California 2023-2024 Regular Session

California Senate Bill SB23 Compare Versions

OldNewDifferences
1-Amended IN Senate May 01, 2023 Amended IN Senate April 12, 2023 Amended IN Senate March 30, 2023 Amended IN Senate February 09, 2023 CALIFORNIA LEGISLATURE 20232024 REGULAR SESSION Senate Bill No. 23Introduced by Senator Caballero(Coauthor: Senator Dodd)December 05, 2022An act to add and repeal Section 1618 of the Fish and Game Code, and to add the heading of Article 1 (commencing with Section 13370) to Chapter 5.5 of Division 7 of, and to add and repeal Article 2 (commencing with Section 13389.1) of Chapter 5.5 of Division 7 of, the Water Code, relating to water. LEGISLATIVE COUNSEL'S DIGESTSB 23, as amended, Caballero. Water supply and flood risk reduction projects: expedited permitting.(1) Existing law prohibits an entity from substantially diverting or obstructing the natural flow of, or substantially changing or using any material from the bed, channel, or bank of, any river, stream, or lake, or deposit or dispose of debris, waste, or other material containing crumbled, flaked, or ground pavement where it may pass into any river, stream, or lake, except under specified conditions, including requiring the entity to send written notification to the Department of Fish and Wildlife regarding the activity in the manner prescribed by the department.This bill would require a project proponent, if already required to submit a notification to the department, to submit to the department the certified or adopted environmental review document, as applicable, for the activity in the notification. The bill would require the department, under prescribed circumstances, to take certain actions within specified timelines, or within a mutually agreed-to extension of time. The bill would require, on or before January 1, 2025, and annually thereafter, the department to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to these provisions. The bill would repeal these provisions on January 1, 2029.(2) Under the Porter-Cologne Water Quality Control Act, the State Water Resources Control Board (state board) and the California regional water quality control boards (regional boards) are the principal state agencies with primary authority over water quality matters. Existing law authorizes the state board to issue permits and promulgate procedures consistent with federal law. This bill would require, if an applicant requests a preapplication consultation, the state board or regional boards to adhere to specified procedures and timelines in reviewing the application before issuing project certification. The bill would authorize a project proponent to petition the state board to reconsider its determination of application completeness, or to appeal to the state board any regional boards determination of application completeness.This bill would require the state board or regional boards to use specified approved conservation and habitat management plans as watershed plans for purposes of implementing the procedures in issuing a project certification, unless the state board or regional boards issuing a project certification determine in writing plans, as specified, unless the permitting authority makes a determination in writing, based on substantial evidence in the record, that an approved plan does not substantially meet the definition of a watershed plan, as defined. The bill would place requirements on the state board and regional boards regarding its determination on what is considered a watershed plan, including making a proposed written determination, and providing for public comment and a written response on that proposed determination. The bill would require, by January 1, 2025, the state board to review and take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under specified federal law within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. The bill would require the state board and regional boards, as part of their implementation of the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State, to address the impacts of dredge and fill activities from water supply and flood risk projects. The bill would require, on January 1, 2025, and annually thereafter, the state board and regional boards to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding specified information related to water supply projects and flood risk reduction projects.This bill would authorize a state agency, defined to mean any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project, to take specified actions in order to complete permit review and approval in an expeditious manner. The bill would make findings and declarations related to the need to expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment. This bill would repeal these provisions on January 1, 2029.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: NO Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 1618 is added to the Fish and Game Code, to read:1618. (a) For purposes of this section, the following definitions apply:(1) Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(2) Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.(3) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(4) Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(b) A project proponent shall do both of the following:(1) Submit a complete notification for the project activity to the department when required under Section 1602.(2) Submit to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) (1) In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete notification, as determined by the department.(B) Sixty days after receipt of the certified or adopted environmental review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement. (2) Nothing in paragraph (1) shall effect affect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.(d) If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).(e) On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.(f) This section shall remain in effect only until January 1, 2029, and as of that date is repealed.SEC. 2. The heading of Article 1 (commencing with Section 13370) is added to Chapter 5.5 of Division 7 of the Water Code, to read: Article 1. Implementation of the Federal Water Pollution Control ActSEC. 3. Article 2 (commencing with Section 13389.1) is added to Chapter 5.5 of Division 7 of the Water Code, to read: Article 2. Water Supply and Flood Risk Reduction Permits13389.1. For the purpose of this article, the following definitions apply:(a) Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(b) Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).(c) Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).(d) Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.(e) Procedures means the State Wetland Definition and Procedures for Discharge Discharges of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.(f) Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376. Section 13160.(g) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(h) State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.(i) Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or drinking water treatment facility.(j) Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.13389.2. (a) (1) This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.(2) The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.(3) The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.(4) Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.(b) (1) Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete application.(B) Sixty Ninety days after receipt of final the certified or adopted environmental documentation review document, as applicable, required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.(2) Paragraph (1) shall apply if the project proponent does all of the following:(A) Requests a preapplication consultation.(B) Files a complete application for project certification.(C) If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project. (D) Submits final environmental documentation to the state board or regional boards the certified or adopted environmental review document, as applicable, for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.(d) If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.(e) (1) If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.(2) Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.(f) (1) If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.(2) The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.(3) If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.(4) If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.(g) The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.(h) The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.(i) This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).(j) Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.13389.3. (a) The Legislature finds and declares all of the following:(1)On that on April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources. as a watershed plan for those aquatic resources, unless the permitting authority makes a written determination, based on substantial evidence in the record, that the habitat conservation plan or natural communities conservation plan does not substantially meet the definition of a watershed plan for those aquatic resources.(2)The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.(3)To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.(b)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:(1)Habitat conservation plans that include biological goals for aquatic resources.(2)Natural communities conservation plans that include biological goals for aquatic resources.(3)Habitat management plans that include biological goals for aquatic resources.(c)(1)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.(2)The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:(A)The watershed plan addresses the project impacts to waters of the state.(B)The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.(C)The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.(3)For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:(A)Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.(B)Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.(d)By January 1, 2025, the state board shall review and take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In its consideration of the general water quality certifications, the state board shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.(b) The state board and regional boards shall implement the procedures, including provisions related to watershed plans, to address the impacts of dredge and fill activities from water supply and flood risk projects.(e)(c) Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding, at a minimum, all of the following:(1) The water supply projects and flood risk reduction projects for which project certifications have been issued.(2) The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.(3) Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.(4) The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.13389.4. (a) A state agency may do any of the following:(1) Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.(2) Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.(3) Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.(b) This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.(c) This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.(d) The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.13389.5. This article shall remain in effect only until January 1, 2029, and as of that date is repealed.
1+Amended IN Senate April 12, 2023 Amended IN Senate March 30, 2023 Amended IN Senate February 09, 2023 CALIFORNIA LEGISLATURE 20232024 REGULAR SESSION Senate Bill No. 23Introduced by Senator Caballero(Coauthor: Senator Dodd)December 05, 2022An act to add and repeal Section 1618 to of the Fish and Game Code, and to add the heading of Article 1 (commencing with Section 13370) to Chapter 5.5 of Division 7 of, and to add and repeal Article 2 (commencing with Section 13389.1) to of Chapter 5.5 of Division 7 of, the Water Code, relating to water. LEGISLATIVE COUNSEL'S DIGESTSB 23, as amended, Caballero. Water supply and flood risk reduction projects: expedited permitting.(1) Existing law prohibits an entity from substantially diverting or obstructing the natural flow of, or substantially changing or using any material from the bed, channel, or bank of, any river, stream, or lake, or deposit or dispose of debris, waste, or other material containing crumbled, flaked, or ground pavement where it may pass into any river, stream, or lake, except under specified conditions, including requiring the entity to send written notification to the Department of Fish and Wildlife regarding the activity in the manner prescribed by the department.This bill would require a project proponent, if already required to submit a notification to the department, to submit final environmental documentation to the department the certified or adopted environmental review document, as applicable, for the activity in the notification. The bill would require the department, under prescribed circumstances, to take certain actions within specified timelines, or within a mutually agreed-to extension of time. The bill would require, on or before January 1, 2025, and annually thereafter, the department to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to these provisions. The bill would repeal these provisions on January 1, 2029.(2) Under the Porter-Cologne Water Quality Control Act, the State Water Resources Control Board (state board) and the California regional water quality control boards (regional boards) are the principal state agencies with primary authority over water quality matters. Existing law authorizes the state board to issue permits and promulgate procedures consistent with federal law. This bill would require, if an applicant requests a preapplication consultation, the state board or regional boards to adhere to specified procedures and timelines in reviewing the application before issuing project certification. The bill would authorize a project proponent to petition the state board to reconsider its determination of application completeness, or to appeal to the state board any regional boards determination of application completeness.This bill would require the state board or regional boards to use specified approved conservation and habitat management plans as watershed plans for purposes of implementing the procedures in issuing a project certification, unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, as defined. The bill would place requirements on the state board and regional boards regarding its determination on what is considered a watershed plan, including making a proposed written determination, and providing for public comment and a written response on that proposed determination. The bill would require, by January 1, 2025, the state board to review and adopt take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under specified federal law within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. The bill would require, on January 1, 2025, and annually thereafter, the state board and regional boards to prepare, provide public notice of, make available for public review on their its internet website, and submit to the relevant legislative committees, as specified, a report regarding specified information related to water supply projects and flood risk reduction projects.This bill would authorize a state agency, defined to mean any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project, to take specified actions in order to complete permit review and approval in an expeditious manner. The bill would make findings and declarations related to the need to expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment. This bill would repeal these provisions on January 1, 2029.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: NO Bill TextThe people of the State of California do enact as follows:SECTION 1. Section 1618 is added to the Fish and Game Code, to read:1618. (a) For purposes of this section, the following definitions apply:(1) Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(2) Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.