Us Congress 2023-2024 Regular Session

Us Congress Senate Bill SB989 Compare Versions

Only one version of the bill is available at this time.
OldNewDifferences
11 II
22 118THCONGRESS
33 1
44 STSESSION S. 989
55 To establish a more uniform, transparent, and modern process to authorize
66 the construction, connection, operation, and maintenance of international
77 border-crossing facilities for the import and export of oil and natural
88 gas and the transmission of electricity.
99 IN THE SENATE OF THE UNITED STATES
1010 MARCH27, 2023
1111 Mr. H
1212 OEVEN(for himself, Mr. MULLIN, Mr. SULLIVAN, and Mr. BUDD) intro-
1313 duced the following bill; which was read twice and referred to the Com-
1414 mittee on Energy and Natural Resources
1515 A BILL
1616 To establish a more uniform, transparent, and modern proc-
1717 ess to authorize the construction, connection, operation,
1818 and maintenance of international border-crossing facili-
1919 ties for the import and export of oil and natural gas
2020 and the transmission of electricity.
2121 Be it enacted by the Senate and House of Representa-1
2222 tives of the United States of America in Congress assembled, 2
2323 SECTION 1. SHORT TITLE. 3
2424 This Act may be cited as the ‘‘North American En-4
2525 ergy Act’’. 5
2626 VerDate Sep 11 2014 02:21 Apr 06, 2023 Jkt 039200 PO 00000 Frm 00001 Fmt 6652 Sfmt 6201 E:\BILLS\S989.IS S989
2727 kjohnson on DSK79L0C42PROD with BILLS 2
2828 •S 989 IS
2929 SEC. 2. APPROVAL FOR BORDER-CROSSING FACILITIES. 1
3030 (a) A
3131 UTHORIZATION OF CERTAINENERGYINFRA-2
3232 STRUCTUREPROJECTS AT AN INTERNATIONAL BOUND-3
3333 ARY OF THEUNITEDSTATES.— 4
3434 (1) A
3535 UTHORIZATION.—Except as provided in 5
3636 paragraph (3) and subsection (e), no person may 6
3737 construct, connect, or operate, a border-crossing fa-7
3838 cility for the import or export of oil or natural gas, 8
3939 or the transmission of electricity, across an inter-9
4040 national border of the United States without obtain-10
4141 ing a certificate of crossing for the border-crossing 11
4242 facility under this subsection. 12
4343 (2) C
4444 ERTIFICATE OF CROSSING.— 13
4545 (A) R
4646 EQUIREMENT.—Not later than 90 14
4747 days after final action is taken, by the relevant 15
4848 official or agency identified under subparagraph 16
4949 (B), under the National Environmental Policy 17
5050 Act of 1969 (42 U.S.C. 4321 et seq.) with re-18
5151 spect to a border-crossing facility for which a 19
5252 person requests a certificate of crossing under 20
5353 this subsection, the relevant official or agency, 21
5454 in consultation with appropriate Federal agen-22
5555 cies, shall issue a certificate of crossing for the 23
5656 border-crossing facility unless the relevant offi-24
5757 cial or agency finds that the construction, con-25
5858 nection, or operation, of the border-crossing fa-26
5959 VerDate Sep 11 2014 02:21 Apr 06, 2023 Jkt 039200 PO 00000 Frm 00002 Fmt 6652 Sfmt 6201 E:\BILLS\S989.IS S989
6060 kjohnson on DSK79L0C42PROD with BILLS 3
6161 •S 989 IS
6262 cility is not in the public interest of the United 1
6363 States. 2
6464 (B) R
6565 ELEVANT OFFICIAL OR AGENCY .— 3
6666 The relevant official or agency referred to in 4
6767 subparagraph (A) is— 5
6868 (i) the Federal Energy Regulatory 6
6969 Commission with respect to border-cross-7
7070 ing facilities consisting of oil or natural 8
7171 gas pipelines; and 9
7272 (ii) the Secretary of Energy with re-10
7373 spect to border-crossing facilities consisting 11
7474 of electric transmission facilities. 12
7575 (C) A
7676 DDITIONAL REQUIREMENT FOR 13
7777 ELECTRIC TRANSMISSION FACILITIES .—In the 14
7878 case of a request for a certificate of crossing for 15
7979 a border-crossing facility consisting of an elec-16
8080 tric transmission facility, the Secretary of En-17
8181 ergy shall require, as a condition of issuing the 18
