Texas 2019 - 86th Regular

Texas Senate Bill SB500 Latest Draft

Bill / Enrolled Version Filed 05/27/2019

                            S.B. No. 500


 AN ACT
 relating to making supplemental appropriations and reductions in
 appropriations and giving direction, including direction regarding
 reimbursement, and adjustment authority regarding appropriations.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  COMPTROLLER OF PUBLIC ACCOUNTS: TEXAS TOMORROW
 FUND. In addition to amounts previously appropriated for the state
 fiscal biennium ending August 31, 2019, the amount necessary to
 fund the prepaid higher education tuition program described by
 Section 19, Article VII, Texas Constitution, for the two-year
 period beginning on the effective date of this Act (estimated to be
 $210,981,159) is appropriated from the economic stabilization fund
 to the comptroller of public accounts for that period for the
 purpose of immediately depositing that amount in the Texas tomorrow
 fund created under that section.
 SECTION 2.  APPROPRIATION REDUCTION: FACILITIES COMMISSION.
 The unencumbered appropriations from the general revenue fund to
 the Facilities Commission made by Chapter 605 (S.B. 1), Acts of the
 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act), for use during the state fiscal biennium
 ending August 31, 2019, for lease payments are reduced by
 $22,589,128.  The commission shall identify the strategies and
 objectives to which the reduction is to be allocated and the amount
 of the reduction for each of those strategies and objectives.
 SECTION 3.  APPROPRIATION REDUCTION: PUBLIC FINANCE
 AUTHORITY. The unencumbered appropriations from the general
 revenue fund to the Public Finance Authority made by Chapter 605
 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 (the
 General Appropriations Act), for use during the state fiscal
 biennium ending August 31, 2019, for bond debt service payments,
 including appropriations subject to Rider 3, page I-48, Chapter 605
 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 (the
 General Appropriations Act), to the bill pattern of the
 appropriations to the authority, are reduced by a total aggregate
 of $35,078,954.  The authority shall identify the strategies and
 objectives to which the reduction is to be allocated and the amount
 of the reduction for each of those strategies and objectives.
 SECTION 4.  APPROPRIATION REDUCTION: OFFICE OF THE ATTORNEY
 GENERAL. (a)  It is the intent of the legislature that the Texas
 Child Support Enforcement System 2.0 project be canceled as of the
 effective date of this Act.
 (b)  The unencumbered appropriations from the general
 revenue fund to the Office of the Attorney General made by Chapter
 605 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017
 (the General Appropriations Act), for use during the state fiscal
 biennium ending August 31, 2019, for Strategy B.1.1., Child Support
 Enforcement, as listed in that Act, are reduced by $21,799,752,
 including $11,370,987 from the Child Support Retained Collection
 Account.
 SECTION 5.  TRUSTEED PROGRAMS WITHIN THE OFFICE OF THE
 GOVERNOR: DISASTER GRANTS.  In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $100,000,000 is appropriated from the economic stabilization fund
 to the Trusteed Programs within the Office of the Governor for the
 two-year period beginning on the effective date of this Act for
 disaster grants under Strategy A.1.1., Disaster Funds, as listed in
 Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act).
 SECTION 6.  LIBRARY AND ARCHIVES COMMISSION: ADDITIONAL
 APPROPRIATIONS. In addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, $4,400,000 is
 appropriated from the general revenue fund to the Library and
 Archives Commission for the two-year period beginning on the
 effective date of this Act for renovating the Promontory Point
 Drive facility in the City of Austin, Texas, for the storage of
 public records.
 SECTION 7.  TEXAS HISTORICAL COMMISSION: NATIONAL MUSEUM OF
 THE PACIFIC WAR. In addition to amounts previously appropriated
 for the state fiscal biennium ending August 31, 2019, $2,149,600 is
 appropriated from the economic stabilization fund to the Texas
 Historical Commission for the two-year period beginning on the
 effective date of this Act for capital projects at the National
 Museum of the Pacific War under Strategy A.1.4., Historic Sites, as
 listed in Chapter 605 (S.B. 1), Acts of the 85th Legislature,
 Regular Session, 2017 (the General Appropriations Act), including:
 (1)  updates to the electrical, security, and heating,
 ventilation, and air conditioning systems;
 (2)  projects to address accessibility issues;
 (3)  exterior, roofing, and structural repairs to the
 Nimitz Barn maintenance area;
 (4)  refurbishment of the Bush Gallery to address wear
 and tear from visitor volume; and
 (5)  technology upgrades to exhibits in the Bush
 Gallery.
 SECTION 8.  TEXAS HISTORICAL COMMISSION: COURTHOUSE
 PRESERVATION GRANTS. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $25,000,000 is appropriated from the economic stabilization fund to
 the Texas Historical Commission for the two-year period beginning
 on the effective date of this Act for courthouse preservation
 grants under Strategy A.1.3., Courthouse Preservation, as listed in
 Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act).
 SECTION 9.  TEXAS HISTORICAL COMMISSION: DEFERRED
 MAINTENANCE. In addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, and in addition to
 other amounts appropriated by this Act, the following amounts are
 appropriated from the economic stabilization fund to the Texas
 Historical Commission for the two-year period beginning on the
 effective date of this Act for the following strategies as listed in
 Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act), for deferred
 maintenance projects:
 (1)  $300,000 for Strategy A.1.1., Architectural
 Assistance; and
 (2)  $2,586,250 for Strategy A.1.4., Historic Sites.
 SECTION 10.  TEXAS HISTORICAL COMMISSION: LEVI JORDAN
 PLANTATION. In addition to amounts previously appropriated for the
 state fiscal biennium ending August 31, 2019, and in addition to
 other amounts appropriated by this Act, $2,000,000 is appropriated
 from the economic stabilization fund to the Texas Historical
 Commission for the two-year period beginning on the effective date
 of this Act for historic site planning at the Levi Jordan
 Plantation, including architectural, engineering, interpretive,
 and site survey services and collections conservation and
 acquisition to develop museum exhibits, under Strategy A.1.4.,
 Historic Sites, as listed in Chapter 605 (S.B. 1), Acts of the 85th
 Legislature, Regular Session, 2017 (the General Appropriations
 Act).
 SECTION 11.  DEPARTMENT OF FAMILY AND PROTECTIVE SERVICES:
 FOSTER CARE. In addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, $88,585,541 is
 appropriated from the general revenue fund to the Department of
 Family and Protective Services for the state fiscal year ending
 August 31, 2019, for foster care payments under Strategy B.1.9.,
 Foster Care Payments, as listed in Chapter 605 (S.B. 1), Acts of the
 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act).
 SECTION 12.  DEPARTMENT OF FAMILY AND PROTECTIVE SERVICES:
 RELATIVE CAREGIVER PAYMENTS. (a)  In addition to amounts
 previously appropriated for the state fiscal biennium ending August
 31, 2019, $6,833,593 is appropriated from the general revenue fund
 to the Department of Family and Protective Services for the state
 fiscal year ending August 31, 2019, for relative caregiver payments
 under Strategy B.1.11., Relative Caregiver Payments, as listed in
 Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act).
 (b)  The unencumbered appropriations from federal Temporary
 Assistance for Needy Families (TANF) funds to the Department of
 Family and Protective Services made by Chapter 605 (S.B. 1), Acts of
 the 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act), for use during the state fiscal biennium
 ending August 31, 2019, for relative caregiver payments under
 Strategy B.1.11., Relative Caregiver Payments, as listed in that
 Act, are reduced by $8,481,040.
 SECTION 13.  DEPARTMENT OF FAMILY AND PROTECTIVE SERVICES:
 DAY CARE. In addition to amounts previously appropriated for the
 state fiscal biennium ending August 31, 2019, $5,000,000 is
 appropriated from federal Child Care and Development Block Grant
 funds to the Department of Family and Protective Services for the
 state fiscal year ending August 31, 2019, for day care payments
 under Strategy B.1.3., TWC Contracted Day Care, as listed in
 Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act).