(3) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(4) Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(b) A project proponent shall do both of the following:(1) Submit a complete notification for the project activity to the department when required under Section 1602.(2) Submitfinal environmental documentation to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) (1) In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete notification. notification, as determined by the department.(B) Sixty days after receipt of final the certified or adopted environmental documentation review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement. (2) Nothing in paragraph (1) shall effect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.(d) If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).(e) On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.(f) This section shall remain in effect only until January 1, 2029, and as of that date is repealed.SEC. 2. The heading of Article 1 (commencing with Section 13370) is added to Chapter 5.5 of Division 7 of the Water Code, to read: Article 1. Implementation of the Federal Water Pollution Control ActSEC. 3. Article 2 (commencing with Section 13389.1) is added to Chapter 5.5 of Division 7 of the Water Code, to read: Article 2. Water Supply and Flood Risk Reduction Permits13389.1. For the purpose of this article, the following definitions apply:(a) Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(b) Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).(c) Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).(d) Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.(e) Procedures means the State Wetland Definition and Procedures for Discharge of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.(f) Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376.(g) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(h) State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.(i) Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(j) Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.13389.2. (a) (1) This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.(2) The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.(3) The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.(4) Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.(b) (1) Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete application.(B) Sixty days after receipt of final environmental documentation required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.(2) Paragraph (1) shall apply if the project proponent does all of the following:(A) Requests a preapplication consultation.(B) Files a complete application for project certification.(C) If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project. (D) Submits final environmental documentation to the state board or regional boards for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.(d) If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.(e) (1) If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.(2) Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.(f) (1) If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.(2) The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.(3) If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.(4) If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.(g) The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.(h) The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.(i) This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).(j) Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.13389.3. (a) The Legislature finds and declares all of the following:(1) On April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources.(2) The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.(3) To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.(b) Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:(1) Habitat conservation plans that include biological goals for aquatic resources.(2) Natural communities conservation plans that include biological goals for aquatic resources.(3) Habitat management plans that include biological goals for aquatic resources.(c) (1) Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.(2) The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:(A) The watershed plan addresses the project impacts to waters of the state.(B) The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.(C) The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.(3) For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:(A) Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.(B) Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.(d) By January 1, 2025, the state board shall review and adopt take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In adopting its consideration of the general water quality certifications, the state board shall rely upon an shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code. Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.(e) Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, and make available for public review on their its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees, committees a report regarding, at a minimum, all of the following:(1) The water supply projects and flood risk reduction projects for which project certifications have been issued.(2) The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.(3) Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.(4) The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.13389.4. (a) A state agency may do any of the following:(1) Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.(2) Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.(3) Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.(b) This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.(c) This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.(d) The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.13389.5. This article shall remain in effect only until January 1, 2029, and as of that date is repealed.
22
3- Amended IN Senate May 01, 2023 Amended IN Senate April 12, 2023 Amended IN Senate March 30, 2023 Amended IN Senate February 09, 2023 CALIFORNIA LEGISLATURE 20232024 REGULAR SESSION Senate Bill No. 23Introduced by Senator Caballero(Coauthor: Senator Dodd)December 05, 2022An act to add and repeal Section 1618 of the Fish and Game Code, and to add the heading of Article 1 (commencing with Section 13370) to Chapter 5.5 of Division 7 of, and to add and repeal Article 2 (commencing with Section 13389.1) of Chapter 5.5 of Division 7 of, the Water Code, relating to water. LEGISLATIVE COUNSEL'S DIGESTSB 23, as amended, Caballero. Water supply and flood risk reduction projects: expedited permitting.(1) Existing law prohibits an entity from substantially diverting or obstructing the natural flow of, or substantially changing or using any material from the bed, channel, or bank of, any river, stream, or lake, or deposit or dispose of debris, waste, or other material containing crumbled, flaked, or ground pavement where it may pass into any river, stream, or lake, except under specified conditions, including requiring the entity to send written notification to the Department of Fish and Wildlife regarding the activity in the manner prescribed by the department.This bill would require a project proponent, if already required to submit a notification to the department, to submit to the department the certified or adopted environmental review document, as applicable, for the activity in the notification. The bill would require the department, under prescribed circumstances, to take certain actions within specified timelines, or within a mutually agreed-to extension of time. The bill would require, on or before January 1, 2025, and annually thereafter, the department to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to these provisions. The bill would repeal these provisions on January 1, 2029.(2) Under the Porter-Cologne Water Quality Control Act, the State Water Resources Control Board (state board) and the California regional water quality control boards (regional boards) are the principal state agencies with primary authority over water quality matters. Existing law authorizes the state board to issue permits and promulgate procedures consistent with federal law. This bill would require, if an applicant requests a preapplication consultation, the state board or regional boards to adhere to specified procedures and timelines in reviewing the application before issuing project certification. The bill would authorize a project proponent to petition the state board to reconsider its determination of application completeness, or to appeal to the state board any regional boards determination of application completeness.This bill would require the state board or regional boards to use specified approved conservation and habitat management plans as watershed plans for purposes of implementing the procedures in issuing a project certification, unless the state board or regional boards issuing a project certification determine in writing plans, as specified, unless the permitting authority makes a determination in writing, based on substantial evidence in the record, that an approved plan does not substantially meet the definition of a watershed plan, as defined. The bill would place requirements on the state board and regional boards regarding its determination on what is considered a watershed plan, including making a proposed written determination, and providing for public comment and a written response on that proposed determination. The bill would require, by January 1, 2025, the state board to review and take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under specified federal law within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. The bill would require the state board and regional boards, as part of their implementation of the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State, to address the impacts of dredge and fill activities from water supply and flood risk projects. The bill would require, on January 1, 2025, and annually thereafter, the state board and regional boards to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding specified information related to water supply projects and flood risk reduction projects.This bill would authorize a state agency, defined to mean any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project, to take specified actions in order to complete permit review and approval in an expeditious manner. The bill would make findings and declarations related to the need to expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment. This bill would repeal these provisions on January 1, 2029.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: NO
3+ Amended IN Senate April 12, 2023 Amended IN Senate March 30, 2023 Amended IN Senate February 09, 2023 CALIFORNIA LEGISLATURE 20232024 REGULAR SESSION Senate Bill No. 23Introduced by Senator Caballero(Coauthor: Senator Dodd)December 05, 2022An act to add and repeal Section 1618 to of the Fish and Game Code, and to add the heading of Article 1 (commencing with Section 13370) to Chapter 5.5 of Division 7 of, and to add and repeal Article 2 (commencing with Section 13389.1) to of Chapter 5.5 of Division 7 of, the Water Code, relating to water. LEGISLATIVE COUNSEL'S DIGESTSB 23, as amended, Caballero. Water supply and flood risk reduction projects: expedited permitting.(1) Existing law prohibits an entity from substantially diverting or obstructing the natural flow of, or substantially changing or using any material from the bed, channel, or bank of, any river, stream, or lake, or deposit or dispose of debris, waste, or other material containing crumbled, flaked, or ground pavement where it may pass into any river, stream, or lake, except under specified conditions, including requiring the entity to send written notification to the Department of Fish and Wildlife regarding the activity in the manner prescribed by the department.This bill would require a project proponent, if already required to submit a notification to the department, to submit final environmental documentation to the department the certified or adopted environmental review document, as applicable, for the activity in the notification. The bill would require the department, under prescribed circumstances, to take certain actions within specified timelines, or within a mutually agreed-to extension of time. The bill would require, on or before January 1, 2025, and annually thereafter, the department to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to these provisions. The bill would repeal these provisions on January 1, 2029.(2) Under the Porter-Cologne Water Quality Control Act, the State Water Resources Control Board (state board) and the California regional water quality control boards (regional boards) are the principal state agencies with primary authority over water quality matters. Existing law authorizes the state board to issue permits and promulgate procedures consistent with federal law. This bill would require, if an applicant requests a preapplication consultation, the state board or regional boards to adhere to specified procedures and timelines in reviewing the application before issuing project certification. The bill would authorize a project proponent to petition the state board to reconsider its determination of application completeness, or to appeal to the state board any regional boards determination of application completeness.This bill would require the state board or regional boards to use specified approved conservation and habitat management plans as watershed plans for purposes of implementing the procedures in issuing a project certification, unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, as defined. The bill would place requirements on the state board and regional boards regarding its determination on what is considered a watershed plan, including making a proposed written determination, and providing for public comment and a written response on that proposed determination. The bill would require, by January 1, 2025, the state board to review and adopt take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under specified federal law within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. The bill would require, on January 1, 2025, and annually thereafter, the state board and regional boards to prepare, provide public notice of, make available for public review on their its internet website, and submit to the relevant legislative committees, as specified, a report regarding specified information related to water supply projects and flood risk reduction projects.This bill would authorize a state agency, defined to mean any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project, to take specified actions in order to complete permit review and approval in an expeditious manner. The bill would make findings and declarations related to the need to expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment. This bill would repeal these provisions on January 1, 2029.Digest Key Vote: MAJORITY Appropriation: NO Fiscal Committee: YES Local Program: NO
44
5- Amended IN Senate May 01, 2023 Amended IN Senate April 12, 2023 Amended IN Senate March 30, 2023 Amended IN Senate February 09, 2023
5+ Amended IN Senate April 12, 2023 Amended IN Senate March 30, 2023 Amended IN Senate February 09, 2023
66
7-Amended IN Senate May 01, 2023
87 Amended IN Senate April 12, 2023
98 Amended IN Senate March 30, 2023
109 Amended IN Senate February 09, 2023
1110
1211 CALIFORNIA LEGISLATURE 20232024 REGULAR SESSION
1312
1413 Senate Bill
1514
1615 No. 23
1716
1817 Introduced by Senator Caballero(Coauthor: Senator Dodd)December 05, 2022
1918
2019 Introduced by Senator Caballero(Coauthor: Senator Dodd)
2120 December 05, 2022
2221
23-An act to add and repeal Section 1618 of the Fish and Game Code, and to add the heading of Article 1 (commencing with Section 13370) to Chapter 5.5 of Division 7 of, and to add and repeal Article 2 (commencing with Section 13389.1) of Chapter 5.5 of Division 7 of, the Water Code, relating to water.
