II 119THCONGRESS 1 STSESSION S. 1020 To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects. IN THE SENATE OF THE UNITED STATES MARCH13, 2025 Mr. D AINES(for himself, Mr. FETTERMAN, Mr. CASSIDY, Mr. KENNEDY, Ms. M URKOWSKI, and Mr. SHEEHY) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Re- sources A BILL To require the Federal Energy Regulatory Commission to extend the time period during which licensees are re- quired to commence construction of certain hydropower projects. Be it enacted by the Senate and House of Representa-1 tives of the United States of America in Congress assembled, 2 SECTION 1. EXTENSION OF TIME TO COMMENCE CON-3 STRUCTION OF CERTAIN HYDROPOWER 4 PROJECTS. 5 (a) D EFINITION OFCOVEREDPROJECT.—In this sec-6 tion, the term ‘‘covered project’’ means a hydropower 7 VerDate Sep 11 2014 02:39 Mar 25, 2025 Jkt 059200 PO 00000 Frm 00001 Fmt 6652 Sfmt 6201 E:\BILLS\S1020.IS S1020 ssavage on LAPJG3WLY3PROD with BILLS 2 •S 1020 IS project with respect to which the Federal Energy Regu-1 latory Commission issued a license before March 13, 2020. 2 (b) A UTHORIZATION OF EXTENSION.—Notwith-3 standing section 13 of the Federal Power Act (16 U.S.C. 4 806), on the request of a licensee of a covered project, 5 the Federal Energy Regulatory Commission may, after 6 reasonable notice and for good cause shown, extend in ac-7 cordance with subsection (c) the period during which the 8 licensee is required to commence construction of the cov-9 ered project for not more than an additional 6 years be-10 yond the 8 years authorized by that section. 11 (c) P ERIOD OFEXTENSION.—An extension of time 12 to commence construction of a covered project under sub-13 section (b) shall— 14 (1) consist of not more than 3 consecutive 2- 15 year periods; 16 (2) begin on the date on which the final exten-17 sion of the period for commencement of construction 18 granted to the licensee under section 13 of the Fed-19 eral Power Act (16 U.S.C. 806) expires; and 20 (3) end on the date that is not more than 6 21 years after the latest date to which the Federal En-22 ergy Regulatory Commission is authorized to extend 23 the period for commencement of construction under 24 that section. 25 VerDate Sep 11 2014 02:39 Mar 25, 2025 Jkt 059200 PO 00000 Frm 00002 Fmt 6652 Sfmt 6201 E:\BILLS\S1020.IS S1020 ssavage on LAPJG3WLY3PROD with BILLS 3 •S 1020 IS (d) REINSTATEMENT OF EXPIREDLICENSE.—If the 1 time period required under section 13 of the Federal 2 Power Act (16 U.S.C. 806) to commence construction of 3 a covered project expires after December 31, 2023, and 4 before the date of enactment of this Act— 5 (1) the Federal Energy Regulatory Commission 6 may reinstate the license for the applicable project 7 effective as of the date of expiration of the license; 8 and 9 (2) the extension authorized under subsection 10 (b) shall take effect on the date of that expiration. 11 Æ VerDate Sep 11 2014 02:39 Mar 25, 2025 Jkt 059200 PO 00000 Frm 00003 Fmt 6652 Sfmt 6301 E:\BILLS\S1020.IS S1020 ssavage on LAPJG3WLY3PROD with BILLS