 SECTION 14.  DEPARTMENT OF FAMILY AND PROTECTIVE SERVICES:
 PURCHASED CLIENT SERVICES. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 the following amounts are appropriated from the general revenue
 fund to the Department of Family and Protective Services for the
 state fiscal year ending August 31, 2019, for the following
 strategies as listed in Chapter 605 (S.B. 1), Acts of the 85th
 Legislature, Regular Session, 2017 (the General Appropriations
 Act), for purchased client services:
 (1)  $4,908,619 for Strategy B.1.4., Adoption
 Purchased Services;
 (2)  $10,550,475 for Strategy B.1.7., Substance Abuse
 Purchased Services; and
 (3)  $5,792,750 for Strategy B.1.8., Other CPS
 Purchased Services.
 SECTION 15.  DEPARTMENT OF STATE HEALTH SERVICES: X-ALD
 NEWBORN SCREENING. In addition to amounts previously appropriated
 for the state fiscal biennium ending August 31, 2019, $7,927,458 is
 appropriated from the general revenue fund to the Department of
 State Health Services for the two-year period beginning on the
 effective date of this Act for screening newborns for X-linked
 adrenoleukodystrophy (X-ALD) under Strategy A.4.1., Laboratory
 Services, as listed in Chapter 605 (S.B. 1), Acts of the 85th
 Legislature, Regular Session, 2017 (the General Appropriations
 Act).
 SECTION 16.  DEPARTMENT OF STATE HEALTH SERVICES: EMERGENCY
 GENERATOR. In addition to amounts previously appropriated for the
 state fiscal biennium ending August 31, 2019, $12,000,000 is
 appropriated from the economic stabilization fund to the Department
 of State Health Services for the two-year period beginning on the
 effective date of this Act for an emergency generator for the Austin
 laboratory to continue laboratory functions during a power outage
 under Strategy A.4.1., Laboratory Services, as listed in Chapter
 605 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017
 (the General Appropriations Act).
 SECTION 17.  DEPARTMENT OF STATE HEALTH SERVICES: TRAUMA
 CAPACITY AND RESPONSE INFRASTRUCTURE. (a)  In addition to amounts
 previously appropriated for the state fiscal biennium ending August
 31, 2019, $17,000,000 is appropriated from the economic
 stabilization fund to the Department of State Health Services for
 the two-year period beginning on the effective date of this Act for
 increasing trauma capacity and improving related trauma response
 infrastructure under Strategy B.2.1., EMS and Trauma Care Systems,
 as listed in Chapter 605 (S.B. 1), Acts of the 85th Legislature,
 Regular Session, 2017 (the General Appropriations Act).
 (b)  Of the amount appropriated under Subsection (a) of this
 section, $2,000,000 may be used only to provide funding in
 accordance with Section 780.004, Health and Safety Code, to trauma
 service area regional advisory councils for improving emergency
 management services.
 (c)  Of the amount appropriated under Subsection (a) of this
 section, $15,000,000 may be used only to provide funding in
 accordance with Section 780.004, Health and Safety Code, to
 hospitals that demonstrate regional need and the ability to
 efficiently and effectively increase trauma capacity and improve
 related trauma response infrastructure.  The Department of State
 Health Services shall allocate:
 (1)  at least 40 percent of that amount to provide
 funding to hospitals in the Rio Grande Valley, prioritizing, to the
 extent consistent with general law, primary teaching hospitals in
 that region with a general surgery residency program pursuing
 designation as a level I trauma facility; and
 (2)  not more than 40 percent of that amount to provide
 funding to hospitals located in a region directly affected by
 Hurricane Harvey.
 (d)  Any funding provided to an entity under Subsection (b)
 or (c) of this section that is not spent for the purpose for which
 the funding was provided must be returned to the state.
 (e)  The unexpended balance of money allocated as provided by
 Subsection (b) or (c) of this section as of August 31, 2020, is
 appropriated to the Department of State Health Services for the
 state fiscal year ending August 31, 2021, for the purpose for which
 it was allocated.
 SECTION 18.  HEALTH AND HUMAN SERVICES COMMISSION: MEDICAID
 SHORTFALL. (a)  In addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, $2,000,000,000 is
 appropriated from the general revenue fund, and $2,150,000,000 is
 appropriated from federal funds, to the Health and Human Services
 Commission for the state fiscal year ending August 31, 2019, for
 Medicaid client services under Goal A, Medicaid Client Services, as
 listed in Chapter 605 (S.B. 1), Acts of the 85th Legislature,
 Regular Session, 2017 (the General Appropriations Act).
 (b)  Of the amounts appropriated under Subsection (a) of this
 section, the Health and Human Services Commission shall transfer
 the following amounts from Goal A, Medicaid Client Services, to the
 following strategies as listed in Chapter 605 (S.B. 1), Acts of the
 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act):
 (1)  $5,500,000 to Strategy D.2.3., Community Mental
 Health Crisis Services; and
 (2)  $2,000,000 to Strategy D.2.2., Community Mental
 Health Services - Children.
 SECTION 19.  HEALTH AND HUMAN SERVICES COMMISSION: RATE
 INCREASE FOR CHILDREN'S HOSPITALS.  In addition to amounts
 previously appropriated for the state fiscal biennium ending August
 31, 2019, $50,000,000 is appropriated from the general revenue fund
 to the Health and Human Services Commission for the two-year period
 beginning on the effective date of this Act for a rate increase for
 children's hospitals under Strategy A.1.5., Children, as listed in
 Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act).
 SECTION 20.  HEALTH AND HUMAN SERVICES COMMISSION:
 REPLACEMENT OF MONEY TRANSFERRED TO ADDRESS NEEDS RESULTING FROM
 HURRICANE HARVEY. In addition to amounts previously appropriated
 for the state fiscal biennium ending August 31, 2019, $110,000,000
 is appropriated from the economic stabilization fund to the Health
 and Human Services Commission for the state fiscal year ending
 August 31, 2019, for Medicaid client services under Strategy
 A.1.5., Children, as listed in Chapter 605 (S.B. 1), Acts of the
 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act), to replace money transferred from that
 strategy to disaster assistance programs to address needs resulting
 from Hurricane Harvey.
 SECTION 21.  HEALTH AND HUMAN SERVICES COMMISSION: STATE
 HOSPITAL CONSTRUCTION. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $445,354,363 is appropriated from the economic stabilization fund
 to the Health and Human Services Commission for the two-year period
 beginning on the effective date of this Act for continuing
 improvements to state hospital facilities under Strategy G.4.2.,
 Facility Capital Repairs and Renovations, as listed in Chapter 605
 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 (the
 General Appropriations Act), as follows:
 (1)  $90,054,363 for construction of a 100-bed
 non-maximum security unit at Rusk State Hospital;
 (2)  $165,000,000 to begin construction of a 240-bed
 replacement campus of Austin State Hospital; and
 (3)  $190,300,000 to begin construction of a 300-bed
 replacement campus of San Antonio State Hospital.
 SECTION 22.  APPROPRIATION REDUCTION: HEALTH AND HUMAN
 SERVICES COMMISSION. The unencumbered appropriations from the
 economic stabilization fund to the Health and Human Services
 Commission made by Chapter 605 (S.B. 1), Acts of the 85th
 Legislature, Regular Session, 2017 (the General Appropriations
 Act), for use during the state fiscal biennium ending August 31,
 2019, for Strategy G.4.2., Facility Capital Repairs and
 Renovations, as listed in that Act, and subject to Rider 221(b),
 page II-111, Chapter 605 (S.B. 1), Acts of the 85th Legislature,
 Regular Session, 2017 (the General Appropriations Act), to the bill
 pattern of the appropriations to the commission, are reduced by
 $2,000,000.