22+An act to add and repeal Section 1618 to of the Fish and Game Code, and to add the heading of Article 1 (commencing with Section 13370) to Chapter 5.5 of Division 7 of, and to add and repeal Article 2 (commencing with Section 13389.1) to of Chapter 5.5 of Division 7 of, the Water Code, relating to water.
2423
2524 LEGISLATIVE COUNSEL'S DIGEST
2625
2726 ## LEGISLATIVE COUNSEL'S DIGEST
2827
2928 SB 23, as amended, Caballero. Water supply and flood risk reduction projects: expedited permitting.
3029
31-(1) Existing law prohibits an entity from substantially diverting or obstructing the natural flow of, or substantially changing or using any material from the bed, channel, or bank of, any river, stream, or lake, or deposit or dispose of debris, waste, or other material containing crumbled, flaked, or ground pavement where it may pass into any river, stream, or lake, except under specified conditions, including requiring the entity to send written notification to the Department of Fish and Wildlife regarding the activity in the manner prescribed by the department.This bill would require a project proponent, if already required to submit a notification to the department, to submit to the department the certified or adopted environmental review document, as applicable, for the activity in the notification. The bill would require the department, under prescribed circumstances, to take certain actions within specified timelines, or within a mutually agreed-to extension of time. The bill would require, on or before January 1, 2025, and annually thereafter, the department to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to these provisions. The bill would repeal these provisions on January 1, 2029.(2) Under the Porter-Cologne Water Quality Control Act, the State Water Resources Control Board (state board) and the California regional water quality control boards (regional boards) are the principal state agencies with primary authority over water quality matters. Existing law authorizes the state board to issue permits and promulgate procedures consistent with federal law. This bill would require, if an applicant requests a preapplication consultation, the state board or regional boards to adhere to specified procedures and timelines in reviewing the application before issuing project certification. The bill would authorize a project proponent to petition the state board to reconsider its determination of application completeness, or to appeal to the state board any regional boards determination of application completeness.This bill would require the state board or regional boards to use specified approved conservation and habitat management plans as watershed plans for purposes of implementing the procedures in issuing a project certification, unless the state board or regional boards issuing a project certification determine in writing plans, as specified, unless the permitting authority makes a determination in writing, based on substantial evidence in the record, that an approved plan does not substantially meet the definition of a watershed plan, as defined. The bill would place requirements on the state board and regional boards regarding its determination on what is considered a watershed plan, including making a proposed written determination, and providing for public comment and a written response on that proposed determination. The bill would require, by January 1, 2025, the state board to review and take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under specified federal law within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. The bill would require the state board and regional boards, as part of their implementation of the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State, to address the impacts of dredge and fill activities from water supply and flood risk projects. The bill would require, on January 1, 2025, and annually thereafter, the state board and regional boards to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding specified information related to water supply projects and flood risk reduction projects.This bill would authorize a state agency, defined to mean any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project, to take specified actions in order to complete permit review and approval in an expeditious manner. The bill would make findings and declarations related to the need to expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment. This bill would repeal these provisions on January 1, 2029.
30+(1) Existing law prohibits an entity from substantially diverting or obstructing the natural flow of, or substantially changing or using any material from the bed, channel, or bank of, any river, stream, or lake, or deposit or dispose of debris, waste, or other material containing crumbled, flaked, or ground pavement where it may pass into any river, stream, or lake, except under specified conditions, including requiring the entity to send written notification to the Department of Fish and Wildlife regarding the activity in the manner prescribed by the department.This bill would require a project proponent, if already required to submit a notification to the department, to submit final environmental documentation to the department the certified or adopted environmental review document, as applicable, for the activity in the notification. The bill would require the department, under prescribed circumstances, to take certain actions within specified timelines, or within a mutually agreed-to extension of time. The bill would require, on or before January 1, 2025, and annually thereafter, the department to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to these provisions. The bill would repeal these provisions on January 1, 2029.(2) Under the Porter-Cologne Water Quality Control Act, the State Water Resources Control Board (state board) and the California regional water quality control boards (regional boards) are the principal state agencies with primary authority over water quality matters. Existing law authorizes the state board to issue permits and promulgate procedures consistent with federal law. This bill would require, if an applicant requests a preapplication consultation, the state board or regional boards to adhere to specified procedures and timelines in reviewing the application before issuing project certification. The bill would authorize a project proponent to petition the state board to reconsider its determination of application completeness, or to appeal to the state board any regional boards determination of application completeness.This bill would require the state board or regional boards to use specified approved conservation and habitat management plans as watershed plans for purposes of implementing the procedures in issuing a project certification, unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, as defined. The bill would place requirements on the state board and regional boards regarding its determination on what is considered a watershed plan, including making a proposed written determination, and providing for public comment and a written response on that proposed determination. The bill would require, by January 1, 2025, the state board to review and adopt take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under specified federal law within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. The bill would require, on January 1, 2025, and annually thereafter, the state board and regional boards to prepare, provide public notice of, make available for public review on their its internet website, and submit to the relevant legislative committees, as specified, a report regarding specified information related to water supply projects and flood risk reduction projects.This bill would authorize a state agency, defined to mean any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project, to take specified actions in order to complete permit review and approval in an expeditious manner. The bill would make findings and declarations related to the need to expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment. This bill would repeal these provisions on January 1, 2029.
3231
3332 (1) Existing law prohibits an entity from substantially diverting or obstructing the natural flow of, or substantially changing or using any material from the bed, channel, or bank of, any river, stream, or lake, or deposit or dispose of debris, waste, or other material containing crumbled, flaked, or ground pavement where it may pass into any river, stream, or lake, except under specified conditions, including requiring the entity to send written notification to the Department of Fish and Wildlife regarding the activity in the manner prescribed by the department.
3433
35-This bill would require a project proponent, if already required to submit a notification to the department, to submit to the department the certified or adopted environmental review document, as applicable, for the activity in the notification. The bill would require the department, under prescribed circumstances, to take certain actions within specified timelines, or within a mutually agreed-to extension of time. The bill would require, on or before January 1, 2025, and annually thereafter, the department to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to these provisions. The bill would repeal these provisions on January 1, 2029.
34+This bill would require a project proponent, if already required to submit a notification to the department, to submit final environmental documentation to the department the certified or adopted environmental review document, as applicable, for the activity in the notification. The bill would require the department, under prescribed circumstances, to take certain actions within specified timelines, or within a mutually agreed-to extension of time. The bill would require, on or before January 1, 2025, and annually thereafter, the department to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to these provisions. The bill would repeal these provisions on January 1, 2029.
3635
3736 (2) Under the Porter-Cologne Water Quality Control Act, the State Water Resources Control Board (state board) and the California regional water quality control boards (regional boards) are the principal state agencies with primary authority over water quality matters. Existing law authorizes the state board to issue permits and promulgate procedures consistent with federal law.
3837
3938 This bill would require, if an applicant requests a preapplication consultation, the state board or regional boards to adhere to specified procedures and timelines in reviewing the application before issuing project certification. The bill would authorize a project proponent to petition the state board to reconsider its determination of application completeness, or to appeal to the state board any regional boards determination of application completeness.
4039
41-This bill would require the state board or regional boards to use specified approved conservation and habitat management plans as watershed plans for purposes of implementing the procedures in issuing a project certification, unless the state board or regional boards issuing a project certification determine in writing plans, as specified, unless the permitting authority makes a determination in writing, based on substantial evidence in the record, that an approved plan does not substantially meet the definition of a watershed plan, as defined. The bill would place requirements on the state board and regional boards regarding its determination on what is considered a watershed plan, including making a proposed written determination, and providing for public comment and a written response on that proposed determination. The bill would require, by January 1, 2025, the state board to review and take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under specified federal law within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. The bill would require the state board and regional boards, as part of their implementation of the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State, to address the impacts of dredge and fill activities from water supply and flood risk projects. The bill would require, on January 1, 2025, and annually thereafter, the state board and regional boards to prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative committees, as specified, a report regarding specified information related to water supply projects and flood risk reduction projects.
40+This bill would require the state board or regional boards to use specified approved conservation and habitat management plans as watershed plans for purposes of implementing the procedures in issuing a project certification, unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, as defined. The bill would place requirements on the state board and regional boards regarding its determination on what is considered a watershed plan, including making a proposed written determination, and providing for public comment and a written response on that proposed determination. The bill would require, by January 1, 2025, the state board to review and adopt take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under specified federal law within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. The bill would require, on January 1, 2025, and annually thereafter, the state board and regional boards to prepare, provide public notice of, make available for public review on their its internet website, and submit to the relevant legislative committees, as specified, a report regarding specified information related to water supply projects and flood risk reduction projects.
