhold payment from your contractor for the amount of the
 claim stated in the notice until the dispute between your
 contractor and the subcontractor or supplier is resolved]. If your
 lender is disbursing money directly to your contractor, you should
 immediately provide a copy of the notice of furnishing to your
 lender [and instruct the lender to withhold payment in the amount of
 the claim stated in the notice. If you continue to pay the
 contractor after receiving the written notice without withholding
 the amount of the claim, you may be liable and your property may be
 subject to a lien for the amount you failed to withhold]. Confirm
 that your contractor has received a copy of each notice of
 furnishing.
 (2)  As a condition to each payment to be made to the
 contractor, including the final payment, you may require the
 contractor to furnish a lien waiver from each subcontractor or
 supplier who sent a notice of furnishing, conditioned only on
 receipt of payment to the subcontractor in the amount specified by
 the lien waiver. The lien waiver should be in the form required by
 statute (Chapter 53, Property Code).  [During construction and for
 30 days after final completion, termination, or abandonment of the
 contract by the contractor, you should withhold or cause your
 lender to withhold 10 percent of the amount of payments made for the
 work performed by your contractor. This is sometimes referred to as
 "statutory retainage.' If you choose not to withhold the 10 percent
 for at least 30 days after final completion, termination, or
 abandonment of the contract by the contractor and if a valid claim
 is timely made by a claimant and your contractor fails to pay the
 claim, you may be personally liable and your property may be subject
 to a lien up to the amount that you failed to withhold.]
 "If a claim is not paid within a certain time period, the
 claimant is required to file a mechanic's lien affidavit in the real
 property records in the county where the property is located. A
 mechanic's lien affidavit is not a lien on your property, but the
 filing of the affidavit could result in a court imposing a lien on
 your property if the claimant is successful in litigation to
 enforce the lien claim.
 "SOME CLAIMS MAY NOT BE VALID. When [you receive a written
 notice of a claim or when] a mechanic's lien affidavit is filed on
 your property, you should know your legal rights and
 responsibilities regarding the claim. Not all claims are valid. In
 order to perfect a valid lien, [A notice of a claim by] a
 subcontractor or supplier is required to send you a notice of
 furnishing and a copy of the subcontractor's or supplier's recorded
 [be sent, and the] mechanic's lien affidavit [is required to be
 filed,] within strict time periods. The notice of furnishing and
 the affidavit must contain certain information. All claimants may
 not fully comply with the legal requirements to collect on a claim.
 If your property is a homestead and you did not enter into a written
 contract with your contractor that complies with the statutory
 requirements for a lien on a homestead, your contractor, the
 subcontractor, or the supplier may not claim a valid lien on your
 property. [If you have paid the contractor in full before receiving
 a notice of a claim and have fully complied with the law regarding
 statutory retainage, you may not be liable for that claim.]
 Accordingly, you should consult your attorney when you receive a
 written notice of a claim to determine the true extent of your
 liability or potential liability for that claim.
 "OBTAIN A LIEN RELEASE AND A BILLS-PAID AFFIDAVIT. [When you
 receive a notice of claim, do not release withheld funds without
 obtaining a signed and notarized release of lien and claim from the
 claimant.] You can [also] reduce the risk of having a claim filed by
 a subcontractor or supplier by requiring as a condition of each
 payment made by you or your lender that your contractor furnish you
 with an affidavit stating that all bills have been paid. Under
 Texas law, on final completion of the work and before final payment,
 the contractor is required to furnish you with an affidavit stating
 that all bills have been paid. If the contractor discloses any
 unpaid bill in the affidavit, you should withhold payment in the
 amount of the unpaid bill until you receive a waiver of lien or
 release from that subcontractor or supplier.
 "OBTAIN TITLE INSURANCE PROTECTION. You may be able to obtain
 a title insurance policy to insure that the title to your property
 and the existing improvements on your property are free from liens
 claimed by subcontractors and suppliers. If your policy is issued
 before the improvements are completed and covers the value of the
 improvements to be completed, you should obtain, on the completion
 of the improvements and as a condition of your final payment,
 a 'completion of improvements' policy endorsement. This
 endorsement will protect your property from liens claimed by
 subcontractors and suppliers that may arise from the date the
 original title policy is issued to the date of the endorsement."