 SECTION 23.  HEALTH AND HUMAN SERVICES COMMISSION: CERTAIN
 TRANSFERS. From amounts previously appropriated for the state
 fiscal biennium ending August 31, 2019, the Health and Human
 Services Commission shall transfer $6,154,893 from Goal A, Medicaid
 Client Services, to Strategy B.1.1., Medicaid Contracts and
 Administration, as listed in Chapter 605 (S.B. 1), Acts of the 85th
 Legislature, Regular Session, 2017 (the General Appropriations
 Act), for use for contingency contracts.
 SECTION 24.  HEALTH AND HUMAN SERVICES COMMISSION: HEALTHY
 TEXAS WOMEN PROGRAM SHORTFALL. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $10,300,000 is appropriated from the general revenue fund to the
 Health and Human Services Commission for the state fiscal year
 ending August 31, 2019, for the Healthy Texas Women program under
 Strategy D.1.1., Women's Health Program, as listed in Chapter 605
 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 (the
 General Appropriations Act).
 SECTION 25.  HEALTH AND HUMAN SERVICES COMMISSION: MENTAL
 HEALTH STATE HOSPITALS. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $31,700,000 is appropriated from the general revenue fund to the
 Health and Human Services Commission for the state fiscal year
 ending August 31, 2019, for mental health state hospital services
 under Strategy G.2.1., Mental Health State Hospitals, as listed in
 Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act).
 SECTION 26.  HEALTH AND HUMAN SERVICES COMMISSION: EARLY
 CHILDHOOD INTERVENTION. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $1,500,000 is appropriated from the general revenue fund to the
 Health and Human Services Commission for the state fiscal year
 ending August 31, 2019, for early childhood intervention under
 Strategy D.1.3., Early Childhood Intervention Services, as listed
 in Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act).
 SECTION 27.  HEALTH AND HUMAN SERVICES COMMISSION: STATE
 SUPPORTED LIVING CENTERS. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $10,100,000 is appropriated from the general revenue fund to the
 Health and Human Services Commission for the state fiscal year
 ending August 31, 2019, for state supported living centers under
 Strategy G.1.1., State Supported Living Centers, as listed in
 Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act).
 SECTION 28.  HEALTH AND HUMAN SERVICES COMMISSION: REPURPOSE
 OF EXPENDITURE OF FUNDS. Notwithstanding Section 20 of the Special
 Provisions Relating to All Health and Human Services Agencies, page
 II-124, Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act), the Health and
 Human Services Commission may use $63,832,747 of the amount
 appropriated under that Act to the commission for Goal A, Medicaid
 Client Services, as listed in that Act and designated under that
 rider for use only for the health insurance providers fee, for
 Medicaid client services.
 SECTION 29.  APPROPRIATION REDUCTION: TEXAS EDUCATION
 AGENCY; SUM-CERTAIN APPROPRIATION FOR FOUNDATION SCHOOL PROGRAM.
 (a)  The unencumbered appropriations from the Foundation School
 Fund, general revenue account number 0193, to the Texas Education
 Agency made by Chapter 605 (S.B. 1), Acts of the 85th Legislature,
 Regular Session, 2017 (the General Appropriations Act), for use
 during the state fiscal biennium ending August 31, 2019, for
 Strategy A.1.1., FSP - Equalized Operations, as listed in that Act,
 are reduced by $903,300,000.
 (b)  Notwithstanding Rider 3, page III-5, Chapter 605 (S.B.
 1), Acts of the 85th Legislature, Regular Session, 2017 (the
 General Appropriations Act), to the bill pattern of the
 appropriations to the Texas Education Agency, the sum-certain
 appropriation to the Foundation School Program for the state fiscal
 year ending August 31, 2019, is $21,495,735,602.
 SECTION 30.  TEXAS EDUCATION AGENCY: SPECIAL EDUCATION
 SUPPORTS AND MAINTENANCE OF STATE FINANCIAL SUPPORT FOR SPECIAL
 EDUCATION. (a)  In addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, the following
 amounts are appropriated from the general revenue fund to the Texas
 Education Agency for the two-year period beginning on the effective
 date of this Act for the following purposes:
 (1)  $33,302,428 to offset federal funds withheld or
 expected to be withheld as a result of a failure to maintain state
 financial support for special education under 20 U.S.C. Section
 1412(a)(18) during the state fiscal year ending August 31, 2012;
 (2)  $74,626,551 to negotiate a settlement agreement
 with the federal government to prevent the withholding of federal
 funds as a result of a failure to maintain state financial support
 for special education under 20 U.S.C. Section 1412(a)(18) during
 the state fiscal years ending August 31, 2017 (estimated to be
 $41,594,326), and August 31, 2018 (estimated to be $33,032,225);
 and
 (3)  $111,625,833 for the following strategies as
 listed in Chapter 605 (S.B. 1), Acts of the 85th Legislature,
 Regular Session, 2017 (the General Appropriations Act), to prevent
 a failure to maintain state financial support for special education
 under 20 U.S.C. Section 1412(a)(18) during the state fiscal year
 ending August 31, 2019:
 (A)  $50,000,000 for Strategy A.2.3., Students
 with Disabilities, for grants to reimburse school districts for:
 (i)  providing extended school year services
 to students enrolled in a special education program under
 Subchapter A, Chapter 29, Education Code;
 (ii)  costs related to identification of
 students eligible to participate in a school district's special
 education program under Section 29.003, Education Code, including
 full individual and initial evaluations and independent education
 evaluations; and
 (iii)  compensatory services costs related
 to the provision of services to students under the Individuals with
 Disabilities Education Act (20 U.S.C. Section 1400 et seq.);
 (B)  $478,500 for information technology needs
 related to special education supports under Strategy B.3.5.,
 Information Systems - Technology; and
 (C)  $61,147,333 for special education funding
 under Strategy A.1.1., FSP - Equalized Operations.
 (b)  The amount appropriated under Subsection (a)(1) of this
 section must be used in the same manner and for the same purposes as
 the withheld federal funds would have been provided.
 (c)  The amounts appropriated under Subsections (a)(2) and
 (3)(C) of this section must be used to provide funding for public
 schools under Strategy A.1.1., FSP - Equalized Operations, as
 listed in Chapter 605 (S.B. 1), Acts of the 85th Legislature,
 Regular Session, 2017 (the General Appropriations Act), to be
 distributed for each full-time equivalent student in average daily
 attendance in a special education program under Subchapter A,
 Chapter 29, Education Code, in proportion to the applicable weight
 for the student under the public school finance system.
 (d)  Not later than December 31, 2020, the Texas Education
 Agency shall report to the Legislative Budget Board and the office
 of the governor regarding the use of funds appropriated under
 Subsection (a)(3)(A) of this section.
 SECTION 31.  TEXAS EDUCATION AGENCY: POST-DISASTER SCHOOL
 SAFETY. (a)  In addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, $10,930,000 is
 appropriated from the economic stabilization fund to the Texas
 Education Agency for the two-year period beginning on the effective
 date of this Act to provide a grant to a school district that
 experienced a school shooting resulting in one or more fatalities
 that occurred during the state fiscal biennium ending August 31,
 2019.
 (b)  The Texas Education Agency may provide a grant to a
 school district with funding appropriated under Subsection (a) of
 this section only for uses relating to necessary and appropriate
 post-disaster recovery approved by the agency in accordance with
 procedures adopted under general law.