4241
4342 This bill would authorize a state agency, defined to mean any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project, to take specified actions in order to complete permit review and approval in an expeditious manner. The bill would make findings and declarations related to the need to expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment.
4443
4544 This bill would repeal these provisions on January 1, 2029.
4645
4746 ## Digest Key
4847
4948 ## Bill Text
5049
51-The people of the State of California do enact as follows:SECTION 1. Section 1618 is added to the Fish and Game Code, to read:1618. (a) For purposes of this section, the following definitions apply:(1) Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(2) Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.(3) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(4) Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(b) A project proponent shall do both of the following:(1) Submit a complete notification for the project activity to the department when required under Section 1602.(2) Submit to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) (1) In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete notification, as determined by the department.(B) Sixty days after receipt of the certified or adopted environmental review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement. (2) Nothing in paragraph (1) shall effect affect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.(d) If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).(e) On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.(f) This section shall remain in effect only until January 1, 2029, and as of that date is repealed.SEC. 2. The heading of Article 1 (commencing with Section 13370) is added to Chapter 5.5 of Division 7 of the Water Code, to read: Article 1. Implementation of the Federal Water Pollution Control ActSEC. 3. Article 2 (commencing with Section 13389.1) is added to Chapter 5.5 of Division 7 of the Water Code, to read: Article 2. Water Supply and Flood Risk Reduction Permits13389.1. For the purpose of this article, the following definitions apply:(a) Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(b) Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).(c) Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).(d) Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.(e) Procedures means the State Wetland Definition and Procedures for Discharge Discharges of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.(f) Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376. Section 13160.(g) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(h) State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.(i) Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or drinking water treatment facility.(j) Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.13389.2. (a) (1) This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.(2) The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.(3) The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.(4) Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.(b) (1) Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete application.(B) Sixty Ninety days after receipt of final the certified or adopted environmental documentation review document, as applicable, required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.(2) Paragraph (1) shall apply if the project proponent does all of the following:(A) Requests a preapplication consultation.(B) Files a complete application for project certification.(C) If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project. (D) Submits final environmental documentation to the state board or regional boards the certified or adopted environmental review document, as applicable, for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.(d) If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.(e) (1) If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.(2) Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.(f) (1) If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.(2) The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.(3) If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.(4) If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.(g) The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.(h) The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.(i) This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).(j) Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.13389.3. (a) The Legislature finds and declares all of the following:(1)On that on April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources. as a watershed plan for those aquatic resources, unless the permitting authority makes a written determination, based on substantial evidence in the record, that the habitat conservation plan or natural communities conservation plan does not substantially meet the definition of a watershed plan for those aquatic resources.(2)The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.(3)To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.(b)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:(1)Habitat conservation plans that include biological goals for aquatic resources.(2)Natural communities conservation plans that include biological goals for aquatic resources.(3)Habitat management plans that include biological goals for aquatic resources.(c)(1)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.(2)The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:(A)The watershed plan addresses the project impacts to waters of the state.(B)The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.(C)The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.(3)For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:(A)Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.(B)Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.(d)By January 1, 2025, the state board shall review and take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In its consideration of the general water quality certifications, the state board shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.(b) The state board and regional boards shall implement the procedures, including provisions related to watershed plans, to address the impacts of dredge and fill activities from water supply and flood risk projects.(e)(c) Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding, at a minimum, all of the following:(1) The water supply projects and flood risk reduction projects for which project certifications have been issued.(2) The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.(3) Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.(4) The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.13389.4. (a) A state agency may do any of the following:(1) Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.(2) Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.(3) Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.(b) This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.(c) This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.(d) The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.13389.5. This article shall remain in effect only until January 1, 2029, and as of that date is repealed.
50+The people of the State of California do enact as follows:SECTION 1. Section 1618 is added to the Fish and Game Code, to read:1618. (a) For purposes of this section, the following definitions apply:(1) Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(2) Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.(3) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(4) Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(b) A project proponent shall do both of the following:(1) Submit a complete notification for the project activity to the department when required under Section 1602.(2) Submitfinal environmental documentation to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) (1) In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete notification. notification, as determined by the department.(B) Sixty days after receipt of final the certified or adopted environmental documentation review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement. (2) Nothing in paragraph (1) shall effect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.(d) If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).(e) On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.(f) This section shall remain in effect only until January 1, 2029, and as of that date is repealed.SEC. 2. The heading of Article 1 (commencing with Section 13370) is added to Chapter 5.5 of Division 7 of the Water Code, to read: Article 1. Implementation of the Federal Water Pollution Control ActSEC. 3. Article 2 (commencing with Section 13389.1) is added to Chapter 5.5 of Division 7 of the Water Code, to read: Article 2. Water Supply and Flood Risk Reduction Permits13389.1. For the purpose of this article, the following definitions apply:(a) Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(b) Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).(c) Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).(d) Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.(e) Procedures means the State Wetland Definition and Procedures for Discharge of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.(f) Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376.(g) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(h) State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.(i) Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(j) Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.13389.2. (a) (1) This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.(2) The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.(3) The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.(4) Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.(b) (1) Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete application.(B) Sixty days after receipt of final environmental documentation required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.(2) Paragraph (1) shall apply if the project proponent does all of the following:(A) Requests a preapplication consultation.(B) Files a complete application for project certification.(C) If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project. (D) Submits final environmental documentation to the state board or regional boards for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.(d) If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.(e) (1) If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.(2) Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.(f) (1) If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.(2) The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.(3) If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.(4) If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.(g) The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.(h) The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.(i) This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).(j) Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.13389.3. (a) The Legislature finds and declares all of the following:(1) On April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources.(2) The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.(3) To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.(b) Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:(1) Habitat conservation plans that include biological goals for aquatic resources.(2) Natural communities conservation plans that include biological goals for aquatic resources.(3) Habitat management plans that include biological goals for aquatic resources.(c) (1) Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.(2) The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:(A) The watershed plan addresses the project impacts to waters of the state.(B) The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.(C) The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.(3) For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:(A) Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.(B) Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.(d) By January 1, 2025, the state board shall review and adopt take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In adopting its consideration of the general water quality certifications, the state board shall rely upon an shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code. Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.(e) Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, and make available for public review on their its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees, committees a report regarding, at a minimum, all of the following:(1) The water supply projects and flood risk reduction projects for which project certifications have been issued.(2) The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.(3) Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.(4) The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.13389.4. (a) A state agency may do any of the following:(1) Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.(2) Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.(3) Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.(b) This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.(c) This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.(d) The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.13389.5. This article shall remain in effect only until January 1, 2029, and as of that date is repealed.
5251
5352 The people of the State of California do enact as follows:
5453
5554 ## The people of the State of California do enact as follows:
5655
57-SECTION 1. Section 1618 is added to the Fish and Game Code, to read:1618. (a) For purposes of this section, the following definitions apply:(1) Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(2) Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.(3) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(4) Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(b) A project proponent shall do both of the following:(1) Submit a complete notification for the project activity to the department when required under Section 1602.(2) Submit to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) (1) In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete notification, as determined by the department.(B) Sixty days after receipt of the certified or adopted environmental review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement. (2) Nothing in paragraph (1) shall effect affect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.(d) If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).(e) On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.(f) This section shall remain in effect only until January 1, 2029, and as of that date is repealed.
56+SECTION 1. Section 1618 is added to the Fish and Game Code, to read:1618. (a) For purposes of this section, the following definitions apply:(1) Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(2) Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.(3) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(4) Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(b) A project proponent shall do both of the following:(1) Submit a complete notification for the project activity to the department when required under Section 1602.(2) Submitfinal environmental documentation to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) (1) In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete notification. notification, as determined by the department.(B) Sixty days after receipt of final the certified or adopted environmental documentation review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement. (2) Nothing in paragraph (1) shall effect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.(d) If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).(e) On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.(f) This section shall remain in effect only until January 1, 2029, and as of that date is repealed.
5857
5958 SECTION 1. Section 1618 is added to the Fish and Game Code, to read:
6059
6160 ### SECTION 1.
6261
63-1618. (a) For purposes of this section, the following definitions apply:(1) Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(2) Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.(3) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(4) Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(b) A project proponent shall do both of the following:(1) Submit a complete notification for the project activity to the department when required under Section 1602.(2) Submit to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) (1) In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete notification, as determined by the department.(B) Sixty days after receipt of the certified or adopted environmental review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement. (2) Nothing in paragraph (1) shall effect affect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.(d) If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).(e) On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.(f) This section shall remain in effect only until January 1, 2029, and as of that date is repealed.
62+1618. (a) For purposes of this section, the following definitions apply:(1) Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(2) Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.(3) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(4) Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(b) A project proponent shall do both of the following:(1) Submit a complete notification for the project activity to the department when required under Section 1602.(2) Submitfinal environmental documentation to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) (1) In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete notification. notification, as determined by the department.(B) Sixty days after receipt of final the certified or adopted environmental documentation review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement. (2) Nothing in paragraph (1) shall effect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.(d) If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).(e) On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.(f) This section shall remain in effect only until January 1, 2029, and as of that date is repealed.
6463
65-1618. (a) For purposes of this section, the following definitions apply:(1) Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(2) Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.(3) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(4) Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(b) A project proponent shall do both of the following:(1) Submit a complete notification for the project activity to the department when required under Section 1602.(2) Submit to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) (1) In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete notification, as determined by the department.(B) Sixty days after receipt of the certified or adopted environmental review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement. (2) Nothing in paragraph (1) shall effect affect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.(d) If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).(e) On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.(f) This section shall remain in effect only until January 1, 2029, and as of that date is repealed.