8282 certificate of crossing under subparagraph (A), 19
8383 that the border-crossing facility be constructed, 20
8484 connected, operated, or maintained consistent 21
8585 with all applicable policies and standards of— 22
8686 (i) the Electric Reliability Organiza-23
8787 tion and the applicable regional entity; and 24
8888 VerDate Sep 11 2014 02:21 Apr 06, 2023 Jkt 039200 PO 00000 Frm 00003 Fmt 6652 Sfmt 6201 E:\BILLS\S989.IS S989
8989 kjohnson on DSK79L0C42PROD with BILLS 4
9090 •S 989 IS
9191 (ii) any Regional Transmission Orga-1
9292 nization or Independent System Operator 2
9393 with operational or functional control over 3
9494 the border-crossing facility. 4
9595 (3) E
9696 XCLUSIONS.—This subsection shall not 5
9797 apply to any construction, connection, operation, or 6
9898 maintenance of a border-crossing facility for the im-7
9999 port or export of oil or natural gas, or the trans-8
100100 mission of electricity— 9
101101 (A) if the border-crossing facility is oper-10
102102 ating for such import, export, or transmission 11
103103 as of the date of enactment of this Act; 12
104104 (B) if a permit described in subsection (d) 13
105105 for the construction, connection, operation, or 14
106106 maintenance has been issued; or 15
107107 (C) if an application for a permit described 16
108108 in subsection (d) for the construction, connec-17
109109 tion, operation, or maintenance is pending on 18
110110 the date of enactment of this Act, until the ear-19
111111 lier of— 20
112112 (i) the date on which such application 21
113113 is denied; or 22
114114 (ii) 2 years after the date of enact-23
115115 ment of this Act, if such a permit has not 24
116116 been issued by such date. 25
117117 VerDate Sep 11 2014 02:21 Apr 06, 2023 Jkt 039200 PO 00000 Frm 00004 Fmt 6652 Sfmt 6201 E:\BILLS\S989.IS S989
118118 kjohnson on DSK79L0C42PROD with BILLS 5
119119 •S 989 IS
120120 (4) EFFECT OF OTHER LAWS .— 1
121121 (A) A
122122 PPLICATION TO PROJECTS .—Nothing 2
123123 in this subsection or subsection (e) shall affect 3
124124 the application of any other Federal statute to 4
125125 a project for which a certificate of crossing for 5
126126 a border-crossing facility is requested under 6
127127 this subsection. 7
128128 (B) N
129129 ATURAL GAS ACT.—Nothing in this 8
130130 subsection or subsection (e) shall affect the re-9
131131 quirement to obtain approval or authorization 10
132132 under sections 3 and 7 of the Natural Gas Act 11
133133 (15 U.S.C. 717b, 717f) for the siting, construc-12
134134 tion, or operation of any facility to import or 13
135135 export natural gas. 14
136136 (C) O
137137 IL PIPELINES.—Nothing in this sub-15
138138 section or subsection (e) shall affect the author-16
139139 ity of the Federal Energy Regulatory Commis-17
140140 sion with respect to oil pipelines under section 18
141141 60502 of title 49, United States Code. 19
142142 (D) S
143143 COPE OF NEPA REVIEW .—Nothing in 20
144144 this Act, or the amendments made by this Act, 21
145145 shall affect the scope of any review required to 22
146146 be conducted under section 102 of the National 23
147147 Environmental Policy Act of 1969 (42 U.S.C. 24
148148 4332) with respect to a project for which a cer-25
149149 VerDate Sep 11 2014 02:21 Apr 06, 2023 Jkt 039200 PO 00000 Frm 00005 Fmt 6652 Sfmt 6201 E:\BILLS\S989.IS S989
150150 kjohnson on DSK79L0C42PROD with BILLS 6
151151 •S 989 IS
152152 tificate of crossing for a border-crossing facility 1
153153 is requested under this subsection. 2
154154 (b) I
155155 MPORTATION OR EXPORTATION OF NATURAL 3
156156 G
157157 AS TOCANADA ANDMEXICO.—Section 3(c) of the Nat-4
158158 ural Gas Act (15 U.S.C. 717b(c)) is amended by adding 5
159159 at the end the following: ‘‘In the case of an application 6
160160 for the importation of natural gas from, or the exportation 7