 SECTION 32.  TEXAS EDUCATION AGENCY: ADDITIONAL
 APPROPRIATIONS FOR SCHOOL SAFETY. In addition to amounts
 previously appropriated for the state fiscal biennium ending August
 31, 2019, $100,000,000 is appropriated from the economic
 stabilization fund to the Texas Education Agency for the two-year
 period beginning on the effective date of this Act to provide
 funding to public schools, including the School for the Blind and
 Visually Impaired and the School for the Deaf, under Strategy
 B.2.2., Health and Safety, as listed in Chapter 605 (S.B. 1), Acts
 of the 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act), for:
 (1)  exterior doors with push bars;
 (2)  metal detectors at school entrances;
 (3)  erected vehicle barriers;
 (4)  security systems that monitor and record school
 entrances, exits, and hallways;
 (5)  campus-wide active shooter alarm systems that are
 separate from fire alarms;
 (6)  two-way radio systems;
 (7)  perimeter security fencing;
 (8)  bullet-resistant glass or film for school
 entrances; and
 (9)  door-locking systems.
 SECTION 33.  TEXAS EDUCATION AGENCY: EXPENSES RELATED TO
 HURRICANE HARVEY. (a)  In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 the following amounts are appropriated from the economic
 stabilization fund to the Texas Education Agency for the state
 fiscal year ending August 31, 2019, for Strategy A.1.1., FSP -
 Equalized Operations, as listed in Chapter 605 (S.B. 1), Acts of the
 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act), for the following purposes related to
 increased state costs under the Foundation School Program resulting
 from Hurricane Harvey:
 (1)  $271,300,000 for:
 (A)  increased student costs;
 (B)  the reduction in school district property
 values; and
 (C)  the reduction of the amount owed by school
 districts under Chapter 41, Education Code, due to disaster
 remediation costs as provided by Section 41.0931, Education Code;
 and
 (2)  $535,200,000 for the adjustment of school district
 property values under Section 42.2523, Education Code, and
 reimbursement to school districts for disaster remediation costs
 under Section 42.2524, Education Code.
 (b)  In addition to other amounts appropriated for the state
 fiscal year ending August 31, 2019, $636,000,000 is appropriated
 from the economic stabilization fund to the Texas Education Agency
 for the two-year period beginning on the effective date of this Act
 for the increased state costs under the Foundation School Program
 resulting from the reduction in school district property values
 associated with Hurricane Harvey.
 SECTION 34.  TEXAS EDUCATION AGENCY: ADULT HIGH SCHOOL
 DIPLOMA AND INDUSTRY CERTIFICATION CHARTER SCHOOL PILOT PROGRAM.
 In addition to amounts previously appropriated for the state fiscal
 biennium ending August 31, 2019, $37,657 is appropriated from the
 general revenue fund to the Texas Education Agency for the state
 fiscal year ending August 31, 2019, for the adult high school
 diploma and industry certification charter school pilot program
 under Section 29.259, Education Code, under Strategy A.2.1.,
 Statewide Educational Programs, as listed in Chapter 605 (S.B. 1),
 Acts of the 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act).
 SECTION 35.  UNIVERSITY OF TEXAS AT AUSTIN: MARINE SCIENCE
 INSTITUTE. In addition to amounts previously appropriated for the
 state fiscal biennium ending August 31, 2019, $10,200,000 is
 appropriated from the economic stabilization fund to The University
 of Texas at Austin for the two-year period beginning on the
 effective date of this Act for storm damage prevention and
 compliance and the mitigation of damages related to Hurricane
 Harvey under Strategy C.2.1., Marine Science Institute, as listed
 in Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act).
 SECTION 36.  UNIVERSITY OF HOUSTON: EXPENSES RELATED TO
 HURRICANE HARVEY. In addition to amounts previously appropriated
 for the state fiscal biennium ending August 31, 2019, $20,288,883
 is appropriated from the economic stabilization fund to the
 University of Houston for the two-year period beginning on the
 effective date of this Act for expenses related to Hurricane
 Harvey.
 SECTION 37.  UNIVERSITY OF HOUSTON - CLEAR LAKE: EXPENSES
 RELATED TO HURRICANE HARVEY. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $83,668 is appropriated from the economic stabilization fund to the
 University of Houston - Clear Lake for the two-year period
 beginning on the effective date of this Act for expenses related to
 Hurricane Harvey.
 SECTION 38.  UNIVERSITY OF HOUSTON - DOWNTOWN: EXPENSES
 RELATED TO HURRICANE HARVEY. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $4,000,000 is appropriated from the economic stabilization fund to
 the University of Houston - Downtown for the two-year period
 beginning on the effective date of this Act for expenses related to
 Hurricane Harvey.
 SECTION 39.  UNIVERSITY OF HOUSTON - VICTORIA: EXPENSES
 RELATED TO HURRICANE HARVEY. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $1,703,828 is appropriated from the economic stabilization fund to
 the University of Houston - Victoria for the two-year period
 beginning on the effective date of this Act for expenses related to
 Hurricane Harvey.
 SECTION 40.  TEXAS SOUTHERN UNIVERSITY: THERMAL PLANT AND
 STEAM TUNNEL MAINTENANCE. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $16,000,000 is appropriated from the economic stabilization fund to
 Texas Southern University for the two-year period beginning on the
 effective date of this Act for the maintenance of the university's
 central thermal plant and site/steam tunnels.
 SECTION 41.  LAMAR UNIVERSITY: PROPERTY DAMAGE RELATED TO
 HURRICANE HARVEY. In addition to amounts previously appropriated
 for the state fiscal biennium ending August 31, 2019, $1,418,585 is
 appropriated from the economic stabilization fund to Lamar
 University for the two-year period beginning on the effective date
 of this Act for property damage related to Hurricane Harvey.
 SECTION 42.  LAMAR INSTITUTE OF TECHNOLOGY: PROPERTY DAMAGE
 RELATED TO HURRICANE HARVEY. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $1,312,657 is appropriated from the economic stabilization fund to
 Lamar Institute of Technology for the two-year period beginning on
 the effective date of this Act for property damage related to
 Hurricane Harvey.
 SECTION 43.  LAMAR STATE COLLEGE - ORANGE: PROPERTY DAMAGE
 RELATED TO HURRICANE HARVEY. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $406,112 is appropriated from the economic stabilization fund to
 Lamar State College - Orange for the two-year period beginning on
 the effective date of this Act for property damage related to
 Hurricane Harvey.
 SECTION 44.  LAMAR STATE COLLEGE - PORT ARTHUR: PROPERTY
 DAMAGE RELATED TO HURRICANE HARVEY. In addition to amounts
 previously appropriated for the state fiscal biennium ending August
 31, 2019, $6,319,458 is appropriated from the economic
 stabilization fund to Lamar State College - Port Arthur for the
 two-year period beginning on the effective date of this Act for
 property damage related to Hurricane Harvey.
 SECTION 45.  TEXAS STATE TECHNICAL COLLEGE SYSTEM
 ADMINISTRATION: FACILITY ABATEMENT AND DEMOLITION.  In addition to
 amounts previously appropriated for the state fiscal biennium
 ending August 31, 2019, $29,644,640 is appropriated from the
 general revenue fund to the Texas State Technical College System
 Administration for the two-year period beginning on the effective
 date of this Act for the abatement and demolition of certain
 facilities on the system's Waco campus.  The legislature finds
 there is a demonstrated need to undertake this abatement and
 demolition.
 SECTION 46.  TEXAS A&M FOREST SERVICE: EXPENSES RELATED TO
 HURRICANE HARVEY. In addition to amounts previously appropriated
 for the state fiscal biennium ending August 31, 2019, $2,458,240 is
 appropriated from the economic stabilization fund to the Texas A&M
 Forest Service for the state fiscal year ending August 31, 2019, for
 expenses related to Hurricane Harvey.
 SECTION 47.  TEXAS A&M FOREST SERVICE: WILDFIRES.  In
 addition to amounts previously appropriated for the state fiscal
 biennium ending August 31, 2019, $54,909,580 is appropriated from
 the economic stabilization fund to the Texas A&M Forest Service for
 the state fiscal year ending August 31, 2019, for expenses related
 to wildfires.