64+1618. (a) For purposes of this section, the following definitions apply:(1) Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(2) Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.(3) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(4) Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(b) A project proponent shall do both of the following:(1) Submit a complete notification for the project activity to the department when required under Section 1602.(2) Submitfinal environmental documentation to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) (1) In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete notification. notification, as determined by the department.(B) Sixty days after receipt of final the certified or adopted environmental documentation review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement. (2) Nothing in paragraph (1) shall effect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.(d) If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).(e) On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.(f) This section shall remain in effect only until January 1, 2029, and as of that date is repealed.
6665
67-1618. (a) For purposes of this section, the following definitions apply:(1) Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(2) Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.(3) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(4) Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(b) A project proponent shall do both of the following:(1) Submit a complete notification for the project activity to the department when required under Section 1602.(2) Submit to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) (1) In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete notification, as determined by the department.(B) Sixty days after receipt of the certified or adopted environmental review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement. (2) Nothing in paragraph (1) shall effect affect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.(d) If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).(e) On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.(f) This section shall remain in effect only until January 1, 2029, and as of that date is repealed.
66+1618. (a) For purposes of this section, the following definitions apply:(1) Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(2) Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.(3) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(4) Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(b) A project proponent shall do both of the following:(1) Submit a complete notification for the project activity to the department when required under Section 1602.(2) Submitfinal environmental documentation to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) (1) In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete notification. notification, as determined by the department.(B) Sixty days after receipt of final the certified or adopted environmental documentation review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement. (2) Nothing in paragraph (1) shall effect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.(3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.(d) If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).(e) On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.(f) This section shall remain in effect only until January 1, 2029, and as of that date is repealed.
6867
6968
7069
7170 1618. (a) For purposes of this section, the following definitions apply:
7271
7372 (1) Flood risk reduction project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.
7473
7574 (2) Notification means the documents described in subparagraphs (A) to (F), inclusive, of paragraph (1) of subdivision (a) of Section 1602.
7675
7776 (3) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.
7877
7978 (4) Water supply project means a project or plan subject to department jurisdiction under this chapter that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.
8079
8180 (b) A project proponent shall do both of the following:
8281
8382 (1) Submit a complete notification for the project activity to the department when required under Section 1602.
8483
85-(2) Submit to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.
84+(2) Submitfinal environmental documentation to the department the certified or adopted environmental review document, as applicable, for the activity in the notification, required under Division 13 (commencing with Section 21000) of the Public Resources Code.
8685
8786 (c) (1) In addition to the timelines applicable to the departments issuance of draft agreements specified in Section 1603 and notwithstanding Sections 65950 and 65952 of the Government Code, if the department determines that the activity in the notification for a water supply project or flood risk reduction project will substantially adversely affect an existing fish and wildlife resource and the project proponent completes the actions described in subdivision (b), the department shall issue the final agreement that includes any reasonable measures mutually agreed to by the project proponent and the department pursuant to subdivision (a) of Section 1603, by either of the following dates, whichever is later:
8887
89-(A) One hundred eighty days after receipt of a complete notification, as determined by the department.
88+(A) One hundred eighty days after receipt of a complete notification. notification, as determined by the department.
9089
91-(B) Sixty days after receipt of the certified or adopted environmental review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement.
90+(B) Sixty days after receipt of final the certified or adopted environmental documentation review document required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the agreement.
9291
93- (2) Nothing in paragraph (1) shall effect affect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.
92+ (2) Nothing in paragraph (1) shall effect the operation of subparagraph (D) of paragraph (4) of subdivision (a) of Section 1602, which applies when the department does not issue a draft agreement to the project proponent within 60 days of the date the notification is complete.
9493
9594 (3) If the department and the project proponent are not able to reach a final agreement on all measures, the project proponent may proceed in accordance with a final agreement issued by an arbitration panel pursuant to subdivision (b) of Section 1603, including reasonable measures necessary to protect the existing fish and wildlife resources substantially adversely affected by the water supply project or flood risk reduction project.
9695
9796 (d) If the department and the project proponent mutually agree to an extension of the date for which the department shall provide a final agreement, the date mutually agreed upon shall apply instead of the time period provided in subdivision (c).
9897
9998 (e) On or before January 1, 2025, and annually thereafter, the department shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding the water supply projects and flood risk reduction projects for which final agreements have been issued pursuant to this section.
10099
101100 (f) This section shall remain in effect only until January 1, 2029, and as of that date is repealed.
102101
103102 SEC. 2. The heading of Article 1 (commencing with Section 13370) is added to Chapter 5.5 of Division 7 of the Water Code, to read: Article 1. Implementation of the Federal Water Pollution Control Act
104103
105104 SEC. 2. The heading of Article 1 (commencing with Section 13370) is added to Chapter 5.5 of Division 7 of the Water Code, to read:
106105
107106 ### SEC. 2.
108107
109108 Article 1. Implementation of the Federal Water Pollution Control Act
110109
111110 Article 1. Implementation of the Federal Water Pollution Control Act
112111
113112 Article 1. Implementation of the Federal Water Pollution Control Act
114113
115114 Article 1. Implementation of the Federal Water Pollution Control Act
116115
117-SEC. 3. Article 2 (commencing with Section 13389.1) is added to Chapter 5.5 of Division 7 of the Water Code, to read: Article 2. Water Supply and Flood Risk Reduction Permits13389.1. For the purpose of this article, the following definitions apply:(a) Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(b) Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).(c) Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).(d) Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.(e) Procedures means the State Wetland Definition and Procedures for Discharge Discharges of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.(f) Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376. Section 13160.(g) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(h) State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.(i) Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or drinking water treatment facility.(j) Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.13389.2. (a) (1) This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.(2) The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.(3) The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.(4) Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.(b) (1) Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete application.(B) Sixty Ninety days after receipt of final the certified or adopted environmental documentation review document, as applicable, required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.(2) Paragraph (1) shall apply if the project proponent does all of the following:(A) Requests a preapplication consultation.(B) Files a complete application for project certification.(C) If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project. (D) Submits final environmental documentation to the state board or regional boards the certified or adopted environmental review document, as applicable, for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.(d) If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.(e) (1) If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.(2) Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.(f) (1) If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.(2) The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.(3) If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.(4) If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.(g) The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.(h) The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.(i) This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).(j) Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.13389.3. (a) The Legislature finds and declares all of the following:(1)On that on April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources. as a watershed plan for those aquatic resources, unless the permitting authority makes a written determination, based on substantial evidence in the record, that the habitat conservation plan or natural communities conservation plan does not substantially meet the definition of a watershed plan for those aquatic resources.(2)The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.(3)To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.(b)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:(1)Habitat conservation plans that include biological goals for aquatic resources.(2)Natural communities conservation plans that include biological goals for aquatic resources.(3)Habitat management plans that include biological goals for aquatic resources.(c)(1)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.(2)The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:(A)The watershed plan addresses the project impacts to waters of the state.(B)The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.(C)The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.(3)For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:(A)Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.(B)Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.(d)By January 1, 2025, the state board shall review and take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In its consideration of the general water quality certifications, the state board shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.(b) The state board and regional boards shall implement the procedures, including provisions related to watershed plans, to address the impacts of dredge and fill activities from water supply and flood risk projects.(e)(c) Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding, at a minimum, all of the following:(1) The water supply projects and flood risk reduction projects for which project certifications have been issued.(2) The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.(3) Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.(4) The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.13389.4. (a) A state agency may do any of the following:(1) Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.(2) Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.(3) Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.(b) This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.(c) This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.(d) The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.13389.5. This article shall remain in effect only until January 1, 2029, and as of that date is repealed.
116+SEC. 3. Article 2 (commencing with Section 13389.1) is added to Chapter 5.5 of Division 7 of the Water Code, to read: Article 2. Water Supply and Flood Risk Reduction Permits13389.1. For the purpose of this article, the following definitions apply:(a) Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(b) Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).(c) Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).(d) Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.(e) Procedures means the State Wetland Definition and Procedures for Discharge of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.(f) Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376.(g) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(h) State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.(i) Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(j) Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.13389.2. (a) (1) This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.(2) The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.(3) The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.(4) Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.(b) (1) Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete application.(B) Sixty days after receipt of final environmental documentation required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.(2) Paragraph (1) shall apply if the project proponent does all of the following:(A) Requests a preapplication consultation.(B) Files a complete application for project certification.(C) If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project. (D) Submits final environmental documentation to the state board or regional boards for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.(d) If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.(e) (1) If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.(2) Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.(f) (1) If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.(2) The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.(3) If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.(4) If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.(g) The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.(h) The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.(i) This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).(j) Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.13389.3. (a) The Legislature finds and declares all of the following:(1) On April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources.(2) The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.(3) To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.(b) Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:(1) Habitat conservation plans that include biological goals for aquatic resources.(2) Natural communities conservation plans that include biological goals for aquatic resources.(3) Habitat management plans that include biological goals for aquatic resources.(c) (1) Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.(2) The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:(A) The watershed plan addresses the project impacts to waters of the state.(B) The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.(C) The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.(3) For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:(A) Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.(B) Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.(d) By January 1, 2025, the state board shall review and adopt take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In adopting its consideration of the general water quality certifications, the state board shall rely upon an shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code. Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.(e) Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, and make available for public review on their its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees, committees a report regarding, at a minimum, all of the following:(1) The water supply projects and flood risk reduction projects for which project certifications have been issued.(2) The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.(3) Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.(4) The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.13389.4. (a) A state agency may do any of the following:(1) Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.(2) Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.(3) Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.(b) This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.(c) This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.(d) The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.13389.5. This article shall remain in effect only until January 1, 2029, and as of that date is repealed.