161161 of natural gas to, Canada or Mexico, the Commission shall 8
162162 grant the application not later than 30 days after the date 9
163163 on which the Commission receives the complete applica-10
164164 tion.’’. 11
165165 (c) T
166166 RANSMISSION OFELECTRICENERGY TOCAN-12
167167 ADA ANDMEXICO.— 13
168168 (1) R
169169 EPEAL OF REQUIREMENT TO SECURE 14
170170 ORDER.—Section 202(e) of the Federal Power Act 15
171171 (16 U.S.C. 824a(e)) is repealed. 16
172172 (2) C
173173 ONFORMING AMENDMENTS .— 17
174174 (A) S
175175 TATE REGULATIONS.—Section 202(f) 18
176176 of the Federal Power Act (16 U.S.C. 824a(f)) 19
177177 is amended by striking ‘‘insofar as such State 20
178178 regulation does not conflict with the exercise of 21
179179 the Commission’s powers under or relating to 22
180180 subsection (e)’’. 23
181181 (B) S
182182 EASONAL DIVERSITY ELECTRICITY 24
183183 EXCHANGE.—Section 602(b) of the Public Util-25
184184 VerDate Sep 11 2014 02:21 Apr 06, 2023 Jkt 039200 PO 00000 Frm 00006 Fmt 6652 Sfmt 6201 E:\BILLS\S989.IS S989
185185 kjohnson on DSK79L0C42PROD with BILLS 7
186186 •S 989 IS
187187 ity Regulatory Policies Act of 1978 (16 U.S.C. 1
188188 824a–4(b)) is amended by striking ‘‘the Com-2
189189 mission has conducted hearings and made the 3
190190 findings required under section 202(e) of the 4
191191 Federal Power Act’’ and all that follows 5
192192 through the period at the end and inserting 6
193193 ‘‘the Secretary has conducted hearings and 7
194194 finds that the proposed transmission facilities 8
195195 would not impair the sufficiency of electric sup-9
196196 ply within the United States or would not im-10
197197 pede or tend to impede the coordination in the 11
198198 public interest of facilities subject to the juris-12
199199 diction of the Secretary.’’. 13
200200 (d) N
201201 OPRESIDENTIALPERMITREQUIRED.—No 14
202202 Presidential permit (or similar permit) shall be required 15
203203 pursuant to any provision of law or Executive order for 16
204204 the construction, connection, operation, or maintenance of 17
205205 an oil or natural gas pipeline or electric transmission facil-18
206206 ity, or any border-crossing facility thereof. 19
207207 (e) M
208208 ODIFICATIONS TO AND MAINTENANCE OF EX-20
209209 ISTINGPROJECTS.—No certificate of crossing under sub-21
210210 section (a), or permit described in subsection (d), shall be 22
211211 required for a modification to or maintenance of— 23
212212 (1) an oil or natural gas pipeline or electric 24
213213 transmission facility that is operating for the import 25
214214 VerDate Sep 11 2014 02:21 Apr 06, 2023 Jkt 039200 PO 00000 Frm 00007 Fmt 6652 Sfmt 6201 E:\BILLS\S989.IS S989
215215 kjohnson on DSK79L0C42PROD with BILLS 8
216216 •S 989 IS
217217 or export of oil or natural gas or the transmission 1
218218 of electricity as of the date of enactment of this Act; 2
219219 (2) an oil or natural gas pipeline or electric 3
220220 transmission facility for which a permit described in 4
221221 subsection (d) has been issued; or 5
222222 (3) a border-crossing facility for which a certifi-6
223223 cate of crossing has previously been issued under 7
224224 subsection (a). 8
225225 (f) E
226226 FFECTIVEDATES; RULEMAKINGDEADLINES.— 9
227227 (1) E
228228 FFECTIVE DATE .—Subsections (a) 10
229229 through (e) and the amendments made by such sub-11
230230 sections shall take effect on the date that is 1 year 12
231231 after the date of enactment of this Act. 13
232232 (2) R
233233 ULEMAKING DEADLINES .—Each relevant 14
234234 official or agency described in subsection (a)(2)(B) 15
235235 shall— 16
236236 (A) not later than 180 days after the date 17
237237 of enactment of this Act, publish in the Federal 18
238238 Register notice of a proposed rulemaking to 19
239239 carry out the applicable requirements of sub-20
240240 section (a); and 21