 SECTION 48.  KILGORE COLLEGE: HIGHER EDUCATION GROUP
 INSURANCE CONTRIBUTIONS. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $1,238,238 is appropriated from the general revenue fund to Kilgore
 College for the state fiscal year ending August 31, 2019, to provide
 for state contributions for health benefits.
 SECTION 49.  LONE STAR COLLEGE SYSTEM: EXPENSES RELATED TO
 HURRICANE HARVEY. In addition to amounts previously appropriated
 for the state fiscal biennium ending August 31, 2019, $13,100,000
 is appropriated from the economic stabilization fund to the Lone
 Star College System for the two-year period beginning on the
 effective date of this Act for expenses related to Hurricane
 Harvey.
 SECTION 50.  JUDICIARY SECTION, COMPTROLLER'S DEPARTMENT:
 VISITING JUDGES PROGRAM. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $400,000 is appropriated from the general revenue fund to the
 Judiciary Section, Comptroller's Department, for the state fiscal
 year ending August 31, 2019, for visiting judge assignments to fill
 district court vacancies under Strategy A.1.2., Visiting Judges -
 Regions, as listed in Chapter 605 (S.B. 1), Acts of the 85th
 Legislature, Regular Session, 2017 (the General Appropriations
 Act).
 SECTION 51.  JUDICIARY SECTION, COMPTROLLER'S DEPARTMENT:
 LONGEVITY PAY. In addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, $523,295 is
 appropriated from the general revenue fund to the Judiciary
 Section, Comptroller's Department, for the state fiscal year ending
 August 31, 2019, for reimbursing counties for longevity pay made to
 eligible assistant district attorneys under Strategy D.1.1.,
 Assistant Prosecutor Longevity Pay, as listed in Chapter 605 (S.B.
 1), Acts of the 85th Legislature, Regular Session, 2017 (the
 General Appropriations Act).
 SECTION 52.  DEPARTMENT OF CRIMINAL JUSTICE: SURVEILLANCE
 CAMERAS. In addition to amounts previously appropriated for the
 state fiscal biennium ending August 31, 2019, $26,000,000 is
 appropriated from the economic stabilization fund to the Department
 of Criminal Justice for the two-year period beginning on the
 effective date of this Act for surveillance cameras under Strategy
 C.1.2., Correctional Support Operations, as listed in Chapter 605
 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 (the
 General Appropriations Act).
 SECTION 53.  DEPARTMENT OF CRIMINAL JUSTICE: CORRECTIONS
 INFORMATION TECHNOLOGY SYSTEM PROJECT. In addition to amounts
 previously appropriated for the state fiscal biennium ending August
 31, 2019, $24,164,000 is appropriated from the economic
 stabilization fund to the Department of Criminal Justice for the
 two-year period beginning on the effective date of this Act for
 corrections information technology system projects under Strategy
 G.1.4., Information Resources, as listed in Chapter 605 (S.B. 1),
 Acts of the 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act).
 SECTION 54.  DEPARTMENT OF CRIMINAL JUSTICE: REPAIR AND
 REHABILITATION OF BUILDINGS AND FACILITIES. In addition to amounts
 previously appropriated for the state fiscal biennium ending August
 31, 2019, $54,000,000 is appropriated from the economic
 stabilization fund to the Department of Criminal Justice for the
 two-year period beginning on the effective date of this Act for the
 repair and rehabilitation of buildings and facilities under
 Strategy D.1.1., Major Repair of Facilities, as listed in Chapter
 605 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017
 (the General Appropriations Act).
 SECTION 55.  DEPARTMENT OF CRIMINAL JUSTICE: CORRECTIONAL
 MANAGED HEALTH CARE. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $190,000,000 is appropriated from the general revenue fund to the
 Department of Criminal Justice for the state fiscal year ending
 August 31, 2019, for correctional managed health care under
 Strategy C.1.9., Hospital and Clinical Care, as listed in Chapter
 605 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017
 (the General Appropriations Act).
 SECTION 56.  DEPARTMENT OF CRIMINAL JUSTICE: REPLACEMENT OF
 MONEY TRANSFERRED TO ADDRESS NEEDS RESULTING FROM HURRICANE HARVEY.
 In addition to amounts previously appropriated for the state fiscal
 biennium ending August 31, 2019, $38,600,000 is appropriated from
 the economic stabilization fund to the Department of Criminal
 Justice for the state fiscal year ending August 31, 2019, for agency
 operations expenses under Strategy C.1.1., Correctional Security
 Operations, as listed in Chapter 605 (S.B. 1), Acts of the 85th
 Legislature, Regular Session, 2017 (the General Appropriations
 Act), to replace money transferred from that strategy to disaster
 assistance programs to address needs resulting from Hurricane
 Harvey.
 SECTION 57.  DEPARTMENT OF CRIMINAL JUSTICE: CORRECTIONAL
 OFFICER OVERTIME. In addition to amounts previously appropriated
 for the state fiscal biennium ending August 31, 2019, $30,000,000
 is appropriated from the general revenue fund to the Department of
 Criminal Justice for the state fiscal year ending August 31, 2019,
 for correctional officer overtime under Strategy C.1.1.,
 Correctional Security Operations, as listed in Chapter 605 (S.B.
 1), Acts of the 85th Legislature, Regular Session, 2017 (the
 General Appropriations Act).
 SECTION 58.  JUVENILE JUSTICE DEPARTMENT: SURVEILLANCE
 CAMERAS. In addition to amounts previously appropriated for the
 state fiscal biennium ending August 31, 2019, $7,547,000 is
 appropriated from the economic stabilization fund to the Juvenile
 Justice Department for the two-year period beginning on the
 effective date of this Act for surveillance cameras under Strategy
 F.1.2., Information Resources, as listed in Chapter 605 (S.B. 1),
 Acts of the 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act).
 SECTION 59.  DEPARTMENT OF PUBLIC SAFETY: HELICOPTER
 REPLACEMENT. In addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, $6,229,489 is
 appropriated from the economic stabilization fund to the Department
 of Public Safety for the two-year period beginning on the effective
 date of this Act for the replacement of one helicopter under
 Strategy A.1.2., Criminal Interdiction, as listed in Chapter 605
 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 (the
 General Appropriations Act).
 SECTION 60.  DEPARTMENT OF PUBLIC SAFETY: CRIME
 LABORATORIES.  In addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, $5,770,426 is
 appropriated from the general revenue fund to the Department of
 Public Safety for the state fiscal year ending August 31, 2019, for
 crime laboratory operations under Strategy E.1.1., Crime
 Laboratory Services, as listed in Chapter 605 (S.B. 1), Acts of the
 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act).
 SECTION 61.  DEPARTMENT OF PUBLIC SAFETY: EXPENSES RELATED
 TO HURRICANE HARVEY AND OTHER NATURAL DISASTERS.  In addition to
 amounts previously appropriated for the state fiscal biennium
 ending August 31, 2019, the following amounts are appropriated from
 the economic stabilization fund to the Department of Public Safety
 for the state fiscal year ending August 31, 2019, for the following
 strategies as listed in Chapter 605 (S.B. 1), Acts of the 85th
 Legislature, Regular Session, 2017 (the General Appropriations
 Act), for agency operations expenses related to Hurricane Harvey
 and other natural disasters:
 (1)  $34,954,409 for Strategy A.1.1., Organized Crime;
 (2)  $60,000,000 for Strategy C.1.1., Traffic
 Enforcement; and
 (3)  $2,000,000 for Strategy G.1.3., Information
 Technology.