118117
119118 SEC. 3. Article 2 (commencing with Section 13389.1) is added to Chapter 5.5 of Division 7 of the Water Code, to read:
120119
121120 ### SEC. 3.
122121
123- Article 2. Water Supply and Flood Risk Reduction Permits13389.1. For the purpose of this article, the following definitions apply:(a) Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(b) Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).(c) Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).(d) Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.(e) Procedures means the State Wetland Definition and Procedures for Discharge Discharges of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.(f) Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376. Section 13160.(g) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(h) State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.(i) Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or drinking water treatment facility.(j) Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.13389.2. (a) (1) This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.(2) The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.(3) The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.(4) Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.(b) (1) Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete application.(B) Sixty Ninety days after receipt of final the certified or adopted environmental documentation review document, as applicable, required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.(2) Paragraph (1) shall apply if the project proponent does all of the following:(A) Requests a preapplication consultation.(B) Files a complete application for project certification.(C) If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project. (D) Submits final environmental documentation to the state board or regional boards the certified or adopted environmental review document, as applicable, for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.(d) If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.(e) (1) If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.(2) Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.(f) (1) If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.(2) The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.(3) If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.(4) If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.(g) The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.(h) The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.(i) This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).(j) Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.13389.3. (a) The Legislature finds and declares all of the following:(1)On that on April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources. as a watershed plan for those aquatic resources, unless the permitting authority makes a written determination, based on substantial evidence in the record, that the habitat conservation plan or natural communities conservation plan does not substantially meet the definition of a watershed plan for those aquatic resources.(2)The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.(3)To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.(b)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:(1)Habitat conservation plans that include biological goals for aquatic resources.(2)Natural communities conservation plans that include biological goals for aquatic resources.(3)Habitat management plans that include biological goals for aquatic resources.(c)(1)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.(2)The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:(A)The watershed plan addresses the project impacts to waters of the state.(B)The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.(C)The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.(3)For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:(A)Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.(B)Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.(d)By January 1, 2025, the state board shall review and take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In its consideration of the general water quality certifications, the state board shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.(b) The state board and regional boards shall implement the procedures, including provisions related to watershed plans, to address the impacts of dredge and fill activities from water supply and flood risk projects.(e)(c) Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding, at a minimum, all of the following:(1) The water supply projects and flood risk reduction projects for which project certifications have been issued.(2) The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.(3) Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.(4) The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.13389.4. (a) A state agency may do any of the following:(1) Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.(2) Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.(3) Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.(b) This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.(c) This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.(d) The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.13389.5. This article shall remain in effect only until January 1, 2029, and as of that date is repealed.
122+ Article 2. Water Supply and Flood Risk Reduction Permits13389.1. For the purpose of this article, the following definitions apply:(a) Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(b) Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).(c) Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).(d) Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.(e) Procedures means the State Wetland Definition and Procedures for Discharge of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.(f) Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376.(g) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(h) State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.(i) Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(j) Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.13389.2. (a) (1) This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.(2) The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.(3) The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.(4) Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.(b) (1) Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete application.(B) Sixty days after receipt of final environmental documentation required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.(2) Paragraph (1) shall apply if the project proponent does all of the following:(A) Requests a preapplication consultation.(B) Files a complete application for project certification.(C) If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project. (D) Submits final environmental documentation to the state board or regional boards for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.(d) If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.(e) (1) If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.(2) Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.(f) (1) If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.(2) The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.(3) If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.(4) If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.(g) The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.(h) The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.(i) This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).(j) Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.13389.3. (a) The Legislature finds and declares all of the following:(1) On April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources.(2) The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.(3) To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.(b) Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:(1) Habitat conservation plans that include biological goals for aquatic resources.(2) Natural communities conservation plans that include biological goals for aquatic resources.(3) Habitat management plans that include biological goals for aquatic resources.(c) (1) Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.(2) The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:(A) The watershed plan addresses the project impacts to waters of the state.(B) The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.(C) The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.(3) For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:(A) Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.(B) Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.(d) By January 1, 2025, the state board shall review and adopt take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In adopting its consideration of the general water quality certifications, the state board shall rely upon an shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code. Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.(e) Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, and make available for public review on their its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees, committees a report regarding, at a minimum, all of the following:(1) The water supply projects and flood risk reduction projects for which project certifications have been issued.(2) The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.(3) Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.(4) The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.13389.4. (a) A state agency may do any of the following:(1) Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.(2) Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.(3) Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.(b) This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.(c) This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.(d) The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.13389.5. This article shall remain in effect only until January 1, 2029, and as of that date is repealed.
124123
125- Article 2. Water Supply and Flood Risk Reduction Permits13389.1. For the purpose of this article, the following definitions apply:(a) Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(b) Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).(c) Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).(d) Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.(e) Procedures means the State Wetland Definition and Procedures for Discharge Discharges of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.(f) Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376. Section 13160.(g) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(h) State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.(i) Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or drinking water treatment facility.(j) Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.13389.2. (a) (1) This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.(2) The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.(3) The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.(4) Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.(b) (1) Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete application.(B) Sixty Ninety days after receipt of final the certified or adopted environmental documentation review document, as applicable, required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.(2) Paragraph (1) shall apply if the project proponent does all of the following:(A) Requests a preapplication consultation.(B) Files a complete application for project certification.(C) If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project. (D) Submits final environmental documentation to the state board or regional boards the certified or adopted environmental review document, as applicable, for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.(d) If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.(e) (1) If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.(2) Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.(f) (1) If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.(2) The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.(3) If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.(4) If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.(g) The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.(h) The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.(i) This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).(j) Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.13389.3. (a) The Legislature finds and declares all of the following:(1)On that on April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources. as a watershed plan for those aquatic resources, unless the permitting authority makes a written determination, based on substantial evidence in the record, that the habitat conservation plan or natural communities conservation plan does not substantially meet the definition of a watershed plan for those aquatic resources.(2)The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.(3)To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.(b)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:(1)Habitat conservation plans that include biological goals for aquatic resources.(2)Natural communities conservation plans that include biological goals for aquatic resources.(3)Habitat management plans that include biological goals for aquatic resources.(c)(1)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.(2)The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:(A)The watershed plan addresses the project impacts to waters of the state.(B)The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.(C)The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.(3)For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:(A)Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.(B)Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.(d)By January 1, 2025, the state board shall review and take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In its consideration of the general water quality certifications, the state board shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.(b) The state board and regional boards shall implement the procedures, including provisions related to watershed plans, to address the impacts of dredge and fill activities from water supply and flood risk projects.(e)(c) Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding, at a minimum, all of the following:(1) The water supply projects and flood risk reduction projects for which project certifications have been issued.(2) The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.(3) Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.(4) The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.13389.4. (a) A state agency may do any of the following:(1) Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.(2) Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.(3) Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.(b) This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.(c) This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.(d) The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.13389.5. This article shall remain in effect only until January 1, 2029, and as of that date is repealed.
124+ Article 2. Water Supply and Flood Risk Reduction Permits13389.1. For the purpose of this article, the following definitions apply:(a) Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(b) Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).(c) Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).(d) Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.(e) Procedures means the State Wetland Definition and Procedures for Discharge of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.(f) Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376.(g) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(h) State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.(i) Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(j) Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.13389.2. (a) (1) This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.(2) The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.(3) The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.(4) Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.(b) (1) Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete application.(B) Sixty days after receipt of final environmental documentation required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.(2) Paragraph (1) shall apply if the project proponent does all of the following:(A) Requests a preapplication consultation.(B) Files a complete application for project certification.(C) If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project. (D) Submits final environmental documentation to the state board or regional boards for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.(d) If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.(e) (1) If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.(2) Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.(f) (1) If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.(2) The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.(3) If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.(4) If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.(g) The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.(h) The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.(i) This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).(j) Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.13389.3. (a) The Legislature finds and declares all of the following:(1) On April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources.(2) The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.(3) To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.(b) Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:(1) Habitat conservation plans that include biological goals for aquatic resources.(2) Natural communities conservation plans that include biological goals for aquatic resources.(3) Habitat management plans that include biological goals for aquatic resources.(c) (1) Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.(2) The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:(A) The watershed plan addresses the project impacts to waters of the state.(B) The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.(C) The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.(3) For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:(A) Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.(B) Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.(d) By January 1, 2025, the state board shall review and adopt take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In adopting its consideration of the general water quality certifications, the state board shall rely upon an shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code. Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.(e) Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, and make available for public review on their its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees, committees a report regarding, at a minimum, all of the following:(1) The water supply projects and flood risk reduction projects for which project certifications have been issued.(2) The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.(3) Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.(4) The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.13389.4. (a) A state agency may do any of the following:(1) Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.(2) Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.(3) Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.(b) This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.(c) This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.(d) The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.13389.5. This article shall remain in effect only until January 1, 2029, and as of that date is repealed.
126125
127126 Article 2. Water Supply and Flood Risk Reduction Permits
128127
129128 Article 2. Water Supply and Flood Risk Reduction Permits
130129
131-13389.1. For the purpose of this article, the following definitions apply:(a) Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(b) Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).(c) Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).(d) Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.(e) Procedures means the State Wetland Definition and Procedures for Discharge Discharges of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.(f) Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376. Section 13160.(g) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(h) State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.(i) Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or drinking water treatment facility.(j) Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.
130+13389.1. For the purpose of this article, the following definitions apply:(a) Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.(b) Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).(c) Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).(d) Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.(e) Procedures means the State Wetland Definition and Procedures for Discharge of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.(f) Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376.(g) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.(h) State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.(i) Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.(j) Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.
