22 By: Vasut H.B. No. 4502
33
44
55 A BILL TO BE ENTITLED
66 AN ACT
77 relating to cost recovery for costs arising from the
88 interconnection of certain electric generation facilities with the
99 ERCOT transmission system.
1010 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
1111 SECTION 1. Section 35.004, Utilities Code, is amended by
1212 amending Subsection (d) and adding Subsection (d-1) to read as
1313 follows:
1414 (d) The commission shall price wholesale transmission
1515 services within ERCOT based on the postage stamp method of pricing
1616 under which a transmission-owning utility's rate is based on the
1717 ERCOT utilities' combined annual costs of transmission, other than
1818 costs described in Subsection (d-1), divided by the total demand
1919 placed on the combined transmission systems of all such
2020 transmission-owning utilities within a power region. An electric
2121 utility subject to the freeze period imposed by Section 39.052 may
2222 treat transmission costs in excess of transmission revenues during
2323 the freeze period as an expense for purposes of determining annual
2424 costs in the annual report filed under Section 39.257.
2525 Notwithstanding Section 36.201, the commission may approve
2626 wholesale rates that may be periodically adjusted to ensure timely
2727 recovery of transmission investment. Notwithstanding Section
2828 36.054(a), if the commission determines that conditions warrant the
2929 action, the commission may authorize the inclusion of construction
3030 work in progress in the rate base for transmission investment
3131 required by the commission under Section 39.203(e).
3232 (d-1) Capital costs incurred to interconnect with the ERCOT
3333 transmission system generation resources and electric energy
3434 storage resources described by Section 35.152(a), including costs
3535 of utility interconnection facilities and all necessary system
3636 upgrades, must be directly assigned by the ERCOT independent system
3737 operator to the generation resource or electric energy storage
3838 resource receiving interconnection service through the facilities.
3939 SECTION 2. This Act takes effect September 1, 2021.