 SECTION 62.  COMMISSION ON ENVIRONMENTAL QUALITY: EXPEDITED
 PROCESSING OF PERMIT APPLICATIONS. Notwithstanding Rider 29, page
 VI-24, Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act), to the bill pattern
 of the appropriations to the Commission on Environmental Quality,
 in addition to amounts previously appropriated for the state fiscal
 biennium ending August 31, 2019, the commission is appropriated for
 the state fiscal year ending August 31, 2019, all fee revenues
 collected from expedited permit review surcharges assessed under
 Section 382.05155, Health and Safety Code, and deposited to the
 Clean Air Account No. 151 in excess of the estimated amount of those
 revenues in the comptroller's biennial revenue estimate for the
 state fiscal biennium ending August 31, 2019, for costs incurred to
 support the expedited processing of permit applications.
 SECTION 63.  COMMISSION ON ENVIRONMENTAL QUALITY:
 LITIGATION EXPENSES. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $1,400,000 is appropriated from the general revenue fund to the
 Commission on Environmental Quality for the state fiscal year
 ending August 31, 2019, for litigation expenses under Strategy
 E.1.4., Rio Grande River Compact, as listed in Chapter 605 (S.B. 1),
 Acts of the 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act).
 SECTION 64.  COMMISSION ON ENVIRONMENTAL QUALITY: CAPITAL
 EXPENDITURES. (a)  Notwithstanding Rider 2, page VI-18, Chapter
 605 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017
 (the General Appropriations Act), to the bill pattern of the
 appropriations to the Commission on Environmental Quality, the
 total amount that the commission may spend for capital budget items
 for the state fiscal year ending August 31, 2019, is increased by
 $1,700,000 for security upgrades and replacing carpet.
 (b)  Notwithstanding Section 14.03, Limitation on
 Expenditures - Capital Budget, Article IX, Chapter 605 (S.B. 1),
 Acts of the 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act), the Commission on Environmental Quality may
 transfer capital budget item appropriations as necessary to make
 the security upgrades and replace carpet as authorized under
 Subsection (a) of this section.
 SECTION 65.  GENERAL LAND OFFICE: EXPENSES RELATED TO
 HURRICANE HARVEY. (a)  In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 the following amounts are appropriated from the economic
 stabilization fund to the General Land Office for the two-year
 period beginning on the effective date of this Act for the following
 strategies as listed in Chapter 605 (S.B. 1), Acts of the 85th
 Legislature, Regular Session, 2017 (the General Appropriations
 Act), to remove vessels and repair or replace structures or
 equipment damaged by Hurricane Harvey:
 (1)  $696,921 for Strategy A.2.1., Asset Management;
 (2)  $20,459,797 for Strategy B.1.1., Coastal
 Management;
 (3)  $430,000 for Strategy B.1.2., Coastal Erosion
 Control Grants; and
 (4)  $2,047,454 for Strategy B.2.1., Oil Spill
 Response.
 (b)  Contingent on the nonrenewal by the effective date of
 this Act of federal grant funding awarded by the Federal Emergency
 Management Agency for the building of emergency short-term housing,
 in addition to amounts previously appropriated for the state fiscal
 biennium ending August 31, 2019, $2,108,755 is appropriated from
 the economic stabilization fund to the General Land Office for the
 two-year period beginning on the effective date of this Act for
 full-time equivalent employees (FTEs) assigned to build emergency
 short-term housing under Strategy D.1.1., Rebuild Housing, as
 listed in Chapter 605 (S.B. 1), Acts of the 85th Legislature,
 Regular Session, 2017 (the General Appropriations Act).
 SECTION 66.  GENERAL LAND OFFICE: ABANDONED VESSEL REMOVAL.
 In addition to amounts previously appropriated for the state fiscal
 biennium ending August 31, 2019, $2,000,000 is appropriated from
 the Coastal Protection Account, general revenue dedicated account
 number 27, to the General Land Office for the two-year period
 beginning on the effective date of this Act for the removal of
 vessels abandoned as a result of Hurricane Harvey.
 SECTION 67.  APPROPRIATION REDUCTION: GENERAL LAND OFFICE.
 The unencumbered appropriations from the general revenue fund to
 the General Land Office made by Chapter 605 (S.B. 1), Acts of the
 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act), for use during the state fiscal biennium
 ending August 31, 2019, for Strategy D.1.1., Rebuild Housing, as
 listed in that Act, are reduced by $48,600,000.
 SECTION 68.  GENERAL LAND OFFICE: MATCHING FUNDS FOR U.S.
 ARMY CORPS OF ENGINEERS PROGRAMS. In addition to amounts
 previously appropriated for the state fiscal biennium ending August
 31, 2019, $200,000,000 is appropriated from the economic
 stabilization fund to the General Land Office for the two-year
 period beginning on the effective date of this Act to provide state
 matching funds to meet federal requirements for studies and
 projects planned to be conducted in the state by the United States
 Army Corps of Engineers.
 SECTION 69.  PARKS AND WILDLIFE DEPARTMENT: BATTLESHIP
 "TEXAS."  (a)  Contingent on Senate Bill No. 1511 or similar
 legislation of the 86th Legislature, Regular Session, 2019,
 relating to the operation of the Battleship "Texas" becoming law,
 in addition to amounts previously appropriated for the state fiscal
 biennium ending August 31, 2019, the following amounts are
 appropriated from the economic stabilization fund to the Parks and
 Wildlife Department for the two-year period beginning on the
 effective date of this Act for the following strategies as listed in
 Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act), for the Battleship
 "Texas":
 (1)  $35,000,000 for Strategy D.1.1., Improvements and
 Major Repairs; and
 (2)  $500,000 for Strategy B.1.1., State Park
 Operations.
 (b)  The amount appropriated under Subsection (a)(2) may be
 used only to conduct a curatorial study of artifacts associated
 with the Battleship "Texas."
 SECTION 70.  PARKS AND WILDLIFE DEPARTMENT: EXPENSES RELATED
 TO HURRICANE HARVEY. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $8,000,000 is appropriated from the economic stabilization fund to
 the Parks and Wildlife Department for the two-year period beginning
 on the effective date of this Act for Strategy D.1.1., Improvements
 and Major Repairs, as listed in Chapter 605 (S.B. 1), Acts of the
 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act), to repair structures or equipment damaged by
 Hurricane Harvey.
 SECTION 71.  PARKS AND WILDLIFE DEPARTMENT: PURCHASE OF
 INTEROPERABLE RADIOS. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $5,000,000 is appropriated from the economic stabilization fund to
 the Parks and Wildlife Department for the state fiscal year ending
 August 31, 2019, for the purchase of interoperable radios under
 Strategy C.1.1., Enforcement Programs, as listed in Chapter 605
 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 (the
 General Appropriations Act).
 SECTION 72.  PARKS AND WILDLIFE DEPARTMENT: WYLER AERIAL
 TRAMWAY. In addition to amounts previously appropriated for the
 state fiscal biennium ending August 31, 2019, $5,000,000 is
 appropriated from the economic stabilization fund to the Parks and
 Wildlife Department for the two-year period beginning on the
 effective date of this Act for overhaul and necessary construction
 related to the Wyler Aerial Tramway and the related tramway system
 under Strategy D.1.1., Improvements and Major Repairs, as listed in
 Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act).
 SECTION 73.  SOIL AND WATER CONSERVATION BOARD: DAM
 INFRASTRUCTURE PROJECTS. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $150,000,000 is appropriated from the economic stabilization fund
 to the Soil and Water Conservation Board for the two-year period
 beginning on the effective date of this Act for dam infrastructure
 projects.
 SECTION 74.  WATER DEVELOPMENT BOARD: MATCHING FUNDS FOR
 FEMA HAZARD MITIGATION GRANT PROGRAM. (a)  In addition to amounts
 previously appropriated for the state fiscal biennium ending August
 31, 2019, $273,000,000 is appropriated from the economic
 stabilization fund to the Water Development Board for the two-year
 period beginning on the effective date of this Act for the purpose
 of providing matching funds for projects sponsored by
 municipalities and counties in this state and approved for the
 Hazard Mitigation Grant program administered by the Federal
 Emergency Management Agency.