132131
133132
134133
135134 13389.1. For the purpose of this article, the following definitions apply:
136135
137136 (a) Flood risk reduction project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a facility, channel, levee, or flood control modification, including nature-based solutions, where flood risk reduction or sea level rise protection is a primary objective of the project.
138137
139138 (b) Habitat conservation plan means any plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.).
140139
141140 (c) Habitat management plan means any habitat conservation plan, natural communities conservation plan, habitat management plan, or other plan agreement or permit approved by or entered into by the Department of Fish and Wildlife in connection with the authorization of taking of an endangered, threatened, or candidate species pursuant to the California Endangered Species Act (Chapter 1.5 (commencing with Section 2050) of Division 3 of the Fish and Game Code).
142141
143142 (d) Natural communities conservation plan means any plan approved by the Department of Fish and Wildlife pursuant to Chapter 10 (commencing with Section 2800) of Division 3 of the Fish and Game Code.
144143
145-(e) Procedures means the State Wetland Definition and Procedures for Discharge Discharges of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.
144+(e) Procedures means the State Wetland Definition and Procedures for Discharge of Dredged or Fill Material to Waters of the State (as adopted by the State Water Resources Control Board on April 2, 2019) as they may be amended from time to time.
146145
147-(f) Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376. Section 13160.
146+(f) Project certification means water quality certification required by, and issued under, Sections 13160, 13260, and 13376.
148147
149148 (g) Project proponent means a public agency or public utility that proposes a water supply project or flood risk reduction project.
150149
151150 (h) State agency means any agency, board, or commission, including the state board or the regional boards, with the power to issue a permit that would authorize a water supply project or authorize a flood risk reduction project.
152151
153-(i) Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or drinking water treatment facility.
152+(i) Water supply project means a project or plan that is proposed by a public agency or a public utility to construct, alter, retrofit, maintain, manage, or improve a groundwater recharge, desalination, recycled water, water conveyance, surface water storage, stormwater capture, or water treatment facility.
154153
155154 (j) Watershed plan means a document or set of documents, developed in consultation with relevant stakeholders, that has a specific goal of aquatic resource restoration, establishment, enhancement or preservation within a watershed, that addresses aquatic resource conditions in the watershed, addresses multiple stakeholder interests and land uses, includes information about identification of priority sites for aquatic resource restoration and protection, includes implementation measures to attain aquatic resource protection goals for the watershed, and is used by the state board or regional boards in determining appropriate terms and conditions, including avoidance, minimization, and compensatory mitigation conditions, to be included in project certifications.
156155
157-13389.2. (a) (1) This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.(2) The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.(3) The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.(4) Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.(b) (1) Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete application.(B) Sixty Ninety days after receipt of final the certified or adopted environmental documentation review document, as applicable, required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.(2) Paragraph (1) shall apply if the project proponent does all of the following:(A) Requests a preapplication consultation.(B) Files a complete application for project certification.(C) If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project. (D) Submits final environmental documentation to the state board or regional boards the certified or adopted environmental review document, as applicable, for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.(d) If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.(e) (1) If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.(2) Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.(f) (1) If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.(2) The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.(3) If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.(4) If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.(g) The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.(h) The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.(i) This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).(j) Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.
156+13389.2. (a) (1) This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.(2) The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.(3) The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.(4) Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.(b) (1) Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:(A) One hundred eighty days after receipt of a complete application.(B) Sixty days after receipt of final environmental documentation required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.(2) Paragraph (1) shall apply if the project proponent does all of the following:(A) Requests a preapplication consultation.(B) Files a complete application for project certification.(C) If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project. (D) Submits final environmental documentation to the state board or regional boards for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.(c) The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.(d) If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.(e) (1) If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.(2) Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.(f) (1) If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.(2) The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.(3) If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.(4) If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.(g) The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.(h) The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.(i) This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).(j) Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.
158157
159158
160159
161160 13389.2. (a) (1) This section shall apply if, before filing an application for project certification for a water supply project or flood risk reduction project, the project proponent requests a preapplication consultation with the state board or regional boards, as appropriate.
162161
163162 (2) The project proponent shall initiate the preapplication consultation at least 60 days before the filing of the application for project certification. Any meeting pursuant to the consultation shall occur no less frequently than once every 60 days thereafter until the project is fully certified.
164163
165164 (3) The 60-day preapplication period may run concurrently with any other preapplication or postapplication consultation period that a project proponent enters into as required by law with any other regulatory agency with jurisdiction.
166165
167166 (4) Nothing in this section shall require an applicant to request or engage in a preapplication consultation not otherwise required by law for any project certification.
168167
169168 (b) (1) Notwithstanding any other law, and if the project proponent complies with paragraph (2), the state board or regional boards shall take final action on a project certification by either of the following dates, whichever is later:
170169
171170 (A) One hundred eighty days after receipt of a complete application.
172171
173-(B) Sixty Ninety days after receipt of final the certified or adopted environmental documentation review document, as applicable, required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.
172+(B) Sixty days after receipt of final environmental documentation required under Division 13 (commencing with Section 21000) of the Public Resources Code for issuance of the project certification.
174173
175174 (2) Paragraph (1) shall apply if the project proponent does all of the following:
176175
177176 (A) Requests a preapplication consultation.
178177
179178 (B) Files a complete application for project certification.
180179
181180 (C) If required for the project, files a complete application or petition under Chapter 2 (commencing with Section 1250) of Part 2 of Division 2 for all water rights approvals or amendments necessary to implement the project.
182181
183- (D) Submits final environmental documentation to the state board or regional boards the certified or adopted environmental review document, as applicable, for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.
182+ (D) Submits final environmental documentation to the state board or regional boards for the project certification required under Division 13 (commencing with Section 21000) of the Public Resources Code.
184183
185184 (c) The state board or regional board shall notify the project proponent in writing whether the application is complete no later than 30 days after the submittal of an application or petition. If the application is determined to be incomplete, the state board or regional boards shall provide the project proponent with a written notification that includes a full list of specific items that were complete and incomplete, and indicate the manner by which incomplete items can be made complete, including a list and thorough description of the specific information needed to complete the application or petition. The list shall be limited to those items actually required by the state board or regional board under applicable law. After the state board or regional board issues the list, it shall not request or require the project proponent to provide any new or additional information that was not identified in the initial list of items found to be incomplete. No list shall include an extension or waiver of any of the time periods prescribed by this section.
186185
187186 (d) If the state board or regional board does not provide the project proponent with a written notification that includes a list of specific items that are complete and incomplete within 30 days after receipt of the initial application or petition, the application or petition shall be deemed complete.
188187
189188 (e) (1) If the state board or regional board provides the written notification determining that the application or petition is incomplete, the project proponent shall act within 45 days after receipt of the notification to submit supplemental materials in order to complete the application or petition, or to appeal the determination, in whole or in part.
190189
191190 (2) Upon receipt of any supplemental materials from the project proponent, the state board or regional board shall, within 30 days after receipt of the supplemental materials, determine the completeness of the application or petition with the supplemental materials and whether to issue the notification of a complete application. In making this determination, the state board or regional board shall be limited to whether the application or petition as supplemented includes the information specified in the prior notification of incompleteness.
192191
193192 (f) (1) If the supplemented application or petition is again determined to be incomplete, the state board or regional board shall provide the project proponent with a written notification specifying the parts of the supplemented application or petition that are still incomplete and indicate the manner by which they can be made complete, including a full list and thorough description of the information needed to complete the application or petition.
194193
195194 (2) The project proponent shall act within 30 days of receipt of that notification to submit additional supplemental materials in order to complete the application or petition, or to appeal the notification of incompleteness, in whole or in part.
196195
197196 (3) If the state board or regional board does not, within 30 days of receipt of application materials from the applicant, provide the project proponent with a written notification specifying those parts of the supplemented application or petition that are still incomplete and indicating the manner by which they can be made complete, the application or petition as supplemented shall be deemed complete for purposes of this section.
198197
199198 (4) If the project proponent elects to supplement a previously supplemented application or petition, the deadlines and obligations set forth in this subdivision shall also apply to any supplemented application or petition.
200199
201200 (g) The state board or regional board may, in the course of processing the application, request the project proponent to clarify, correct, or otherwise supplement the information required for the application under subdivision (c). This shall not affect any specified deadlines under this section.
202201
203202 (h) The project proponent may petition the state board to reconsider its determination of application completeness, or may appeal to the state board any regional boards determination of application completeness. The project proponent may petition for reconsideration or appeal a determination of completeness, either in whole or in part, and the state board shall act on the petition for reconsideration or appeal no later than 60 days after receipt of the appeal in accordance with subdivision (c) of Section 65943 of the Government Code. Within 30 days of the timely issuance by the state board of its final written determination of completeness, the project proponent may challenge the determination of completeness in court.
204203
205204 (i) This section does not supersede or otherwise amend any deadlines set forth by or in the Federal Water Pollution Control Act (33 U.S.C. Sec. 1251 et seq.).
206205
207206 (j) Except as provided in subdivision (h), this section does not amend the procedures or any deadlines for administrative or judicial appeal of a project certification as set forth under state or federal law.