 SECTION 39.  Section 53.259, Property Code, is amended by
 amending Subsections (a) and (c) to read as follows:
 (a)  As a condition of final payment under a residential
 construction contract, the original contractor shall, at the time
 the final payment is tendered, execute and deliver to the owner, or
 the owner's agent, an affidavit acknowledging the amount claimed
 for payment and stating that the original contractor has paid each
 person in full for all labor and materials used in the construction
 of improvements on the real property. If the original contractor
 has not paid each person in full, the original contractor shall
 state in the affidavit the amount owed and the name and, if known,
 the address and telephone number of each person to whom a payment is
 owed.
 (c)  A person commits an offense if the person intentionally,
 knowingly, or recklessly makes a false or misleading statement in
 an affidavit under this section. An offense under this section is a
 misdemeanor. A person adjudged guilty of an offense under this
 section shall be punished by a fine not to exceed $4,000 or
 confinement in jail for a term not to exceed one year or both a fine
 and confinement. [A person may not receive community supervision
 for the offense.]
 SECTION 40.  Section 53.281, Property Code, is amended to
 read as follows:
 Sec. 53.281.  WAIVER AND RELEASE OF LIEN OR PAYMENT BOND
 CLAIM.  (a)  Except as provided by Section 53.287, any [Any] waiver
 and release of a lien or payment bond claim under this chapter is
 unenforceable unless a waiver and release is executed and delivered
 in accordance with this subchapter.
 (b)  A waiver and release is effective to release the owner,
 the owner's property, the contractor, and the surety on a payment
 bond from claims and liens only if:
 (1)  the waiver and release substantially complies with
 one of the forms prescribed by Section 53.284;
 (2)  the waiver and release is signed by the claimant or
 the claimant's authorized agent and acknowledged [notarized]; and
 (3)  in the case of a conditional release, evidence of
 payment to the claimant exists.
 (c)  A waiver and release that substantially complies with a
 form required by Section 53.284 may be combined with a bills-paid
 affidavit that substantially conforms to the requirements of
 Section 53.085 or 53.259.
 SECTION 41.  Section 53.283, Property Code, is amended to
 read as follows:
 Sec. 53.283.  UNCONDITIONAL WAIVER AND RELEASE: PAYMENT
 REQUIRED.  (a)  A person may not require a claimant or potential
 claimant to execute an unconditional waiver and release for a
 progress payment or final payment amount unless the claimant or
 potential claimant received payment in that amount in good and
 sufficient funds.
 (b)  Notwithstanding Subsection (a), a contractual
 requirement for a claimant to waive or release the claimant's lien
 rights under this chapter before performance of the work for which
 the claim for payment is asserted is void.
 (c)  A claimant may tender an unconditional waiver and
 release for payment before the actual receipt of a payment to be
 delivered in trust to an attorney, title insurance company, title
 insurance agent, or federally insured financial institution acting
 as an escrow agent.  The escrow agent may deliver the waiver and
 release only after the claimant has confirmed receipt of payment in
 good and sufficient funds.
 SECTION 42.  Section 53.284, Property Code, is amended by
 amending Subsections (b), (c), (d), and (e) and adding Subsection
 (f) to read as follows:
 (b)  If a claimant or potential claimant is required to
 execute a waiver and release in exchange for or to induce the
 payment of a progress payment and is not paid in exchange for the
 waiver and release or if a single payee check or joint payee check
 is given in exchange for the waiver and release, the waiver and
 release must read:
 "CONDITIONAL WAIVER AND RELEASE ON PROGRESS PAYMENT
 "Project ___________________
 "Job No. ___________________
 "On receipt by the signer of this document of a check from
 ________________ (maker of check) in the sum of $__________ payable
 to _____________________ (payee or payees of check) and when the
 check has been properly endorsed and has been paid by the bank on
 which it is drawn, this document becomes effective to release any
 mechanic's lien right, any right arising from a payment bond that
 complies with a state or federal statute, any common law payment
 bond right, any claim for payment, and any rights under any similar
 ordinance, rule, or statute related to claim or payment rights for
 persons in the signer's position that the signer has on the property
 of ________________ (owner) located at ______________________
 (location) for [to] the following project [extent]:
 ______________________ (project [job] description).
 "This release covers a progress payment for all labor,
 services, equipment, or materials furnished to the property or to
 __________________ (person with whom signer contracted) as
 indicated in the attached statement(s) or progress payment
 request(s), except for unpaid retention or [,] pending
 modifications and changes [, or other items furnished].