241241 (B) not later than 1 year after the date of 22
242242 enactment of this Act, publish in the Federal 23
243243 Register a final rule to carry out the applicable 24
244244 requirements of subsection (a). 25
245245 VerDate Sep 11 2014 02:21 Apr 06, 2023 Jkt 039200 PO 00000 Frm 00008 Fmt 6652 Sfmt 6201 E:\BILLS\S989.IS S989
246246 kjohnson on DSK79L0C42PROD with BILLS 9
247247 •S 989 IS
248248 (g) JUDICIALREVIEW.—Any entity aggrieved by a 1
249249 final agency action taken under this section may obtain 2
250250 a review of such action by filing a petition for review in 3
251251 the United States Court of Appeals for any circuit wherein 4
252252 an applicant for authorization under this section is located 5
253253 or has its principal place of business, or in the United 6
254254 States Court of Appeals for the District of Columbia. The 7
255255 petition must be filed not later than 60 days after such 8
256256 action is taken. 9
257257 (h) D
258258 EFINITIONS.—In this section: 10
259259 (1) A
260260 PPROPRIATE FEDERAL AGENCIES .—The 11
261261 term ‘‘appropriate Federal agencies’’ in subsection 12
262262 (a)(2)(A) means the Secretary of Defense, the Attor-13
263263 ney General, the Secretary of the Interior, the Sec-14
264264 retary of Commerce, the Secretary of Transpor-15
265265 tation, the Secretary of Energy, the Secretary of 16
266266 Homeland Security, the Administrator of the Envi-17
267267 ronmental Protection Agency, and, for applications 18
268268 concerning the border with Mexico, the United 19
269269 States Commissioner of the International Boundary 20
270270 and Water Commission. 21
271271 (2) B
272272 ORDER-CROSSING FACILITY.—The term 22
273273 ‘‘border-crossing facility’’ means— 23
274274 (A) the portion of an oil pipeline between 24
275275 an international boundary and the first main-25
276276 VerDate Sep 11 2014 02:21 Apr 06, 2023 Jkt 039200 PO 00000 Frm 00009 Fmt 6652 Sfmt 6201 E:\BILLS\S989.IS S989
277277 kjohnson on DSK79L0C42PROD with BILLS 10
278278 •S 989 IS
279279 line valve on the United States side of an inter-1
280280 national boundary; and 2
281281 (B) the portion of a natural gas pipeline or 3
282282 electric transmission facility that is located at 4
283283 an international boundary of the United States. 5
284284 (3) E
285285 LECTRIC RELIABILITY ORGANIZATION ; RE-6
286286 GIONAL ENTITY.—The terms ‘‘Electric Reliability 7
287287 Organization’’ and ‘‘regional entity’’ have the mean-8
288288 ings given those terms in section 215 of the Federal 9
289289 Power Act (16 U.S.C. 824o). 10
290290 (4) I
291291 NDEPENDENT SYSTEM OPERATOR ; RE-11
292292 GIONAL TRANSMISSION ORGANIZATION .—The terms 12
293293 ‘‘Independent System Operator’’ and ‘‘Regional 13
294294 Transmission Organization’’ have the meanings 14
295295 given those terms in section 3 of the Federal Power 15
296296 Act (16 U.S.C. 796). 16
297297 (5) M
298298 ODIFICATION.—The term ‘‘modification’’ 17
299299 includes a reversal of flow direction, change in own-18
300300 ership, change in flow volume, change in product de-19
301301 livered, addition or removal of an interconnection, or 20
302302 an adjustment to regulate flow (such as a reduction 21
303303 or increase in the number of pump or compressor 22
304304 stations or valves). 23
305305 VerDate Sep 11 2014 02:21 Apr 06, 2023 Jkt 039200 PO 00000 Frm 00010 Fmt 6652 Sfmt 6201 E:\BILLS\S989.IS S989
306306 kjohnson on DSK79L0C42PROD with BILLS 11
307307 •S 989 IS
308308 (6) NATURAL GAS.—The term ‘‘natural gas’’ 1
309309 has the meaning given that term in section 2 of the 2
310310 Natural Gas Act (15 U.S.C. 717a). 3
311311 (7) O
312312 IL.—The term ‘‘oil’’ means petroleum or 4
313313 a petroleum product. 5
314314 Æ
315315 VerDate Sep 11 2014 02:21 Apr 06, 2023 Jkt 039200 PO 00000 Frm 00011 Fmt 6652 Sfmt 6301 E:\BILLS\S989.IS S989
316316 kjohnson on DSK79L0C42PROD with BILLS