 (b)  Contingent on Senate Bill No. 7 or similar legislation
 of the 86th Legislature, Regular Session, 2019, relating to flood
 control planning and the funding of flood planning, mitigation, and
 infrastructure projects becoming law:
 (1)  the appropriation of money made in Subsection (a)
 of this section has no effect; and
 (2)  in addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, $273,000,000 is
 appropriated from the Texas infrastructure resiliency fund to the
 Water Development Board for the two-year period beginning on the
 effective date of this Act for the purpose of providing matching
 funds for projects sponsored by municipalities and counties in this
 state and approved for the Hazard Mitigation Grant program
 administered by the Federal Emergency Management Agency.
 SECTION 75.  WATER DEVELOPMENT BOARD: MATCHING FUNDS FOR
 FEMA PUBLIC ASSISTANCE GRANT PROGRAM. (a)  In addition to amounts
 previously appropriated for the state fiscal biennium ending August
 31, 2019, $365,000,000 is appropriated from the economic
 stabilization fund to the Water Development Board for the two-year
 period beginning on the effective date of this Act for the purpose
 of providing matching funds for projects sponsored by
 municipalities and counties in this state and approved for the
 Public Assistance grant program administered by the Federal
 Emergency Management Agency.
 (b)  Contingent on Senate Bill No. 7 or similar legislation
 of the 86th Legislature, Regular Session, 2019, relating to flood
 control planning and the funding of flood planning, mitigation, and
 infrastructure projects becoming law:
 (1)  the appropriation of money made in Subsection (a)
 of this section has no effect; and
 (2)  in addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, $365,000,000 is
 appropriated from the Texas infrastructure resiliency fund to the
 Water Development Board for the two-year period beginning on the
 effective date of this Act for the purpose of providing matching
 funds for projects sponsored by municipalities and counties in this
 state and approved for the Public Assistance grant program
 administered by the Federal Emergency Management Agency.
 (c)  Out of the amount appropriated under Subsection (a) or
 (b) of this section, as applicable, $30,000,000 may be used only to
 provide a grant to Harris County to remove accumulated siltation
 and sediment deposits located at the confluence of the San Jacinto
 River and Lake Houston.
 SECTION 76.  WATER DEVELOPMENT BOARD: STATE FLOOD RISK MAPS
 AND STATE FLOOD PLAN. (a)  In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 and in addition to other amounts appropriated by this Act, the
 following amounts are appropriated from the economic stabilization
 fund to the Water Development Board for the two-year period
 beginning on the effective date of this Act for the following
 strategies as listed in Chapter 605 (S.B. 1), Acts of the 85th
 Legislature, Regular Session, 2017 (the General Appropriations
 Act), for developing or updating flood risk maps in the state, using
 current data and technology standards, to support development of a
 state flood plan:
 (1)  $43,970,000 for Strategy A.4.1., Perform
 Community Assistance Related to NFIP;
 (2)  $1,330,000 for Strategy D.1.1., Central
 Administration; and
 (3)  $1,700,000 for Strategy D.1.2., Information
 Resources.
 (b)  Contingent on Senate Bill No. 7 or similar legislation
 of the 86th Legislature, Regular Session, 2019, relating to flood
 control planning and the funding of flood planning, mitigation, and
 infrastructure projects becoming law:
 (1)  the appropriation of money made in Subsection (a)
 of this section has no effect; and
 (2)  in addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, and in addition to
 other amounts appropriated by this Act, the following amounts are
 appropriated from the floodplain management account 0330 in the
 Texas infrastructure resiliency fund to the Water Development Board
 for the two-year period beginning on the effective date of this Act
 for the following strategies as listed in Chapter 605 (S.B. 1), Acts
 of the 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act), for developing or updating flood risk maps in
 the state, using current data and technology standards, to support
 development of a state flood plan:
 (A)  $43,970,000 for Strategy A.4.1., Perform
 Community Assistance Related to NFIP;
 (B)  $1,330,000 for Strategy D.1.1., Central
 Administration; and
 (C)  $1,700,000 for Strategy D.1.2., Information
 Resources.
 (c)  Using money appropriated by Subsection (a) or (b) of
 this section, as applicable, the Water Development Board may employ
 22.0 full-time equivalent employees (FTEs) during the state fiscal
 year ending August 31, 2020, and 36.0 FTEs during the state fiscal
 year ending August 31, 2021, in addition to the number of FTEs the
 board is authorized by other law to employ during those state fiscal
 years.
 SECTION 77.  WATER DEVELOPMENT BOARD: FLOOD INFRASTRUCTURE
 PROJECTS. (a)  In addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, and in addition to
 other amounts appropriated by this Act, the following amounts are
 appropriated from the economic stabilization fund to the Water
 Development Board for the two-year period beginning on the
 effective date of this Act for the following strategies as listed in
 Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act), for infrastructure
 projects related to drainage, flood mitigation, or flood control
 and for necessary and reasonable expenses of the board in
 administering those projects:
 (1)  $790,750,000 for Strategy A.4.1., Perform
 Community Assistance Related to NFIP;
 (2)  $995,000 for Strategy D.1.1., Central
 Administration; and
 (3)  $1,255,000 for Strategy D.1.2., Information
 Resources.
 (b)  Contingent on Senate Bill No. 7 or similar legislation
 of the 86th Legislature, Regular Session, 2019, relating to flood
 control planning and the funding of flood planning, mitigation, and
 infrastructure projects becoming law and the constitutional
 amendment proposed by the 86th Legislature, Regular Session, 2019,
 providing for the creation of the flood infrastructure fund to
 assist in the financing of drainage, flood mitigation, and flood
 control projects being approved by the voters:
 (1)  the appropriation of money made in Subsection (a)
 of this section has no effect; and
 (2)  in addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, and in addition to
 other amounts appropriated by this Act, the following amounts are
 appropriated from the flood infrastructure fund to the Water
 Development Board for the two-year period beginning on the
 effective date of this Act for the following strategies as listed in
 Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act), for infrastructure
 projects related to drainage, flood mitigation, or flood control
 and for necessary and reasonable expenses of the board in
 administering those projects:
 (A)  $790,750,000 for Strategy A.4.1., Perform
 Community Assistance Related to NFIP;
 (B)  $995,000 for Strategy D.1.1., Central
 Administration; and
 (C)  $1,255,000 for Strategy D.1.2., Information
 Resources.
 (c)  Using money appropriated by Subsection (a) or (b) of
 this section, as applicable, the Water Development Board may employ
 9.0 full-time equivalent employees (FTEs) during the state fiscal
 year ending August 31, 2020, and 15.0 FTEs during the state fiscal
 year ending August 31, 2021, in addition to the number of FTEs the
 board is authorized by other law to employ during those state fiscal
 years to administer the project funding.
 SECTION 78.  DEPARTMENT OF TRANSPORTATION: TRANSPORTATION
 INFRASTRUCTURE FUND. In addition to amounts previously
 appropriated for the state fiscal biennium ending August 31, 2019,
 $125,000,000 is appropriated from the economic stabilization fund
 to the Department of Transportation for the two-year period
 beginning on the effective date of this Act for Strategy A.1.8.,
 Construction Grants and Services, as listed in Chapter 605 (S.B.
 1), Acts of the 85th Legislature, Regular Session, 2017 (the
 General Appropriations Act), to provide grants for transportation
 infrastructure projects under Subchapter C, Chapter 256,
 Transportation Code.
 SECTION 79.  DEPARTMENT OF TRANSPORTATION: EMERGENCY AND
 FIRST RESPONDER AIRPORT FACILITIES. In addition to amounts
 previously appropriated for the state fiscal biennium ending August
 31, 2019, $5,000,000 is appropriated from the economic
 stabilization fund to the Department of Transportation for the
 two-year period beginning on the effective date of this Act to
 expand an airport hangar at the South Texas International Airport
 used by the Department of Public Safety for emergency and first
 responders, including facilities used for Department of Public
 Safety aircraft staging and storage purposes, under Strategy
 C.5.1., Aviation Services, as listed in Chapter 605 (S.B. 1), Acts
 of the 85th Legislature, Regular Session, 2017 (the General
 Appropriations Act).