 "Before any recipient of this document relies on this
 document, the recipient should verify evidence of payment to the
 signer.
 "The signer warrants that the signer has already paid or will
 use the funds received from this progress payment to promptly pay in
 full all of the signer's laborers, subcontractors, materialmen, and
 suppliers for all work, materials, equipment, or services provided
 for or to the above referenced project in regard to the attached
 statement(s) or progress payment request(s).
 "Date ____________________________
 "_________________________________ (Company name)
 "By ______________________________ (Signature)
 "_________________________________ (Title)
 "(Insert acknowledgment)"
 (c)  If a claimant or potential claimant is required to
 execute an unconditional waiver and release to prove the receipt of
 good and sufficient funds for a progress payment and the claimant or
 potential claimant asserts in the waiver and release that the
 claimant or potential claimant has been paid the progress payment,
 the waiver and release must:
 (1)  contain a notice at the top of the document,
 printed in bold type at least as large as the largest type used in
 the document, but not smaller than 10-point type, that reads:
 "NOTICE:
 "This document waives rights unconditionally and states that
 you have been paid for giving up those rights.  It is prohibited for
 a person to require you to sign this document if you have not been
 paid the payment amount set forth below.  If you have not been paid,
 use a conditional release form."; and
 (2)  below the notice, read:
 "UNCONDITIONAL WAIVER AND RELEASE ON PROGRESS PAYMENT
 "Project ___________________
 "Job No. ___________________
 "The signer of this document has been paid and has received a
 progress payment in the sum of $___________ for all labor,
 services, equipment, or materials furnished to the property or to
 _____________________ (person with whom signer contracted) on the
 property of _______________________ (owner) located at
 ______________________ (location) for [to] the following project
 [extent]: ______________________ (project [job] description).  The
 signer therefore waives and releases any mechanic's lien right, any
 right arising from a payment bond that complies with a state or
 federal statute, any common law payment bond right, any claim for
 payment, and any rights under any similar ordinance, rule, or
 statute related to claim or payment rights for persons in the
 signer's position that the signer has on the above referenced
 project to the following extent:
 "This release covers a progress payment for all labor,
 services, equipment, or materials furnished to the property or to
 __________________ (person with whom signer contracted) as
 indicated in the attached statement(s) or progress payment
 request(s), except for unpaid retention or [,] pending
 modifications and changes [, or other items furnished].
 "The signer warrants that the signer has already paid or will
 use the funds received from this progress payment to promptly pay in
 full all of the signer's laborers, subcontractors, materialmen, and
 suppliers for all work, materials, equipment, or services provided
 for or to the above referenced project in regard to the attached
 statement(s) or progress payment request(s).
 "Date ____________________________
 "_________________________________ (Company name)
 "By ______________________________ (Signature)
 "_________________________________ (Title)
 "(Insert acknowledgment)"
 (d)  If a claimant or potential claimant is required to
 execute a waiver and release in exchange for or to induce the
 payment of a final payment and is not paid in good and sufficient
 funds in exchange for the waiver and release or if a single payee
 check or joint payee check is given in exchange for the waiver and
 release, the waiver and release must read:
 "CONDITIONAL WAIVER AND RELEASE ON FINAL PAYMENT
 "Project ___________________
 "Job No. ___________________
 "On receipt by the signer of this document of a check from
 ________________ (maker of check) in the sum of $____________
 payable to _____________________ (payee or payees of check) and
 when the check has been properly endorsed and has been paid by the
 bank on which it is drawn, this document becomes effective to
 release any mechanic's lien right, any right arising from a payment
 bond that complies with a state or federal statute, any common law
 payment bond right, any claim for payment, and any rights under any
 similar ordinance, rule, or statute related to claim or payment
 rights for persons in the signer's position that the signer has on
 the property of _____________________ (owner) located at
 ______________________ (location) for [to] the following project
 [extent]: ______________________ (project [job] description).