208207
209-13389.3. (a) The Legislature finds and declares all of the following:(1)On that on April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources. as a watershed plan for those aquatic resources, unless the permitting authority makes a written determination, based on substantial evidence in the record, that the habitat conservation plan or natural communities conservation plan does not substantially meet the definition of a watershed plan for those aquatic resources.(2)The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.(3)To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.(b)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:(1)Habitat conservation plans that include biological goals for aquatic resources.(2)Natural communities conservation plans that include biological goals for aquatic resources.(3)Habitat management plans that include biological goals for aquatic resources.(c)(1)Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.(2)The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:(A)The watershed plan addresses the project impacts to waters of the state.(B)The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.(C)The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.(3)For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:(A)Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.(B)Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.(d)By January 1, 2025, the state board shall review and take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In its consideration of the general water quality certifications, the state board shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.(b) The state board and regional boards shall implement the procedures, including provisions related to watershed plans, to address the impacts of dredge and fill activities from water supply and flood risk projects.(e)(c) Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding, at a minimum, all of the following:(1) The water supply projects and flood risk reduction projects for which project certifications have been issued.(2) The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.(3) Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.(4) The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.
208+13389.3. (a) The Legislature finds and declares all of the following:(1) On April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources.(2) The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.(3) To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.(b) Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:(1) Habitat conservation plans that include biological goals for aquatic resources.(2) Natural communities conservation plans that include biological goals for aquatic resources.(3) Habitat management plans that include biological goals for aquatic resources.(c) (1) Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.(2) The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:(A) The watershed plan addresses the project impacts to waters of the state.(B) The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.(C) The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.(3) For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:(A) Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.(B) Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.(d) By January 1, 2025, the state board shall review and adopt take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In adopting its consideration of the general water quality certifications, the state board shall rely upon an shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code. Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.(e) Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, and make available for public review on their its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees, committees a report regarding, at a minimum, all of the following:(1) The water supply projects and flood risk reduction projects for which project certifications have been issued.(2) The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.(3) Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.(4) The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.
210209
211210
212211
213212 13389.3. (a) The Legislature finds and declares all of the following:
214213
215-(1)On that on April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources. as a watershed plan for those aquatic resources, unless the permitting authority makes a written determination, based on substantial evidence in the record, that the habitat conservation plan or natural communities conservation plan does not substantially meet the definition of a watershed plan for those aquatic resources.
214+(1) On April 2, 2019, the state board adopted the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (procedures) that requires that any habitat conservation plan approved by the United States Fish and Wildlife Service pursuant to the federal Endangered Species Act (16 U.S.C. Sec. 1531 et seq.) before December 31, 2020, and any natural communities conservation plan approved by the Department of Fish and Wildlife pursuant to the Natural Communities Conservation Planning Act before December 31, 2020, shall be used by the state board and regional boards in issuing project certifications, if the plan includes biological goals for aquatic resources.
216215
217216 (2) The procedures further require that the state board or regional boards shall use the approved plans as watershed management plans under the procedures unless the state board or regional boards determine that the approved habitat conservation plan or the natural communities conservation plan does not substantially meet the definition of a watershed plan, as set forth in the procedures, for aquatic resources.
218217
219-
220-
221218 (3) To expedite water supply projects and flood risk reduction projects to better address climate change impacts while protecting the environment, the Legislature finds that for purposes of issuing project certifications in compliance with the procedures, as they may be amended from time to time, the state board or regional boards shall expand their reliance on approved habitat conservation plans, natural community conservation plans, and other habitat management plans for provision of avoidance, minimization, and compensatory mitigation for project certifications, if those plans are approved by other state and federal agencies with jurisdiction and address biological goals for aquatic resources.
222-
223-
224219
225220 (b) Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, the state board or regional boards shall use the following approved plans as watershed plans for purposes of implementing the procedures in issuing a project certification:
226221
227-
228-
229222 (1) Habitat conservation plans that include biological goals for aquatic resources.
230-
231-
232223
233224 (2) Natural communities conservation plans that include biological goals for aquatic resources.
234225
235-
236-
237226 (3) Habitat management plans that include biological goals for aquatic resources.
238-
239-
240227
241228 (c) (1) Unless the state board or regional boards issuing a project certification determine in writing that an approved plan does not substantially meet the definition of a watershed plan, for those impacts to waters of the state already addressed by the approved plan, the state board or regional boards shall accept, as terms of the project certification, any avoidance, minimization, and compensatory mitigation required by the approved plan to address those impacts, if the public entity administering the approved habitat conservation plan, natural community conservation plan, or habitat management plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the avoidance, minimization, and compensatory mitigation.
242229
243-
244-
245230 (2) The state board or regional boards shall not impose on any project certification terms and conditions mandating avoidance, minimization, or compensatory mitigation for impacts to waters of the state in addition to those already provided pursuant to approved plans administered as set forth in paragraph (1) if all of the following conditions are met:
246-
247-
248231
249232 (A) The watershed plan addresses the project impacts to waters of the state.
250233
251-
252-
253234 (B) The project proponent implements the avoidance, minimization, and compensatory mitigation as required by the watershed plan.
254-
255-
256235
257236 (C) The public entity administering the watershed plan identifies, tracks, and publicly reports the impacts to waters of the state and the manner that they are addressed by the implementation of watershed plan avoidance, minimization, and compensatory mitigation requirements.
258237
259-
260-
261238 (3) For the state board or regional boards to make a determination that an approved habitat conservation plan, natural communities conservation plan, or habitat management plan that includes biological goals for aquatic resources does not substantially meet the definition of a watershed plan for purposes of issuing a project certification, the state board or regional boards shall do both of the following:
262-
263-
264239
265240 (A) Make a proposed written determination, supported by specific written findings of insufficiency, available for public review and comment for at least 30 days prior to the adoption of the determination of insufficiency.
266241
267-
268-
269242 (B) Provide written responses to public comments received on the determination of insufficiency prior to making a decision on the determination.
270243
244+(d) By January 1, 2025, the state board shall review and adopt take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In adopting its consideration of the general water quality certifications, the state board shall rely upon an shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code. Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.
271245
272-
273-(d)By January 1, 2025, the state board shall review and take action on general water quality certifications for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) within the state for discharge of dredge and fill material in connection with water supply projects and flood risk reduction projects. In its consideration of the general water quality certifications, the state board shall, whenever possible, use the environmental review document completed by the United States Army Corps of Engineers under the federal National Environmental Policy Act (42 U.S.C. Sec. 4321, et seq.) for compliance with its duties under the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code pursuant to Section 21083.7 of the Public Resources Code and its implementing regulations.
274-
275-
276-
277-(b) The state board and regional boards shall implement the procedures, including provisions related to watershed plans, to address the impacts of dredge and fill activities from water supply and flood risk projects.
278-
279-(e)
280-
281-
282-
283-(c) Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, make available for public review on its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees a report regarding, at a minimum, all of the following:
246+(e) Notwithstanding Section 10231.5 of the Government Code, beginning on January 1, 2025, and annually thereafter, the state board and regional boards shall prepare, provide public notice of, and make available for public review on their its internet website, and submit to the relevant legislative policy committees and relevant legislative budget committees, committees a report regarding, at a minimum, all of the following:
284247
285248 (1) The water supply projects and flood risk reduction projects for which project certifications have been issued.
286249
287250 (2) The water supply projects and flood risk reduction projects for which project certifications have been issued in reliance upon avoidance, minimization, and compensatory mitigation created and provided through an approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan.
288251
289252 (3) Any approved habitat conservation plan, natural communities conservation plan, or habitat mitigation plan found by the state board and regional boards to be insufficient as a watershed management plan and the reasons for the determination of insufficiency.
290253
291254 (4) The general water quality certifications adopted by the state board for general nationwide permits issued by the United States Army Corps of Engineers under Section 404 of the Federal Water Pollution Control Act (33 U.S.C. Sec. 1344) to authorize discharges of dredge and fill material in connection with water supply projects and flood risk reduction projects.
292255
293256 13389.4. (a) A state agency may do any of the following:(1) Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.(2) Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.(3) Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.(b) This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.(c) This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.(d) The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.
294257
295258
296259
297260 13389.4. (a) A state agency may do any of the following:
298261
299262 (1) Enter into an agreement with a project proponent to recover costs for actions authorized by this section to expedite the review of environmental documents prepared pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code, and review the processing and issuance of project certifications, and other authorizations, permits, and approvals for water supply projects and flood risk reduction projects, with the goal of completing permit review and approval in an expeditious manner.
300263
301264 (2) Hire or compensate staff or contract for services needed to achieve the goal of completing permit review and approval in an expeditious manner.
302265
303266 (3) Work collaboratively with project proponents and other agencies with jurisdiction over the water supply project or flood risk reduction project to implement an integrated regulatory approach in authorizing the projects, similar to efforts implemented by the state permitting agencies for projects funded by the local parcel tax measure, San Francisco Bay Restoration Authority Measure AA, the San Francisco Bay Clean Water, Pollution Prevention and Habitat Restoration Measure.
304267
305268 (b) This section does not limit or expand the authority or discretion of a state agency with regard to conducting review of environmental documents under Division 13 (commencing with Section 21000) of the Public Resources Code, processing or issuing a project certification or other permit, approval, or authorization, or imposing conditions in conjunction with the issuance of a project certification or other permit, approval, or authorization.
306269
307270 (c) This section does not affect the project proponents ability to phase the permitting or construction of a water supply project or flood risk reduction project.
308271
309272 (d) The Federal Energy Regulatory Commission, the United States Army Corps of Engineers, the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the United States Environmental Protection Agency may, and are encouraged to, participate in implementing the integrated regulatory approach authorized by this section.
310273
311274 13389.5. This article shall remain in effect only until January 1, 2029, and as of that date is repealed.
312275
313276
314277
315278 13389.5. This article shall remain in effect only until January 1, 2029, and as of that date is repealed.