 SECTION 80.  DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS:
 AFFORDABLE RENTAL HOUSING IN CERTAIN AREAS AFFECTED BY NATURAL
 DISASTERS. In addition to amounts previously appropriated for the
 state fiscal biennium ending August 31, 2019, $4,000,000 is
 appropriated from the economic stabilization fund to the Department
 of Housing and Community Affairs for the two-year period beginning
 on the effective date of this Act for the provision of affordable
 rental housing in areas of the state most affected by natural
 disasters.
 SECTION 81.  TEXAS WORKFORCE COMMISSION: EXPENSES RELATED TO
 HURRICANE HARVEY. In addition to amounts previously appropriated
 for the state fiscal biennium ending August 31, 2019, $8,931,385 is
 appropriated from the economic stabilization fund to the Texas
 Workforce Commission for the state fiscal year ending August 31,
 2019, for Strategy A.2.1., Vocational Rehabilitation, as listed in
 Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular
 Session, 2017 (the General Appropriations Act), for vocational
 rehabilitation services expenses related to Hurricane Harvey.
 SECTION 82.  BOARD OF PHARMACY: PRESCRIPTION MONITORING
 PROGRAM. In addition to amounts previously appropriated for the
 state fiscal biennium ending August 31, 2019, $6,099,312 is
 appropriated from the general revenue fund to the Board of Pharmacy
 for the two-year period beginning on the effective date of this Act
 for statewide integration of and upgrades to the prescription
 monitoring program database under Strategy B.1.1., Enforcement, as
 listed in Chapter 605 (S.B. 1), Acts of the 85th Legislature,
 Regular Session, 2017 (the General Appropriations Act).
 SECTION 83.  TEACHER RETIREMENT SYSTEM: ADDITIONAL PAYMENT.
 Contingent on compliance with the requirements regarding the
 amortization period of the unfunded actuarial liabilities of the
 Teacher Retirement System under Section 821.006, Government Code,
 in addition to amounts previously appropriated for the state fiscal
 biennium ending August 31, 2019, $589,000,000 is appropriated from
 the economic stabilization fund to the Teacher Retirement System
 for the two-year period beginning on the effective date of this Act
 for the purpose of providing a one-time additional payment to
 certain annuitants.
 SECTION 84.  TEACHER RETIREMENT SYSTEM: STATE CONTRIBUTION.
 Contingent on Senate Bill No. 12 or similar legislation of the 86th
 Legislature, Regular Session, 2019, relating to the contributions
 and benefits under the Teacher Retirement System becoming law, in
 addition to amounts previously appropriated for the state fiscal
 biennium ending August 31, 2019, the following amounts are
 appropriated from the economic stabilization fund to the Teacher
 Retirement System for the following periods for the purpose of
 immediately depositing that amount as a state contribution in the
 Teacher Retirement System Trust Account number 0960:
 (1)  $263,000,000 for the state fiscal year ending
 August 31, 2020; and
 (2)  $261,000,000 for the state fiscal year ending
 August 31, 2021.
 SECTION 85.  COMPTROLLER OF PUBLIC ACCOUNTS: TEXAS
 INFRASTRUCTURE RESILIENCY FUND. (a)  Contingent on Senate Bill
 No. 7 or similar legislation of the 86th Legislature, Regular
 Session, 2019, relating to flood control planning and the funding
 of flood planning, mitigation, and infrastructure projects
 becoming law, in addition to amounts previously appropriated for
 the state fiscal biennium ending August 31, 2019, $857,000,000 is
 appropriated from the economic stabilization fund to the
 comptroller of public accounts for the state fiscal year ending
 August 31, 2019, for the purpose of immediately depositing that
 amount to the credit of the Texas infrastructure resiliency fund.
 (b)  Of the amount appropriated under Subsection (a) of this
 section, the comptroller of public accounts shall deposit at least
 $47,000,000 to the credit of the floodplain management account 0330
 in the Texas infrastructure resiliency fund.
 SECTION 86.  COMPTROLLER OF PUBLIC ACCOUNTS: FLOOD
 INFRASTRUCTURE FUND. Contingent on Senate Bill No. 7 or similar
 legislation of the 86th Legislature, Regular Session, 2019,
 relating to flood control planning and the funding of flood
 planning, mitigation, and infrastructure projects becoming law and
 the constitutional amendment proposed by the 86th Legislature,
 Regular Session, 2019, providing for the creation of the flood
 infrastructure fund to assist in the financing of drainage, flood
 mitigation, and flood control projects being approved by the
 voters, in addition to amounts previously appropriated for the
 state fiscal biennium ending August 31, 2019, $793,000,000 is
 appropriated from the economic stabilization fund to the
 comptroller of public accounts for the state fiscal year ending
 August 31, 2019, for the purpose of immediately depositing that
 amount to the credit of the flood infrastructure fund.
 SECTION 87.  REIMBURSEMENT TO ECONOMIC STABILIZATION FUND.
 If any state agency or public institution of higher education
 receives reimbursement from the federal government, an insurer, or
 another source for an expenditure paid from money appropriated by
 this Act:
 (1)  the agency or institution shall reimburse the
 state in an amount equal to the lesser of the amount appropriated
 under this Act and spent for that expenditure or the amount
 reimbursed by the other source for that expenditure; and
 (2)  the comptroller of public accounts shall deposit
 the amount of the reimbursement to the credit of the economic
 stabilization fund.
 SECTION 88.  EFFECTIVE DATE. (a)  Subject to Subsections
 (b) and (c) of this section, this Act takes effect immediately.
 (b)  Sections 1, 5, 7, 8, 9, 10, 16, 17, 20, 21, 31, 32, 33,
 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 46, 47, 49, 52, 53, 54, 56,
 58, 59, 61, 65, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80,
 81, 83, 84, 85, and 86 of this Act take effect only if this Act
 receives a vote of two-thirds of the members present in each house
 of the legislature, as provided by Section 49-g(m), Article III,
 Texas Constitution.
 (c)  Section 45 of this Act takes effect only if this Act
 receives a vote of two-thirds of each house of the legislature, as
 provided by Section 17(j), Article VII, Texas Constitution.
 ______________________________ ______________________________
 President of the Senate Speaker of the House
 I hereby certify that S.B. No. 500 passed the Senate on March 13,
 2019, by the following vote:  Yeas 31, Nays 0; April 17, 2019, Senate
 refused to concur in House amendments and requested appointment of
 Conference Committee; April 18, 2019, House granted request of the
 Senate; May 26, 2019, Senate adopted Conference Committee Report by the
 following vote:  Yeas 30, Nays 1; passed subject to the provisions of
 Article III, Section 49a, of the Constitution of Texas.
 ______________________________
 Secretary of the Senate
 I hereby certify that S.B. No. 500 passed the House, with
 amendments, on March 27, 2019, by the following vote:  Yeas 149,
 Nays 0; April 18, 2019, House granted request of the Senate for
 appointment of Conference Committee; May 26, 2019, House adopted
 Conference Committee Report by the following vote:  Yeas 146, Nays 1,
 one present not voting; passed subject to the provisions of
 Article III, Section 49a, of the Constitution of Texas.
 ______________________________
 Chief Clerk of the House
 Approved:
 I, Glenn Hegar, Comptroller of
 ______________________________    Public Accounts, do hereby
 Date                  certify that the amounts
 appropriated in the herein
 S.B. No. 500, Regular Session,
 ______________________________    86th Legislature, are within the
 Governor                amount estimated to be available
 in the affected fund.
 Certified _____________, 2019.
 ______________________________
 Comptroller of Public Accounts