 "This release covers the final payment to the signer for all
 labor, services, equipment, or materials furnished to the property
 or to __________________ (person with whom signer contracted).
 "Before any recipient of this document relies on this
 document, the recipient should verify evidence of payment to the
 signer.
 "The signer warrants that the signer has already paid or will
 use the funds received from this final payment to promptly pay in
 full all of the signer's laborers, subcontractors, materialmen, and
 suppliers for all work, materials, equipment, or services provided
 for or to the above referenced project up to the date of this waiver
 and release.
 "Date ____________________________
 "_________________________________ (Company name)
 "By ______________________________ (Signature)
 "_________________________________ (Title)
 "(Insert acknowledgment)"
 (e)  If a claimant or potential claimant is required to
 execute an unconditional waiver and release to prove the receipt of
 good and sufficient funds for a final payment and the claimant or
 potential claimant asserts in the waiver and release that the
 claimant or potential claimant has been paid the final payment, the
 waiver and release must:
 (1)  contain a notice at the top of the document,
 printed in bold type at least as large as the largest type used in
 the document, but not smaller than 10-point type, that reads:
 "NOTICE:
 "This document waives rights unconditionally and states that
 you have been paid for giving up those rights.  It is prohibited for
 a person to require you to sign this document if you have not been
 paid the payment amount set forth below.  If you have not been paid,
 use a conditional release form."; and
 (2)  below the notice, read:
 "UNCONDITIONAL WAIVER AND RELEASE ON FINAL PAYMENT
 "Project ___________________
 "Job No. ___________________
 "The signer of this document has been paid in full for all
 labor, services, equipment, or materials furnished to the property
 or to ___________________ (person with whom signer contracted) on
 the property of ______________________ (owner) located at
 ______________________ (location) for [to] the following project
 [extent]: ______________________ (project [job] description).  The
 signer therefore waives and releases any mechanic's lien right, any
 right arising from a payment bond that complies with a state or
 federal statute, any common law payment bond right, any claim for
 payment, and any rights under any similar ordinance, rule, or
 statute related to claim or payment rights for persons in the
 signer's position.
 "The signer warrants that the signer has already paid or will
 use the funds received from this final payment to promptly pay in
 full all of the signer's laborers, subcontractors, materialmen, and
 suppliers for all work, materials, equipment, or services provided
 for or to the above referenced project up to the date of this waiver
 and release.
 "Date ____________________________
 "_________________________________ (Company name)
 "By ______________________________ (Signature)
 "_________________________________ (Title)
 "(Insert acknowledgment)"
 (f)  If the owner has filed and posted a notice of
 commencement as required by Section 53.125, the owner may require,
 as a condition for final payment, a claimant who has filed a notice
 of furnishing to file with the lien website a conditional waiver and
 release on final payment described by Subsection (d).
 SECTION 43.  The following provisions of the Property Code
 are repealed:
 (1)  Section 53.001(11);
 (2)  Section 53.022(b);
 (3)  Section 53.025;
 (4)  Section 53.053;
 (5)  Section 53.056;
 (6)  Section 53.057;
 (7)  Section 53.058;
 (8)  Section 53.083;
 (9)  Section 53.084;
 (10)  Subchapter E, Chapter 53;
 (11)  Section 53.206(c);
 (12)  Section 53.252;
 (13)  Section 53.253; and
 (14)  Section 53.254(g).
 SECTION 44.  The changes in law made by this Act apply only
 to an original contract entered into on or after the effective date
 of this Act. An original contract entered into before the effective
 date of this Act is governed by the law as it existed immediately
 before the effective date of this Act, and that law is continued in
 effect for that purpose.
 SECTION 45.  This Act takes effect May 1, 2018.