 relating to cost recovery for costs arising from the
 interconnection of certain electric generation facilities with the
 ERCOT transmission system.
 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
 SECTION 1.  Section 35.004, Utilities Code, is amended by
 amending Subsection (d) and adding Subsection (d-1) to read as
 follows:
 (d)  The commission shall price wholesale transmission
 services within ERCOT based on the postage stamp method of pricing
 under which a transmission-owning utility's rate is based on the
 ERCOT utilities' combined annual costs of transmission, other than
 costs described in Subsection (d-1), divided by the total demand
 placed on the combined transmission systems of all such
 transmission-owning utilities within a power region. An electric
 utility subject to the freeze period imposed by Section 39.052 may
 treat transmission costs in excess of transmission revenues during
 the freeze period as an expense for purposes of determining annual
 costs in the annual report filed under Section 39.257.
 Notwithstanding Section 36.201, the commission may approve
 wholesale rates that may be periodically adjusted to ensure timely
 recovery of transmission investment. Notwithstanding Section
 36.054(a), if the commission determines that conditions warrant the
 action, the commission may authorize the inclusion of construction
 work in progress in the rate base for transmission investment
 required by the commission under Section 39.203(e).
 (d-1)  Capital costs incurred to interconnect with the ERCOT
 transmission system generation resources and electric energy
 storage resources described by Section 35.152(a), including costs
 of utility interconnection facilities and all necessary system
 upgrades, must be directly assigned by the ERCOT independent system
 operator to the generation resource or electric energy storage
 resource receiving interconnection service through the facilities.